At least 523 records · Page 29

Flow behavior in liquid molding

The liquid molding (LM) process for manufacturing polymer composites with structural properties has the potential to significantly lower fabrication costs and increase production rates. LM includes both resin transfer molding and structural reaction injection molding. To achieve this potential, however, the underlying science base must be improved to facilitate effective process optimization and implementation of on-line process control. The National Institute of Standards and Technology (NIST) has a major program in LM that includes materials characterization, process simulation models, on-line process monitoring and control, and the fabrication of test specimens. The results of this program are applied to real parts through cooperative projects with industry. The key feature in the effort is a comprehensive and integrated approach to the processing science aspects of LM. This paper briefly outlines the NIST program and uses several examples to illustrate the work.

Hunston, D.↗

Learning error distribution kernel‐enhanced neural network methodology for multi‐intersection signal control optimization

Traffic congestion has substantially induced significant mobility and energy inefficiency. Many research challenges are identified in traffic signal control and management associated with artificial intelligence (AI)-based models. For example, developing AI-driven dynamic traffic system models that accurately capture high-resolution traffic attributes and formulate robust control algorithms for traffic signal optimization is difficult. Additionally, uncertainties in traffic system modeling and control processes can further complicate traffic signal system controllability. To partially address these challenges, this study presents a novel, hybrid neural network model enhanced with a probability density function kernel shaping technique to formulate traffic system dynamics better and improve comprehensive traffic network modeling and control. The numerical experimental tests were conducted, and the results demonstrate that the proposed control approach outperforms the baseline control strategies and reduces overall average delays by 11.64% on average. By leveraging the capabilities of this innovative model, this study aims to address major challenges related to traffic congestion and energy inefficiency toward more effective and adaptable AI-based traffic control systems.

Wang, Hong [Oak Ridge National Laboratory (ORNL), ↗

Raman Spectroscopy Based On-Line, Real-Time Monitoring to Reduce Composition Uncertainties: Enhanced sensitivity through optimization of Raman Parameters

Optical spectroscopy-based on-line monitoring of Hanford processing streams can enable real-time characterization of chemical composition of process streams and batches, ultimately enabling and enhancing process control. It can provide immediate feedback on process conditions and has the potential to reduce the needed number of grab sample collections, thereby reducing times and costs associated with laboratory processing. Here we discuss the utilization of Raman spectroscopy to quantify multiple target analytes that are common within Hanford tanks and waste processing streams. Analytes include: nitrate, nitrite, carbonate, chromate, sulfate, phosphate, hydroxide, oxalate, ammonia, and aluminate. Most notably in this work, Raman applications to low-concentration streams are explored and optimized. Raman instrument specifications are compared; specifically, the impact of utilizing three different Raman excitation wavelengths, 405, 532, and 671 nm, is discussed. Also, Raman data collection parameters such as collection time and spectral averaging are measured and discussed. Finally, optical libraries of chemical targets were collected using optimized collection parameters and chemometric models were built to automate quantification of chemical targets. These models were validated through application to simulants and real Hanford process samples. Chemometric models performed well on both training and validation sets, suggesting these approaches can be successfully applied to on-line and real-time monitoring of low concentration Hanford processing streams. The use of the combine Raman wave lengths with the enhanced chemometric models for the low concentration streams significantly improved the chemical detection levels and significantly reduced uncertainties of those measurements.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization through Integration of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution of wall conditions in utility boilers. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of a coal-fired utility boiler in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

42 ENGINEERING↗

Manufacturing methods of a composite cell case for a Ni-Cd battery

Basic manufacturing method refinements for using graphite epoxy material for a nickel cadmium battery cell case were performed to demonstrate production feasibility. The various facets of production scale-up, i.e., process and tooling development, together with material and process control, were integrated into a comprehensive manufacturing process that assures production reproducibility and product uniformity. Test results substantiate that a battery cell case produced from graphite epoxy pre-impregnated material, utilizing the internal pressure bag fabrication method, is feasible.

Bauer, J. L.↗

Viscosity dependence of the rates of diffusional processes

It is shown that the rates of diffusion-controlled processes may have a solvent vicosity independent part as well as a viscosity dependent part. Some relevant experiments involving intramolecular polypeptide movements are discussed, and implications for some experiments on diffusion in membranes are outlined.

Weaver, D. L.↗

Program for Automated Real-Time Monitoring

Process-control decisions made by applying rules to process data streams. Expert System Executive computer program demonstrates feasibility of automated real-time monitoring. Using Executives knowledge of system formally coded as set of rules specifying actions taken under various conditions. Program makes inferences about observed data based on rules. Written in C language.

Goodrum, Glenn R.↗

Intelligent control and adaptive systems; Proceedings of the Meeting, Philadelphia, PA, Nov. 7, 8, 1989

Various papers on intelligent control and adaptive systems are presented. Individual topics addressed include: control architecture for a Mars walking vehicle, representation for error detection and recovery in robot task plans, real-time operating system for robots, execution monitoring of a mobile robot system, statistical mechanics models for motion and force planning, global kinematics for manipulator planning and control, exploration of unknown mechanical assemblies through manipulation, low-level representations for robot vision, harmonic functions for robot path construction, simulation of dual behavior of an autonomous system. Also discussed are: control framework for hand-arm coordination, neural network approach to multivehicle navigation, electronic neural networks for global optimization, neural network for L1 norm linear regression, planning for assembly with robot hands, neural networks in dynamical systems, control design with iterative learning, improved fuzzy process control of spacecraft autonomous rendezvous using a genetic algorithm.

Rodriguez, Guillermo↗

Progress in the Multijunction Solar Cell Mantech Program

In September, 1995, the joint Wright Laboratory/Phillips Laboratory/NASA Lewis Multijunction Solar Cell Manufacturing Technology (ManTech) Program began to improve multijunction cell performance and scale them up to production size and quantity to support Air Force and commercial satellite programs. The first milestone of the program has been reached and the purpose of this paper is to present the results of the program so far. The objectives of the Multijunction Solar Cell ManTech Program are to increase the GaInP2/GaAs/Ge lot average cell efficiency to 24-26%, increase the cell size to > or equal to 16 sq cm while maintaining high efficiency, and limit the per cell costs to < or equal to 1.15X state of the art GaAs/Ge cells. Advanced manufacturing technology and process control techniques such as in-situ process monitoring and real time process feedback are being used to optimize multijunction solar cell growth processes to achieve these goals. This paper will discuss progress made in Phase I of the program and give an overview of Phase II but will focus on side-by-side testing results collected by Phillips Laboratory and NASA Lewis on Phase I deliverable cells from both vendors. Cell performance, pre- and post radiation, and temperature coefficient results on initial production multijunction solar cells will be presented and discussed. The data shows that this technology meets the objectives of the program, and that, in the interim before a new solar simulation standard becomes widely available, the measurement techniques being used by the major space solar cell manufacturers are providing adequate testing results for solar array design.

Keener, David N.↗

Monitoring of International Space Station Telemetry Using Shewhart Control Charts

Shewhart control charts have been established as an expedient method for analyzing dynamic, trending data in order to identify anomalous subsystem performance as soon as such performance would exceed a statistically established baseline. Additionally, this leading indicator tool integrates a selection methodology that reduces false positive indications, optimizes true leading indicator events, minimizes computer processor unit duty cycles, and addresses human factor concerns (i.e., the potential for flight-controller data overload). This innovation leverages statistical process control, and provides a relatively simple way to allow flight controllers to focus their attention on subtle system changes that could lead to dramatic off-nominal system performance. Finally, this capability improves response time to potential hardware damage and/or crew injury, thereby improving space flight safety. Shewhart control charts require normalized data. However, the telemetry from the ISS Early External Thermal Control System (EETCS) was not normally distributed. A method for normalizing the data was implemented, as was a means of selecting data windows, the number of standard deviations (Sigma Level), the number of consecutive points out of limits (Sequence), and direction (increasing or decreasing trend data). By varying these options, and treating them like dial settings, the number of nuisance alerts and leading indicators were optimized. The goal was to capture all leading indicators while minimizing the number of nuisances. Lean Six Sigma (L6S) design of experiment methodologies were employed. To optimize the results, Perl programming language was used to automate the massive amounts of telemetry data, control chart plots, and the data analysis.

Fitch, Jeffery T.↗

High-Temperature Multi-Process Sensor Development and Demonstration at a Full-scale PC Combustion System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution of wall conditions in utility boilers. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of a coal-fired utility boiler in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Defense Waste Processing Facility (DWPF) Durability-Composition Models and the Applicability of the Associated Reduction of Constraints (ROC) Criteria for High TiO 2 Containing Glasses

Radioactive high-level waste (HLW) at the Savannah River Site (SRS) has successfully been vitrified into borosilicate glass in the DWPF since 1996. Vitrification requires stringent product/process (P/P) constraints since the glass cannot be reworked once it has been poured into ten foot tall by two foot diameter canisters. A unique “feed forward” statistical process control (SPC) was developed for this control rather than relying on statistical quality control (SQC). In SPC, the feed composition to the DWPF melter is controlled prior to vitrification. In SQC, the glass product would be sampled after it is vitrified. Individual glass property-composition models form the basis for the “feed forward” SPC. The models transform constraints on the melt and glass properties into constraints on the feed composition going to the melter in order to determine, at the 95% confidence level, that the feed will be processable and that the durability of the resulting waste form will be acceptable to a geologic repository. The DWPF SPC system is known as the Product Composition Control System (PCCS). One of the process models within PCCS is known as the Thermodynamic Hydration Energy Reaction MOdel (THERMO™). The DWPF will soon be receiving increased concentrations of TiO 2 -, Na 2 O-, and Cs 2 O-enriched wastes from the Salt Waste Processing Facility (SWPF). The SWPF has been built to pretreat the high-curie fraction of the salt waste to be removed from the HLW tanks in the F- and H-Area Tank Farms at the SRS. In order to validate the existing TiO 2 term in THERMO™ beyond 2.0 wt% in the DWPF, new durability data were developed over the target range of 2.00 to 6.00 wt% TiO 2 and evaluated against the 1995 durability model. The durability was measured by the 7-day Product Consistency Test. This study documents the adequacy of the existing THERMO™ terms. It is recommended that the modified THERMO™ durability models and the modified property acceptable region limits for the durability constraints be incorporated in the next revision of the technical bases for PCCS and then implemented into PCCS. It is also recommended that an reduction of constraints of 4 wt% Al 2 O 3 be implemented with no restrictions on the amount of alkali in the glass for TiO 2 values ≥2 wt%. The ultimate limit on the amount of TiO 2 that can be accommodated from SWPF will be determined by the three PCCS models, the waste composition of a given sludge batch, the waste loading of the sludge batch, and the frit used for vitrification.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A mobile system for a comprehensive online-characterization of nanoparticle aggregates based on wide-angle light scattering and laser-induced incandescence

A mobile demonstrator for the comprehensive online-characterization of gas-borne nanoparticle aggregates is presented. Two optical measurement techniques are combined, both utilizing a pulsed Nd:YAG laser as light source. Aggregate size and fractal dimension are measured by Wide-Angle Light Scattering (WALS). An ellipsoidal mirror images elastically scattered light from scattering angles between 10° and 165° onto a CCD-camera chip resulting in an almost complete scattering diagram with high angular resolution. Primary particle size and volume fraction are measured by time-resolved Laser-Induced Incandescence (TiRe-LII). Here, particles are heated up to about 3000 K by the short laser pulse, the enhanced thermal radiation signal is detected with gated photomultiplier tubes. Analysis of the signal decay time and maximum LII-signal allows for the determination of primary particle diameter and volume fraction. The performance of the system is demonstrated by combined measurements on soot nanoparticle aggregates from a soot aerosol generator. Particle and aggregate sizes are varied by using different equivalence ratios of the combustion in the generator. Soot volume fraction can be adjusted by different levels of dilution with air. Online-measurements were carried out demonstrating the favorable performance of the system and the potential for industrial applications such as process control and product development. The particle properties obtained are confirmed through transmission electron microscopy analysis on representative samples.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

A Physical Model of Moulin Formation and Evolution

Nearly all proglacial water discharge from the present-day Greenland Ice Sheet is routed englacially via moulins. Identification of these moulins in high-resolution imagery is a frequent topic of study, but the processes controlling how and where moulins form, including on past ice sheets for which remote-sensing data are not available, remain poorly understood. Because moulins may reasonably compose approximately 10-15% of the englacial-subglacial hydrologic system, the evolution and shape of moulins can alter the timing of meltwater inputs to the bed. This evolution can impact both the form of the subglacial hydrologic system and the structure of associated geomorphological structures. Here, we develop a physical model of moulin formation and evolution to constrain the role of englacial processes in controlling the form and structure of the subglacial hydrologic system. Ice deformation within and around a moulin is both viscous and elastic, with the rate of turbulent and heat dissipation from water circulation in the moulin controlling both moulin wall melting and warming of the surrounding ice. We find moulin geometry is responsive to changes in these parameters over hours to days, indicating that diurnal and multi-day variations in surface melt can substantially alter the geometry of a moulin and the pressure-discharge relationship at the bed of the ice sheet. These results should be considered carefully when determining surface water inputs for subglacial hydrologic models. In the future, a parameter space study of these results will be combined with an analytic model to create a predictive, stochastic model of moulin and crevasse locations. This future model will be applicable to constraining the potential for surface-to-bed connections in regions where the exact ice-sheet surface morphology is not known, including ice sheets under future warming atmospheric conditions, and paleo ice sheets, where moulins created modern landforms.

Andrews, Lauren C.↗

Normal Pulse Voltammetry for Real Time Analysis of Electro-refiner Salt with High Concentrations of Analytes

Spent nuclear fuel pyro-processing could be a preferred alternative for aqueous processing. However, there will be a large hold up of actinides in the molten salt media that must be safeguarded in commercial facilities. A real or near real time monitoring method for electro-refiner salt needs to be developed to meet this requirement. In addition, real time monitoring method can also be applied to optimize process control. Voltammetry would be an ideal method to monitor the ER salt composition because of the low cost and robustness. The equipment required to carry out voltammetry analysis include only a potentiostat and three electrodes, which can be placed in-situ.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗