Search NASA⌕ Search

SEARCH · Search NASA

Results for “Launch Support”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Ares V: Game Changer for National Security Launch

NASA is designing the Ares V cargo launch vehicle to vastly expand exploration of the Moon begun in the Apollo program and enable the exploration of Mars and beyond. As the largest launcher in history, Ares V also represents a national asset offering unprecedented opportunities for new science, national security, and commercial missions of unmatched size and scope. The Ares V is the heavy-lift component of NASA's dual-launch architecture that will replace the current space shuttle fleet, complete the International Space Station, and establish a permanent human presence on the Moon as a stepping-stone to destinations beyond. During extensive independent and internal architecture and vehicle trade studies as part of the Exploration Systems Architecture Study (ESAS), NASA selected the Ares I crew launch vehicle and the Ares V to support future exploration. The smaller Ares I will launch the Orion crew exploration vehicle with four to six astronauts into orbit. The Ares V is designed to carry the Altair lunar lander into orbit, rendezvous with Orion, and send the mated spacecraft toward lunar orbit. The Ares V will be the largest and most powerful launch vehicle in history, providing unprecedented payload mass and volume to establish a permanent lunar outpost and explore significantly more of the lunar surface than was done during the Apollo missions. The Ares V consists of a Core Stage, two Reusable Solid Rocket Boosters (RSRBs), Earth Departure Stage (EDS), and a payload shroud. For lunar missions, the shroud would cover the Lunar Surface Access Module (LSAM). The Ares V Core Stage is 33 feet in diameter and 212 feet in length, making it the largest rocket stage ever built. It is the same diameter as the Saturn V first stage, the S-IC. However, its length is about the same as the combined length of the Saturn V first and second stages. The Core Stage uses a cluster of five Pratt & Whitney Rocketdyne RS-68B rocket engines, each supplying about 700,000 pounds of thrust. Its propellants are liquid hydrogen and liquid oxygen. The two solid rocket boosters provide about 3.5 million pounds of thrust at liftoff. These 5.5-segment boosters are derived from the 4-segment boosters now used on the Space Shuttle, and are similar to those used in the Ares I first stage. The EDS is powered by one J-2X engine. The J-2X, which has roughly 294,000 pounds of thrust, also powers the Ares I Upper Stage. It is derived from the J-2 that powered the Saturn V second and third stages. The EDS performs two functions. Its initial suborbital burns will place the lunar lander into a stable Earth orbit. After the Orion crew vehicle, launched separately on an Ares I, docks with the lander/EDS stack, EDS will ignite a second time to put the combined 65-metric ton vehicle into a lunar transfer orbit. When it stands on the launch pad at Kennedy Space Center late in the next decade, the Ares V stack will be approximately 381 feet tall and have a gross liftoff mass of 8.1 million pounds. The current point-of-departure design exceeds Saturn V s mass capability by approximately 40 percent. Using the current payload shroud design, Ares V can carry 315,000 pounds to 29-degree low Earth orbit (LEO) or 77,000 pounds to a geosynchronous orbit. Another unique aspect of the Ares V is the 33-foot-diameter payload shroud, which encloses approximately 30,400 cubic feet of usable volume. A larger hypothetical shroud for encapsulating larger payloads has been studied. While Ares V makes possible larger payload masses and volumes, it may alternately make possible more cost-effective mission design if the relevant payload communities are willing to consider an alternative to the existing approach that has driven them to employ complexity to solve current launch vehicle mass and volume constraints. By using Ares V s mass and volume capabilities as margin, payload designers stand to reduce development risk and cost. Significant progress has been made on the Ares V to support a plaed fiscal 2011 authority-to-proceed (ATP) milestone. The Ares V team is actively reaching out to external organizations during this early concept phase to ensure that the Ares V vehicle can be leveraged for national security, science, and commercial development needs. This presentation will discuss Ares V vehicle configuration, the path to the current concept, accomplishments to date, and potential payload utilization opportunities.

Sumrall, Phil↗

Progress in the Fabrication and Testing of Telescope Mirrors for the James Webb Space Telescope

The telescope of the James Webb Space Telescope (JWST) is an f/20, three mirror anastigmat design, passively cooled (40K) in an L2 orbit. The design provides diffraction limited performance (Strehl > or = 0.8) at .=2 m. To fit within the launch vehicle envelope (Arianne V), the 6.6 meter primary mirror and the secondary mirror support structure are folded for launch, then deployed and aligned in space. The primary mirror is composed of 18 individual, 1.3 meter (flat flat) hexagonal segments, each adjustable in seven degrees of freedom (six rigid body + radius of curvature) provided by a set of high precision actuators. The actuated secondary mirror (approx.0.74m) is similarly positioned in six degrees of rigid body motion. The approx..70x.51m, fixed tertiary and approx. 0.17m, flat fine steering mirror complete the telescope mirror complement. The telescope is supported by a composite structure optimized for performance at cryogenic temperatures. All telescope mirrors are made of Be with substantial light-weighting (21 kg for each 1.3M primary segment). Additional Be mounting and supporting structure for the high precision (approx.10nm steps) actuators are attached to the primary segments and secondary mirror. All mirrors undergo a process of thermal stabilization to reduce stress. An extensive series of interferometric measurements guide each step of the polishing process. Final polishing must account for any deformation between the ambient temperature of polishing and the cryogenic, operational temperature. This is accomplished by producing highly precise, cryo deformation target maps of each surface which are incorporated into the final polishing cycle. All flight mirrors have now completed polishing, coating with protected Au and final cryo testing, and the telescope is on track to meet all system requirements. We here review the measured performance of the component mirrors and the predicted performance of the flight telescope.

Bowers, Charles↗

Mars Sample Return mission: Two alternate scenarios

Two scenarios for accomplishing a Mars Sample Return mission are presented herein. Mission A is a low cost, low mass scenario, while Mission B is a high technology, high science alternative. Mission A begins with the launch of one Titan IV rocket with a Centaur G' upper stage. The Centaur performs the trans-Mars injection burn and is then released. The payload consists of two lander packages and the Orbital Transfer Vehicle, which is responsible for supporting the landers during launch and interplanetary cruise. After descending to the surface, the landers deploy small, local rovers to collect samples. Mission B starts with 4 Titan IV launches, used to place the parts of the Planetary Transfer Vehicle (PTV) into orbit. The fourth launch payload is able to move to assemble the entire vehicle by simple docking routines. Once complete, the PTV begins a low thrust trajectory out from low Earth orbit, through interplanetary space, and into low Martian orbit. It deploys a communication satellite into a 1/2 sol orbit and then releases the lander package at 500 km altitude. The lander package contains the lander, the Mars Ascent Vehicle (MAV), two lighter than air rovers (called Aereons), and one conventional land rover. The entire package is contained with a biconic aeroshell. After release from the PTV, the lander package descends to the surface, where all three rovers are released to collect samples and map the terrain.

Source record↗

Mars sample return mission: Two alternate scenarios

Two scenarios for accomplishing a Mars Sample Return mission are presented. Mission A is a low-cost, low-mass scenario, while Mission B is a high-technology, high-science alternative. Mission A begins with the launch of one Titan 4 rocket with a Centaur G' upper stage. The Centaur performs the trans-Mars injection burn and is then released. The payload consists of two lander packages and the orbital transfer vehicle, which is responsible for supporting the landers during launch and interplanetary cruise. Near Mars, the landers separate - one bound for a polar site and the other for an equatorial site. After descending to the surface, the landers deploy small, local rovers to collect samples. The rovers return these samples to the landers for loading on the direct return rockets, which return the samples directly to the Earth's surface. Mission B starts with four Titan 4 launches, used to place the components of the planetary transfer vehicle (PTV) into orbit. The fourth launch payload is able to move to assemble the entire vehicle by simple docking routines. Once complete, the PTV begins a low-thrust trajectory out from low Earth orbit, through interplanetary space, and into low Mars orbit. It deploys a communications satellite into a one half sol orbit and then releases the lander pad cage at 500 km altitude. The lander package contains the lander, the Mars ascent vehicle (MAV), two lighter-than-air rovers (called Aereons), and one conventional land rover. The entire package is contained within a biconic aeroshell. After release from the PTV the lander package descends to the surface, where all three rovers are released to collect samples and map the terrain. The Aereons attempt to circumnavigate Mars and collect samples from a wide variety of sites, while the land rover examines a local area more thoroughly. The Aereons are equipped with small sample return rockets that can return their samples to the lander in the event that an Aereon is incapable of returning to the lander itself. Once all samples have been collected they are loaded onto the MAV and launched into orbit. The PTV then collects the samples and returns them to Earth orbit for recovery.

Source record↗

KSC ground operations planning for Space Station

At the Kennedy Space Center (KSC) in Florida, processing facilities are being built and activated to support the processing, checkout, and launch of Space Station elements. The generic capability of these facilities will be utilized to support resupply missions for payloads, life support services, and propellants for the 30-year life of the program. Special Ground Support Equipment (GSE) is being designed for Space Station hardware special handling requirements, and a Test, Checkout, and Monitoring System (TCMS) is under development to verify that the flight elements are ready for launch. The facilities and equipment used at KSC, along with the testing required to accomplish the mission, are described in detail to provide an understanding of the complexity of operations at the launch site. Assessments of hardware processing flows through KSC are being conducted to minimize the processing flow times for each hardware element. Baseline operations plans and the changes made to improve operations and reduce costs are described, recognizing that efficient ground operations are a major key to success of the Space Station.

Lyon, J. R.↗

Evaluation of Anomaly Detection Capability for Ground-Based Pre-Launch Shuttle Operations

This chapter will provide a thorough end-to-end description of the process for evaluation of three different data-driven algorithms for anomaly detection to select the best candidate for deployment as part of a suite of IVHM (Integrated Vehicle Health Management) technologies. These algorithms were deemed to be sufficiently mature enough to be considered viable candidates for deployment in support of the maiden launch of Ares I-X, the successor to the Space Shuttle for NASA's Constellation program. Data-driven algorithms are just one of three different types being deployed. The other two types of algorithms being deployed include a "nile-based" expert system, and a "model-based" system. Within these two categories, the deployable candidates have already been selected based upon qualitative factors such as flight heritage. For the rule-based system, SHINE (Spacecraft High-speed Inference Engine) has been selected for deployment, which is a component of BEAM (Beacon-based Exception Analysis for Multimissions), a patented technology developed at NASA's JPL (Jet Propulsion Laboratory) and serves to aid in the management and identification of operational modes. For the "model-based" system, a commercially available package developed by QSI (Qualtech Systems, Inc.), TEAMS (Testability Engineering and Maintenance System) has been selected for deployment to aid in diagnosis. In the context of this particular deployment, distinctions among the use of the terms "data-driven," "rule-based," and "model-based," can be found in. Although there are three different categories of algorithms that have been selected for deployment, our main focus in this chapter will be on the evaluation of three candidates for data-driven anomaly detection. These algorithms will be evaluated upon their capability for robustly detecting incipient faults or failures in the ground-based phase of pre-launch space shuttle operations, rather than based oil heritage as performed in previous studies. Robust detection will allow for the achievement of pre-specified minimum false alarm and/or missed detection rates in the selection of alert thresholds. All algorithms will also be optimized with respect to an aggregation of these same criteria. Our study relies upon the use of Shuttle data to act as was a proxy for and in preparation for application to Ares I-X data, which uses a very similar hardware platform for the subsystems that are being targeted (TVC - Thrust Vector Control subsystem for the SRB (Solid Rocket Booster)).

Martin, Rodney Alexander↗

Launch vehicles for the Space Exploration Initiative

NASA study results concerning the launch vehicle options required to support the SEI First Lunar Outpost (FLO) missions are reviewed. The FLO requirements, single launch per mission and a capability of delivering 34.5 t to the lunar surface, dictate a launch vehicle capable of delivering approximatley 93 t to trans-lunar injection. Whether an NLS or a Saturn Y derived vehicle approach is utilized, the development of liquid LOX/RP boosters using F-1A engines will be required. The discussion covers the mission scenario, vehicle configurations, launch vehicle design definition, launch facilities, and cost.

Cook, Stephen↗

Scientific and technical support for the Galileo net flux radiometer experiment

This report describes work supported by a post-launch grant (NCC 2-679) that originally covered the period from 1 January 1990 through 31 December 1992. This was extended an additional nine months at no cost until 30 September 1993, and once more until to 30 November 93. A final report on the effort from 1 January 1990 through 30 November 1993 (anticipated) is provided following the background discussion. Tasks required during the post launch period are briefly as follows: (1) attend PSG (Project Science Group) meetings; (2) support in-flight checkouts; maintain and keep safe the spare instrument and GSE (Ground Support Equipment); (3) organize and maintain documentation; (4) finish calibration measurements, documentation, and analysis; (5) characterize and diagnose instrument anomalies; (6) develop descent data analysis tools; and (7) science data analysis and publication. The following sections provide background information on the NFR instrument followed by the complete progress report.

Sromovsky, Lawrence A.↗

Technology Maturity Towards Highly Reusable Space Transportation Goals

The National Aeronautics and Space Administration's (NASA) Advanced Space Transportation Program (ASTP) has advanced key propulsion and launch vehicle systems technologies towards enabling the concepts identified by the Highly Reusable Space Transportation (HRST) Study as having significant potential for reducing the cost of access to space. The Marshall Space Flight Center (MSFC) manages the ASTP for the NASA Aero-Space Technology Enterprise. The HRST Study was conducted from 1995 through 1997 to evaluated launch concepts with the potential to reduce launch cost to $100 to $200 per pound of payload to low Earth orbit in the 2016 to 2022 timeframe. The HRST represents a generation of launch vehicles beyond the Lockheed-Martin VentureStar concept with a goal of another factor of ten reduction in launch cost below the next generation Reusable Launch Vehicle. Several concepts were developed and evaluated during the initial HRST studies. At the completion of the concept development phase in 1997, four task forces were formed to integrate the results of the study. These task forces were System Concept Definition, Operations Assessment. Cost Assessment and Technology Assessment. The Operations Assessment task force published its final report in November 1998. The Operations Assessment task force evaluated both single stage to orbit (SSTO) and two-stage to orbit (TSTO) concepts. SSTO concepts included horizontal takeoff and horizontal landing, vertical takeoff and vertical landing and vertical takeoff and horizontal landing. Horizontally launched concepts including launch assist options. SSTO concepts included airbreathing and all rocket as well as combination propulsion systems. The Operations Assessment considered the significance of performance margin, flight rate capability, reliability, launch assist, design optimization and technology development. These studies serve as a guide for the ASTP to prioritize technology development towards future highly reusable launch systems. Although the ASTP supports the development of technology that is focused at a near term fully reusable launch vehicle, the core of the technology development is looking ahead to future generations of launch vehicles that will enable dramatic growth in civil and commercial space enterprise. The primary focus of the paper is to status the key enabling technologies including rocket based combined cycle (RBCC) propulsion, magnetic launch assist, long life, low weight rocket propulsion, integral hot structures. robust thermal protection systems and integrated vehicle health management. The ASTP technology roadmap is leading rapidly towards system demonstration and eventual future X vehicle flight demonstrations.

Lyles, Garry↗

Analyses of Kennedy Space Center Tropospheric Doppler Radar Wind Profiler Data for Space Launch System Program Certification

This paper documents the methodology and results of analyses used to certify the Kennedy Space Center (KSC) Tropospheric Doppler Radar Wind Profiler (TDRWP) as input to launch commit evaluations for the National Aeronautics and Space Administration’s (NASA) Space Launch System Program (SLSP). These analyses, and the requirements that they address, were designed by the Marshall Space Flight Center Natural Environments Branch (MSFC NE) to certify that the TDRWP provides data of sufficient accuracy and resolution for SLSP, and that the instrument provides enough reliability to support Day-of- Launch Initialization Loads Update (DOLILU) operations. On day-of-launch (DOL), space launch vehicle operators have used data from wind profilers to reverse a previous GO call in prelaunch loads and trajectory assessments due to the profiler’s capability to quickly identify changes in the wind profile within a rapidly changing wind environment. Certification of the TDRWP would allow SLSP to use DOL wind data generated by the TDRWP to design the vehicle trajectory and to verify trajectory and load constraints during the countdown for launch commit decision.

Barbre, Robert E., Jr.↗

Ares V: A National Launch Asset for the 21st Century

NASA is designing the Ares V as the cargo launch vehicle to carry NASA's exploration plans into the 21st century. The Ares V is the heavy-lift component of NASA's dual-launch architecture that will replace the current space shuttle fleet, complete the International Space Station, and establish a permanent human presence on the Moon as a stepping stone to destinations beyond. During extensive independent and internal architecture and vehicle trade studies as part of the Exploration Systems Architecture Study, NASA selected the Ares I crew launch vehicle and the Ares V to support future exploration. The smaller Ares I will launch the Orion crew exploration vehicle with four to six astronauts into orbit. The Ares V is designed to carry the Altair lunar lander into orbit, rendezvous with Orion, and send the mated spacecraft toward lunar orbit. The Ares V will be the largest and most powerful launch vehicle in history, providing unprecedented payload mass and volume to establish a permanent lunar outpost and explore significantly more of the lunar surface than was done during the Apollo missions. The Ares V also represents a national asset offering opportunities for new science, national security, and commercial missions of unmatched size and scope. Using the dual-launch Earth Orbit Rendezvous approach, the Ares I and Ares V together will be able to inject roughly 57percent more mass to the Moon than the Apollo-era Saturn V. Ares V alone will be able to send nearly 414,000 pounds into low Earth orbit (LEO) or more than 138,000 pounds directly to the Moon, compared with 262,000 pounds and 99,000 pounds, respectively for the Saturn V. Significant progress has been made on the Ares V to support a planned fiscal 2011 authority-to-proceed (ATP) milestone. This paper discusses recent progress on the Ares V and planned future activities.

Sumrall, Phil↗

Operational efficiency: Automatic ascent flight design

The expected increase in launch vehicle operations to support Space Station Freedom and a Lunar/Mars exploration initiative will require a more efficient approach to ascent flight design and operations. A concept is presented of continuous improvement in ascent flight design through an evolutionary process beginning with today's vehicles and continuing into the next century with the Advanced Launch System (ALS) and Advanced Manned Launch System (AMLS). A pictorial view is given of the improvement path described. The detailed objectives necessary to obtain efficiency improvements are described. The technology milestones along this evolutionary path are outlined and the accomplishments to date are summarized. The technology issues are discussed which must be addressed.

Source record↗

A New Vision and A More Rational Process Will Advance Space Life Support Through Better Projects

Many space life support assumptions are obviously mistaken but they are generally accepted because they mutually support each other and because they advance a mistaken futuristic vision of closed human ecosystems in space. Many projects have been mistakenly selected to increase life support system closure or reduce launch mass in order to implement this impractical vision. Project members rarely challenge their project’s assumptions and guiding vision. Systems engineering including cost, reliability, risk, and system trade-offs has been very strongly discouraged to prevent rational criticism of these dubious assumptions, the projects, and the ecosystem vision. A more realistic vision can define better near term life support goals and future aspirations that will improve mission support and increase public interest. Given more realistic goals, it will be possible to develop effective technical alternatives, use open rational project selection methods, conduct professional project management, and make swifter progress in the inevitable human advance into space. The current unworkable human space settlement scenario involves moon visits and permanent bases, zero gravity trips to Mars, Mars visits and bases, all leading to extensive human settlements on the moon and Mars. This is unrealistic because the moon and Mars have less than Earth normal gravity and high radiation that can seriously damage human health. A better alternative would use rotating space colonies that produce Earth gravity and are radiation shielded. The attractive fantasy of reproducing terrestrial ecology in space should be replaced by the idea of building a closed system based on advancing technology such as artificial photosynthesis. Past mistaken projects include growing plants for food to replicate terrestrial food sources, recovering small amounts of water from difficult to process waste to achieve high system closure, and using newly designed, lighter, but unreliable hardware to reduce launch mass. The political process supporting the false assumptions, projects, and vision has deliberately prevented the usual systems engineering and cost-benefit analysis. We are going to do much better.

Harry W. Jones↗

Usage of Fault Detection Isolation & Recovery (FDIR) in Constellation (CxP) Launch Operations

This paper will explore the usage of Fault Detection Isolation & Recovery (FDIR) in the Constellation Exploration Program (CxP), in particular Launch Operations at Kennedy Space Center (KSC). NASA's Exploration Technology Development Program (ETDP) is currently funding a project that is developing a prototype FDIR to demonstrate the feasibility of incorporating FDIR into the CxP Ground Operations Launch Control System (LCS). An architecture that supports multiple FDIR tools has been formulated that will support integration into the CxP Ground Operation's Launch Control System (LCS). In addition, tools have been selected that provide fault detection, fault isolation, and anomaly detection along with integration between Flight and Ground elements.

Ferrell, Rob↗

Artemis I Countdown 101

Before the Artemis I mission launches on its way around the Moon, the launch team at Kennedy Space Center and supporting teams across the country will begin the launch countdown about two days before liftoff. The launch countdown contains "L Minus” and "T Minus" times. "L minus" indicates how far away we are from liftoff in hours and minutes and does not include built-in holds. “T minus” time is a sequence of events that are built into the launch countdown where counting and holds are inserted. The 730,000 gallons of propellants that will be loaded into the rocket are liquid oxygen (LO2) and liquid hydrogen (LH2). Pauses in the countdown, or "holds," are built into the countdown to allow the launch team to target a precise launch window, and to provide a cushion of time for certain tasks and procedures without impacting the overall schedule. For the Artemis I countdown, planned built-in holds vary in length and occur at the following times: L-8 hours, 40 minutes, and L-40 minutes.

Madison Elizabeth Tuttle↗

Targeting space station technologies

NASA's Space Station Technology Steering Committee has undertaken the definition of the level of technology that is desirable for use in the initial design and operation of an evolutionary, long service life space station, as well as the longer term technology required for the improvement of capabilities. The technology should initially become available in 1986, in order to support a space station launch as early as 1990. Toward this end, the committee seeks to assess technology forecasts based on existing research and testing capacity, and then plan and monitor a program which will move current technology to the requisite level of sophistication and reliability. The Space Shuttle is assumed to be the vehicle for space station delivery, assembly, and support on a 90-day initial cycle. Space station tasks will be military, commercial, and scientific, including on-orbit satellite servicing.

Olstad, W. B.↗

Proposed Facility Modifications to Support Propulsion Systems Testing Under Simulated Space Conditions at Plum Brook Station's Spacecraft Propulsion Research Facility (B-2)

Preparing NASA's Plum Brook Station's Spacecraft Propulsion Research Facility (B-2) to support NASA's new generation of launch vehicles has raised many challenges for B-2 s support staff. The facility provides a unique capability to test chemical propulsion systems/vehicles while simulating space thermal and vacuum environments. Designed and constructed 4 decades ago to support upper stage cryogenic engine/vehicle system development, the Plum Brook Station B-2 facility will require modifications to support the larger, more powerful, and more advanced engine systems for the next generation of vehicles leaving earth's orbit. Engine design improvements over the years have included large area expansion ratio nozzles, greater combustion chamber pressures, and advanced materials. Consequently, it has become necessary to determine what facility changes are required and how the facility can be adapted to support varying customers and their specific test needs. Instrumental in this task is understanding the present facility capabilities and identifying what reasonable changes can be implemented. A variety of approaches and analytical tools are being employed to gain this understanding. This paper discusses some of the challenges in applying these tools to this project and expected facility configuration to support the varying customer needs.

Edwards, Daryl A.↗

Proposed Facility Modifications to Support Propulsion Systems Testing Under Simulated Space Conditions at Plum Brook Station's Spacecraft Propulsion Research Facility (B-2)

Preparing NASA's Plum Brook Station's Spacecraft Propulsion Research Facility (B-2) to support NASA's new generation of launch vehicles has raised many challenges for B-2's support staff. The facility provides a unique capability to test chemical propulsion systems/vehicles while simulating space thermal and vacuum environments. Designed and constructed in the early 1960s to support upper stage cryogenic engine/vehicle system development, the Plum Brook Station B-2 facility will require modifications to support the larger, more powerful, and more advanced engine systems for the next generation of vehicles leaving earth's orbit. Engine design improvements over the years have included large area expansion ratio nozzles, greater combustion chamber pressures, and advanced materials. Consequently, it has become necessary to determine what facility changes are required and how the facility can be adapted to support varying customers and their specific test needs. Exhaust system performance, including understanding the present facility capabilities, is the primary focus of this work. A variety of approaches and analytical tools are being employed to gain this understanding. This presentation discusses some of the challenges in applying these tools to this project and expected facility configuration to support the varying customer needs.

Edwards, Daryl A.↗