Search NASA⌕ Search

SEARCH · Search NASA

Results for “Ground Operational Support System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

In-Space Crew-Collaborative Task Scheduling

As humans venture farther from Earth for longer durations, it will become essential for those on the journey to have significant control over the scheduling of their own activities as well as the activities of their companion systems and robots. However, the crew will not do all the scheduling; timelines will be the result of collaboration with ground personnel. Emerging technologies such as in-space message buses, delay-tolerant networks, and in-space internet will be the carriers on which the collaboration rides. Advances in scheduling technology, in the areas of task modeling, scheduling engines, and user interfaces will allow the crew to become virtual scheduling experts. New concepts of operations for producing the timeline will allow the crew and the ground support to collaborate while providing safeguards to ensure that the mission will be effectively accomplished without endangering the systems or personnel.

Jaap, John↗

Remote Collaboration on Task Scheduling for Humans at Mars

As humans venture farther from Earth for longer durations, it will become essential for those on the journey to have significant control over the scheduling of their own activities as well as the activities of their companion systems and robots. However, the crew will not do all the scheduling; timelines will be the result of collaboration with ground personnel. Emerging technologies such as in-space message buses, delay-tolerant networks, and in-space internet will be the carriers on which the collaboration rides. Advances in scheduling technology, in the areas of task modeling, scheduling engines, and user interfaces will allow the crew to become virtual scheduling experts. New concepts of operations for producing the timeline will allow the crew and the ground support to collaborate while providing safeguards to ensure that the mission will be effectively accomplished without endangering the systems or personnel.

Jaap, John↗

Small satellite space operations

CTA Space Systems has played a premier role in the development of the 'lightsat' programs of the 80's and 90's. The high costs and development times associated with conventional LEO satellite design, fabrication, launch, and operations continue to motivate the development of new methodologies, techniques, and generally low cost and less stringently regulated satellites. These spacecraft employ low power 'lightsat' communications (versus TDRSS for NASA's LEO's) and typically fly missions with payload/experiment suites that can succeed, for example, without heavily redundant backup systems and large infrastructures of personnel and ground support systems. Such small yet adaptable satellites are also typified by their very short contract-to-launch times (often one to two years). This paper reflects several of the methodologies and perspectives of our successful involvement in these innovative programs and suggests how they might relieve NASA's mounting pressures to reduce the cost of both the spacecraft and their companion mission operations. It focuses on the use of adaptable, sufficiently powerful yet inexpensive PC-based ground systems for wide ranging user terminal (UT) applications and master control facilities for mission operations. These systems proved themselves in successfully controlling more than two dozen USAF, USN, and ARPA satellites at CTA/SS. UT versions have linked with both GEO and LEO satellites and functioned autonomously in relay roles often in remote parts of the world. LEO applications particularly illustrate the efficacy of these concepts since a user can easily mount a lightweight antenna, usually an omni or helix with light duty rotors and PC-based drivers. A few feet of coax connected to a small transceiver module (the size of a small PC) and a serial line to an associated PC establishes a communications link and together with the PC constitute a viable ground station. Applications included geomagnetic mapping; spaceborne solid state recorder validation; global store-and-forward data communications for both scientific and military purposes such as Desert Storm; UHF transponder services for both digital data and voice using a constellation; remote sensor monitoring of weather and oceanographic conditions; classified payloads; and UHF spectrum surveillance. Ground processing has been accomplished by automatic unattended or manual operation. Management of multiple assets highlights the relative ease with which two constellations totaling nine satellites were controlled from one system including constellation station keeping. Our experience in small end-to-end systems including concurrent design, development, and testing of the flight and operational ground systems offers low cost approaches to NASA scientific satellite operations of the 1990's.

Reiss, Keith↗

Commissioning of NASA's 3rd Generation Tracking and Data Relay Satellites (TDRS KLM)

In the summer of 2017, the third and final spacecraft of the 3rd generation of the Tracking and Data Relay Satellites (TDRS) launched aboard an Atlas V rocket from Complex 41 on the Eastern Test Range. Finishing final testing and integration in the first quarter of 2018, the TDRS-M communication and navigation satellite completes a constellation that began service in the early 1980s. The 3rd generation of spacecraft, TDRS-K, L, and M, not only provided beneficial systems engineering lessons in handling anomalous Radio Frequency and Doppler interference as well as integrating new spacecraft into an aging ground support infrastructure, but also supplies NASA with a valuable test bed for new operational concepts and technologies useful in defining the future architecture of the NASA Space Network. This paper presents an overview of the TDRS-K, L, and M missions, including transfer orbit, Level 5 bus and payload testing, and finally NASA-led Level 6 testing, which includes active TDRS System (TDRSS) users. Highlights include relevant testing results, commissioning challenges, and lessons learned. The final discussion includes a brief overview of future NASA communication and navigation technologies and network architectures.

Data Relay↗

Iodine Hall-Effect Electric Propulsion System Research, Development, and System Durability Demonstration

This paper reviews recent iodine electric propulsion research and development activities at the NASA Glenn Research Center (GRC). Activities included (i) investigation of the iodine compatibility of BaO-CaO-Al2O3 impregnated tungsten hollow cathodes based on a flight heritage design, (ii) investigation of the iodine compatibility of a handful of materials common to propulsion systems, spacecraft, and ground test facilities, (iii) development of reliable iodine feed system technologies, (iv) implementation of test facility improvements in an attempt to mitigate iodine associated negative impacts, and culminated in (v) an 1,174-hour hybrid iodine-xenon propulsion system durability demonstration (iodine fed Hall-effect thruster with xenon fed cathode). Each of the activities resulted in extensive insights that shall inform future iodine electric propulsion developments. While reliable operation of a BaO-CaO-Al2O3 impregnated tungsten hollow cathode on iodine vapor was not achieved, long-term operation on xenon gas in proximity to an iodine fed thruster was demonstrated without any measurable degradation or cross-contamination of the cathode. Furthermore, iodine material corrosion investigations conducted at 300degC over 5, 15, and 30 days showed significant deterioration of all materials evaluated, although the same materials with a silicon coating proved nearly impervious to iodine so long as the coating was not mechanically damaged. Finally, the 1,174-hour durability test demonstration showed that (i) iodine feed system technologies developed at GRC delivered well-regulated uninterrupted propellant, (ii) implementation of appropriate facility improvements and procedures can limit negative impacts of iodine on test hardware and ground support equipment, although facility challenges with iodine are extensive, and (iii) a Hall-effect thruster operates with similar performance whether employing iodine or xenon propellant over long durations. The work was motivated by strong government and commercial interest in the growing capabilities of small-spacecraft (<500 kg), in combination with interest for denser low-power, high delta-v in-space propulsion systems. This work adds to a growing body of research and development efforts aimed at addressing the many anticipated challenges of implementing iodine as an in-space propellant. This work was conducted under the Advanced In-Space Propulsion (AISP) project funded through the Game Changing Development (GCD) program within NASA's Science Technology Mission Directorate (STMD).

Benavides, Gabriel F.↗

Iodine Hall-Effect Electric Propulsion System Research, Development, and System Durability Demonstration

This paper reviews recent iodine electric propulsion research and development activities at the NASA Glenn Research Center (GRC). Activities included (i) investigation of the iodine compatibility of BaO-CaO-Al2O3 impregnated tungsten hollow cathodes based on a flight heritage design, (ii) investigation of the iodine compatibility of a handful of materials common to propulsion systems, spacecraft, and ground test facilities, (iii) development of reliable iodine feed system technologies, (iv) implementation of test facility improvements in an attempt to mitigate iodine associated negative impacts, and culminated in (v) an 1,174-hour hybrid iodine-xenon propulsion system durability demonstration (iodine fed Hall-effect thruster with xenon fed cathode). Each of the activities resulted in extensive insights that shall inform future iodine electric propulsion developments. While reliable operation of a BaO-CaO-Al2O3 impregnated tungsten hollow cathode on iodine vapor was not achieved, long-term operation on xenon gas in proximity to an iodine fed thruster was demonstrated without any measurable degradation or cross-contamination of the cathode. Furthermore, iodine material corrosion investigations conducted at 300 C over 5, 15, and 30 days showed significant deterioration of all materials evaluated, although the same materials with a silicon coating proved nearly impervious to iodine so long as the coating was not mechanically damaged. Finally, the 1,174-hour durability test demonstration showed that (i) iodine feed system technologies developed at GRC delivered well-regulated uninterrupted propellant, (ii) implementation of appropriate facility improvements and procedures can limit negative impacts of iodine on test hardware and ground support equipment, although facility challenges with iodine are extensive, and (iii) a Hall-effect thruster operates with similar performance whether employing iodine or xenon propellant over long durations. The work was motivated by strong government and commercial interest in the growing capabilities of small-spacecraft (<500 kg), in combination with interest for denser low-power, high delta-v in-space propulsion systems. This work adds to a growing body of research and development efforts aimed at addressing the many anticipated challenges of implementing iodine as an in-space propellant. This work was conducted under the Advanced In-Space Propulsion (AISP) project funded through the Game Changing Development (GCD) program within NASA's Science Technology Mission Directorate (STMD).

Benavides, Gabriel F.↗

Iodine Hall-Effect Electric Propulsion System Research, Development, and System Durability Demonstration

This paper reviews recent iodine electric propulsion research and development activities at the NASA Glenn Research Center (GRC). Activities included (i) investigation of the iodine compatibility of BaO-CaO-Al2O3 impregnated tungsten hollow cathodes based on a flight heritage design, (ii) investigation of the iodine compatibility of a handful of materials common to propulsion systems, spacecraft, and ground test facilities, (iii) development of reliable iodine feed system technologies, (iv) implementation of test facility improvements in an attempt to mitigate iodine associated negative impacts, and culminated in (v) an 1,174-hour hybrid iodine-xenon propulsion system durability demonstration (iodine fed Hall-effect thruster with xenon fed cathode). Each of the activities resulted in extensive insights that shall informfuture iodine electric propulsion developments. While reliable operation of a BaO-CaO-Al2O3 impregnated tungsten hollow cathode on iodine vapor was not achieved, long-term operation on xenon gas in proximity to an iodine fed thruster was demonstrated without any measurable degradation or cross-contamination of the cathode. Furthermore, iodine material corrosion investigations conducted at 300 degrees C over 5, 15, and 30 days showed significant deterioration of all materials evaluated, although the same materials with a silicon coating proved nearly impervious to iodine so long as the coating was not mechanically damaged. Finally, the 1,174-hour durability test demonstration showed that (i) iodine feed system technologies developed at GRC delivered well-regulated uninterrupted propellant, (ii) implementation of appropriate facility improvements and procedures can limit negative impacts of iodine on test hardware and ground support equipment, although facility challenges with iodine are extensive, and (iii) a Hall-effect thruster operates with similar performance whether employing iodine or xenon propellant over long durations. The work was motivated by strong government and commercial interest in the growing capabilities of small-spacecraft (<500 kg), in combination with interest for denser low-power, high delta-v in-space propulsion systems. This work adds to a growing body of research and development efforts aimed at addressing the many anticipated challenges of implementing iodine as an in-space propellant. This work was conducted under the Advanced In-Space Propulsion (AISP) project funded through the Game Changing Development (GCD) program within NASA's Science Technology Mission Directorate (STMD).

Benavides, Gabriel F.↗

Surface Systems Capability Gaps for Enabling NASA’s Sustainable Lunar Operations

This paper discusses the NASA Ground, Test, and Surface Systems Taxonomy (TX-13) related capability gaps, including details of architecture, technology, engineering, and policy gaps for enabling sustainable lunar surface operations and subsequent Mars missions. Architecture gaps include standardized architectures and interfaces, multi-element systems engineering and integration, design for supportability, and nuclear payload processing and launch approach. Technology gaps, primarily focused on uncrewed surface operations, include automated/autonomous cryogenic loading, transfer, servicing, and storage of commodities; health determination and fault management; automated/autonomous planning and scheduling; automated/autonomous inspection, maintenance and repair; logistics management and reliability; launch and landing site preparation; commodity management; and advanced umbilicals and dust tolerant interfaces. Engineering gaps include high-purity propellant production for ground and surface applications and large-scale xenon servicing capabilities. The policy gap includes nuclear propulsion acceptance testing and qualification approach. Strategically identifying human/automation roles and tasks and infusing automation and autonomy practices early in a system’s lifecycle is essential for achieving the mission objectives for a sustainable human lunar presence, improving performance and mission effectiveness, reducing operations costs and reliance on humans to perform tasks, and accommodating ground communication delays.

Surface Systems↗

Head-Worn Displays for NextGen

The operating concepts emerging under the Next Generation air transportation system (NextGen) require new technology and procedures - not only on the ground-side - but also on the flight deck. Flight deck display and decision support technologies are specifically targeted to overcome aircraft safety barriers that might otherwise constrain the full realization of NextGen. One such technology is the very lightweight, unobtrusive head-worn display (HWD). HWDs with an integrated head-tracking system are being researched as they offer significant potential benefit under emerging NextGen operational concepts. Two areas of benefit for NextGen are defined. First, the HWD may be designed to be equivalent to the Head-Up Display (HUD) using Virtual HUD concepts. As such, these operational credits may be provided to significantly more aircraft for which HUD installation is neither practical nor possible. Second, the HWD provides unique display capabilities, such as an unlimited field-of-regard. These capabilities may be integral to emerging NextGen operational concepts, eliminating safety issues which might otherwise constrain the full realization of NextGen. The paper details recent research results, current HWD technology limitations, and future technology development needed to realize HWDs as a enabling technology for NextGen.

Bailey, Randall E.↗

Radiation protection and instrumentation

Radiation was found not to be an operational problem during the Apollo program. Doses received by the crewmen of Apollo missions 7 through 17 were small because no major solar-particle events occurred during those missions. One small event was detected by a radiation sensor outside the Apollo 12 spacecraft, but no increase in radiation dose to the crewmen inside the spacecraft was detected. Radiation protection for the Apollo program was focused on both the peculiarities of the natural space radiation environment and the increased prevalence of manmade radiation sources on the ground and onboard the spacecraft. Radiation-exposure risks to crewmen were assessed and balanced against mission gain to determine mission constraints. Operational radiation evaluation required specially designed radiation detection systems onboard the spacecraft in addition to the use of satellite data, solar observatory support, and other liaison. Control and management of radioactive sources and radiation-generating equipment was important in minimizing radiation exposure of ground-support personnel, researchers, and the Apollo flight and backup crewmen.

J. Vernon Bailey↗

CAIDA CUI Confirmation for OMRS & LCC SOCRRATES Emulator and iSEE Upgrade, Operations, & Analysis

This internship has focused on providing solutions for the Customer Avionics Interface Development and Analysis (CAIDA) subsystem. The main emulator that has been used during this internship is the Software-Only CEV (Crew Exploration Vehicle) Risk Reduction Analysis and Test Engineering Simulator (SOCRRATES). This emulator uses advanced math and physics methods to simulate specific points in a mission, such as ascent, entry, and orbit. Exploration Ground Systems (EGS) must ensure that all KSC based ground systems can be properly integrated with the flight vehicle software, therefore, the Modeling and Simulation Branch (NE-XM) of the KSC (Kennedy Space Center) Engineering Directorate supports a virtual environment that simulates the interface between ground systems and the flight vehicle. A primary component in assuring that is knowing whether the emulators have incorporated the correct CUIs (Compact Unique Identifiers) into their system, as well as understanding both the static and dynamic responses of the individual CUIs. Also, an effort for verification of Operational Maintenance Requirements Specifications (OMRS) and Launch Commit Criteria (LCC) that are supported by SOCRRATES for the Orion Crew Module were part of the project tasks this semester. This internship also focused on comparing two different simulation Commercial-off-the-shelf (COTS) products and to determine whether or not a COTS package was a viable replacement for the current software that the iSEE (Immersive Simulations and Engineering Environment) lab uses. Upon research and testing, I found that this software was not feasible for the lab. It could not easily load CAD (Computer-Aided Design) or CREO models, give live feedback while the user is in the environment, and was not compatible with a virtual reality headset, all of which are necessary for the lab.

Bundy, Caleb↗

Using software metrics and software reliability models to attain acceptable quality software for flight and ground support software for avionic systems

This paper is concerned with methods of measuring and developing quality software. Reliable flight and ground support software is a highly important factor in the successful operation of the space shuttle program. Reliability is probably the most important of the characteristics inherent in the concept of 'software quality'. It is the probability of failure free operation of a computer program for a specified time and environment.

Lawrence, Stella↗

Flight Management System Execution of Idle-Thrust Descents in Operations

To enable arriving aircraft to fly optimized descents computed by the flight management system (FMS) in congested airspace, ground automation must accurately predict descent trajectories. To support development of the trajectory predictor and its error models, commercial flights executed idle-thrust descents, and the recorded data includes the target speed profile and FMS intent trajectories. The FMS computes the intended descent path assuming idle thrust after top of descent (TOD), and any intervention by the controllers that alters the FMS execution of the descent is recorded so that such flights are discarded from the analysis. The horizontal flight path, cruise and meter fix altitudes, and actual TOD location are extracted from the radar data. Using more than 60 descents in Boeing 777 aircraft, the actual speeds are compared to the intended descent speed profile. In addition, three aspects of the accuracy of the FMS intent trajectory are analyzed: the meter fix crossing time, the TOD location, and the altitude at the meter fix. The actual TOD location is within 5 nmi of the intent location for over 95% of the descents. Roughly 90% of the time, the airspeed is within 0.01 of the target Mach number and within 10 KCAS of the target descent CAS, but the meter fix crossing time is only within 50 sec of the time computed by the FMS. Overall, the aircraft seem to be executing the descents as intended by the designers of the onboard automation.

Stell, Laurel L.↗

Autonomous Satellite Command and Control through the World Wide Web: Phase 3

NASA's New Millenium Program (NMP) has identified a variety of revolutionary technologies that will support orders of magnitude improvements in the capabilities of spacecraft missions. This program's Autonomy team has focused on science and engineering automation technologies. In doing so, it has established a clear development roadmap specifying the experiments and demonstrations required to mature these technologies. The primary developmental thrusts of this roadmap are in the areas of remote agents, PI/operator interface, planning/scheduling fault management, and smart execution architectures. Phases 1 and 2 of the ASSET Project (previously known as the WebSat project) have focused on establishing World Wide Web-based commanding and telemetry services as an advanced means of interfacing a spacecraft system with the PI and operators. Current automated capabilities include Web-based command submission, limited contact scheduling, command list generation and transfer to the ground station, spacecraft support for demonstrations experiments, data transfer from the ground station back to the ASSET system, data archiving, and Web-based telemetry distribution. Phase 2 was finished in December 1996. During January-December 1997 work was commenced on Phase 3 of the ASSET Project. Phase 3 is the subject of this report. This phase permitted SSDL and its project partners to expand the ASSET system in a variety of ways. These added capabilities included the advancement of ground station capabilities, the adaptation of spacecraft on-board software, and the expansion of capabilities of the ASSET management algorithms. Specific goals of Phase 3 were: (1) Extend Web-based goal-level commanding for both the payload PI and the spacecraft engineer; (2) Support prioritized handling of multiple PIs as well as associated payload experimenters; (3) Expand the number and types of experiments supported by the ASSET system and its associated spacecraft; (4) Implement more advanced resource management, modeling and fault management capabilities that integrate the space and ground segments of the space system hardware; (5) Implement a beacon monitoring test; (6) Implement an experimental blackboard controller for space system management; (7) Further define typical ground station developments required for Internet-based remote control and for full system automation of the PI-to-spacecraft link. Each of those goals is examined in the next section. Significant sections of this report were also published as a conference paper.

Cantwell, Brian↗

GAJAT A Rapid Prototyping Mission Architecture Tool with Embedded Costing

GAJAT is a Near Earth Mission Architecture (NEMA) Rapid Prototyping Analysis Tool. It Was designed to be operated by a single systems engineer to replicate the mission design output of JPL's Team X. GAJAT provides estimates for: (1) The overall design of an observatory with a defined payload [instrument(s)] (2) The spacecraft consumable resources required to support the mission over its specified operational period (3) The minimum launch vehicle capability requirement (4) The Ground Segment Requirements, and (5) The cost for developing and launching the observatory (mission development cost) and the cost to operate the system over the specified operational period (mission operations cost), the sum of these two being the total mission cost.

Near Earth Mission Architecture (NEMA)↗

Desert Research and Technology Studies (DRATS) Traverse Planning

Slide 1] The Desert Research and Technology Studies (DRATS) include large scale field tests of manned lunar surface exploration systems; these tests are sponsored by the Director s Office of Integration (DOI) [sic, Directorate Integration Office (DIO)] within the Constellation Program and they include geological exploration objectives along well designed traverses. These traverses are designed by the Traverse Team, an ad hoc group of some 10 geologists form NASA and academia, as well as experts in mission operation who define the operational constraints applicable to specific simulation scenarios. [Slide 2] These DRATS/DOI tests focus on 1) the performance of major surface systems, such as rovers, mobile habitats, communication architecture, navigation tools, earth-moving equipment, unmanned reconnaissance robots etc. under realistic field conditions and 2) the development of operational concepts that integrate all of these systems into a single, optimized operation. The participation of science is currently concentrating on geological sciences, with the objective of developing suitable tools and documentation protocols to sample representative rocks for Earth return, and to generate some conceptual understanding of the ground support structure that will be needed for the real time science-support of a lunar surface crew. [Slide 3] Major surface systems exercised in the June 2008 analog tests at the Moses Lake site, WA. [Upper left] The Chariot Rover (developed at Johnson Space Center) is an unpressurized vehicle driven by fully suited crews. [Upper right] Mobile Habitat provided by the Jet Propulsion Laboratory. Chariot is the more nimble and mobile vehicle and the idea is to drive the habitat remotely to some rendezvous place where Chariot would catch up - after a lengthy traverse - at the end of the day. [Lower left] The K-10 remotely operated robot (provided by NASA Ames Research Center) conducting scientific/geologic reconnaissance of the prospective traverse region, locating specific sites for more detailed exploration by Chariot and its crew. [Lower right] This earth-moving equipment (provided by NASA KSC) can be attached to Chariot and is envisioned to, for example, level an outpost site or to mine lunar soi

Horz, Friedrich↗

The X-15/HL-20 operations support comparison

During the 1960's, the United States X-15 rocket-plane research program successfully demonstrated the ability to support a reusable vehicle operating in a near-space environment. The similarity of the proposed HL-20 lifting body concept in general size, weight, and subsystem composition to that of the X-15 provided an opportunity for a comparison of the predicted support manpower and turnaround times with those experienced in the X-15 program. Information was drawn from both reports and discussions with X-15 program personnel to develop comparative operations and support data. Based on the assumption of comparability between the two systems, the predicted staffing levels, skill mix, and refurbishment times of an operational HL-20 appear to be similar to those experienced by the X-15 for ground support. However, safety, environmental, and support requirements have changed such that the HL-20 will face a different operating environment than existed at Edwards during the 1950's and 1960's. Today's operational standards may impose additional requirements on the HL-20 that will add to the maintenance and support burden estimate based on the X-15 analogy.

Morris, W. Douglas↗

Operation Evaluation of the VEGGIE Food Production System in the Habitat Demonstration Unit

The 2010 Desert Research and Technology Studies (DRATS) of the VEGGIE Food Production System in the Habitat Demonstration Unit (HDU) Pressurized Excursion Module (PEM) was the first operational evaluation of salad crop production technology in a NASA analog test. A systematic evaluation of rooting media and nutrient delivery systems were evaluated for three lettuce cultivars that have shown promise as candidates for a surface based food production system. The VEGGIE nutrient delivery system worked well, was able to be maintained by multiple operators with a minimum of training, and supported excellent lettuce growth for the duration of the test. A Hazard Analysis and Critical Control Point (HACCP) evaluation was performed using ProSantm as sanitation agent prior to consumption was approved, and the crew was allowed to consume the lettuce grown using the VEGGIE light cap and gravity based nutrient delivery system at the completion of the 14-day DRAT field test. The DRAT field test validated the crew operations; Growth of all lettuce cultivars was excellent. The operational DRAT field testing in the HDU identified light quality issues related to morphology and pigment development that will need to be addressed through additional testing. Feedback from the crew, ground support personnel, and human factors leads was uniformly positive on the psychological value of having the crop production system in the excursion module. A number of areas have been identified for future work, to minimize the "footprint" of the Food Production system through creative use of unused wall and floor space in the unit.

Stutte, Gary W.↗