Search NASA⌕ Search

SEARCH · Search NASA

Results for “PROGRESS UPDATE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

GGOS Bureau of Networks and Observations: Network Infrastructure and Related Activities

The GGOS Bureau of Networks and Observations works with the IAG Services (IVS, ILRS, IGS, IDS, IGFS, and PSMSL) to advocate for the expansion and upgrade of space geodesy networks for the maintenance and improvement of the reference frame and other applications, as well as for the integration with other techniques, including absolute gravity and sea level measurements from tide gauges. New sites are being established following the GGOS concept of “core” and co-location sites, and new technologies are being implemented to enhance performance in data yield as well as accuracy. The Bureau continues to meet with organizations to discuss possibilities, including partnerships, for new and expanded participation. The GGOS Network continues to grow as new stations join every year. The Bureau holds meetings frequently, providing the opportunity for representatives from the services to meet and share progress and plans, and to discuss issues of common interest. It also monitors the status and projects the evolution of the network based on information from the current and expected future participants. Of particular interest at the moment is the integration of gravity and tide gauge networks and the forthcoming establishment of the new absolute gravity reference frame. The IAG Committees and Joint Working Groups play an essential role in the Bureau activity. The Standing Committee on Performance Simulations and Architectural Trade-offs (PLATO) uses simulation and analysis techniques to project future network capability and to examine trade-off options. The Committee on Data and Information is working on a strategy for a GGOS metadata system for data products and a more comprehensive long-term plan for an all-inclusive system. The Committee on Satellite Missions is working to enhance communication with the space missions, to advocate for missions that support GGOS goals and to enhance ground systems support. The IERS Working Group on Site Survey and Co-location (also participating in the Bureau) is working to enhance standardization in procedures, outreach and to encourage new survey groups to participate and improve procedures to determine systems’ reference points, a crucial aid in the detection of technique-specific systematic errors. We will give a brief update on the status and projection of the network infrastructure of the next several years, and the progress and plans of the Committees/Working Group in their critical role in enhancing data product quality and accessibility to the users.

Carey Noll↗

Global Carbon Budget 2021

Abstract. Accurate assessment of anthropogenic carbon dioxide (CO2) emissions and their redistribution among the atmosphere, ocean, and terrestrial biosphere in a changing climate is critical to better understand the global carbon cycle, support the development of climate policies, and project future climate change. Here we describe and synthesize datasets and methodology to quantify the five major components of the global carbon budget and their uncertainties. Fossil CO2 emissions (EFOS) are based on energy statistics and cement production data, while emissions from land-use change (ELUC), mainly deforestation, are based on land use and land-use change data and bookkeeping models. Atmospheric CO2 concentration is measured directly, and its growth rate (GATM) is computed from the annual changes in concentration. The ocean CO2 sink (SOCEAN) is estimated with global ocean biogeochemistry models and observation-based data products. The terrestrial CO2 sink (SLAND) is estimated with dynamic global vegetation models. The resulting carbon budget imbalance (BIM), the difference between the estimated total emissions and the estimated changes in the atmosphere, ocean, and terrestrial biosphere, is a measure of imperfect data and understanding of the contemporary carbon cycle. All uncertainties are reported as ±1σ. For the first time, an approach is shown to reconcile the difference in our ELUC estimate with the one from national greenhouse gas inventories, supporting the assessment of collective countries' climate progress. For the year 2020, EFOS declined by 5.4 % relative to 2019, with fossil emissions at 9.5 ± 0.5 GtC yr−1 (9.3 ± 0.5 GtC yr−1 when the cement carbonation sink is included), and ELUC was 0.9 ± 0.7 GtC yr−1, for a total anthropogenic CO2 emission of 10.2 ± 0.8 GtC yr−1 (37.4 ± 2.9 GtCO2). Also, for 2020, GATM was 5.0 ± 0.2 GtC yr−1 (2.4 ± 0.1 ppm yr−1), SOCEAN was 3.0 ± 0.4 GtC yr−1, and SLAND was 2.9 ± 1 GtC yr−1, with a BIM of −0.8 GtC yr−1. The global atmospheric CO2 concentration averaged over 2020 reached 412.45 ± 0.1 ppm. Preliminary data for 2021 suggest a rebound in EFOS relative to 2020 of +4.8 % (4.2 % to 5.4 %) globally. Overall, the mean and trend in the components of the global carbon budget are consistently estimated over the period 1959–2020, but discrepancies of up to 1 GtC yr−1 persist for the representation of annual to semi-decadal variability in CO2 fluxes. Comparison of estimates from multiple approaches and observations shows (1) a persistent large uncertainty in the estimate of land-use changes emissions, (2) a low agreement between the different methods on the magnitude of the land CO2 flux in the northern extra-tropics, and (3) a discrepancy between the different methods on the strength of the ocean sink over the last decade. This living data update documents changes in the methods and datasets used in this new global carbon budget and the progress in understanding of the global carbon cycle compared with previous publications of this dataset (Friedlingstein et al., 2020, 2019; Le Quéré et al., 2018b, a, 2016, 2015b, a, 2014, 2013). The data presented in this work are available at https://doi.org/10.18160/gcp-2021 (Friedlingstein et al., 2021).

Friedlingstein, Pierre (ORCID:0000000333094739)↗

Out Brief for the Structural Reliability Partnership Workshop

The Structural Reliability Partnership Workshop was held in Albuquerque, NM on August 29-30, 2017 and was hosted by Sandia National Laboratories. Attendees were present from academia, industry and several other national laboratories. The workshop kicked off with an introduction to the SRP to familiarize potential members with what the purpose, structure and benefits would be to their organization. Technical overviews were given on several topics by attendees from each sector – national labs, universities and industry – to provide a snapshot of the type of work that is currently being conducted on structural reliability. Attendees were then given the opportunity to suggest and discuss potential Challenge Scenario topics. Three were ultimately decided upon as being the most important: Additive Manufacturing, Hydrogen Pipeline Steels, and Bolted Joined Structures. These were then analyzed using Quad Charts to determine What, How, Who, and Why these areas would be further investigated. Rather than restricting future research to only one area, the option was left open to investigate both the top two, depending on interest and cost associated with hosting such an event. More informal collaboration may be undertaken for the third topic if members have time and interest. Other items discussed pertained to the organization, structure and policies of the Partnership. Topics including Data Management, IP, and mechanisms of partnering/information sharing were touched upon but final decisions were not made. Further action is needed before this can be done. Action items were outlined and assigned, where possible. The next workshop is to be held in early August 2018 in Boulder, CO and is to be hosted by NIST. In the interim, quarterly updates are to take place via WebEx to maintain a line of communication and to ensure progress on both the administrative and technical tasks.

99 GENERAL AND MISCELLANEOUS↗

Advanced Materials and Component Development for Lithium-ion Cells for NASA Missions

Human missions to Near Earth Objects, such as asteroids, planets, moons, libration points, and orbiting structures, will require safe, high specific energy, high energy density batteries to provide new or extended capabilities than are possible with today s state-of-the-art aerospace batteries. The National Aeronautics and Space Administration is developing advanced High Energy and Ultra High Energy lithium-ion cells to address these needs. In order to meet the performance goals, advanced, high-performing materials are required to provide improved performance at the component-level that contributes to performance at the integrated cell level. This paper will provide an update on the performance of experimental materials through the completion of two years of development. The progress of materials development, remaining challenges, and an outlook for the future of these materials in near term cell products will be discussed.

Reid, Concha M.↗

Deep Space navigation for the BioSentinel spacecraft science orbit

BioSentinel is an astrobiology small spacecraft mission. The payload consists of two parts, the first has optical and microfluidics sensors, and the second is a Linear Energy Transfer spectrometer that has the objective to measure deep space radiation from events such as coronal mass ejections. The goal of the mission is to observe potential DNA damage due to the radiation in heliocentric space on the living organism Saccharomyces cerevisiae, which is a budding yeast. Two types of this living organism are included in the payload. The first is a natural type that is more radiation tolerant, while the second is a mutant strain that has a deficiency in a gene that allows DNA repair once damage occurs. The impact caused by the radiation on the DNA is compared to an identical sample aboard the International Space Station, as well as another identical sample at a laboratory on the ground. The BioSentinel mission consists of a 6U CubeSat currently ,as of January 2024, active in heliocentric orbit. The spacecraft was launched aboard the first SLS flight as part of the Artemis-I campaign in November 2022. After successful deployment from the launch vehicle, it performed a lunar flyby with an altitude of 406 km. The delta-V imparted by the flyby provided the necessary energy to achieve a heliocentric orbit, in an Earth-trailing pattern. The navigation analysis consisted of a Kalman-filter that utilized data from the Deep Space Network and the ESA Estrack network. All those antennas were needed since the Artemis-1 campaign included the deployment of several other cubesats, therefore the scheduling process required more antenna assets than usual due to simultaneous demands from various missions. The processed tracking data was later also refined with a smoother in order to obtain a more accurate solution. The type of tracking data included TCP, Sequential Range, Doppler and Range formats. The solar radiation pressure coefficient, as well as the delta-V from the deployment and the flyby were modeled to obtain suitable solutions that could decrease the position and velocity uncertainties at several steps along the mission concept of operations. The final product each time resulted in updated ephemeris files that were used by the mission and the antenna networks as the mission progressed. Once in the final science orbit, the utilized antennas are only from the DSN network and the data format is bounded to just TCP. Regular orbit determination is performed, every two weeks. The spacecraft is in a nominal well-known orbit, performing regular operations. This paper includes an analysis of the final science orbit, the techniques and procedures utilized to perform orbit determination and a description of the overall navigation campaign produced during the mission and, more specifically, during the final science operations in Deep Space.

BioSentinel↗

Specification of requirements for the virtual environment for reactor applications simulation environment

In 2010, the United States Dept. of Energy initiated a research and development effort to develop modern modeling and simulation methods that could utilize high performance computing capabilities to address issues important to nuclear power plant operation, safety and sustainability. To respond to this need, a consortium of national laboratories, academic institutions and industry partners (the Consortium for Advanced Simulation of Light Water Reactors - CASL) was formed to develop an integrated Virtual Environment for Reactor Applications (VERA) modeling and simulation capability. A critical element for the success of the CASL research and development effort was the development of an integrated set of overarching requirements that provides guidance in the planning, development, and management of the VERA modeling and simulation software. These requirements also provide a mechanism from which the needs of a broad array of external CASL stakeholders (e.g. reactor / fuel vendors, plant owner / operators, regulatory personnel, etc.) can be identified and integrated into the VERA development plans. This paper presents an overview of the initial set of requirements contained within the VERA Requirements Document (VRD) that currently is being used to govern development of the VERA software within the CASL program. The complex interdisciplinary nature of these requirements together with a multi-physics coupling approach to realize a core simulator capability pose a challenge to how the VRD should be derived and subsequently revised to accommodate the needs of different stakeholders. Thus, the VRD is viewed as an evolving document that will be updated periodically to reflect the changing needs of identified CASL stakeholders and lessons learned during the progress of the CASL modeling and simulation program. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Decommissioning of the V1 Nuclear Power Plant Jaslovske Bohunice - 20270

The paper focuses on introducing the approach and method applied for decommissioning of the V1 nuclear power plant (further the 'V1 NPP') located in Jaslovske Bohunice in the Slovak Republic, to the conference participants. The Paper outlines activities and steps necessary to comply with the requirements contained in the decision of the Slovak government from 1999 regarding the early shutdown of the V1 NPP. The company responsible for the V1 NPP decommissioning is Jadrova a vyradovacia spolocnost, a.s., (further JAVYS) with the State as a sole shareholder. On the basis of the V1 NPP Decommissioning Conceptual Plan, out of four assessed options, JAVYS selected the immediate decommissioning option (the 'IDO') for the V1 NPP. On the basis of multi-criteria analysis, the IDO specified the approach of immediate and continuous dismantling of equipment followed by demolition of buildings and preparation of the site for its further potential use. The IDO also included the summary of technical, environmental, legislative information as well as the determination of assumed costs for decommissioning of the V1 NPP. Prior to commencement of the V1 NPP decommissioning, within the process of termination of operation, activities connected with de-fuelling, monitoring, processing of historical waste and, not to forget, the process of obtaining the license for the V1 NPP decommissioning were executed. JAVYS decided to divide the decommissioning process into two stages. In 2011, JAVYS obtained a license for the first stage of the V1 NPP decommissioning. Within this stage, dismantling of inactive equipment, demolitions of inactive buildings, monitoring of systems and preparatory works for the upcoming stage of decommissioning were implemented. In 2015, in line with the license for the 2. stage of the V1 NPP decommissioning, the activities of decontamination and dismantling of contaminated and active equipment as well as demolitions of remaining buildings began. In this stage radioactive waste (RAW) produced during the decommissioning is to be processed. After decontamination, the material fulfilling the free release criteria is to be released into the environment, the site is to be cleared from the scope of the Atomic Act and released from the surveillance of the national regulators. Future application of certain methods and techniques for decontamination and dismantling in similar environments might bring an added value to the operators. Paper includes a description of best practices for Nuclear Power Plant VVER type reactors decommissioning. Schedule comparison is given to show how the critical path of certain projects is being managed. Application of the International Standard for Decommissioning Costing (ISDC) methodology provides a uniform method which enables comparison of cost estimates to other nuclear facilities under decommissioning. The cost estimate for the V1 NPP decommissioning has been continuously updated based on more advanced and detailed information on the decommissioning activities and projects. Monitoring of progress of the V1 NPP decommissioning is performed via four key-performance indicators. The Earned Value Management (EVM) methodology is used for evaluating time and cost aspect of decommissioning activities while waste conditioning index is calculated by comparing the actually produced waste to planned values of waste for a respective monitored period. Radiological safety index is assessed by comparison of the personnel records on the individual yearly doses received by each respective employee to the boundary value. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NASA's Space Launch System Begins Integration, Stacking in Preparation for Artemis I Launch

The Artemis era of human lunar exploration is nearing take-off as NASA’s new super heavy-lift launch vehicle, the Space Launch System (SLS), begins stack-ing and integration operations in mid-2020 at Kennedy Space Center (KSC) in Florida. With a planned upgrade path to progressively more powerful vehicles and availability in crew and cargo configurations, SLS provides a unique and flexible launch solution to send crew, large-scale infrastructure and robotic probes to deep space. The SLS Block 1 vehicle, the initial variant to fly, is optimized for lunar missions with a proven propulsion system consisting of four liquid hydrogen (LH2)/liquid oxygen (LOX)-fed RS-25 engines and twin five-segment solid rocket boosters (SRBs). The Block 1 vehicle can also be outfitted with an industry-standard 5 m-class payload fairing (the “cargo” configuration) and will launch at least 27 metric tons (t) of mass to trans-lunar injection (TLI). SLS is the backbone of NASA’s Artemis program, which will return the agency’s human spaceflight program to the Moon for the first time since 1972. For the Artemis I mission, SLS will send an uncrewed Orion spacecraft to TLI, where it will enter a distant retrograde lunar orbit and fly 38,000 nmi past the Moon – farther than any spacecraft built for humans has ever traveled. The SLS Block 1 vehicle for Artemis I completed manufacturing in 2019. Several elements, including the upper stage, have been delivered to the Exploration Ground Systems (EGS) program at KSC and are being prepped for integration and stack-ing. The five-segment solid rocket boosters – the largest and most powerful ever built for flight – are also complete. The booster motor segments for the Artemis I flight are scheduled to ship from prime contractor Northrop Grumman’s Utah facilities and begin stacking and integration at KSC in June 2020. The SLS core stage is the largest rocket stage NASA has ever built in terms of volume and height, and includes the avionics and the tanks that feed cryogenic propellant to the four RS-25s (formerly Space Shuttle Main Engines [SSMEs]). They have been modified with an updated controller and nozzle insulation to protect them from the hotter launch environment. The SLS core stage is currently being test-ed at NASA’s Stennis Space Center (SSC) in a series of “green run” tests to verify it meets design and performance requirements. Following the green run test series, which is scheduled to culminate with a full-duration hot-fire of the four RS-25 engines, the core stage will ship to KSC and be stacked between the sol-id rocket boosters in the Vehicle Assembly Building (VAB). Integration of the vehicle will continue with the upper stage, known as the Interim Cryogenic Propulsion Stage (ICPS) and the Launch Vehicle Stage Adapter (LVSA) on the core stage. Another adapter, the Orion Stage Adapter (OSA), connects SLS to Orion and provides housing for 13 6U CubeSat payloads manifested on Artemis I. The CubeSats will be released in deep space after Orion separates from the vehicle, and the flight marks the first ride share opportunity for independent small-sats to deep space. The second major SLS variant to come online, Block 1B, replaces the single-engine ICPS with a four-engine LH2/LOX Exploration Upper Stage (EUS). This more powerful upper stage, along with other vehicle up-grades, will enable the Block 1B vehicle to launch 38-42 t to TLI, depending on crew or cargo configuration. The final evolution of the vehicle, Block 2, will onramp evolved solid rocket boosters to increase mass to TLI to 43-46 t, de-pending on crew or cargo configuration. The Block 1B/Block 2 vehicles can be outfitted with an 8.4 m-diameter payload fairing in 19.1 m or 27.4 m lengths, to provide unprecedented volume for payloads. With the initial Block 1 vehicle completely manufactured and the core stage in final testing before shipping to KSC, the SLS Program and its industry partners have made significant progress manufacturing subsequent vehicles. For the second Block 1 vehicle, the solid rocket motor segments are complete, as are the RS-25 engines with controllers. All five major components of the Artemis II core stage – the forward skirt, LOX and LH2 tanks, intertank and engine section – are manufactured and technicians are installing subsystems at NASA’s rocket factory, Michoud Assembly Facility. The RL-10 engine for the Artemis II ICPS is complete and panels have been machined for its LH2 tank. In addition, panels are machined for the vehicle’s two adapters, with welding scheduled to begin in summer 2020. Flight hard-ware is also in production for the third SLS vehicle, with several booster motor segments cast. The pace of development on the EUS has increased, with the goal to complete Critical Design Review (CDR) in December 2020. Several EUS test rings have been machined at Michoud. The EUS is designed to exe-cute a variety of missions – human spaceflight, deployment of deep-space infra-structure, or high-C3 missions to the outer solar system – with crew and cargo configurations available beginning in the mid-2020s. The near-term goal for the nation’s powerful new space exploration asset, however, is to launch the Arte-mis program, and send the first woman and the next man to the lunar surface. At the Astrodynamics Specialist Conference, the SLS program will update the community on the progress of the initial Block 1 vehicle in final green run test-ing, integration and stacking. In addition, this paper will provide an update to the community on the manufacturing status of subsequent Block 1 and Block 1B vehicles.

Steve Creech↗

Validating Connected, Automated, and Electric Vehicle Models and Simulation - Research Performance Progress Report

The objective of this project is to test connected and automated vehicles with both electrified and internal combustion engine powertrains to support updates and validation of modeling and simulation tools. This includes the development of the components and network architecture to execute and collect empirical data for multiple scenarios and traffic interactions. Specific program objectives include: • Translate Lab algorithms into vehicle and infrastructure controls • Conduct physical testing at realistic scale • Evaluate system performance • Improve models using empirical data • Improve control algorithms from lessons learned • Identify system and algorithm assumptions which need refinement It is important to note that the objective of this project was not to demonstrate the efficacy of the selected algorithms to improve energy efficiency but rather to validate and improve modeling and simulation tools using empirical data. While it is a desirable outcome to concurrently demonstrate improved energy efficiency through use of these algorithms, and in most cases that was the outcome, the success of this project was not predicated on the performance of the algorithm towards improving energy efficiency across all scenarios and test matrices.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ORNL Infrastructure: Status Update on BEA Research Reactor Cask Planning Activities Completed During FY 2025

This report documents Oak Ridge National Laboratory’s (ORNL’s) FY 2025 progress toward establishing readiness to use the Battelle Energy Alliance (BEA) Research Reactor (BRR) shipping cask in support of the Nuclear Science User Facilities (NSUF). The BRR cask will provide a new shared infrastructure capability for transporting irradiated fuels and materials between ORNL and Idaho National Laboratory (INL), thereby supporting NSUF’s mission of enabling user access to advanced nuclear research facilities. In FY 2025, ORNL advanced the regulatory, contractual, safety review, and planning activities necessary to qualify its facilities and staff for BRR cask handling. Although loaded shipments were delayed due to fabrication lead times for Orano Federal Services LLC’s internal basket hardware, the program progressed to the point where an empty cask dry run is scheduled for October 2025. This dry run represents a critical step in demonstrating ORNL’s ability to receive, handle, and return the BRR cask.

99 GENERAL AND MISCELLANEOUS↗

The PDF4LHC21 combination of global PDF fits for the LHC Run III

A precise knowledge of the quark and gluon structure of the proton, encoded by the parton distribution functions (PDFs), is of paramount importance for the interpretation of high-energy processes at present and future lepton–hadron and hadron–hadron colliders. Motivated by recent progress in the PDF determinations carried out by the CT, MSHT, and NNPDF groups, we present an updated combination of global PDF fits: PDF4LHC21. It is based on the Monte Carlo combination of the CT18, MSHT20, and NNPDF3.1 sets followed by either its Hessian reduction or its replica compression. Extensive benchmark studies are carried out in order to disentangle the origin of the differences between the three global PDF sets. In particular, dedicated fits based on almost identical theory settings and input datasets are performed by the three groups, highlighting the role played by the respective fitting methodologies. We compare the new PDF4LHC21 combination with its predecessor, PDF4LHC15, demonstrating their good overall consistency and a modest reduction of PDF uncertainties for key LHC processes such as electroweak gauge boson production and Higgs boson production in gluon fusion. We study the phenomenological implications of PDF4LHC21 for a representative selection of inclusive, fiducial, and differential cross sections at the LHC. The PDF4LHC21 combination is made available via the LHAPDF library and provides a robust, user-friendly, and efficient method to estimate the PDF uncertainties associated to theoretical calculations for the upcoming Run III of the LHC and beyond.

quantum chromodynamics↗

Lawrence Livermore National Laboratory FY 2016 Laboratory Directed Research and Development Annual Report

The LDRD annual report for FY2016 consists of two parts: The Overview. This section contains a broad description of the LDRD Program, highlights of recent accomplishments and awards, Program statistics, and the LDRD portfolio-management processes. Project Reports. Project reports are submitted by all principal investigators at the end of the fiscal year. The length and depth of the report depends on the project’s lifecycle. For projects that will be continuing the following year, the principal investigator submits a continuing project report, which is a brief update containing descriptions of the goals, scope, motivation, relevance (to DOE/NNSA and Livermore mission areas), and technical progress achieved in FY16, as well as a list of selected publications and presentations that resulted from the research. For projects that concluded in FY16, a more detailed final report is provided that is technical in nature and includes the background, objectives, scientific approach, accomplishments, and impacts on the Laboratory missions, as well as a list of publications and presentations that resulted from the research. Project reports are listed under their research topics and organized by year and type, such as exploratory research (ER), feasibility study (FS), laboratory-wide competition (LW), and strategic initiative (SI). Each project is assigned a unique tracking code, an identifier that consists of three elements. The first is the fiscal year in which the project began, the second represents the project type, and the third identifies the serial number of the project for that fiscal year. For example, 16-ERD-100 means the project is an exploratory research project that began in FY16. The three-digit number (100) represents the serial number for the project.

36 MATERIALS SCIENCE↗

September 2021 Operational Highlights

Bulleted highlights including progress report for NSRC's Rocky Flats Digitization Lab, the Online Vault bulk upload, patching and system updates, and information about publishing NSRC-produced The Vault .

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Ares I First Stage Progress

Building on the legacy of the Space Shuttle and other NASA space exploration initiatives, the propulsion for the Ares I First Stage will be a Shuttle derived reusable solid rocket motor. Significant progress has been made to date by the Ares First Stage Team. This brief status provides an update on the design and development of the Ares First Stage propulsion system.

Brasfield, Fred↗

Progress on Plant-Level Modeling and Simulation of Used Nuclear Fuel Dissolution: Startup Condition with Quasi-Developed Flow and Varying Acid Concentration

An update to a previous report is presented here describing the startup condition of a continuous dissolver. The need for a careful implementation of a startup condition is twofold. First, by varing the used fuel composition and various other parameters of the model, it becomes difficult to solve the governing equations accurately or to obtain a converged solution for an arbitrary initial condition. This is evident when coupling the dissolver module with a third-party user simulator. The second impetus for improving the modeling of the startup process is that an improved realism is obtained and the model is more complete and useful for accounting material balances rigorously. The aforementioned previous report on this dissolver module is a required reading for the understanding of this update.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Sparing Healthy Tissue and Increasing Tumor Dose Using Bayesian Modeling of Geometric Uncertainties for Planning Target Volume Personalization

Objective: To develop a mathematical tool that can update a patient's planning target volume (PTV) partway through a course of radiation therapy to more precisely target the tumor for the remainder of treatment and reduce dose to surrounding healthy tissue. Methods and Materials: Daily on-board imaging was used to collect large datasets of displacements for patients undergoing external beam radiation therapy for solid tumors. Bayesian statistical modeling of these geometric uncertainties was used to optimally trade off between displacement data collected from previously treated patients and the progressively accumulating data from a patient currently partway through treatment, to optimally predict future displacements for that patient. These predictions were used to update the PTV position and margin width for the remainder of treatment, such that the clinical target volume (CTV) was more precisely targeted. Results: Software simulation of dose to CTV and normal tissue for 2 real prostate displacement datasets consisting of 146 and 290 patients treated with a minimum of 30 fractions each showed that re-evaluating the PTV position and margin width after 8 treatment fractions reduced healthy tissue dose by 19% and 17%, respectively, while maintaining CTV dose. Conclusion: Incorporating patient-specific displacement patterns from early in a course of treatment allows PTV adaptation for the remainder of treatment. This substantially reduces the dose to healthy tissues and thus can reduce radiation therapy–induced toxicities, improving patient outcomes.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Solar cell efficiency tables (Version 61)

Abstract Consolidated tables showing an extensive listing of the highest independently confirmed efficiencies for solar cells and modules are presented. Guidelines for inclusion of results into these tables are outlined, and new entries since July 2022 are reviewed. Graphs showing progress with each cell technology over the 30‐year history of the tables are also included plus an updated list of designated test centres.

14 SOLAR ENERGY↗