At least 523 records · Page 29

Full-Scale Crash Test of a MD-500 Helicopter with Deployable Energy Absorbers

A new externally deployable energy absorbing system was demonstrated during a full-scale crash test of an MD-500 helicopter. The deployable system is a honeycomb structure and utilizes composite materials in its construction. A set of two Deployable Energy Absorbers (DEAs) were fitted on the MD-500 helicopter for the full-scale crash demonstration. Four anthropomorphic dummy occupants were also used to assess human survivability. A demonstration test was performed at NASA Langley's Landing and Impact Research Facility (LandIR). The test involved impacting the helicopter on a concrete surface with combined forward and vertical velocity components of 40-ft/s and 26-ft/s, respectively. The objectives of the test were to evaluate the performance of the DEA concept under realistic crash conditions and to generate test data for validation of dynamic finite element simulations. Descriptions of this test as well as other component and full-scale tests leading to the helicopter test are discussed. Acceleration data from the anthropomorphic dummies showed that dynamic loads were successfully attenuated to within non-injurious levels. Moreover, the airframe itself survived the relatively severe impact and was retested to provide baseline data for comparison for cases with and without DEAs.

Kellas, Sotiris↗

Modeling and Analysis of Structural Dynamics for a One-Tenth Scale Model NGST Sunshield

New modeling and analysis techniques have been developed for predicting the dynamic behavior of the Next Generation Space Telescope (NGST) sunshield. The sunshield consists of multiple layers of pretensioned, thin-film membranes supported by deployable booms. Modeling the structural dynamic behavior of the sunshield is a challenging aspect of the problem due to the effects of membrane wrinkling. A finite element model of the sunshield was developed using an approximate engineering approach, the cable network method, to account for membrane wrinkling effects. Ground testing of a one-tenth scale model of the NGST sunshield were carried out to provide data for validating the analytical model. A series of analyses were performed to predict the behavior of the sunshield under the ground test conditions. Modal analyses were performed to predict the frequencies and mode shapes of the test article and transient response analyses were completed to simulate impulse excitation tests. Comparison was made between analytical predictions and test measurements for the dynamic behavior of the sunshield. In general, the results show good agreement with the analytical model correctly predicting the approximate frequency and mode shapes for the significant structural modes.

Johnston, John↗

Umbilical Deployment Device

The landing scheme for NASA's next-generation Mars rover will encompass a novel landing technique (see figure). The rover will be lowered from a rocket-powered descent stage and then placed onto the surface while hanging from three bridles. Communication between the rover and descent stage will be maintained through an electrical umbilical cable, which will be deployed in parallel with structural bridles. The -inch (13-mm) umbilical cable contains a Kevlar rope core, around which wires are wrapped to create a cable. This cable is helically coiled between two concentric truncated cones. It is deployed by pulling one end of the cable from the cone. A retractable mechanism maintains tension on the cable after deployment. A break-tie tethers the umbilical end attached to the rover even after the cable is cut after touchdown. This break-tie allows the descent stage to develop some velocity away from the rover prior to the cable releasing from the rover deck, then breaks away once the cable is fully extended. The descent stage pulls the cable up so that recontact is not made. The packaging and deployment technique can store a long length of cable in a relatively small volume while maintaining compliance with the minimum bend radius requirement for the cable being deployed. While the packaging technique could be implemented without the use of break-ties, they were needed in this design due to the vibratory environment and the retraction required by the cable. The break-ties used created a series of load-spikes in the deployment signature. The load spikes during the deployment of the initial three coils of umbilical showed no increase between the different temperature trials. The cold deployment did show an increased load requirement for cable extraction in the region where no break-ties were used. This increase in cable drag was superimposed on the loads required to rupture the last set of break-ties, and as such, these loads saw significant increase when compared to their ambient counterparts. While the loads showed spikes of high magnitude, they were of short duration. Because of this, neither the deployment of the rover, nor the motion of the descent stage, would be adversely affected. In addition, the umbilical was found to have a maximum of 1.2 percent chance for recontact with the ultra-high frequency antenna due to the large margin of safety built in.

Shafer, Michael W.↗

Development of a Deployable Nonmetallic Boom for Reconfigurable Systems of Small Modular Spacecraft

Launch vehicle payload capacity and the launch environment represent two of the most operationally limiting constraints on space system mass, volume, and configuration. Large-scale space science and power platforms as well as transit vehicles have been proposed that greatly exceed single-launch capabilities. Reconfigurable systems launched as multiple small modular spacecraft with the ability to rendezvous, approach, mate, and conduct coordinated operations have the potential to make these designs feasible. A key characteristic of these proposed systems is their ability to assemble into desired geometric (spatial) configurations. While flexible and sparse formations may be realized by groups of spacecraft flying in close proximity, flyers physically connected by active structural elements could continuously exchange power, fluids, and heat (via fluids). Configurations of small modular spacecraft temporarily linked together could be sustained as long as needed with minimal propellant use and reconfigured as often as needed over extended missions with changing requirements. For example, these vehicles could operate in extremely compact configurations during boost phases of a mission and then redeploy to generate power or communicate while coasting and upon reaching orbit. In 2005, NASA funded Phase 1 of a program called Modular Reconfigurable High-Energy Technology Demonstrator Assembly Testbed (MRHE) to investigate reconfigurable systems of small spacecraft. The MRHE team was led by NASA's Marshall Space Flight Center and included Lockheed Martin's Advanced Technology Center (ATC) in Palo Alto and its subcontractor, ATK. One of the goals of Phase 1 was to develop an MRHE concept demonstration in a relevant 1-g environment to highlight a number of requisite technologies. In Phase 1 of the MRHE program, Lockheed Martin devised and conducted an automated space system assembly demonstration featuring multipurpose free-floating robots representing Spacecraft in the newly built Controls and Automation Laboratory (CAL) at the ATC. The CAL lab features a 12' x 24' granite air-bearing table and an overhead simulated starfield. Among the technologies needed for the concept demo were mating interfaces allowing the spacecraft to dock and deployable structures allowing for adjustable separation between spacecraft after a rigid connection had been established. The decision to use a nonmetallic deployable boom for this purpose was driven by the MRHE concept demo requirements reproduced in Table 1.

Rehnmark, Fredrik↗

Deployable and erectable concepts for large spacecraft

Computerized structural sizing techniques were used to determine structural proportions of minimum mass tetrahedral truss platforms designed for low Earth and geosynchronous orbit. Optimum (minimum mass) deployable and erectable, hexagonal shaped spacecraft are sized to satisfy multiple design requirements and constraints. Strut dimensions characterizing minimum mass designs are found to be significantly more slender than those conventionally used for structural applications. Comparison studies show that mass characteristics of deployable and erectable platforms are approximately equal and that the shuttle flights required by deployable trusses become excessive above certain critical stiffness values. Recent investigations of eractable strut assembly are reviewed. Initial erectable structure assembly experiments show that a pair of astronauts can achieve EVA assembly times of 2-5 min/strut and studies indicate that an automated assembler can achieve times of less than 1 min/strut for around the clock operation.

Bush, H. G.↗

An 11-meter deployable truss for the SEASAT radar antenna

A folding three dimensional truss and tripod assembly which deploys the SEASAT Synthetic Aperture Radar Antenna is described. The folding structure with the antenna panels and rf components stows in an 8.5-inch-thick package. Upon deployment, the structure produced is a flat and rigid support for the antenna.

Campbell, B. E.↗

Adaptive structures - Test hardware and experimental results

The facilities and procedures used at JPL to test adaptive structures such as the large deployable reflector (LDR) are described and preliminary results are reported. The applications of adaptive structures in future NASA missions are outlined, and the techniques which are employed to modify damping, stiffness, and isolation characteristics, as well as geometric changes, are listed. The development of adaptive structures is shown to be effective as a result of new actuators and sensors, and examples are listed for categories such as fiber optics, shape-memory materials, piezoelectrics, and electrorheological fluids. Some ground test results are described for laboratory truss structures and truss test beds, which are shown to be efficient and easy to assemble in space. Adaptive structures are shown to be important for precision space structures such as the LDR, and can alleviate ground test requirements.

Wada, Ben K.↗

Benchmarking MCNP models to support gamma irradiation experiments

Seismic isolators and damping devices have been used for 30+ years to reduce seismic forces and deployed in 10,000+ structures, including bridges, buildings, and mission-critical infrastructure. Studies have shown that seismic isolation of nuclear power plants can reduce the seismic risk by several orders of magnitude and substantially reduce the overnight capital cost. Advanced reactor developers are considering seismic isolation as an integral design feature in their reactor design. It can either be deployed at the building level, isolating the entire reactor building, or at the component level, isolating individual pieces of safety-class equipment, such as a reactor vessel or a steam generator. For equipment isolation, located close to the reactor vessel, the seismic isolators and/or damping devices may be exposed to gamma and neutron radiation, with a possible effect on their mechanical properties which would affect the response of the isolated equipment under earthquake shaking. The Department of Energy, as part of its Nuclear Energy University Program (NEUP), in collaboration with the Idaho National Laboratory (INL), is funding a project at the University at Buffalo (UB) to investigate the effect of gamma radiation on the mechanical properties of various seismic protective devices. (When isolating equipment, the seismic protective devices will be located outside the reactor vessel where the neutron exposure will be insignificant.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Large space structures raise testing challenges

The testing approaches and techniques necessary for combined ground and space verification for large space structures (LSS) to be deployed and assembled in space are explored. The size of LSS precludes full ground tests, thereby requiring assemblies, components, and their interactions to be examined on orbit. Ground tests involving drop tests and zero-g aircraft flights can be performed with scale models, but need computational compensation to eliminate gravitational and torque effects that do not occur in space. Structural rigidity also varies from ground to space, and can partly be accounted for in ground tests by using cable supports, although numerical modelling must remove the effects of the cables' presence. Long-term funding is recommended for on-orbit tests of components in order to build a data base for later testing and actual construction of LSS.

Hanks, B. R.↗

Commissioning the James Webb Space Telescope Optical Telescope Element

The James Webb Space Telescope (JWST) launched on December 25th, 2021. The observatory was deployed and commissioned during its first six months. The Optical Telescope Element includes both large deployments of the Deployable Tower Assembly, Secondary Mirror Support Structure and the Primary Mirror Wings and it includes the deployment and alignment of the 18 primary mirror segments and the secondary mirror. The initial phase included cooldown and ice mitigation efforts followed by telescope deployments, mirror deployment and wavefront sensing and control. This paper will discuss the entire OTE commissioning from deployment through alignment including a discussion of results and lessons learned.

Lee D Feinberg↗

Structural assembly in space

A cost algorithm for predicting assembly costs for large space structures is given. Assembly scenarios are summarized which describe the erection, deployment, and fabrication tasks for five large space structures. The major activities that impact total costs for structure assembly from launch through deployment and assembly to scientific instrument installation and checkout are described. Individual cost elements such as assembly fixtures, handrails, or remote minipulators are also presented.

Stokes, J. W.↗

Inflatable Vessel and Method

An inflatable module comprising a structural core and an inflatable shell, wherein the inflatable shell is sealingly attached to the structural core. In its launch or pre-deployed configuration, the wall thickness of the inflatable shell is collapsed by vacuum. Also in this configuration, the inflatable shell is collapsed and efficiently folded around the structural core. Upon deployment, the wall thickness of the inflatable shell is inflated; whereby the inflatable shell itself, is thereby inflated around the structural core, defining therein a large enclosed volume. A plurality of removable shelves are arranged interior to the structural core in the launch configuration. The structural core also includes at least one longeron that, in conjunction with the shelves, primarily constitute the rigid, strong, and lightweight load-bearing structure of the module during launch. The removable shelves are detachable from their arrangement in the launch configuration so that, when the module is in its deployed configuration and launch loads no longer exist, the shelves can be rearranged to provide a module interior arrangement suitable for human habitation and work. In the preferred embodiment, to provide efficiency in structural load paths and attachments, the shape of the inflatable shell is a cylinder with semi-toroidal ends.

Raboin, Jasen L.↗

Control theoretics for large structural systems

The areas of research addressed include modeling identification for both the purposes of analysis and controls, design of structural control systems actuator sensor placement, and distributed sensing and actuation as opposed to co-located sensor and actuators. Also investigated are adaptive/learning processes that could more specifically be referred to as inflight testing procedures where a structure is tested during its deployment or assembly and during its orbital life at specific points where the characteristics of the structure for the purpose of tuning the control system are identified. Another area is redundancy management techniques for structural systems. This is important because of the reliability issue for managing multiple very large numbers of sensors and actuators.

Montgomery, R. C.↗

System concept for a moderate cost Large Deployable Reflector (LDR)

A study was carried out at JPL during the first quarter of 1985 to develop a system concept for NASA's LDR. Major features of the concept are a four-mirror, two-stage optical system; a lightweight structural composite segmented primary reflector; and a deployable truss backup structure with integral thermal shield. The two-stage optics uses active figure control at the quaternary reflector located at the primary reflector exit pupil, allowing the large primary to be passive. The lightweight composite reflector panels limit the short-wavelength operation to approximately 30 microns but reduce the total primary reflector weight by a factor of 3 to 4 over competing technologies. On-orbit thermal analysis indicates a primary reflector equilibrium temperature of less than 200 K with a maximum gradient of about 5 C across the 20-m aperture. Weight and volume estimates are consistent with a single Shuttle launch, and are based on Space Station assembly and checkout.

Swanson, P. N.↗

Towards real-time simulation of large space structures: Stabilization of fluid/thermal/structure interactions and implementation on high performance supercomputers

Within the Center for Space Construction, the SIMSTRUC project's objectives center around the development of simulation tools for the realistic analysis of large space structures. The word 'tools' is the broad sense; it designates mathematical models, finite element/finite difference formulations, computational algorithms, implementations on advanced computer architectures, and visualization capabilities. The results of our activities during the first year within the SIMSTRUC project are reported. On the modeling side, an alternative approach to fluid/thermal/structure interaction analysis that is a departure from the 'loosely coupled' and 'unified' approaches that are being currently practiced are described. The advantages of our approach both in terms of accuracy and computational efficiency were demonstrated. On the computational side, a software architecture for parallel/vector and massively parallel supercomputers that speeds up finite element and finite difference computations by several orders of magnitude is presented. As an example, the simulation of the deployment of a space structure that used to require over six hours of a workstation using a conventional finite element software, now runs on a multiprocessor using a parallel computation strategy in less than three seconds. In order to promote the physical understanding of the simulation behavior, a real-time visualization capability on the Connection Machine, which allows the analyst to watch the graphical animation of the results at the same time these are generated, was also developed. It is believed that by combining efficient analytical formulations with the state-of-the-art high performance computer implementations and superfast visualization capabilities, SIMSTRUC is moving fast towards the real-time simulation of large space structures. The designers as well as the researchers will certainly benefit from this technology.

Farhat, C.↗

The STEP/STACBEAM experiment technology development for very large solar array deployers

The Stacking Triangular Articulated Compact Beam (STACBEAM) is discussed with reference to structural testing experiments afforded by ground simulation and the Space Technology Experiments Platform (STEP). The STACBEAM lends itself to a deployment technique which offers a radical improvement in flexible blanket solar array technology. A system for deployment and support of a solar array blanket is described which consists of the blanket, its containment structure, the support structure and its deployer, the blanket stiffening battens, and the deployable boom standoffs. In operation, the blanket is pulled out and supported by the STACBEAM which packages next to the folded blanket. Since the STACBEAM does not rotate during extension, complete control of the blanket is maintained during extension. Deployment of this system occurs one bay at a time in a sequential manner. The deployer provides sufficient rigidity so that beam stiffness is not degraded during the deployment process.

Samuels, R.↗

Variation in the modal parameters of space structures

An analytic and experimental study of gravity and suspension influences on space structural test articles is presented. A modular test article including deployable, erectable, and rotary modules was assembled in three one- and two-dimensional structures. The two deployable modules utilized cable diagonal bracing rather than rigid cross members; within a bay of one of the deployable modules, the cable preload was adjustable. A friction lock was used on the alpha joint to either allow or prohibit rotary motion. Suspension systems with plunge fundamentals of 1, 2, and 5 Hz were used for ground testing to evaluate the influences of suspension stiffness. Assembly and reassembly testing was performed, as was testing on two separate shipsets at two test sites. Trends and statistical variances in modal parameters are presented as a function of force amplitude, joint preload, reassembly, shipset and suspension. Linear finite element modeling of each structure provided analytical results for 0-g unsuspended and 1-g suspended models, which are correlated with the analytical model.

Crawley, Edward F.↗