Search NASA⌕ Search

SEARCH · Search NASA

Results for “Continuous Optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

507 records · Page 29

Microchannel-based Membrane-less Extraction of Li from Unconventional Lithium Sources & the Separation of REE

This final report provides an overview of the Project's entire duration, covering July 1, 2021 to December 31, 2023. It primarily focuses on the achievements, technological developments, and unique challenges the team faced while working on separating and extracting Lithium from produced waters. The project's primary aim was to create an integrated, high-throughput, membrane-less, and modular microfluidic platform that could extract Lithium from unconventional sources. We have successfully met all goals and milestones envisioned in the SOPO document. The most critical primary milestones, including the Go-No-Go milestone (refer to the Gantt chart in the Appendices), were successfully accomplished. We demonstrated phase separation (>90%) and extraction (>85%) performance in the MPSE using synthetic, and representative produced water composition feed at 50 ml/min total flow through MPSE 36. We have also performed a parametric study of the MPSE operations, beyond the scope of SOPO, exploring operating conditions of current and broader interest. The extended investigation of operational parameters is concurrent with our efforts to seek further development of the MPSE technology beyond the scope of the Project. Along these lines of development, we have made efforts to be responsive to DOE calls for technological developments of other types of resources (beyond PW) for the recovery of Critical Materials and higher TRL development (beyond TRL 4). During the work on this Project, we developed and implemented three innovative technical approaches that emerged from our efforts to successfully meet the Project milestones. The innovative & original technical approaches developed and implemented in this Project are now the contributions to process engineering that could be clearly credited to the Project. First, Convergent Design Approach is a comprehensive feedforward & feedback loop of four design phases: i) design for functionality, ii) design for manufacturing, iii) design for sustainability, and iv) design for market. Next was Process Intensification. A major aim of this Project was to create an innovative phase separation & extraction microscale-based technology for Li separation – thus the words microchannel-based in the Project title. A microscale-based technology is intrinsically in the center of the Process Intensification domain as defined by its unique principles. Therefore, Process Intensification was implicitly envisioned in the Project’s SOPO. Lastly, Time Scale Analysis is a novel tool for discovering the needs and directions of Process Intensification implementations in any process technology. This Project is fully credited for developing and implementing the three novel technical approaches mentioned above. These are general contributions to process engineering that emerged from this Project. Beyond the original SOPO scope, the OSU-U.Pitt research group utilized a Convergent Design methodology, integrating first-principles mathematical modeling with experimental validation on the Minimum Development Vehicle. By creating these Digital Twins, the team rapidly assessed manufacturing iterations to support TEA analysis. This framework further enabled the development of advanced Surface Modification Techniques, where hydrophobic and oleophobic coating strategies were optimized via Digital Twin tools and validated through rigorous 100-hour longevity testing. TEA Analysis: The closing efforts of this Project were focused on the TEA analysis. TEA analysis had two primary functions: i) enabling critical assessments of design variations withing 10 the Concurrent Design Approach, thus enabling evolution of the MPSE design to reach faster- better-cheaper alternatives; and ii) to create a bridge between the accomplishments of this Project and future projects of higher TRL, beyond TRL 6 level. It is important to note that the TEA model created in the Project stirred the technological solutions for the recovery of critical materials toward a vision of a very profitable modular plant that has unique zero-waste water discharge signature. More importantly, thanks to our experimental performance data and conservative assumptions, the TEA model predicts minimal technological and investment risks. Low cost of a modular unit of a nominal capacity of [1000 tons of Li 2 CO 3 /year] positions the MPSE based technology within the reach of community investors, thus offering a paradigm shift in the development of critical technologies. The project successfully navigated two primary challenges: solvent selection and manufacturing adaptation. Restricted by the SOPO to existing literature for lithium recovery, the team identified a critical need for a "material excellence program" to develop next-generation solvents, eventually concluding with a preliminary investigation into promising Ionic Liquids (ILs). Simultaneously, COVID-19 supply chain disruptions forced a pivot from traditional manufacturing to advanced additive methods at ATAMI-OSU. By transitioning from stainless steel to 3D-printed polymer substrates, the team achieved a transformative three-order-of- magnitude reduction in manufacturing costs and compressed prototyping timelines from several months to just two days. The MPSE technology offers significant energy, environmental, and economic advantages by overcoming the traditional bottlenecks of phase-separation hardware and contactor size. Unlike conventional mixer-settlers or membrane-based systems, MPSE operates without moving parts or fouling-prone membranes, achieving robust performance even with challenging, viscous, or particulate-heavy feeds. Key performance metrics include an energy intensity reduction of 5–50x (3–40 kJ/m 3 ) compared to incumbent technologies and a dramatic reduction of processing time to under 60 seconds, which drastically reduces the physical plant footprint. These technical efficiencies translate into superior economic outcomes; for a 100 t/year Li 2 CO 3 facility, implementing MPSE is projected to nearly halve contactor CAPEX (from $\$$6.08M to $\$$3.01M) and significantly increase the project's Net Present Value (NPV), derisking new investment and enabling distributed critical-mineral processing configurations. The commercialization of MPSE technology is being spearheaded by Vigsur Dynamics Inc., which has adopted a structured, parallel approach to technical and business development since its formation in January 2026. Following extensive customer discovery and engagement with the Oregon State University accelerator, Vigsur Dynamics is working to establish a business model that transitions from pilot demonstrations to modular hardware sales, ultimately aiming for a "build-own-operate" service strategy. Current technical milestones—including 100 hours of continuous operation, superior energy efficiency, and successful 6-unit modular scale-up— provide a foundation for this transition. Backed by ongoing IP licensing and a growing network of industrial and venture advisors, the company is actively de-risking the platform to replace conventional mixer-settler systems in the critical minerals market.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Diagnostics: Chapter 8 of the special issue: on the path to tokamak burning plasma operation

This chapter presents the activity conducted by the ITPA topical group (TG) on Diagnostics over about the last 15 years. Following a general introduction of the ITER Diagnostics led by their measurement roles, the document is organized in several subchapters detailing the design support, research and development activity conducted by each of the specialist working groups (WGs) of the TG. Please note that the magnetic diagnostics were supported at the TG without a specific WG. Their status is included in the general introduction. In the following some highlights of the subchapter’s contents are provided. Recent advances in ITER first wall (FW) diagnostics for the measurements of plasma-metallic wall interaction in support of the ITER research plan are reported. An InfraRed imaging Video Bolometer for ITER has been developed and tested on several tokamaks to measure the radiated power loss. A laser-induced breakdown spectroscopy (LIBS) technique which utilizes a pulsed laser beam to ablate locally by forming a crater, will measure local tritium inventory in the FW material. Real-time Residual Gas Analyzers will measure the neutral gas composition in a divertor port and an equatorial port during plasma operation. Due to the full metallic FW environment, the plasma-wall interaction in ITER will face several challenges such as the compromised radiated power and divertor heat flux measurements by reflection. Ray tracing and analysis codes have been developed to eliminate and correct the effects of reflection in the measurements. The characteristics of the reflecting surfaces depending on the roughness and angle of the incidence have been measured by dedicated experiments, and the results were applied to the reflection elimination. For the measurement of the metallic impurity radiation induced by eroded metallic atoms, a vacuum ultraviolet spectrometer has been developed and tested. An extensive thermonuclear diagnostic suite will be required to support the operation of ITER and the planned experimental program for future burning plasma experiments. Due to the harsh environmental conditions, the implementation of diagnostic systems in ITER is a major challenge. These conditions include high levels of neutron and gamma fluxes, neutron heating, particle bombardment. Therefore, the selection and design of diagnostic systems must take into account a number of phenomena previously unseen in diagnostic design. For this reason, the measurement of neutrons and confined or lost fast ions, with particular emphasis on alpha particles, is critical to ITER. The diagnostics associated with these measurements will be important for future plasma-burning experiments at ITER. The high neutron emission and very large plasma size in ITER make neutron diagnostics the main diagnostic method used to measure plasma parameters such as fusion power, fusion power density, ion temperature, energy of fast ions and their spatial distributions in the plasma core. Active spectroscopy techniques are methods where a neutral particle beam is injected into the plasma and information on plasma parameters is extracted from the measurement of line emission resulting from the beam-plasma interaction, either by plasma ions or by beam atoms. Spatial localization is achieved by crossing the beamline and multiple observation lines. The ITER plasma will be a high temperature, moderately dense, fully ionized collisional plasma. The plasma facing surfaces are principally metallic being fashioned from beryllium or tungsten but many other elements, arising from either structural or from operational needs, may enter this plasma. The energy range of the emitted photons range from meV (infra-red) to multi keV (x-rays) and originate from all areas of the plasma volume. The primary role of passive emission diagnostics is to identify what is in the plasma from spectral signatures. Extracting quantitative information from these measurements such as impurity content, ion temperature, rotation, degree of detachment and radiated power depends on calibrated instruments, a physics model of the atomic and molecular processes and plasma transport and an analysis workflow that takes into account environmental effects such as reflections. The particular needs for ITER have prompted a multi-machine, many-year effort to address all these aspects and this chapter reviews the work on diagnostic design, experiments and new analysis techniques. An overview of the laser diagnostics to be implemented on ITER is also provided in this paper. This includes descriptions of the Thomson scattering in the core, edge and divertor regions, polarimetry and interferometry diagnostics used for measuring plasma density and also measurements of helium density in the divertor using Laser Induced Flourescence. Techniques which can allow improvements on current measurements are also addressed in particular expanding poloidal polarimetry measurements to measure field fluctuations and proposed use of dispersion interferometery which has a number of advantages over existing methods. This paper identifies particular areas where further research and testing on existing tokamaks is useful even at this advanced stage to inform the design of diagnostics for ITER. Outstanding areas of concern for the implementation of laser diagnostics, in particular with a view to reliable operation are identified. An overview of the latest developments of microwave diagnostic systems and techniques is given. The primary focus is the contributions for ITER—the next step burning plasma experiment—which is supplemented by describing recent progress of techniques applicable for fusion experiments beyond ITER. The contributions are intentionally kept concise, and are being supplemented by a rich list of references for further studies. Radiation induced effects are receiving continuous and well-deserved attention of the ITER diagnostic community and they are in many cases one of the primary design drivers of the ITER diagnostic systems. The paper summarizes recent progress in this area focusing primarily on the ITER diagnostics but in some cases provides also outlook for the possible solutions for even more demanding radiation environment of fusion reactors beyond ITER. Despite advancements in the area of modeling and simulation of various radiation induced effects, experimental testing in a nuclear environment as close as possible to the target one is still seen as unavoidable for proper qualification of particular diagnostic functional elements. Recent advancement within three diagnostic areas: optical diagnostics, magnetics and bolometers is covered. Encouraging results on qualification of silica glass vacuum window assemblies are presented. In the area of magnetic sensors, progress of irradiation tests performed on ITER in-vessel LTCC inductive sensors is presented with outlook for novel technological approaches to inductive sensors utilizing thick printing and photolithography technologies being highlighted. Summary of advancements in the area of steady state magnetic field sensors based on Hall effect is given. New results of neutron irradiation test of the ITER borosilicate glass inserts for vacuum electrical feedthroughs are summarized finding negligible swelling at target level of neutron fluence. Off-line irradiation tests of fiber optic current sensors for plasma current measurement demonstrated that both for gamma doses up to 5 MGy and a total neutron fluence up to 10 15 cm −2 , radiation induced changes are still compatible with required measurement accuracy on ITER. The ITER bolometers are given as an example how considering radiation effects may influence the diagnostic design. Finally, outlook for future main R&D directions is outlined. All optical and laser-based diagnostics in ITER will be using mirrors to guide plasma radiation toward detectors, cameras and sensors. In the hostile plasma, radiation and particle environment the optical characteristics of diagnostic mirrors will degrade directly affecting the entire performance of involved diagnostic systems. An assessment of factors affecting mirror performance is provided. Among the prime adverse factors are deposition of plasma impurities, sputtering of mirror surface and steam ingress in the vicinity of mirrors. Within the International Tokamak Physics Activity with active support by ITER central team and domestic agencies, the structured research and development (R&D) program on mitigation of risks for diagnostic mirrors is underway. Within this program the mirror material development, the passive mitigation of mirror degradation by using diagnostic ducts and shutters along with an active mirror recovery program comprising the in-situ mirror cleaning and calibration is underway. Recent developments in diagnostic mirror R&D are described in this Chapter along with an example of their implementation of R&D solutions in ITER Infrared Thermography diagnostic. An assessment of still open engineering and physics questions, considerations on mirror risks during an early phase of ITER operation are given along with an overview of diagnostic mirror evolution in the late ITER operation stage toward the demonstration fusion power plant. Several crucial areas of diagnostic R&D outlined in ITER Research Plan are addressed. The basic control groups in a fusion reactor can be broken-down in five categories: (1) plasma position, magnetic configuration, and plasma current control, (2) profile control and confinement optimization, (3) MHD control and suppression, (4) edge dissipation control, radiation and plasma exhaust control and (5) break-down optimization. These categories are coupled via the physics (a control action in one domain will affect the other domains) and via shared actuators (e.g. ECRH for impurity accumulation avoidance, current density distribution control and MHD suppression). Consequently, a supervisory control system should determine the priority of the various control tasks, their couplings, and the interfaces with the safety and interlock system. For the systematic development of the various controllers taking the complexity of the plasma and the control system into account, a model-based approach is required. A short historical overview is given of the developments in systems and control theory and control engineering with special emphasis on those developments that are most relevant for Nuclear Fusion research and operation. An overview is given of the state of the field of fusion plasma control for the control categories. It will be shown how synthetic diagnostics are being developed in ITER and how they are used in diagnostic design and design validation and how they can be in model-based controller synthesis using relatively simple models. In modern control methods, multiple diagnostics are used to constrain relatively simple models. The constrained models provide an estimate for the state. This opens the route to state controllers, such as model predictive control. A major challenge in nuclear fusion research is the coherent combination of data from heterogeneous diagnostics and modeling codes for machine control and safety as well as physics studies. Measured data from different diagnostics often provide information about the same subset of physical parameters. Additionally, information provided by some diagnostics might be needed for the analysis of other diagnostics. A joint analysis of complementary and redundant data allows, e.g. to improve the reliability of parameter estimation, to increase the spatial and temporal resolution of profiles, to obtain synergistic effects, to consider diagnostics interdependencies and to find and resolve data inconsistencies. Physics-based modeling and parameter relationships provide additional information improving the treatment of ill-posed inversion problems. A coherent combination of all kind of available information within a probabilistic framework allows for improved data analysis results. The concept of integrated data analysis (IDA) in the framework of Bayesian probability theory is outlined and contrasted with conventional data analysis. Components of the probabilistic approach are summarized and specific ingredients beneficial for data analysis at fusion devices are discussed.

ITER↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗