Search NASA⌕ Search

SEARCH · Search NASA

Results for “Nuclear Operating Experience”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

An integrated equipment for massive segmentation and packaging of control Rod Guide Tubes - 15161

Over time, some utilities have decided to undergo safety upgrades that include replacement of some ageing components like control rod guide tubes (GT's). GT's are safety related components because they control the path of the control rods into and out of the core. These components are usually stored underwater in interim storage pools to decay their radioactivity. When the interim storage facility reaches saturation, treatment and final disposal of the retired Guide Tubes needs to be performed. Based on more than 30 years of experience and lessons learned in the development of segmentation and packaging technologies for nuclear components, Westinghouse has designed, commissioned and will operate a dedicated system for cutting and packaging retired GT's from 900 MW plants, currently stored in a EDF maintenance facility located in the south of France. The first main technical challenge was the waste volume optimization. Two separate waste streams had to be considered for coping with the highly irradiated portion of the GT's (lower part) and the very low level waste sections (upper part). The segmentation plan has been designed to minimize the waste volume of the highly irradiated waste and therefore develop a process which could be adapted to the container size specified by EDF. Metallic baskets have been designed to optimize the packaging and storage density in the containers. All cutting techniques previously used by Westinghouse in similar applications were assessed and underwater mechanical cutting with a band saw was selected as the preferred method. A turning stand positions the GT in front of the band saw. When the cut is completed, the remnant GT is inserted into the next turning stand for the next cut. Each cell of the turning stand positions the GT at the pre-defined cutting height. An integrated water filtration system is used to ensure good visibility during the cutting operations and to minimize water volume and limit the final liquid effluents. The whole process of GT insertion, cutting, packaging and waste conditioning is carried out in a hot cell and controlled remotely. The operator can therefore follow the packaging plan accurately and safely by using a four axis pick and place unit, while keeping personal radiation exposure low. This innovative process allows cutting and packaging large quantities of GT's in a safe and efficient manner. The pilot project covers the segmentation of 93 GT's but it can be further used for cutting larger quantities of retired GT's resulting from the upcoming GT replacement campaigns. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Importance of Experience Based Decommissioning Planning - 16242

Decommissioning of a nuclear facility is an extensive and multidisciplinary task which involves the management and technical actions associated with ceasing operation and thereafter the step by step transfer of the facility from an operating plant to an object under decommissioning. The decommissioning phase includes dismantling of systems and components, decontamination and clearance, demolition of buildings, remediation of any contaminated ground and finally a survey of the site. Several of these activities generate radioactive or potentially radioactive waste which has to be managed properly prior to clearance or disposal. What makes decommissioning of nuclear installations unique is to a large extent the radioactive waste management. No other industries have that complex regulatory frameworks for waste management. If a decommissioning project in the nuclear industry does not consider the waste aspects to the extent required, there is a large risk of failure causing a reduced trust by the regulators and other stakeholders as well as cost and schedule overruns. This paper will give an overview of important aspects and findings gathered during decades of planning and conducting decommissioning and nuclear facility modernization projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hydraulic Shuttle Irradiation System (HSIS) Recently Installed in the Advanced Test Reactor (ATR)

2010 International Congress on Advances in Nuclear Power Plants (ICAPP’10) ANS Annual Meeting Imbedded Topical San Diego, CA June 13 – 17, 2010 Hydraulic Shuttle Irradiation System (HSIS) Recently Installed in the Advanced Test Reactor (ATR) Author: A. Joseph Palmer, Mechanical Engineer, Irradiation Test Programs, 208-526-8700, Joe.Palmer@INL.gov Affiliation: Idaho National Laboratory P.O. Box 1625, MS-3840 Idaho Falls, ID 83415 INL/CON-10-17680 ABSTRACT Most test reactors are equipped with shuttle facilities (sometimes called rabbit tubes) whereby small capsules can be inserted into the reactor and retrieved during power operations. With the installation of Hydraulic Shuttle Irradiation System (HSIS) this capability has been restored to the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL). The general design and operating principles of this system were patterned after the hydraulic rabbit at Oak Ridge National Laboratory’s (ORNL) High Flux Isotope Reactor (HFIR), which has operated successfully for many years. Using primary coolant as the motive medium the HSIS system is designed to simultaneously transport fourteen shuttle capsules, each 16 mm OD x 57 mm long, to and from the B-7 position of the reactor. The B-7 position is one of the higher flux positions in the reactor with typical thermal and fast (>1 Mev) fluxes of 2.8E+14 n/cm2/sec and 1.9E+14 n/cm2/sec respectively. The available space inside each shuttle is approximately 14 mm diameter x 50 mm long. The shuttle containers are made from titanium which was selected for its low neutron activation properties and durability. Shuttles can be irradiated for time periods ranging from a few minutes to several months. The Send and Receive Station (SRS) for the HSIS is located 2.5 m deep in the ATR canal which allows irradiated shuttles to be easily moved from the SRS to a wet loaded cask, or transport pig. The HSIS system first irradiated (empty) shuttles in September 2009 and has since completed a Readiness Assessment in November 2009. The HSIS is a key component of the ATR National Scientific User Facility (NSUF) operated by Battelle Energy Alliance, LLC and is available to a wide variety of university researchers for nuclear fuels and materials experiments as well as medical isotope research and production.

07 ISOTOPE AND RADIATION SOURCES↗

Invited Article: A novel calibration method for the JET real-time far infrared polarimeter and integration of polarimetry-based line-integrated density measurements for machine protection of a fusion plant

In this paper, we present the work in the implementation of a new calibration for the JET real-time polarimeter based on the complex amplitude ratio technique and a new self-validation mechanism of data. This allowed easy integration of the polarimetry measurements into the JET plasma density control (gas feedback control) and as well as machine protection systems (neutral beam injection heating safety interlocks). The new addition was used successfully during 2014 JET Campaign and is envisaged that will operate routinely from 2015 campaign onwards in any plasma condition (including ITER relevant scenarios). This mode of operation elevated the importance of the polarimetry as a diagnostic tool in the view of future fusion experiments.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Modernizing the Nuclear Industry and New Ways of Working

Nuclear energy is recognized as the most feasible energy source towards achieving nation-wide net-zero goals (COP 208, MIT). Additionally, the demand for reliable, consistent energy supply is soaring with the construction of energy hungry data centers and AI tools. This means the construction of new nuclear and the continuation of current nuclear are a high national priority. However, this leaves the nuclear industry with a workforce challenge. The rising demand for nuclear power is threatened by an underpopulated workforce. There exist a few contributors to the decreased workforce such as skewed workforce demographics resulting in large-scale workforce retirement. Also, some plants have observed difficulty hiring and retaining skill sets that typically comprise the nuclear power workforce – specifically skilled craftsman. Those who are graduating with desirable skills are seeking employment in sectors that are more modern and culturally more aligned with younger generational values. Lastly, within the nuclear sector, skilled employees will be a competitive commodity as advanced plants come online offering work environments that incorporate modern technologies, skill sets, and opportunities for career advancement. These factors emphasize the need for legacy plants to modernize with a focus on the workplace environment and culture that meets younger generations’ skills, cultural expectations, and desire for advancement opportunities. Nuclear plants are actively engaged in deploying advancements that improve the management of systems, structures, and components as well as process improvements and technologies that can reduce the costs of operation and maintenance. However, the advancements must also be analyzed, reviewed and deployed in a manner that considers the impact on how people within the organization collaborate, communicate, make decisions, and solve problems. Neglecting to consider the cultural impact of modernization risks poor adoption, unrealized opportunities, or insignificant change toward helping attract new employees. The traditional way of working is not necessarily the way new generations want to engage with their employer. For instance, in a survey performed by North American Young Generation in Nuclear the top three reasons for younger nuclear employees to seek other job opportunities was seeking better work-life balance, a lack of advancement opportunities, and work culture and leadership style differences (Smyth et al. 2022). Integrated Operations for Nuclear (ION) is an approach for the nuclear industry to create long-term strategic modernization plans and analyze each advancement for the impact on people and processes and measure how those impacts flow up to support high-level, long-term plant goals and requirements. One principle of ION is to replace the current labor-centric operation style in legacy nuclear plants with data-centric collaborative operation styles. This paper will explain how transitioning operations to leverage centralized skills and responsibility, multi-skilled teams, and collaborative decision making can flatten the hierarchical structure in plants, enable greater individual efficacy while also offering more experiences and advancement opportunities to staff. Adopting the ION way of working shifts the industry mind-set towards more networked, collaborative, and modern way of working that will attract skilled, next-generation workers to operate the legacy nuclear fleet.

99 - GENERAL AND MISCELLANEOUS↗

The Effect of Birthrate Granularity on the Release- to- Birth Ratio for the AGR-1 In-core Experiment

The AGR-1 Advanced Gas Reactor (AGR) tristructural-isotropic-particle fuel experiment underwent 13 irradiation intervals from December 2006 until November 2009 within the Idaho National Laboratory Advanced Test Reactor in support of the Next Generation Nuclear Power Plant program. During this multi-year experiment, release-to-birth rate ratios were computed at the end of each operating interval to provide information about fuel performance. Fission products released during irradiation were tracked daily by the Fission Product Monitoring System using 8-hour measurements. Birth rates calculated by MCNP with ORIGEN for as-run conditions were computed at the end of each irradiation interval. Each time step in MCNP provided neutron flux, reaction rates and AGR-1 compact composition, which were used to determine birth rates using ORIGEN. The initial birth-rate data, consisting of four values for each irradiation interval at the beginning, end, and two intermediate times, were interpolated to obtain values for each 8-hour activity. The problem with this method is that any daily changes in heat rates or perturbations, such as shim control movement or core/lobe power fluctuations, would not be reflected in the interpolated data and a true picture of the system would not be presented. At the conclusion of the AGR-1 experiment, great efforts were put forth to compute daily birthrates, which were reprocessed with the 8-hour release activity. The results of this study are presented in this paper.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Developments in Type B Casks activities within EnergySolutions Cask Division - 16554

At the end of 2008, the industry experienced sudden shortage of Type B Low Level Radioactive Waste (LLRW) transport casks available for transportation of nuclear waste within the United States of America. Due to retirement of previously certified Type B legacy packages and in order to meet the industry demand requirements, EnergySolutions (referred to as the Company) started fabrication of four additional 8-120B packages and added them in a fleet in late 2014, essentially, doubling their fleet of Type B casks. One 3-60B cask was delivered in Spring 2015 to support transportation of irradiated hardware. With growing Type B cask fleet and additional resource demand during maintenance/operations of newer and older casks, the Company had experienced several challenges. This paper will discuss lessons learned from manufacturing of new casks and address, in detail, the current developments associated with operations of Type A and B casks. The topics of discussion will include the Company current cask inventory, major developments associated with user interface and equipment improvements in 2015, issues and challenges the Company maintenance team faces in a daily operations of the casks as well as the latest licensing update for EnergySolutions owned Type B packages. Also, the paper will discuss the company strategic direction for improvement of the cask operations culture and user interface experience. This information shall benefit owners of LLRW cask fleet to improve efficiency of operations, customers experience and satisfaction. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The effect of birthrate granularity on the release-to-birth ratio for the AGR-1 in-core experiment

The AGR-1 Advanced Gas Reactor (AGR) tristructural-isotropic-particle fuel experiment underwent 13 irradiation intervals from December 2006 until November 2009 within the Idaho National Laboratory Advanced Test Reactor in support of the Next Generation Nuclear Power Plant program. During this multi-year experiment, release-to-birth rate ratios were computed at the end of each operating interval to provide information about fuel performance. Fission products released during irradiation were tracked daily by the Fission Product Monitoring System using 8-h measurements. Birth rate calculated by MCNP with ORIGEN for as-run conditions were computed at the end of each irradiation interval. Each time step in MCNP provided neutron flux, reaction rates and AGR-1 compact composition, which were used to determine birth rate using ORIGEN. The initial birth-rate data, consisting of four values for each irradiation interval at the beginning, end, and two intermediate times, were interpolated to obtain values for each 8-h activity. The problem with this method is that any daily changes in heat rates or perturbations, such as shim control movement or core/lobe power fluctuations, would not be reflected in the interpolated data and a true picture of the system would not be presented. At the conclusion of the AGR-1 experiment, great efforts were put forth to compute daily birthrates, which were reprocessed with the 8-h release activity. The results of this study are presented in this paper.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

AGC-4 Disassembly Report

The Advanced Reactor Terminology Graphite Research and Development program is currently measuring irradiated material property changes in several grades of nuclear graphite to predict behavior and operating performance within the core of these new high temperature reactor designs. The Advanced Graphite Creep (AGC) experiment, consisting of six irradiation capsules, will generate the irradiated graphite performance data for the Very High Temperature Reactor operating conditions. All six capsules in the experiment conducted at Idaho National Laboratory will be irradiated in the Advanced Test Reactor, disassembled in the Hot Fuel Examination Facility, and examined at the Idaho National Laboratory Research Center. This is the disassembly report describing the disassembly, shipment, post irradiation inspection, and storage of the graphite specimens contained within the AGC 4 irradiation test series capsule (the fourth irradiation capsule of the series). AGC 4 was irradiated in the Advanced Test Reactor (ATR) East Flux Trap (EFT) during ATR Cycle 157D, 158A, 162A, 162B, 164A, 164B, 166A, and Cycle 166B. Approximately 3.6 dpa was achieved. Desired experiment temperatures were exceeded by at least 100C during the second Cycle of irradiation due to the insertion of the KJRR experiment. The capsule was removed from the ATR and transferred to the Hot Fuel Examination Facility on May 15, 2020 and eventually unloaded into the Hot Fuel Examination Facility (HFEF) Decon Cell through Penetration 2D on February 26, 2021. It was moved to the HFEF Main Cell Window 3M for disassembly on March 15, 2021. Disassembly and specimen extraction began March 18, 2021, and packaging of the graphite specimens was completed on April 16, 2021. Several anomalies were noted, specifically that the radiological dose rates were nominally an order of magnitude higher than that of the previous AGC experiments. This report summarizes the disassembly of the AGC 4 experiment.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

AGC-4 Disassembly Report

The Advanced Reactor Terminology Graphite Research and Development program is currently measuring irradiated material property changes in several grades of nuclear graphite to predict behavior and operating performance within the core of these new high temperature reactor designs. The Advanced Graphite Creep (AGC) experiment, consisting of six irradiation capsules, will generate the irradiated graphite performance data for the Very High Temperature Reactor operating conditions. All six capsules in the experiment conducted at Idaho National Laboratory will be irradiated in the Advanced Test Reactor, disassembled in the Hot Fuel Examination Facility, and examined at the Idaho National Laboratory Research Center. This is the disassembly report describing the disassembly, shipment, post irradiation inspection, and storage of the graphite specimens contained within the AGC 4 irradiation test series capsule (the fourth irradiation capsule of the series). AGC 4 was irradiated in the Advanced Test Reactor (ATR) East Flux Trap (EFT) during ATR Cycle 157D, 158A, 162A, 162B, 164A, 164B, 166A, and Cycle 166B. Approximately 3.6 dpa was achieved. Desired experiment temperatures were exceeded by at least 100C during the second Cycle of irradiation due to the insertion of the KJRR experiment. The capsule was removed from the ATR and transferred to the Hot Fuel Examination Facility on May 15, 2020 and eventually unloaded into the Hot Fuel Examination Facility (HFEF) Decon Cell through Penetration 2D on February 26, 2021. It was moved to the HFEF Main Cell Window 3M for disassembly on March 15, 2021. Disassembly and specimen extraction began March 18, 2021, and packaging of the graphite specimens was completed on April 16, 2021. Several anomalies were noted, specifically that the radiological dose rates were nominally an order of magnitude higher than that of the previous AGC experiments. This report summarizes the disassembly of the AGC 4 experiment.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

SCALE 6.3 Validation: Reactor Physics

This study was performed to validate the SCALE/Polaris v6.3.0–PARCS v3.4.2 code procedure with the ENDF/B-VII.1 AMPX 56-group library for light-water reactor analysis by comparing the simulated results with the measured data for critical experiments and operating light-water reactors. Uncertainties of the SCALE/Polaris–PARCS code procedure for light-water reactor physics analysis were evaluated in the validation for key nuclear parameters such as reactivity, control bank work, temperature coefficients, and pin and assembly power peaking factors. In addition, the SCALE/TRITON v6.3.1 procedure with the ENDF/B-VII.1 and VIII.0 252-group and continuous-energy cross sections was validated for non-lightwater reactors including the HTR-10 reactor, the High-Temperature Test Reactor, the Molten Salt Reactor Experiment, and the Experimental Breeder Reactor II.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Effects of an Advanced Reactor’s Design, Use of Automation, and Mission on Human Operators

The roles, functions, and tasks of the human operator in existing light water nuclear power plants (NPPs) are based on sound nuclear and human factors engineering (HFE) principles, are well defined by the plant’s conduct of operations, and have been validated by years of operating experience. However, advanced NPPs whose engineering designs differ from existing light-water reactors (LWRs) will impose changes on the roles, functions, and tasks of the human operators. The plans to increase the use of automation, reduce staffing levels, and add to the mission of these advanced NPPs will also affect the operator’s roles, functions, and tasks. We assert that these factors, which do not appear to have received a lot of attention by the design engineers of advanced NPPs relative to the attention given to conceptual design of these reactors, can have significant risk implications for the operators and overall plant safety if not mitigated appropriately. This paper presents a high-level analysis of a specific advanced NPP and how its engineered design, its plan to use greater levels of automation, and its expanded mission have risk significant implications on operator performance and overall plant safety.

99 GENERAL AND MISCELLANEOUS↗

Testing and Starting up of the Plasma Melting Facility for Industrial Treatment of Radioactive Waste - 17362

The operation and maintenance of nuclear power plants, the nuclear fuel cycle in general, research laboratories and pharmaceutical, medical and industrial facilities generate low-level radioactive waste which, along with the historical radioactive waste from past nuclear activities, needs to be treated and stored, awaiting final disposal. Plasma technology offers a very effective way of treating this waste with a high volume reduction factor (VRF), free from organics, liquids and moisture, and meets without a doubt the acceptance criteria for safe storage and disposal. By means of a plasma beam of approximately 5000 deg. C, the inorganic materials are melted into a glassy slag, containing most of the radioactive isotopes while the organic material is gasified and afterwards oxidized in an afterburner and purified in an off-gas cleaning system. This paper describes the principles of plasma, the different waste feed systems, off-gas treatment and operational experience and future plasma plants. More specifically, it presents the new full-scale plasma facility for the treatment of radioactive waste at the Kozloduy Nuclear Power Plant in Bulgaria for which construction and assembly was finalized end of August 2016. It also describes in more detail the Site Acceptance Tests (SAT) of this facility. This facility is designed and built as an EPC contract by the Joint Venture Iberdrola Ingenieria y Construccion (Spain) and Belgoprocess (Belgium). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

E-36: The First Proto-Megascience Experiment at NAL

E-36, an experiment on small-angle proton-proton scattering, began testing equipment at the National Accelerator Laboratory (NAL) using a newly achieved 100 GeV proton beam on February 12, 1972, marking the beginning of NAL’s experimental program. This experiment, which drew collaborators from NAL, the Joint Institute for Nuclear Research (Dubna, USSR), the University of Rochester (Rochester, New York), and Rockefeller University (New York, New York) was significant not only as a milestone in Fermilab’s history but also as a model of cooperation between the East and West at a time when Cold War tensions still ran high. An examination of the origin, operation, and resolution of E-36 and the chain of experiments it spawned reveals the complex interplay of science and politics that drove these experiments as well as seeds of the megascience paradigm that has come to dominate high energy physics research since the 1970s.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Office of Nuclear Verification FY 2023 Quarterly Report TSVT Q1

This project encompasses the continued development and training of a U.S. operational team, the Test Site Verification Team (TSVT), supporting verification of nuclear testing activities. TSVT builds on decades of U.S. nuclear testing history and nuclear explosion monitoring experience. The Team maintains readiness to deploy internationally on short notice to provide field-based support of verification of declared or undeclared nuclear testing and associated activities, as well as follow-on activities including monitoring and capability disablement and dismantlement, as established by negotiated agreement or treaty. The roles and structure of the TSVT are integrated with other NA-243 deployable verification teams and the interagency. FY23 TSVT activities focus on continued capability buildup within the team, including Team trainings and exercises with a focus on missions in confined spaces (e.g., tunnels, mines, other underground facilities), increased familiarity with foreign nuclear weapons testing programs, demonstration of Team capacity to deploy, train, and practice sustained OPSEC in non-western locations, establishment of sustainable storage and maintenance of equipment, specification and procurement of additional equipment to support field observations, further evolution of concepts of operation documents (CONOPs), and mission coordination with Headquarters and associated Stakeholders. Activities will culminate with a full-scale domestic team exercise at the end of FY23 focusing on underground activities signatures/observations and safety including advanced outdoor safety and familiarity in working around explosive test environments. In addition, we will be further articulating approaches and capacity relevant to the identification of nuclear tests, as well as monitoring of nuclear testing activities and/or dismantlement of nuclear test sites and anticipate developing additional equipment requests in support of this evolution. The TSVT Team Leads will also coordinate with its Senior Advisor, the TSVT Logistics and Readiness (L&R) Training Lead, and NNSA Headquarters to draft a five-year TSVT training and exercise plan, that strategically and incrementally builds capacity and expertise in key areas of significance for the continuum of nuclear and nuclear-related testing activities that fall within the team’s mission space.

42 ENGINEERING↗

Assessment of the Viability of Scaled Annular Pellet Fabrication Technologies

The DOE-NE AFC program broadly supports the creation of novel fuel forms including intermetallics, composites, and dopants for high uranium density compounds. While data can be obtained for key performance indicators such as thermal expansion and oxidation resistance in steam, fuel qualification remains a time intensive process. As such, accelerated fuel qualification methods are a recent focus of the program. By first looking at systems with known historical irradiation testing information, like UO 2 , the method of accelerated burnup testing can be validated, followed by use on novel materials with less information available, like silicides and nitrides. The biggest time delay in doing irradiation testing is reaching a “high burnup” fuel, to effectively model how the fuel will behave when it has been fully used. Reaching this point conventionally could take upwards of 30 years. Accelerated burnup would be approaching the threshold of “high burnup”, something on the order or 50GWd/MTU, more quickly, which although achievable in test reactors requires a decade to achieve using current irradiation testing schemes. To achieve this faster rate, the fuel is likely going to be subject to thermal effects commiserate with the increased heat by more fission. In a normal fuel pellet, this increased temperature would operate less efficiently because the thermal diffusivity of the pellet only allows it to transfer heat so quickly, thus causing a high centerline temperature and noticeable stress along the diameter of the pellet. Solutions could include smaller pellets, which would have a greater surface area giving off heat relative to their volume, or “shaped” fuel designs modifying the thermal behavior. The concept that drives the annular pellet design is reduction of the thermal gradient caused from the high “centerline” temperature at the center of a normal pellet to its surface. By removing the center of the pellet, the new centerline will instead be closer to an edge (whether that be the inner or outer edge), allowing cooling to wick away more heat than the traditional design. In an ideal world, the center of the pellet could also have a heat wick running through it allowing heat to be transported away from throughout the pellet. This increase in heat removal would allow the pellet to be subjected to higher energy output, and thus accelerate the burn-up process. UO 2 has been the staple fuel form of nuclear energy for decades, and replacement of this functionally understood material can only be done with sufficient fuel qualification. Increasing the burnup allows us to characterize new fuels with limited to no operational experience behind them, including carbides, nitrides, and silicide’s. Production of the unique geometries detailed herein will allow us to cut qualification times from multi-decadal experiments into the sub-decadal range, vastly increasing the quantity and quality of information available.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Top Fuel 2016 Proceedings

Top Fuel, also called Light Water Reactor (LWR) Fuel Performance Meeting, is an annual topical meeting whose primary objective is to bring together leading specialists in LWR fuel from around the world to analyze advances in nuclear fuel technology and to use the findings of the latest cutting-edge research to help manufacture high performance nuclear fuels of today and tomorrow. The conference hosts 2 plenary sessions, 2 special sessions, and numerous technical sessions organized into 5 technical track ares: Track 1 - Fuel performance reliability, operations and maintenance experience; Track 2 - Advances in fuel technologies (e.g., enhanced accident tolerant fuel); Track 3 - Transient and off-normal fuel behavior; Track 4 - Used fuel storage, transportation, and reuse/recovery; and Track 5 - Fuel modeling and analysis. These proceedings gather 169 papers.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

National Criticality Experiments Research Center (NCERC) - capabilities and recent measurements

The National Criticality Experiments Research Center (NCERC) located at the Device Assembly Facility (DAF) at the Nevada National Security Site (NNSS) and operated by Los Alamos National Laboratory (LANL) is home to four critical assemblies which are used to support of range of missions, including nuclear criticality safety and nuclear nonproliferation. Additionally, subcritical systems can also be assembled at NCERC. NCERC is providing critical and subcritical experiments valuable to the nuclear data community and experiments performed at NCERC are often published as benchmarks in the International Criticality Safety Benchmark Evaluation Project (ICSBEP) Handbook. This manuscript will give a broad overview of recent experiments performed at NCERC, upcoming experiments, and why integral measurements are important and useful to the nuclear data community. The four critical assemblies are GODIVA IV, FLATTOP, COMET, and PLANET. GODIVA IV is a cylindrical metal fast burst reactor, the fourth in the GODIVA series that dates back to the 1950’s. FLATTOP is an highly enriched uranium (HEU) or Pu core reflected by natural uranium. COMET and PLANET are vertical lift assemblies, where one half of the reactor can be lifted to the upper half of the reactor to create a critical system. Some recent experiments include various critical intermediate energy assemblies with lead, and subcritical measurements of plutonium reflected by copper, tungsten, and nickel. Work is also underway to make a better measurement of the critical mass of neptunium, using a neptunium sphere surrounded by nickel shells. Additionally, measurements will be performed next year with HEU shells from Rocky Flats. These HEU shells will be stacked together to make larger systems, allowing for a large range of criticality (from subcritical to delayed critical). Other upcoming measurements include an HEU critical assembly sensitive to intermediate energy neutrons.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗