Search NASA⌕ Search

SEARCH · Search NASA

Results for “Humans to Mars”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Power Systems Evaluated for Solar Electric Propulsion Vehicles

Solar electric propulsion (SEP) mission architectures are applicable to a wide range NASA missions including the robotic exploration of the outer planets in the next decade and the human exploration of Mars within the next 2 decades. SEP enables architectures that are very mass efficient with reasonable power levels (1-MW class) aerobrake and cryogenic upper-stage transportation technologies are utilized. In this architecture, the efficient SEP stage transfers the payload from low Earth orbit (LEO) High Energy Elliptical Parking Orbit (HEEPO) within a period of 6 to 12 months. highthrust, cryogenic upper stage and payload then separate from the SEP vehicle for injection to the planetary target, allowing for fast heliocentric trip times. This mission architecture offers a potential reduction in mass to LEO in comparison to alternative all-chemical nuclear propulsion schemes. Mass reductions may allow launch vehicle downsizing enable missions that would have been grounded because of cost constraints. The preceding figure illustrates a conceptual SEP stage design for a human Mars mission. Researchers at the NASA Glenn Research Center at Lewis Field designed conceptual SEP vehicle, conceived the mission architecture to use this vehicle, and analyzed the vehicle s performance. This SEP stage has a dry mass of 35 metric tons (MT), 40 MT of xenon propellant, and a photovoltaic array that spans 110 m, providing power to a cluster of eight 100-kW Hall thrusters. The stage can transfer an 80-MT payload and upper stage to the desired HEEPO. Preliminary packaging studies show this space-station-class SEP vehicle meets the proposed "Magnum" launch vehicle and volume requirements with considerable margin. An SEP vehicle for outer planetary missions, such as the Europa Mapper Mission, would be dramatically smaller than human Mars mission SEP stage. In this mission architecture, the SEP power system with the payload to provide spacecraft power throughout the mission. Several photovoltaic array design concepts were considered for the SEP vehicle power system for the human mission to Mars. These include a space station derivative, a SCARLET (Solar Concentrator Arrays with Refractive Linear Element Technology) derivative, and a hybrid inflatable-deployable thin polymer membrane array with thin-film solar cells (as shown in the concept illustration). This concept is based on a design developed for the Next Generation Space Telescope Sun shield. The array is divided into 16 independent electrical sections with 500-V, negative-grounded solar cell strings. The power system employs a channelized, 500-Vdc power management and distribution (PMAD) architecture with lithium ion batteries for energy storage for vehicle and payload secondary loads (the high-power Hall thrusters do not operate in eclipse periods). The 500-V PMAD voltage permits "direct-drive" thruster operation, greatly reducing the power processing unit size, complexity, and power loss. Similar power system architecture, designs, and technology are assumed for the Europa Mapper Mission SEP vehicle. The primary exceptions are that the photovoltaic array is assumed to consist of two rectangular wings and that the power system rating is 15 kW in Earth orbit and 200 W at Europa. To size the SEP vehicle power system, a dedicated Fortran code was developed to predict detailed power system performance, mass, and thermal control requirements. This code also modeled all the relevant Earth orbit environments; that is, the particulate radiation, plasma, meteoroids and debris, ultraviolet radiation, contamination, and thermal conditions. Analysis results for the Human Mars Mission SEP vehicle show a power system mass of 9-MT and photovoltaic array area of 5800-square meters for the thin-membrane design concept with CuInS2 thin-film cells. Power processing unit input power for a thin-membrane array design with three-junction, amorphous SiGe solar cells is shown in the graph. Power falls off rapidly inhe first weeks of the mission because of light-induced (Staebler-Wronksi) solar cell losses. During the next 200 days, power decreases steadily as the SEP stage spirals through the proton belts and sustains the bulk of the mission radiation damage. Once the vehicle apogee is above approximately four Earth radii, little additional degradation is incurred. From 400 to 800 days, a 1100-km "parking" orbit is maintained to await the next payload transfer opportunity. This orbit is below the main proton belt, and thus, little radiation dose is accumulated during this time period. During the second LEO-to-HEEPO transfer, power degrades somewhat further, but power requirements are still met. In comparison, the Europa Mapper SEP vehicle power system had a mass of 150 kg and a thin membrane array area of 100 square meters.

Kerslake, Thomas W.↗

Construction of Power Receiving Rectenna Using Mars- In-Situ Materials; A Low Energy Materials Processing Approach

It is highly desirable to have a non-nuclear power rich option for the human exploration of Mars. Utilizing a Solar Electric Propulsion, SEP, / Power Beaming architecture for a non-nuclear power option for a human Mars base potentially avoids the weather and dust sensitivities of the surface photovoltaic option. Further from Mars areosynchronous orbit near year round power can be provided. Mission analysis, however, concludes that ultra high (245 GHz) frequencies or laser transmission technologies are required for Mars landed mass competitiveness with the surface photovoltaic option if the receiving rectifying antenna "rectenna" is transported from Earth. It is suggested in this paper that producing rectenna in situ on Mars surface might make a more conventional 5.8 GHz system competitive with surface PV. The premium of a competitive, robust, continuous base power might make the development of a 10 plus MWe class SEP for human Mars mission a more attractive non-nuclear option.

Curreri, Peter A.↗

In-Space Transportation Sensitivity to Roundtrip Mission Duration and Mars Vicinity Stay Time

The National Aeronautics and Space Administration’s Exploration Systems Development Mission Directorate has been developing architecture concepts for human missions to Mars in alignment with the agency’s Moon-to-Mars Strategy & Objectives. One of the key components of a human Mars mission is the in-space transportation system that delivers crew and cargo to Mars vicinity and returns the crew safely back to Earth. The Mars Architecture Team within ESDMD’s Strategy and Architecture Office has been evaluating multiple in-space transportation options to satisfy this functional need. The first step of this evaluation is to understand key architectural drivers for in-space transportation systems. Lunar and Mars missions have unique challenges, and systems designed for one may not be directly applicable to the other as they have different energy and mission needs. In addition, the time and distance for a Mars mission will be drastically different from the historical and current programs, requiring a new paradigm for mission architects. This paper investigates the impact of mission duration on a variety of different transportation options. As mission duration decreases, the total energy required to perform a roundtrip Mars mission increases exponentially, significantly increasing the required Earth departure mass. Sensitivity analyses of various in-space transportation system concepts were shown in this paper to begin mapping out the in-space transportation trade space. Each of the transportation systems has its own strengths and weaknesses, especially in the context of the continuous mission duration and vicinity stay time trade space. Although mission duration and Mars vicinity stay time may be key architecture drivers from an in-space transportation perspective, the decision of acceptable mission duration cannot be made solely from this perspective. Mission duration also has tangible impacts to crew health and performance, as well as system reliability and other key architecture considerations. The integrated nature of the architecture decision road map will be the primary focus of the Mars Architecture Team in the coming analysis cycle. This in-space transportation analysis will serve as the first guidepost of this critical activity that will guide the Moon-to-Mars Architecture into the humans to Mars segment.

Mars↗

In-Space Transportation Sensitivity to Roundtrip Mission Duration and Mars Vicinity Stay Time

The National Aeronautics and Space Administration’s Exploration Systems Development Mission Directorate has been developing architecture concepts for human missions to Mars in alignment with the agency’s Moon-to-Mars Strategy & Objectives. One of the key components of a human Mars mission is the in-space transportation system that delivers crew and cargo to Mars vicinity and returns the crew safely back to Earth. The Mars Architecture Team within ESDMD’s Strategy and Architecture Office has been evaluating multiple in-space transportation options to satisfy this functional need. The first step of this evaluation is to understand key architectural drivers for in-space transportation systems. Lunar and Mars missions have unique challenges, and systems designed for one may not be directly applicable to the other as they have different energy and mission needs. In addition, the time and distance for a Mars mission will be drastically different from the historical and current programs, requiring a new paradigm for mission architects. This paper investigates the impact of mission duration on a variety of different transportation options. As mission duration decreases, the total energy required to perform a roundtrip Mars mission increases exponentially, significantly increasing the required Earth departure mass. Sensitivity analyses of various in-space transportation system concepts were shown in this paper to begin mapping out the in-space transportation trade space. Each of the transportation systems has its own strengths and weaknesses, especially in the context of the continuous mission duration and vicinity stay time trade space. Although mission duration and Mars vicinity stay time may be key architecture drivers from an in-space transportation perspective, the decision of acceptable mission duration cannot be made solely from this perspective. Mission duration also has tangible impacts to crew health and performance, as well as system reliability and other key architecture considerations. The integrated nature of the architecture decision road map will be the primary focus of the Mars Architecture Team in the coming analysis cycle. This in-space transportation analysis will serve as the first guidepost of this critical activity that will guide the Moon-to-Mars Architecture into the humans to Mars segment.

Mars↗

Parametric Cost Estimates of Four 20 Ton Payload Mars EDL Vehicle Concepts

Cost is one of the biggest obstacles to sending humans to Mars. Many studies have examined various vehicles and/or technologies which could be used to send humans to Mars. However, nearly all of these studies have either ignored cost or have used the mass of the vehicles as a surrogate for cost. This work presents parametric cost estimates of four Mars Entry, Descent, and Landing vehicle concepts capable of landing 20 tons of payload on the surface of Mars. The concepts are the Co-Optimization Blunt-body Re-entry Analysis-Mid lift to drag ratio Rigid Vehicle (Cobra–MRV), Adaptive Deployable Entry and Placement Technology (ADEPT), Hypersonic Inflatable Aerodynamic Decelerator (HIAD), and Capsule concepts. Two variants of the HIAD concept are studied, one with a single HIAD heatshield and one with two HIADs. The study presents the development and production cost of each vehicle and the total cost to build five flight units and fifteen flight units. Five flight units is representative of a single mission, or a "Flags and Footprints" style campaign, whereas fifteen flight units is representative of multiple missions going to multiple sites on Mars. All costs presented in this work are normalized to the average of the first unit production cost of the lander concepts. There is a large amount of uncertainty both in the design of the vehicles and the cost of the vehicles and it is impossible to claim with certainty which vehicle will cost the least. However, it is likely that the total cost to produce five flight units will be in the following ranking from least costly to most costly, Single HIAD, Capsule, Dual HIAD, Cobra, ADEPT. The ranking for fifteen units is similar but with the positions of the Dual HIAD and Cobra reversed. This study only considers the cost of the entry vehicle and does not take into account the effect of the entry vehicle’s mass on the cost of the in-space propulsion stage or launch vehicle.

Paul D Friz↗

Mars Reconnaissance: Civil Engineering Advances For Human Exploration

Ensuring the safety of crew and cargo in future human missions to Mars is of critical importance to mission success. On Earth, we do not send people to remote, extreme environments to live for months or years without building safe shelters, landing strips, roads, and necessary infrastructure in advance.

Laurent Sibille↗

Mars ISRU for Production of Mission Critical Consumables - Options, Recent Studies, and Current State of the Art

In 1978, a ground breaking paper titled, "Feasibility of Rocket Propellant Production on Mars" by Ash, Dowler, and Varsi discussed how ascent propellants could be manufactured on the Mars surface from carbon dioxide collected from the atmosphere to reduce launch mass. Since then, the concept of making mission critical consumables such as propellants, fuel cell reactants, and life support consumables from local resources, commonly known as In-Situ Resource Utilization (ISRU), for robotic and human missions to Mars has been studied many times. In the late 1990's, NASA initiated a series of Mars Human Design Reference Missions (DRMs), the first of which was released in 1997. These studies primarily focused on evaluating the impact of making propellants on Mars for crew ascent to Mars orbit, but creating large caches of life support consumables (water & oxygen) as a backup for regenerative life support systems for long-duration surface stays (>500 days) was also considered in Mars DRM 3.0. Until science data from the Mars Odyssey orbiter and subsequent robotic missions revealed that water may be widely accessable across the surface of Mars, prior Mars ISRU studies were limited to processing Mars atmospheric resources (carbon dioxide, nitrogen, argon, oxygen, and water vapor). In December 2007, NASA completed the Mars Human Design Reference Architecture (DRA) 5.0 study which considered water on Mars as a potential resource for the first time in a human mission architecture. While knowledge of both water resources on Mars and the hardware required to excavate and extract the water were very preliminary, the study concluded that a significant reduction in mass and significant enhancements to the mission architecture were possible if Mars water resources were utilized. Two subsequent Mars ISRU studies aimed at reexamining ISRU technologies, processing options, and advancements in the state-of-the-art since 2007 and to better understand the volume and packaging associated with Mars ISRU systems further substantiated the preliminary results from the Mars DRA 5.0 study. This paper will provide an overview of Mars ISRU consumable production options, the analyses, results, and conclusions from the Mars DRA 5.0 (2007), Mars Collaborative (2013), and Mars ISRU Payload for the Supersonic Retro Propulsion (2014) mission studies, and the current state-of-the-art of Mars ISRU technologies and systems. The paper will also briefly discuss the mission architectural implications associated with Mars resource and ISRU processing options.

Sanders, G. B.↗

A Phobos-Deimos Mission as an Element of the NASA Mars Design Reference Architecture 5.0

NASA has conducted a series of mission studies over the past 25 years examining the eventual exploration of the surface of Mars by humans. The latest version of this evolutionary series of design reference missions/architectures - Design Reference Architecture 5 or DRA-5 - was completed in 2007. This paper examines the implications of including a human mission to explore the moons of Mars and teleoperate robots in various locations, but not to land the human crews on Mars, as an element of this reference architecture. Such a mission has been proposed several times during this same 25 year evolution leading up to the completion of DRA-5 primarily as a mission of testing the in-space vehicles and operations while surface vehicles and landers are under development. But such a precursor or test mission has never been explicitly included as an element of this Architecture. This paper will first summarize the key features of the DRA-5 to provide context for the remainder of the assessment. This will include a description of the in-space vehicles that would be the subject of a shakedown test during the Mars orbital mission. A decision tree will be used to illustrate the factors that will be analyzed, and the sequence in which they will be addressed, for this assessment. The factors that will be analyzed include the type of interplanetary transfer orbit (opposition class versus conjunction class), the type of parking orbit (circular versus elliptical), and the type of propulsion technology (high thrust chemical versus nuclear thermal rocket). The manner in which each of these factors impacts an individual mission will be described. In addition to the direct impact of these factors, additional considerations impacting crew health and overall programmatic outcomes will be discussed. Numerical results for each of the factors in the decision tree will be grouped with derived qualitative impacts from crew health and programmatic consideration. These quantitative and qualitative results will be summarized in a pros/cons table as a summary for this analysis.

Hoffman, Stephen J.↗

Potential Advantages of Conducting Short Duration Visits to the Martian Surface

Recent NASA concepts for human missions to Mars, including the Evolvable Mars Campaign and Design Reference Architecture 5.0, have focused on the conduct of missions with long duration stays on the Martian surface. The decision to focus on long duration missions (typically to a single site) is driven by a desire to increase the perceived sustainability of the human Mars campaign, predicated on the assumption that sustainability is best achieved by maximizing the level of activity on the surface, providing for continuous growth in operations, and promoting pioneering of Mars. However, executing a series of long duration missions to a single site is not the only option for human exploration of Mars that has been proposed. Other architectures have been evaluated that focus on missions with short duration surface stays, with each mission visiting a separate site on the surface. This type of architecture is less efficient in that elements are not typically reused from one mission to the next but requires a far less complex surface architecture. There are potentially valid arguments to be made that a short duration, multiple site approach could result in different types of advantages when compared to the long duration, single site approach to Mars exploration, particularly for initial human missions to Mars. These arguments revolve around four areas: Achieved Value, Risk Mitigation, Developmental Affordability, and Operational Affordability & Flexibility. The question of Achieved Value relates to the prioritization of goals for Martian exploration. As discussed, goals related to pioneering and expanding human presence are often referenced as justifications for the long duration approach. However, there are other competing goals, including science and exploration. While there is not a clear consensus among planetary scientists, many have argued that the value of being able to visit multiple sites could outweigh the value of continually visiting a single site. Risk Mitigation is a major concern for initial human missions to Mars. There are a number of hazards related to operating on the Martian surface that are not well characterized. It may be desirable to conduct a series of short duration missions to better understand the nature of these risks prior to committing to a long duration mission. Developmental Affordability relates to the ability of NASA and its partners to develop and deploy the proposed architecture. Any human missions to Mars will be among the most complex endeavors ever undertaken. The capabilities that must be developed to enable any human Mars missions are extremely challenging. The total design, development, test, and evaluation (DDT&E) budget required to develop just the essential capabilities alone will be substantial. If additional surface capabilities are required to support long duration surface stays, the development effort could be unaffordable. Operational Affordability & Flexibility relates to the continued costs to execute the Mars campaign. Long duration missions, even with some amount of in-situ resource utilization, require a significant level of resupply for every mission. This requires additional launches and in-space transportation assets, increasing the operational complexity and total operational cost. This paper will explore each of the four potential advantages of short duration missions in detail. The authors will present comparisons between proposed long duration and short duration architectures through an evaluation of relevant performance, cost, and risk metrics.

Stromgren, Chel↗

Use of Web 2.0 Technologies for Public Outreach on a Simulated Mars Mission

Recent advances in social media and internet communications have revolutionized the ways people interact and disseminate information. Astronauts are already taking advantage of these tools by blogging and tweeting from space, and almost all NASA missions now have presences on the major social networking sites. One priotity for future human explorers on Mars will be communicating their experiences to the people back on Earth. During July 2009, a 6-member crew of volunteers carried out a simulated Mars mission at the Flashline Mars Arctic Research Station (FMARS). The Mars Society built the mock Mars habitat in 2000-01 to help develop key knowledge and inspire the public for human Mars exploration. It is located on Devon island about 1600 km from the North Pole within the Arctic Circle. The structure is situated on the rim of Haughton Crater in an environment geologically and biologically analogous to Mars. Living in a habitat, conducting EVAs wearing spacesuits, and observing communication delays with "Earth,"the crew endured restrictions similar to those that will be faced by future human Mars explorers. Throughout the expedition, crewmembers posted daily blog entries, reports, photos, videos, and updates to their website and social media outlets Twitter, Facebook, YouTube, and Picasa Web Albums. During the sixteen EVAs of thier field science research campaign, FMARS crewmembers collected GPS track information and took geotagged photos using GPS-enabled cameras. They combined their traverse GPS tracks with photo location information into KML/KMZ files that website visitors can view in Google Earth.

Ferrone, Kristine↗

Cost Breakeven Analysis of Lunar In-Situ Propellant Production for Human Missions to the Moon and Mars

NASA is preparing to return humans to the lunar surface as a first step to a human exploration campaign of Mars. Both a sustained lunar campaign and a campaign of missions to Mars will require tens to hundreds of tonnes of propellant. Although this propellant could be delivered from Earth, an alternative approach is to use the potentially vast quantities of lunar ice to enable in-situ propellant production on the lunar surface. This study evaluates the cost breakeven for using lunar-derived propellants, as opposed to those delivered from Earth, in support of an extended human exploration campaign with both a multi-year presence on the Moon as well as multiple crewed missions to Mars. In so doing, the value of lunar propellant production is considered in the context of future exploration priorities, addressing the question: over what range of human missions to the lunar surface and Mars does in-situ propellant production trade favorably with propellant delivery from Earth on the basis of cost? The results of this analysis show that the magnitude and duration of the lunar campaign, more so than the Mars campaign, drive the breakeven and that without long lifetime ISRU systems, with greater than 5 years of autonomous operation before replacement, the demand in cis-lunar space for a Mars campaign favors propellant delivery from Earth.

Christopher A Jones↗

Cost Breakeven Analysis of Lunar In-Situ Propellant Production for Human Missions to the Moon and Mars

NASA is preparing to return humans to the lunar surface as a first step to a human exploration campaign of Mars. Both a sustained lunar campaign and a campaign of missions to Mars will require tens to hundreds of tonnes of propellant. Although this propellant could be delivered from Earth, an alternative approach is to use the potentially vast quantities of lunar ice to enable in-situ propellant production on the lunar surface. This study evaluates the cost breakeven for using lunar-derived propellants, as opposed to those delivered from Earth, in support of an extended human exploration campaign with both a multi-year presence on the Moon as well as multiple crewed missions to Mars. In so doing, the value of lunar propellant production is considered in the context of future exploration priorities, addressing the question: over what range of human missions to the lunar surface and Mars does in-situ propellant production trade favorably with propellant delivery from Earth on the basis of cost? The results of this analysis show that the magnitude and duration of the lunar campaign, more so than the Mars campaign, drive the breakeven and that without long lifetime ISRU systems, with greater than 5 years of autonomous operation before replacement, the demand in cis-lunar space for a Mars campaign favors propellant delivery from Earth.

Christopher A. Jones↗

Mars Commercial-Compatible Initial Human-Precursor Surveying and Instrument-Deployment Concepts

Water is a critical resource need for future human exploration and habitation of Mars and other planetary environments. An integral scientific question in the search for life outside of Earth is: What are the constraints on life in planetary environments? One of the most critical features of habitable environments is the availability of water - both as an environment for prebiotic chemistry, abiogenesis, and life; and as a vehicle for generating geo- and electro- chemical systems that can support metabolism. Seeking evidence of life prior to human arrival is important both to preserve signs of any existing or past evidence of Martian life, reducing the risks of unintentional forward contamination of Martian environments, and to potentially protect the health of any human crews. Looking forward towards Mars, future human exploration will require a rapid, but thorough, initial survey of any local “area of operations” on Mars to determine the spatial distribution, quantity, and quality (e.g., salt/mineral/organic content) of any local water, as well as to evaluate any signs of current or extinct life. We will discuss several candidate field survey methodologies, involving humans, a teamed instrument platform and a surveying/sampling rover. These are proposed to be validated in a given terrestrial Mars analog environment exhibiting varying distributions of water (ice, permafrost, rock-bound) to evaluate the constraints on life. Commercial space exploration brings the future possibility of unprecedented mass, power and in situ instrument capability, potentially enabling thorough exploration of the geology, hydrology and astrobiology of a km-radius study-zone around a future Mars human/commercial space landing site. We propose to study several representative planetary surface precursor-survey architectures and mission concepts (that are commercial-Mars-compatible), and to test and compare them in field application. We will examine some of the performance issues, using given metrics and controls, of spacesuited humans using handheld and standalone instruments, vs. a robotic human-tended rover/drill, robot arm and instruments. The latter rover-based architecture can in turn be viewed in terms of returned-to-base sample in-situ analyses vs sample analysis performed on a standalone instrument platform deployed away from the primary area of operations.

astrobiology↗

Application of a Detached Eddy Simulation Approach with Finite-Rate Chemistry to Mars-Relevant Retropropulsion Operating Environments

Human-scale Mars vehicles will require retropropulsion for descent and landing, replacing heritage supersonic parachute systems with an extended phase of powered flight. Due to the limitations of terrestrial testing in Mars-relevant conditions, design and analysis will increasingly rely on computational modeling and simulation. This paper provides an overview of a computational campaign investigating the aerodynamics of a Mars lander concept along various points on a powered descent trajectory including supersonic, transonic, and subsonic conditions using finite-rate chemistry. Simulations using unstructured grids containing billions of elements are performed at scale using thousands of Graphics Processing Units, enabling run-times of a few days for each simulation presented. At each freestream condition, significant minor species concentrations are observed external to the nozzles in the large mixing region upstream of the vehicle. While the flowfields are highly non-stationary in all cases, the mean integrated forces and moments on the vehicle remain small in comparison to the deceleration provided through retropropulsion.

Ashley Korzun↗

Affordable Exploration of Mars: Recommendations from a Community Workshop on Sustainable Initial Human Missions

There is a growing consensus that within two decades initial human missions to Mars are affordable under plausible budget assumptions and with sustained international participation. In response to this idea, a distinguished group of experts from the Mars exploration stakeholder communities attended the "Affording Mars" workshop at George Washington University in December, 2013. Participants reviewed and discussed scenarios for affordable and sustainable human and robotic exploration of Mars, the role of the International Space Station over the coming decade as the essential early step toward humans to Mars, possible "bridge" missions in the 2020s, key capabilities required for affordable initial missions, international partnerships, and a usable definition of affordability and sustainability. We report here the findings, observations, and recommendations that were agreed to at that workshop.

Community↗

The Search for Life from Antarctica to Mars

Although the Viking results may indicate that Mars has no life today, the possibility exists that Mars may hold the best record of the events that led to the origin of life. There is direct geomorphological evidence that in the past Mars had large amounts of liquid water on its surface. Atmospheric models would suggest that this early period of hydrological activity was due to the presence of a thick atmosphere and the resulting warmer temperatures. From a biological perspective the existence of liquid water, by itself motivates the question of the origin of life on Mars. From studies of the Earth's earliest biosphere we know that by 3.5 Gyr. ago, life had originated on Earth and reached a fair degree of biological sophistication. Surface activity and erosion on Earth make it difficult to trace the history of life before the 3.5 Gyr timeframe. If Mars did maintain a clement environment for longer than it took for life to originate on Earth, then the question of the origin of life on Mars follows naturally. Human exploration of Mars will probably begin with a small base manned by a temporary crew, a necessary first start. But exploration of the entire planet win require a continued presence on the Martian surface and the development of a self sustaining community in which humans can live and work for very long periods of time. A permanent Mars research base can be compared to the permanent research bases which several nations maintain in Antarctica at the South Pole, the geomagnetic pole, and elsewhere. In the long run, a continued human presence on Mars will be t he most economical way to study that planet in detail. It is possible that at some time in the future we might recreate a habitable climate on Mars, returning it to the life-bearing state it may have enjoyed early in its history. Our studies of Mars are still in a preliminary state but everything we have learned suggests that it may be possible to restore Mars to a habitable climate.

McKay, Christopher P.↗

The Nuclear Thermal Propulsion Stage (NTPS): A Key Space Asset for Human Exploration and Commercial Missions to the Moon

The nuclear thermal rocket (NTR) has frequently been discussed as a key space asset that can bridge the gap between a sustained human presence on the Moon and the eventual human exploration of Mars. Recently, a human mission to a near Earth asteroid (NEA) has also been included as a "deep space precursor" to an orbital mission of Mars before a landing is attempted. In his "post-Apollo" Integrated Space Program Plan (1970 to 1990), Wernher von Braun, proposed a reusable Nuclear Thermal Propulsion Stage (NTPS) to deliver cargo and crew to the Moon to establish a lunar base initially before sending human missions to Mars. The NTR was selected because it was a proven technology capable of generating both high thrust and high specific impulse (Isp approx. 900 s)-twice that of today's best chemical rockets. During the Rover and NERVA programs, 20 rocket reactors were designed, built and successfully ground tested. These tests demonstrated the (1) thrust levels; (2) high fuel temperatures; (3) sustained operation; (4) accumulated lifetime; and (5) restart capability needed for an affordable in-space transportation system. In NASA's Mars Design Reference Architecture (DRA) 5.0 study, the "Copernicus" crewed NTR Mars transfer vehicle used three 25 klbf "Pewee" engines-the smallest and highest performing engine tested in the Rover program. Smaller lunar transfer vehicles-consisting of a NTPS with three approx. 16.7 klbf "SNRE-class" engines, an in-line propellant tank, plus the payload-can be delivered to LEO using a 70 t to LEO upgraded SLS, and can support reusable cargo delivery and crewed lunar landing missions. The NTPS can play an important role in returning humans to the Moon to stay by providing an affordable in-space transportation system that can allow initial lunar outposts to evolve into settlements capable of supporting commercial activities. Over the next decade collaborative efforts between NASA and private industry could open up new exploration and commercial opportunities for both organizations. With efficient NTP, commercial habitation and crew delivery systems, a "mobile cislunar research station" can transport crews to small NEAs delivered to the E-ML2 point. Also possible are week-long "lunar tourism" missions that can carry passengers into lunar orbit for sightseeing (and plenty of picture taking), then return them to Earth orbit where they would re-enter and land using a small reusable lifting body based on NASA's HL-20 design. Mission descriptions, key vehicle features and operational characteristics are described and presented.

Borowski, Stanley K.↗