Search NASA⌕ Search

SEARCH · Search NASA

Results for “DESIGN PHASE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Spin Forming Aluminum Crew Module (CM) Metallic Aft Pressure Vessel Bulkhead (APVBH) - Phase II

The principal focus of this project was to assist the Multi-Purpose Crew Vehicle (MPCV) Program in developing a spin forming fabrication process for manufacture of the Orion crew module (CM) aft pressure vessel bulkhead. The spin forming process will enable a single piece aluminum (Al) alloy 2219 aft bulkhead resulting in the elimination of the current multiple piece welded construction, simplify CM fabrication, and lead to an enhanced design. Phase I (NASA TM-2014-218163 (1)) of this assessment explored spin forming the single-piece CM forward pressure vessel bulkhead. The Orion MPCV Program and Lockheed Martin (LM) recently made two critical decisions relative to the NESC Phase I work scope: (1) LM selected the spin forming process to manufacture a single-piece aft bulkhead for the Orion CM, and (2) the aft bulkhead will be manufactured from Al 2219. Based on the Program's new emphasis related to the spin forming process, the NESC was asked to conduct a Phase II assessment to assist in the LM manufacture of the aft bulkhead and to conduct a feasibility study into spin forming the Orion CM cone. This activity was approved on June 19, 2013. Dr. Robert Piascik, NASA Technical Fellow for Materials at the Langley Research Center (LaRC), was selected to lead this assessment. The project plan was approved by the NASA Engineering and Safety Center (NESC) Review Board (NRB) on July 18, 2013. The primary stakeholders for this assessment were the NASA and LM MPCV Program offices. Additional benefactors are commercial launch providers developing CM concepts.

Hoffman, Eric K.↗

Comparative Analysis of Static and Dynamic Probabilistic Risk Assessment

Implementation of risk-informed design allows the design team to thoroughly explore the risks of a system while iterating the operations concept, design, and requirements until the system meets mission objects and is achievable within constraints. To arrive at a space system design that is likely to meet all constraints placed upon mass, cost, performance and risk, the system requirements must be understood and traded against each other as early as the conceptual design phase. Depending on the project phase and the goals of the risk analysis, various PRA methodologies could be used to produce quantitative risk estimates to enable such a process. In order to better understand the applicability, advantages, and limitations of various PRA methodologies, a comparative analysis of three bottom-up, component-based PRA approaches was performed. The three methods examined are a traditional static fault tree, a fault tree hybrid, and a dynamic Monte Carlo simulation. Each approach was used to assess a generic reaction control system (RCS) thruster pod and mission. The methods are assessed in terms of the process of modeling a system, the actionable information produced for the design team, and the overall fidelity of the quantitative risk evaluation generated. The paper also discusses the applicability of each methodology to the different phases of system development.

Probablistic↗

Comparing Pre-Launch Assumptions to In-Flight Navigation Performance of OSIRIS-REx

The Sample Return Capsule (SRC) onboard the NASA Origins, Spectral Inter-pretation, Resource Identification, and Security–Regolith Explorer (OSIRIS-REx)spacecraft is currently carrying samples of the B-type asteroid Bennu for safe re-turn to Earth at the Utah Test and Training Range on September 24, 2023. These samples were collected during the Touch And Go (TAG) sampling event on October 20, 2020, when the spacecraft contacted the surface for a few seconds at a location less than 1 meter from the target. The unprecedented navigation performance achieved during that event was the culmination of experience gained during two years of cruise and two years of increasingly challenging operation sat Bennu. As we had hoped, the proximity navigation performance at Bennu exceeded pre-launch analysis. This paper will compare the navigation performance through the proximity operation phases to our pre-launch analysis and will quantify how refinements of the small force models governing the spacecraft motion near Bennu considerably improved the down-track state predictions leading up to the successful TAG event. It was evident to the team and to expert peer reviewers during the design phase that exquisite model fidelity and aggressive operational concepts, which challenged and advanced the state of the art for deep space proximity operations, would be required to meet the mission’s objectives. This paper summarizes the superlative achievements of the team in rising to and overcoming these challenges.

Peter G Antresian↗

Using Life-Cycle Human Factors Engineering to Avoid $2.4 Million in Costs: Lessons Learned from NASA's Requirements Verification Process for Space Payloads

The Human Factors Implementation Team (HFIT) process has been used to verify human factors requirements for NASA International Space Station (ISS) payloads since 2003, resulting in $2.4 million in avoided costs. This cost benefit has been realized by greatly reducing the need to process time-consuming formal waivers (exceptions) for individual requirements violations. The HFIT team, which includes astronauts and their technical staff, acts as the single source for human factors requirements integration of payloads. HFIT has the authority to provide inputs during early design phases, thus eliminating many potential requirements violations in a cost-effective manner. In those instances where it is not economically or technically feasible to meet the precise metric of a given requirement, HFIT can work with the payload engineers to develop common sense solutions and formally document that the resulting payload design does not materially affect the astronaut s ability to operate and interact with the payload. The HFIT process is fully ISO 9000 compliant and works concurrently with NASA s formal systems engineering work flow. Due to its success with payloads, the HFIT process is being adapted and extended to ISS systems hardware. Key aspects of this process are also being considered for NASA's Space Shuttle replacement, the Crew Exploration Vehicle.

Carr, Daniel↗

Proposed preliminary criteria for space shuttle access equipment at the operational site

A comparison was made between the methods of access utilized, or proposed, by the military, commercial airlines, and the space shuttle Phase B contractors. The methodology was subjected to consideration for space shuttle use and similarity to current space shuttle access concepts. The Phase B contractor concepts were in turn examined for degree of use of the state-of-the-art and progressive extension of new cost-effective ideas. This comparison disclosed a need for better definition of the criteria/requirements for space shuttle access equipment. Preliminary criteria, needed prior to initiation of the detail design (Phase C/D effort) of ground hardware for the operational site, are presented.

Beck, P. E.↗

Hardware Assessment in Support of the Dynamic Power Convertor Development Effort

Stirling Radioisotope Power Systems (RPS) are being developed by NASA's RPS Program in collaboration with the U.S. Department of Energy (DOE). Efforts ranging from 2001 to 2015 enabled development of the Technology Demonstration Convertor (TDC) for use in the 110-watt Stirling Radioisotope Generator (SRG-110) and the Advanced Stirling Convertor (ASC) for use in the Advanced Stirling Radioisotope Generator (ASRG). The DOE selected Lockheed Martin Space Systems Company (LMSSC) as the system integration contractor for both flight development efforts. The SRG-110 housed two TDCs fabricated by Infinia and resulted in the production of 16x demonstration units and 2x engineering units. The project was redirected in 2006 to make use of a more efficient and lower mass ASCs under development by Sunpower Inc. The DOE managed the flight contract with LMSSC and subcontractor Sunpower Inc. from 2007 to 2013 to build the ASRG, with support from NASA Glenn Research Center (GRC). Sunpower Inc. held two parallel contracts to produce ASCs, one with Lockheed Martin to produce ASC-F flight units and one with GRC for the production of ASC-E3 engineering unit pathfinders that were used to refine the flight design and production processes. The DOE initiated termination of the ASRG contract in late 2013. After ASRG had ended, GRC completed characterization testing of the ASRG Engineering Unit #2 (EU2) and the GRC contract with Sunpower was also completed. The NASA RPS Program Office has recently initiated a new Dynamic Power Conversion development effort which includes the potential maturation of Stirling, Brayton, and Rankine power convertors for the next generation of RPS. The effort started with the request for proposal and review of submits. Contracts are anticipated for release in 2017 and will initially focus on a design phase prior to fabrication and testing. This new effort will focus on robustness in addition to high efficiency, specific power, and reliability. Also, some requirements introduced during the ASRG contract have also been included in the new effort, such as constant lateral loading. Due to the focus on robustness and new requirements relative to the older TDC design, the Stirling Cycle Development Project has initiated an assessment of government owned hardware to help inform requirements evolution and evaluation of future designs. While lessons learned from the ASRG flight development project have been taken into consideration, the evaluation of the TDC design had not been completed for some existing environments or relatively new requirements. To further assess the TDC design, a series of tasks were initiated to evaluate degradation for units that have operated unattended for over 105,000 hours, demonstrate robustness to a random vibration environment, characterize and evaluate performance for varying lateral load profiles. The status for each task are described.

Wilson, Scott D.↗

Hardware Assessment in Support of the Dynamic Power Convertor Development Effort

Stirling Radioisotope Power Systems (RPS) are being developed by NASAs RPS Program in collaboration with the U.S. Department of Energy (DOE). Efforts ranging from 2001 to 2015 enabled development of the Technology Demonstration Convertor (TDC) for use in the 110-watt Stirling Radioisotope Generator (SRG-110) and the Advanced Stirling Convertor (ASC) for use in the Advanced Stirling Radioisotope Generator (ASRG). The DOE selected Lockheed Martin Space Systems Company (LMSSC) as the system integration contractor for both flight development efforts. The SRG-110 housed two TDCs fabricated by Infinia and resulted in the production of 16x demonstration units and 2x engineering units. The project was redirected in 2006 to make use of a more efficient and lower mass ASCs under development by Sunpower Inc. The DOE managed the flight contract with LMSSC and subcontractor Sunpower Inc. from 2007 to 2013 to build the ASRG, with support from NASA Glenn Research Center (GRC). Sunpower Inc. held two parallel contracts to produce ASCs, one with Lockheed Martin to produce ASC-F flight units and one with GRC for the production of ASC-E3 engineering unit pathfinders that were used to refine the flight design and production processes. The DOE initiated termination of the ASRG contract in late 2013. After ASRG had ended, GRC completed characterization testing of the ASRG Engineering Unit 2 (EU2) and the GRC contract with Sunpower was also completed. The NASA RPS Program Office has recently initiated a new Dynamic Power Conversion development effort which includes the potential maturation of Stirling, Brayton, and Rankine power convertors for the next generation of RPS. The effort started with the request for proposal and review of submits. Contracts are anticipated for release in 2017 and will initially focus on a design phase prior to fabrication and testing. This new effort will focus on robustness in addition to high efficiency, specific power, and reliability. Also, some requirements introduced during the ASRG contract have also been included in the new effort, such as constant lateral loading. Due to the focus on robustness and new requirements relative to the older TDC design, the Stirling Cycle Development Project has initiated an assessment of government owned hardware to help inform requirements evolution and evaluation of future designs. While lessons learned from the ASRG flight development project have been taken into consideration, the evaluation of the TDC design had not been completed for some existing environments or relatively new requirements. To further assess the TDC design, a series of tasks were initiated to evaluate degradation for units that have operated unattended for over 105,000 hours, demonstrate robustness to a random vibration environment, characterize and evaluate performance for varying lateral load profiles. The status for each task are described.

Wilson, Scott D.↗

Evolution of the Next Exploration Toilet through Human-in-the-Loop (HITL) Testing

Human waste collection in space is a unique and necessary function that all crewmembers must perform. The variability in how each crewmember uses the toilet to urinate and defecate introduces complexities and challenges with regards to overall hardware design. Because of this variability, it is important to consider crew inputs in all aspects of a toilet design especially with regards to crew interfaces that could impact overall waste collection. Access to crew feedback is essential to the design process and should be considered early and often through the various design phases. In 2020, NASA started a project for the Human Landing System (HLS) program to develop a Government Furnished Equipment (GFE) toilet option. The project is known as the Lavatory On-Orbit (LOO). During the early development of the LOO, the project team conducted several crew evaluations to collect and summarize valuable crew feedback on system design, function, and overall usability to influence the next design iteration. Because every person could use the system differently in space, it was extremely important to collect and analyze the data in a very methodical manner to appropriately influence the design based on the evaluation results. Establishing a standard process ensures consistent data collection from one evaluation to another, helps to maintain privacy for each test subject’s inputs and removes any potential bias from test subject to test subject. To date, the team has completed four crew evaluations on prototypes for the different LOO hardware. This paper will summarize the methodology used to conduct the evaluations as well as how data was collected and analyzed. The paper will also provide details on each of the evaluations and how the design was updated based on the results.

toilet↗

Evolution of the Next Exploration Toilet Through Human-in-the-Loop (HITL) Testing

Human waste collection in space is a unique and necessary function that all crewmembers must perform. The variability in how each crewmember uses the toilet to urinate and defecate introduces complexities and challenges with regards to overall hardware design. Because of this variability, it is important to consider crew inputs in all aspects of a toilet design especially with regards to crew interfaces that could impact overall waste collection. Access to crew feedback is essential to the design process and should be considered early and often through the various design phases. In 2020, NASA started a project for the Human Landing System (HLS) program to develop a Government Furnished Equipment (GFE) toilet option. The project is known as the Lavatory On-Orbit (LOO). During the early development of the LOO, the project team conducted several crew evaluations to collect and summarize valuable crew feedback on system design, function, and overall usability to influence the next design iteration. Because every person could use the system differently in space, it was extremely important to collect and analyze the data in a very methodical manner to appropriately influence the design based on the evaluation results. Establishing a standard process ensures consistent data collection from one evaluation to another, helps to maintain privacy for each test subject’s inputs and removes any potential bias from test subject to test subject. To date, the team has completed four crew evaluations on prototypes for the different LOO hardware. This paper will summarize the methodology used to conduct the evaluations as well as how data was collected and analyzed. The paper will also provide details on each of the evaluations and how the design was updated based on the results.

toilet↗

Evolution of the Next Exploration Toilet Through Human-in-the-Loop (HITL) Testing

Human waste collection in space is a unique and necessary function that all crewmembers must perform. The variability in how each crewmember uses the toilet to urinate and defecate introduces complexities and challenges with regards to overall hardware design. Because of this variability, it is important to consider crew inputs in all aspects of a toilet design especially with regards to crew interfaces that could impact overall waste collection. Access to crew feedback is essential to the design process and should be considered early and often through the various design phases. In 2020, NASA started a project for the Human Landing System (HLS) program to develop a Government Furnished Equipment (GFE) toilet option. The project is known as the Lavatory On-Orbit (LOO). During the early development of the LOO, the project team conducted several crew evaluations to collect and summarize valuable crew feedback on system design, function, and overall usability to influence the next design iteration. Because every person could use the system differently in space, it was extremely important to collect and analyze the data in a very methodical manner to appropriately influence the design based on the evaluation results. Establishing a standard process ensures consistent data collection from one evaluation to another, helps to maintain privacy for each test subject’s inputs and removes any potential bias from test subject to test subject. To date, the team has completed four rounds of crew evaluations with multiple crewmembers on prototypes for the different LOO subsystems. This paper will summarize the methodology used to conduct the evaluations as well as how data was collected and analyzed. The paper will also provide details on each of the evaluations and how the design was updated based on the results.

toilet↗

Evolution of the Next Exploration Toilet Through Human-in-the-Loop (HITL) Testing

Human waste collection in space is a unique and necessary function that all crewmembers must perform. The variability in how each crewmember uses the toilet to urinate and defecate introduces complexities and challenges with regards to overall hardware design. Because of this variability, it is important to consider crew inputs in all aspects of a toilet design especially with regards to crew interfaces that could impact overall waste collection. Access to crew feedback is essential to the design process and should be considered early and often through the various design phases. In 2020, NASA started a project for the Human Landing System (HLS) program to develop a Government Furnished Equipment (GFE) toilet option. The project is known as the Lavatory On-Orbit (LOO). During the early development of the LOO, the project team conducted several crew evaluations to collect and summarize valuable crew feedback on system design, function, and overall usability to influence the next design iteration. Because every person could use the system differently in space, it was extremely important to collect and analyze the data in a very methodical manner to appropriately influence the design based on the evaluation results. Establishing a standard process ensures consistent data collection from one evaluation to another, helps to maintain privacy for each test subject’s inputs and removes any potential bias from test subject to test subject. To date, the team has completed four rounds of crew evaluations with multiple crewmembers on prototypes for the different LOO subsystems. This paper will summarize the methodology used to conduct the evaluations as well as how data was collected and analyzed. The paper will also provide details on each of the evaluations and how the design was updated based on the results.

toilet↗

Optimization of the Second Target Station cold source moderators using an automated workflow

The Second Target Station (STS) at the US Department of Energy’s Oak Ridge National Laboratory is designed to become the world’s highest peak-brightness spallation source of cold neutrons. Successful completion of the STS, which is currently in the preliminary design phase, will provide transformative new capabilities to examine novel materials for future technologies. At STS, neutrons will be generated by spallation reactions in a solid tungsten target. They will be moderated and thermalized in two cold (20 K) para-hydrogen moderators. Careful optimization of these moderators is essential to the project’s success. To find optimal moderator designs, an advanced optimization workflow integrates high-fidelity neutronics calculations using the Monte Carlo N-Particle (MCNP) transport code MCNP6.2 with state-of-the-art optimization algorithms in the Dakota optimization toolkit. For each design iteration, a parametrized solid CAD geometry is generated in Creo and automatically converted into an unstructured mesh geometry by Attila 4MC for the neutronics calculation with MCNP. Iterations repeat until optimal designs are found. Herein this paper presents the results of a sensitivity and optimization study for the cylindrical and tube moderators. Both moderators can be optimized for maximum peak brightness, maximum time-integrated brightness, or any combination between these extremes. Maximum peak brightness is achieved by using smaller optimal dimensions of the moderators, whereas maximum time-integrated brightness is achieved by using larger dimensions. A Pareto front details the designs that optimally balance both brightness metrics. The Pareto front can be found in only 40–110 iterations with 4–5 design parameters when using the efficient global and Pareto-set optimization algorithms in Dakota. Additionally, important engineering constraints can be taken into account, such as the coupling between the cylindrical moderator radius and aluminum vessel wall thicknesses required to ensure structural integrity of the vessels. This interaction has a significant impact on the resulting optimal designs. Our new, highly efficient, fully automated optimization workflow will be used to optimize additional STS components in the future and can be adopted for design and optimization studies at other experimental neutron and accelerator facilities.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Software analysis handbook: Software complexity analysis and software reliability estimation and prediction

This handbook documents the three software analysis processes the Space Station Software Analysis team uses to assess space station software, including their backgrounds, theories, tools, and analysis procedures. Potential applications of these analysis results are also presented. The first section describes how software complexity analysis provides quantitative information on code, such as code structure and risk areas, throughout the software life cycle. Software complexity analysis allows an analyst to understand the software structure, identify critical software components, assess risk areas within a software system, identify testing deficiencies, and recommend program improvements. Performing this type of analysis during the early design phases of software development can positively affect the process, and may prevent later, much larger, difficulties. The second section describes how software reliability estimation and prediction analysis, or software reliability, provides a quantitative means to measure the probability of failure-free operation of a computer program, and describes the two tools used by JSC to determine failure rates and design tradeoffs between reliability, costs, performance, and schedule.

Computer systems design↗

Low Activity Waste Pretreatment System (LAWPS) Conceptual Design Approach - 16568

The Low Activity Waste Pretreatment System (LAWPS) will be capable of providing the Waste Treatment and Immobilization Project's (WTP) Low Activity Waste Facility (LAW) the feed material needed to operate both of the LAW melters at full capacity. LAWPS will receive supernatant from the Hanford AP tank farm, filter solids from the waste, remove cesium from the waste, and then stage the feed in storage tanks for supplying the LAW facility. The LAWPS project team is currently executing the preliminary design phase of the project leading to Critical Decision 2 (CD-2). CD-2 is the approval of the performance baseline. The Critical Decision 1 (CD-1) package was approved by the Department of Energy Deputy Under Secretary in May 2015. This paper will focus on creating and gaining approval of the CD-1 package and initiating execution of the preliminary design work. The intent of the paper will be to highlight the activities that facilitated achievement of the goals and present key activities that have been performed to increase the likelihood of preliminary design success. Initiating the immobilization of Hanford tank waste will be a tremendous accomplishment. LAWPS is one of the key projects required to achieve this accomplishment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ISS Ammonia Pump Failure, Recovery, and Lesson Learned A Hydrodynamic Bearing Perspective

The design, development, and operation of long duration spaceflight hardware has become an evolutionary process in which meticulous attention to details and lessons learned from previous experiences play a critical role. Invaluable to this process is the ability to retrieve and examine spaceflight hardware that has experienced a premature failure. While these situations are rare and unfortunate, the failure investigation and recovery from the event serve a valuable purpose in advancing future space mechanism development. Such a scenario began on July 31, 2010 with the premature failure of an ammonia pump on the external active thermal control system of the International Space Station. The ground-based inspections of the returned pump and ensuing failure investigation revealed five potential bearing forces that were un-accounted for in the design phase and qualification testing of the pump. These forces could combine in a number of random orientations to overload the pump bearings leading to solid-surface contact, wear, and premature failure. The recovery plan identified one of these five forces as being related to the square of the operating speed of the pump and this fact was used to recover design life through a change in flight rules for the operation of the pump module. Through the course of the failure investigation, recovery, and follow-on assessment of pump wear life, design guidance has been developed to improve the life of future mechanically pumped thermal control systems for both human and robotic exploration missions.

Bruckner, Robert J.↗

Final design of the beam source for the MITICA injector

The megavolt ITER injector and concept advancement experiment is the prototype and the test bed of the ITER heating and current drive neutral beam injectors, currently in the final design phase, in view of the installation in Padova Research on Injector Megavolt Accelerated facility in Padova, Italy. The beam source is the key component of the system, as its goal is the generation of the 1 MeV accelerated beam of deuterium or hydrogen negative ions. This paper presents the highlights of the latest developments for the finalization of the MITICA beam source design, together with a description of the most recent analyses and R&D activities carried out in support of the design.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

From BERTopic to SysML: Informing Model-Based Failure Analysis With Natural Language Processing for Complex Aerospace Systems

The development of emerging complex aerospace systems will require new approaches for capturing safety incident scenarios as early as possible in the design phase. However, for novel systems, relevant data available is limited. In this work, we propose a framework informing model-based mission assurance activities with historical incident reports, lessons learned, or other relevant engineering documents using natural language processing. In doing so, we investigate whether there is useful information in data sets that are relevant, if not identical, to the system under design and whether, through rigorous systems engineering practice, this information can be effectively leveraged through model-based failure analysis. In a worked case study, we apply state-of-the-art topic modeling techniques to two data sets, a mission relevant data set and a system relevant data set. The sets of topics are merged and interpreted to form a preliminary list of failure topics that can be used to inform the identification of off-nominal modes in the model-based failure modes and effects analysis development. Once data from the system in operation is available, it can be used to update the topics identified. By extracting information about likely failures from relevant historical data sets and utilizing model-based mission assurance to ensure relevance and rigor, unanticipated failures can be reduced, and projects can more effectively learn from past missions.

Failure Analysis↗