Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operational flexibility”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

An integrated transportation and operations comparison of space and ground based OTV's

This paper presents the results of a comparison of space vs. ground basing of orbital transfer vehicles (OTV). The comparison was done assuming an 11-year mission model beginning in 1995 and averaging over 100 MT of payloads per year to GEO. When analyzed from a total transportation standpoint, the launch system employed had the greatest impact on the basing mode comparison. A launch fleet consisting of both a basic STS and a Shuttle derivative cargo vehicle provided the least cost. Only a small advantage (3%) was found in flight performance for the space based (SB) OTV once it incorporated the necessary provisions for space debris protection and on-orbit maintenance. Propellant storage and transfer losses associated with the SB OTV amounted to 12% of the actual flight propellant requirement. Turnaround of the SB OTV required a crew of 3 and 40% duty cycle. The life cycle cost comparison including all involved space elements indicated less than a 10% difference between basing modes. The SB OTV however is judged to provide more flexibility in launch manifesting, simplified recovery operations and greater potential for improvement.

Davis, E. E.↗

Next Gen NEAR: Near Earth Asteroid Human Robotic Precursor Mission Concept

Asteroids have long held the attention of the planetary science community. In particular, asteroids that evolve into orbits near that of Earth, called near-Earth objects (NEO), are of high interest as potential targets for exploration due to the relative ease (in terms of delta V) to reach them. NASA's Flexible Path calls for missions and experiments to be conducted as intermediate steps towards the eventual goal of human exploration of Mars; piloted missions to NEOs are such example. A human NEO mission is a valuable exploratory step beyond the Earth-Moon system enhancing capabilities that surpass our current experience, while also developing infrastructure for future mars exploration capabilities. To prepare for a human rendezvous with an NEO, NASA is interested in pursuing a responsible program of robotic NEO precursor missions. Next Gen NEAR is such a mission, building on the NEAR Shoemaker mission experience at the JHU/APL Space Department, to provide an affordable, low risk solution with quick data return. Next Gen NEAR proposes to make measurements needed for human exploration to asteroids: to demonstrate proximity operations, to quantify hazards for human exploration and to characterize an environment at a near-Earth asteroid representative of those that may be future human destinations. The Johns Hopkins University Applied Physics Laboratory has demonstrated exploration-driven mission feasibility by developing a versatile spacecraft design concept using conventional technologies that satisfies a set of science, exploration and mission objectives defined by a concept development team in the summer of 2010. We will describe the mission concept and spacecraft architecture in detail. Configuration options were compared with the mission goals and objectives in order to select the spacecraft design concept that provides the lowest cost, lowest implementation risk, simplest operation and the most benefit for the mission implementation. The Next Gen NEAR spacecraft was designed to support rendezvous with a range of candidate asteroid targets and could easily be launched with one of several NASA launch vehicles. The Falcon 9 launch vehicle supports a Next Gen NEAR launch to target many near-Earth asteroids under consideration that could be reached with a C3 of 18 km2/sec2 or less, and the Atlas V-401 provides added capability supporting launch to NEAs that require more lift capacity while at the same time providing such excess lift capability that another payload of opportunity could be launch in conjunction with Next Gen NEAR. Next Gen NEAR will measure and interact with the target surface in ways never undertaken at an asteroid, and will prepare for first human precursor mission by demonstrating exploration science operations at an accessible NEO. This flexible mission and spacecraft design concept supports target selection based on upcoming Earth-based observations and also provides opportunities for co-manifest & international partnerships. JHU/APL has demonstrated low cost, low risk, high impact missions and this mission will help to prepare NASA for human NEO exploration by combining the best of NASA s human and robotic exploration capabilities.

Rivkin, Andrew S.↗

Operational Considerations when Designing New Ground Systems

The Hubble Space Telescope (HST) launched in April of 1991 with a nominal 15-year old mission. Since then, the HST mission life has been extended to 2010. As is true for all NASA missions, HST is being asked to decrease its operational costs for the remainder of its mission life. Various techniques are being incorporated for cost reductions, with one of the core means being the design of a new and more efficient ground system for HST operations. This new ground system, "Vision 2000", will reduce operational and maintenance costs and also provide the HST Project with added flexibility to react to future changes. Vision 2000 began supporting HST Operations in January of 1999 and will support the mission for the remainder of the mission life. Upgrading a satellite's ground system is a popular approach for reducing costs, but it is also inherently risky. Validating a new ground system can be a severe distraction to a flight team while operating a satellite. Mission data collection and health and safety requirements are rarely, if ever, relaxed during this validation period, forcing flight teams to undertake an additional task while operating the satellite. Additionally, flight teams must usually undergo extensive training to effectively utilize the new system. Once again, this training usually occurs as an additional task, in addition to the nominal satellite operations. While operating the spacecraft, the Flight Team typically assists in the design, validation, and verification of a new ground system. This is a distraction and strain on the Flight Team, but the benefit of using the Flight Team in all phases of ground system development far outweigh the negative aspects. Finally, above the cost of the new system, the integration into the facility with the current control center system are resources and costs not normally taken into account in the design phase of the new system. In addition to the standard issues faced by a Project when upgrading its ground system, the HST Project also must continue to support Space Shuttle servicing missions, which occur approximately every two to three years. This paper will address many of the issues common to all missions when re-hosting ground systems, and those faced by the HST Project in particular.

Walyus, Keith↗

An Energy-Based Hysteresis Model for Magnetostrictive Transducers

This paper addresses the modeling of hysteresis in magnetostrictive transducers. This is considered in the context of control applications which require an accurate characterization of the relation between input currents and strains output by the transducer. This relation typically exhibits significant nonlinearities and hysteresis due to inherent properties of magnetostrictive materials. The characterization considered here is based upon the Jiles-Atherton mean field model for ferromagnetic hysteresis in combination with a quadratic moment rotation model for magnetostriction. As demonstrated through comparison with experimental data, the magnetization model very adequately quantifies both major and minor loops under various operating conditions. The combined model can then be used to accurately characterize output strains at moderate drive levels. The advantages to this model lie in the small number (six) of required parameters and the flexibility it exhibits in a variety of operating conditions.

Calkins, F. T.↗

Space Telescope Control System science user operations

The Space Telescope science users will have a flexible and efficient means of accessing the capabilities provided by the ST Pointing Control System, particularly with respect to managing the overal acquisition and pointing functions. To permit user control of these system functions - such as vehicle scanning, tracking, offset pointing, high gain antenna pointing, solar array pointing and momentum management - a set of special instructions called 'constructs' is used in conjuction with command data packets. This paper discusses the user-vehicle interface and introduces typical operational scenarios.

Dougherty, H. J.↗

Potential Operating Orbits for the SAFE-400

Safety must be ensured during all phases of space fission system design, development, fabrication, launch, operation, and shutdown. One potential space fission system application is fission electric propulsion (FEP), in which fission energy is converted into electricity and used to power high efficiency (Isp is greater than 3000s) electric thrusters. For these types of systems it is important to determine which operational scenarios ensure safety while allowing maximum mission performance and flexibility. Space fission systems are essentially non-radioactive at launch, prior to extended operation at high power. Once high power operation begins, system radiological inventory steadily increases as fission products build up. For a given fission product isotope, the maximum radiological inventory is typically achieved once the system has operated for a length of time equivalent to several half-lives. After that time, the isotope decays at the same rate it is produced, and no further inventory builds in. For an FEP mission beginning in Earth orbit, altitude and orbital lifetime increase as the propulsion system operates. Two simultaneous effects of fission propulsion system operation are thus (1) increasing fission product inventory and (2) increasing orbital lifetime. Phrased differently, as fission products build up, more time is required for the fission products to naturally convert back into non-radioactive isotopes. Simultaneously, as fission products build up, orbital lifetime increases, providing more time for the fission products to naturally convert back into non-radioactive isotopes. Operational constraints required to ensure safety can thus be quantified.

Houts, Mike↗

Spitzer Space Telescope in-orbit checkout and science verification operations

Spitzer Space Telescope, the fourth and final of NASA's great observatories, and the first mission in NASA's Origins Program was launched 25 August 2003 into an Earth-trailing solar orbit. The observatory was designed to probe and explore the universe in the infrared. Before science data could be acquired, however, the observatory had to be initialized, characterized, calibrated, and commissioned. A two phased operations approach was defined to complete this work. These phases were identified as In-Orbit Checkout (IOC) and Science Verification (SV). Because the observatory lifetime is cryogen-limited these operations had to be highly efficient. The IOC/SV operations design accommodated a pre-defined distributed organizational structure and a complex, cryogenic flight system. Many checkout activities were inter-dependent, and therefore the operations concept and ground data system had to provide the flexibility required for a 'short turn-around' environment. This paper describes the adaptive operations system design and evolution, implementation, and lessons-learned from the completion of IOC/SV.

space verification↗

Functional description of a command and control language tutor

The status of an ongoing project to explore the application of Intelligent Tutoring System (ITS) technology to NASA command and control languages is described. The primary objective of the current phase of the project is to develop a user interface for an ITS to assist NASA control center personnel in learning Systems Test and Operations Language (STOL). Although this ITS will be developed for Gamma Ray Observatory operators, it will be designed with sufficient flexibility so that its modules may serve as an ITS for other control languages such as the User Interface Language (UIL). The focus of this phase is to develop at least one other form of STOL representation to complement the operational STOL interface. Such an alternative representation would be adaptively employed during the tutoring session to facilitate the learning process. This is a key feature of this ITS which distinguishes it from a simulator that is only capable of representing the operational environment.

Elke, David R.↗

Payload impact of space shuttle and tug

The advantages offered by space shuttle and tug for space operations are summarized. Economical transportation to a space station and operations in orbit; frequent sorties, with flexible scheduling, for experiment missions; and an economical and flexible replacement for conventional launchers are discussed. These advantages include many potential benefits for payload design, construction, and use.

Newell, H. E.↗

Apollo experience report: Real-time auxiliary computing facility development

The Apollo real time auxiliary computing function and facility were an extension of the facility used during the Gemini Program. The facility was expanded to include support of all areas of flight control, and computer programs were developed for mission and mission-simulation support. The scope of the function was expanded to include prime mission support functions in addition to engineering evaluations, and the facility became a mandatory mission support facility. The facility functioned as a full scale mission support activity until after the first manned lunar landing mission. After the Apollo 11 mission, the function and facility gradually reverted to a nonmandatory, offline, on-call operation because the real time program flexibility was increased and verified sufficiently to eliminate the need for redundant computations. The evaluation of the facility and function and recommendations for future programs are discussed in this report.

Allday, C. E.↗

Development and evaluation of thermoplastic street maintenance material

An all-weather permanent street patching material was investigated for flexible and rigid pavements. The economic, operational, and material requirements are discussed along with the results of field tests with various mixtures of EVA resins and asphalt. Cost analyses for thermoplastic patching methods are included.

Siemens, W. D.↗

The data system dynamic simulation /DSDS/

The paper describes the development by NASA of the data system dynamic simulation (DSDS) which provides a data system simulation capability for a broad range of programs, with the capability to model and simulate all or any portion of an end-to-end data system to multiple levels of fidelity. Versatility is achieved by specifying parameters which define the performance characteristics of data system components, and by specifying control and data paths in a data system. DSDS helps reduce overall simulation cost and the time required for obtaining a data systems analysis, and helps provide both early realistic representations of data systems and the flexibility to study design changes and operating strategies.

Hooper, J. W.↗

JSC space base/power module studies

Users of the Orbiter/Spacelab combination will require both higher electrical power and longer duration than is available with the current baseline system. Present Orbiter/Spacelab mission capability is primarily constrained by the hydrogen and oxygen available to generate power in the Orbiter fuel cells. It is also necessary to assure that considerable attitude or point flexibility is retained to assure efficient operation of the Orbiter radiator cooling system. Beyond these early limitations, it is foreseen that orbital operations will eventually need even greater quantities of the basic space utilities: electrical power; heat rejection; and attitude control. Such operations, forecasted for the mid to late 1980's, will be best accommodated by a module stored in orbit that can furnish these to a docked Orbiter/Spacelab or other vehicles. The Orbital Service Module concept to provide for these services is presented.

Craig, J. W.↗

Benefits of solar/fossil hybrid gas turbine systems

The potential benefits of solar/fossil hybrid gas turbine power systems were assessed. Both retrofit and new systems were considered from the aspects of; cost of electricity, fuel conservation, operational mode, technology requirements, and fuels flexibility. Hybrid retrofit (repowering) of existing combustion (simple Brayton cycle) turbines can provide near-term fuel savings and solar experience, while new and advanced recuperated or combined cycle systems may be an attractive fuel saving and economically competitive vehicle to transition from today's gas and oil-fired powerplants to other more abundant fuels.

Bloomfield, H. S.↗

Large Area Crop Inventory Experiment (LACIE). Development of procedure M for multicrop inventory, with tests of a spring-wheat configuration

The author has identified the following significant results. An outgrowth of research and development activities in support of LACIE was a multicrop area estimation procedure, Procedure M. This procedure was a flexible, modular system that could be operated within the LACIE framework. Its distinctive features were refined preprocessing (including spatially varying correction for atmospheric haze), definition of field like spatial features for labeling, spectral stratification, and unbiased selection of samples to label and crop area estimation without conventional maximum likelihood classification.

Horvath, R.↗

Benefits of solar/fossil hybrid gas turbine systems

The potential benefits of solar/fossil hybrid gas turbine power systems were assessed. Both retrofit and new systems were considered from the aspects of cost of electricity, fuel conservation, operational mode, technology requirements, and fuels flexibility. Hybrid retrofit (repowering) of existing combustion (simple Brayton cycle) turbines can provide near-term fuel savings and solar experience, while new and advanced recuperated or combined cycle systems may be an attractive fuel saving and economically competitive vehicle to transition from today's gas and oil-fired powerplants to other more abundant fuels.

Bloomfield, H. S.↗

A real-time dynamic spacecraft simulator for the LANDSAT-D mission

A real time dynamic simulator for LANDSAT D was developed and has played an integral role in the development and validation of both the ground control system and of the on-board flight software. The simulator utilized an electronic replica of the spacecraft on-board computer and data handling hardware interfaced to a VAX 11/780 computer and simulation software. Key features of the simulator design are a modular software architecture tailored to the VAX/VMS real time capabilities, a microprocessor controlled interface between the VAX and the flight hardware replica, complete simulation of the spacecraft and NASA network communication links, and a flexible and powerful scenario structuring and operator control capability. The design goals and trade-offs, software, and hardware design are summarized. The application of the simulator to the validation of both the ground systems and on-board software is reviewed in detail.

Coffin, A. R.↗