Search NASA⌕ Search

SEARCH · Search NASA

Results for “Path Planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Computational problems and signal processing in SETI

The Search for Extraterrestrial Intelligence (SETI), currently being planned at NASA, will require that an enormous amount of data (on the order of 10 exp 11 distinct signal paths for a typical observation) be analyzed in real time by special-purpose hardware. Even though the SETI system design is not based on maximum entropy and Bayesian methods (partly due to the real-time processing constraint), it is expected that enough data will be saved to be able to apply these and other methods off line where computational complexity is not an overriding issue. Interesting computational problems that relate directly to the system design for processing such an enormous amount of data have emerged. Some of these problems are discussed, along with the current status on their solution.

Deans, Stanley R.↗

Orbital Space Plane (OSP) Program at Lockheed Martin

Lockheed Martin has been an active participant in NASA's Space Launch Initiative (SLI) programs over the past several years. SLI, part of NASA's Integrated Space Transportation Plan (ISTP), was restructured in November 2002 to focus the overall theme of safer, more affordable space transportation along two paths the Orbital Space Plane (OSP) and the Next Generation Launch Technology programs. The Orbital Space Plane program has the goal of providing rescue capability from the International Space Station by 2008 or earlier and transfer capability for crew (and contingency cargo) by 2012. The Next Generation Launch Technology program is combining research and development efforts from the 2d Generation Reusable Launch Vehicle (2GRLV) program with cutting-edge, advanced space transportation programs (previously designated 31d Generation) into one program aimed at enabling safe, reliable, cost-effective reusable launch systems by the middle of the next decade. Lockheed Martin is one of three prime contractors working to bring Orbital Space Plane system concepts to a system design level of maturity by December 2003. This paper and presentation will update the aerospace community on the progress of the OSP program, from an industry perspective, and provide insights into Lockheed Martin's role in enabling the vision of a safer, more affordable means of taking people to and from space.

Ford, Robert↗

Secondary Payload Opportunities on NASA's Space Launch System (SLS) Enable Science and Deep Space Exploration

For the first time in almost 40 years, a NASA human-rated launch vehicle has completed its Critical Design Review (CDR). With this milestone, NASA's Space Launch System (SLS) and Orion spacecraft are on the path to launch a new era of deep space exploration. This first launch of SLS and the Orion Spacecraft is planned no later than November 2018 and will fly along a trans-lunar trajectory, testing the performance of the SLS and Orion systems for future missions. NASA is making investments to expand the science and exploration capability of the SLS by developing the capability to deploy small satellites during the trans-lunar phase of the mission trajectory. Exploration Mission 1 (EM-1) will include thirteen 6U Cubesat small satellites to be deployed beyond low earth orbit. By providing an earth-escape trajectory, opportunities are created for the advancement of small satellite subsystems, including deep space communications and in-space propulsion. This SLS capability also creates low-cost options for addressing existing Agency strategic knowledge gaps and affordable science missions. A new approach to payload integration and mission assurance is needed to ensure safety of the vehicle, while also maintaining reasonable costs for the small payload developer teams. SLS EM-1 will provide the framework and serve as a test flight, not only for vehicle systems, but also payload accommodations, ground processing, and on-orbit operations. Through developing the requirements and integration processes for EM-1, NASA is outlining the framework for the evolved configuration of secondary payloads on SLS Block upgrades. The lessons learned from the EM-1 mission will be applied to processes and products developed for future block upgrades. In the heavy-lift configuration of SLS, payload accommodations will increase for secondary opportunities including small satellites larger than the traditional Cubesat class payload. The payload mission concept of operations, proposed payload capacity of SLS, and the payload requirements for launch and deployment will be described to provide potential payload users an understanding of this unique exploration capability.

Singer, Jody↗

Aerocapture Design Study for a Titan Polar Orbiter

In 2014 a team at NASA Goddard Space Flight Center (GSFC) studied the feasibility of using active aerocapture to reduce the chemical Delta V requirements for inserting a small scientific satellite into Titan polar orbit. The scientific goals of the mission would be multi-spectral imaging and active radar mapping of Titan's surface and subsurface. The study objectives were to: (i) identify and select from launch window opportunities and refine the trajectory to Titan; (ii) study the aerocapture flight path and refine the entry corridor; (iii) design a carrier spacecraft and systems architecture; (iv) develop a scientific and engineering plan for the orbital portion of the mission. Study results include: (i) a launch in October 2021 on an Atlas V vehicle, using gravity assists from Earth and Venus to arrive at Titan in January 2031; (ii) initial aerocapture via an 8-km wide entry corridor to reach an initial 350X6000 km orbit, followed by aerobraking to reach a 350X1500 km orbit, and a periapse raise maneuver to reach a final 1500 km circular orbit; (iii) a three-part spacecraft system consisting of a cruise stage, radiator module, and orbiter inside a heat shield; (iv) a 22-month mission including station keeping to prevent orbital decay due to Saturn perturbations, with 240 Gb of compressed data returned. High-level issues identified include: (i) downlink capability - realistic downlink rates preclude the desired multi-spectral, global coverage of Titan's surface; (ii) power - demise of the NASA ASRG (Advanced Stirling Radioisotope Generator) program, and limited availability at present of MMRTGs (Multi-Mission Radioisotope Generators) needed for competed outer planet missions; (iii) thermal - external radiators must be carried to remove 4 kW of waste heat from MMRTGs inside the aeroshell, requiring heat pipes that pass through the aeroshell lid, compromising shielding ability; (iv) optical navigation to reach the entry corridor; (v) the NASA requirement of continuous critical event coverage for the orbiter, especially during the peak heating of the aerocapture when the radio link will be broken. In conclusion, although Titan aerocapture allows for considerable savings in propellant mass, this comes at a cost of increased mission complexity. Further architecture study and refinement is required to reduce high-level mission risks and to elucidate the optimum architecture.

Nixon, Conor A.↗

NASA's Space Launch System: An Enabling Capability for International Exploration

As the program moves out of the formulation phase and into implementation, work is well underway on NASA's new Space Launch System, the world's most powerful launch vehicle, which will enable a new era of human exploration of deep space. As assembly and testing of the rocket is taking place at numerous sites around the United States, mission planners within NASA and at the agency's international partners continue to evaluate utilization opportunities for this ground-breaking capability. Developed with the goals of safety, affordability, and sustainability in mind, the SLS rocket will launch the Orion Multi-Purpose Crew Vehicle (MPCV), equipment, supplies, and major science missions for exploration and discovery. NASA is developing this new capability in an austere economic climate, a fact which has inspired the SLS team to find innovative solutions to the challenges of designing, developing, fielding, and operating the largest rocket in history, via a path that will deliver an initial 70 metric ton (t) capability in December 2017 and then continuing through an incremental evolutionary strategy to reach a full capability greater than 130 t. SLS will be enabling for the first missions of human exploration beyond low Earth in almost half a century, and from its first crewed flight will be able to carry humans farther into space than they have ever voyaged before. In planning for the future of exploration, the International Space Exploration Coordination Group, representing 12 of the world's space agencies, has created the Global Exploration Roadmap, which outlines paths toward a human landing on Mars, beginning with capability-demonstrating missions to the Moon or an asteroid. The Roadmap and corresponding NASA research outline the requirements for reference missions for these destinations. SLS will offer a robust way to transport international crews and the air, water, food, and equipment they would need for such missions.

Creech, Stephen D.↗

NASA's Space Launch System: An Enabling Capability for International Exploration

As the program moves out of the formulation phase and into implementation, work is well underway on NASA's new Space Launch System, the world's most powerful launch vehicle, which will enable a new era of human exploration of deep space. As assembly and testing of the rocket is taking place at numerous sites around the United States, mission planners within NASA and at the agency's international partners continue to evaluate utilization opportunities for this ground-breaking capability. Developed with the goals of safety, affordability, and sustainability in mind, the SLS rocket will launch the Orion Multi-Purpose Crew Vehicle (MPCV), equipment, supplies, and major science missions for exploration and discovery. NASA is developing this new capability in an austere economic climate, a fact which has inspired the SLS team to find innovative solutions to the challenges of designing, developing, fielding, and operating the largest rocket in history, via a path that will deliver an initial 70 metric ton (t) capability in December 2017 and then continuing through an incremental evolutionary strategy to reach a full capability greater than 130 t. SLS will be enabling for the first missions of human exploration beyond low Earth in almost half a century, and from its first crewed flight will be able to carry humans farther into space than they have ever voyaged before. In planning for the future of exploration, the International Space Exploration Coordination Group, representing 12 of the world's space agencies, has created the Global Exploration Roadmap, which outlines paths toward a human landing on Mars, beginning with capability-demonstrating missions to the Moon or an asteroid. The Roadmap and corresponding NASA research outline the requirements for reference missions for these destinations. SLS will offer a robust way to transport international crews and the air, water, food, and equipment they would need for such missions.

Creech, Stephen D.↗

Magnetohydrodynamic Augmented Propulsion Experiment

A fundamental obstacle to routine space access is the specific energy limitations associated with chemical fuels. In the case of vertical take-off, the high thrust needed for vertical liftoff and acceleration to orbit translates into power levels in the 10 GW range. Furthermore, useful payload mass fractions are possible only if the exhaust particle energy (i.e., exhaust velocity) is much greater than that available with traditional chemical propulsion. The electronic binding energy released by the best chemical reactions (e.g., LOX/LH2 for example, is less than 2 eV per product molecule (approx. 1.8 eV per H2O molecule), which translates into particle velocities less than 5 km/s. Useful payload fractions, however, will require exhaust velocities exceeding 15 km/s (i.e., particle energies greater than 20 eV). As an added challenge, the envisioned hypothetical RLV (reusable launch vehicle) should accomplish these amazing performance feats while providing relatively low acceleration levels to orbit (2-3g maximum). From such fundamental considerations, it is painfully obvious that planned and current RLV solutions based on chemical fuels alone represent only a temporary solution and can only result in minor gains, at best. What is truly needed is a revolutionary approach that will dramatically reduce the amount of fuel and size of the launch vehicle. This implies the need for new compact high-power energy sources as well as advanced accelerator technologies for increasing engine exhaust velocity. Electromagnetic acceleration techniques are of immense interest since they can be used to circumvent the thermal limits associated with conventional propulsion systems. This paper describes the Magnetohydrodynamic Augmented Propulsion Experiment (MAPX) being undertaken at NASA Marshall Space Flight Center (MSFC). In this experiment, a 1-MW arc heater is being used as a feeder for a 1-MW magnetohydrodynamic (MHD) accelerator. The purpose of the experiment is to demonstrate that an MHD accelerator can be an effective augmentation system for increasing engine exhaust velocity. More specifically, the experiment is intended to show that electromagnetic effects are effective at producing flow acceleration whereas electrothermal effects do not cause unacceptable heating of the working fluid. The MHD accelerator was designed as an externally diagonalized segmented Faraday channel, which will be inserted into an existing 2-tesla electromagnet. This allows the external power to be connected through two terminals thereby minimizing the complexity and cost associated with powering each segment independently. The design of the accelerator and other components in the flow path has been completed and fabrication activities are underway. This paper provides a full description of MAPX including performance analysis, design, and test plans, and current status.

Litchford, Ron J.↗

Integrated Methane Monitoring Platform Design

This report presents design plans for integrated methane monitoring platforms for the oil and gas sector, which include satellites, aircrafts, drones, mobile platforms, open-path systems, sensor networks, LDAR techniques, and other systems.

03 NATURAL GAS↗

Comet Halley: The view from Pioneer Venus

The plans to scan Halley's Comet at close range using the Pioneer Venus Orbiter are discussed. The composition of comets, their paths through space, and the history of comet encounters are examined. An ultraviolet spectrometer aboard the spacecraft will determine the composition of the gaseous coma and will measure the total gas production during its passage. The Pioneer Venus Orbiter will observe the comet for five weeks before solar interference with communications occurs as Venus passes on the far side of the Sun from Earth. Diagrams of the solar system and the relationship of the comet to the planets and the Sun are provided.

Source record↗

Semiautomated Management Of Arriving Air Traffic

System of computers, graphical workstations, and computer programs developed for semiautomated management of approach and arrival of numerous aircraft at airport. System comprises three subsystems: traffic-management advisor, used for controlling traffic into terminal area; descent advisor generates information integrated into plan-view display of traffic on monitor; and final-approach-spacing tool used to merge traffic converging on final approach path while making sure aircraft are properly spaced. Not intended to restrict decisions of air-traffic controllers.

Erzberger, Heinz↗

The Logistic Path from the International Space Station to the Moon and Beyond

The period from the loss of the Space Shuttle Columbia in February 2003 to resumption of Space Shuttle flights, planned for May 2005, has presented significant challenges to International Space Station (ISS) maintenance operations. Sharply curtailed upmass capability has forced NASA to revise its support strategy and to undertake maintenance activities that have significantly expanded the envelope of the ISS maintenance concept. This experience has enhanced confidence in the ability to continue to support ISS in the period following the permanent retirement of the Space Shuttle fleet in 2010. Even greater challenges face NASA with the implementation of the Vision for Space Exploration that will introduce extended missions to the Moon beginning in the period of 2015 - 2020 and ultimately see human missions to more distant destinations such as Mars. The experience and capabilities acquired through meeting the maintenance challenges of ISS will serve as the foundation for the maintenance strategy that will be employed in support of these future missions.

Watson, J. K.↗

The Mars Technology Program

Future Mars missions require new capabilities that currently are not available. The Mars Technology Program (MTP) is an integral part of the Mars Exploration Program (MEP). Its sole purpose is to assure that required technologies are developed in time to enable the baselined and future missions. The MTP is a NASA-wide technology development program managed by JPL. It is divided into a Focused Program and a Base Program. The Focused Program is tightly tied to the proposed Mars Program mission milestones. It involves time-critical deliverables that must be developed in time for infusion into the proposed Mars 2005, and, 2009 missions. In addition a technology demonstration mission by AFRL will test a LIDAR as part of a joint NASNAFRL experiment. This program bridges the gap between technology and projects by vertically integrating the technology work with pre-project development in a project-like environment with critical dates for technology infusion. A Base Technology Program attacks higher riskhigher payoff technologies not in the critical path of missions.

technology Mars exploration lander rover sample re↗

Resource Prospector Instrumentation for Lunar Volatiles Prospecting, Sample Acquisition and Processing

Data gathered from lunar missions within the last two decades have significantly enhanced our understanding of the volatile resources available on the lunar surface, specifically focusing on the polar regions. Several orbiting missions such as Clementine and Lunar Prospector have suggested the presence of volatile ices and enhanced hydrogen concentrations in the permanently shadowed regions of the moon. The Lunar Crater Observation and Sensing Satellite (LCROSS) mission was the first to provide direct measurement of water ice in a permanently shadowed region. These missions with other orbiting assets have laid the groundwork for the next step in the exploration of the lunar surface; providing ground truth data of the volatiles by mapping the distribution and processing lunar regolith for resource extraction. This next step is the robotic mission Resource Prospector (RP). Resource Prospector is a lunar mission to investigate 'strategic knowledge gaps' (SKGs) for in-situ resource utilization (ISRU). The mission is proposed to land in the lunar south pole near a permanently shadowed crater. The landing site will be determined by the science team with input from broader international community as being near traversable landscape that has a high potential of containing elevated concentrations of volatiles such as water while maximizing mission duration. A rover will host the Regolith & Environment Science and Oxygen & Lunar Volatile Extraction (RESOLVE) payload for resource mapping and processing. The science instruments on the payload include a 1-meter drill, neutron spectrometer, a near infrared spectrometer, an operations camera, and a reactor with a gas chromatograph-mass spectrometer for volatile analysis. After the RP lander safely delivers the rover to the lunar surface, the science team will guide the rover team on the first traverse plan. The neutron spectrometer (NS) and near infrared (NIR) spectrometer instruments will be used as prospecting tools to guide the traverse path. The NS will map the water-equivalent hydrogen concentration as low as 0.5% by weight to an 80 centimeter depth as the rover traverses the lunar landscape. The NIR spectrometer will measure surficial H2O/OH as well as general mineralogy. When the prospecting instruments identify a potential volatile-rich area during the course of a traverse, the prospect is then mapped out and the most promising location identified. An augering drill capable of sampling to a depth of 100 centimeters will excavate regolith for analysis. A quick assay of the drill cuttings will be made using an operations camera and NIR spectrometer. With the water depth confirmed by this first auguring activity, a regolith sample may be extracted for processing. The drill will deliver the regolith sample to a crucible that will be sealed and heated. Evolved volatiles will be measured by a gas chromatograph-mass spectrometer and the water will be captured and photographed. RP is a solar powered mission, which given the polar location translates to a relatively short mission duration on the order of 4-15 days. This short mission duration drives the concept of operations, instrumentation, and data analysis towards critical real time analysis and decision support. Previous payload field tests have increased the fidelity of the hardware, software, and mission operations. Current activities include a mission level field test to optimize interfaces between the payload and rover as well as better understand the interaction of the science and rover teams during the mission timeline. This paper will include the current status of the science instruments on the payload as well as the integrated field test occurring in fall of 2015. The concept of operations will be discussed, including the real time science and engineering decision-making process based on the critical data from the instrumentation. The path to flight will be discussed with the approach to this ambitious low cost mission.

ISRU↗

Multicriteria-Based Selection of Microalgae Biorefineries: Biomass Composition Defines the Most Suitable Product Portfolios

The supply of microalgae-derived biofuels and bioproducts will be vital in a global-scale bioeconomy. As the diversity of microalgae strains and their compositional plasticity may yield a wide array of products of market interest, the design of effective biorefineries is a central aspect in the path to making microalgae-based products available in the market. In this way, the conversion of microalgae biomass should be planned to employ mature technologies, while maximizing economic and environmental benefits obtained from a diverse product portfolio. This study applied sequential, hybrid Multicriteria Decision Analyses (MCDA) to aid the decision-making process of outlining the most suitable biorefining pathways for specific compositional profiles. For this, the methodology simultaneously considered multiple technical, economic, and environmental criteria, such as market aspects for the main algae-derived products, potential reduction in greenhouse gas (GHG) emissions provided by the biobased alternatives, and technology readiness level of conversion routes, among others. The framework was tested using productivity and compositional data for 13 high-productivity summer strains cultivated under varying nutrient availability. The analysis pointed to compositional profile being a key driver in defining the core biorefining strategy of algae biomass, with lipid-to-carbohydrate ratios higher than roughly 1 warranting the preferential processing of lipids into hydrocarbon fuels with the remainder of the algae biomass compounds being sent to higher-value applications, such as carboxylic acids and renewable thermoplastic substitutes. An in-depth process simulation, techno-economic assessment (TEA), and life-cycle analysis (LCA) effort was carried out as a closing step to corroborate the results stemming from the proposed framework. This study validates the use of MCDAs as a screening method prior to implementing more time-consuming analysis techniques and makes a compelling case for this approach as a product selection tool on a wide range of algae species, thus helping establish species-agnostic (but composition-driven) biorefineries.

biofuels↗

High Voltage EEE Parts for EMA/EHA Applications on Manned Launch Vehicles

The objective of this paper is an assessment of high voltage electronic components required for high horsepower electric thrust vector control (TVC) systems for human spaceflight launch critical application. The scope consists of creating of a database of available Grade 1 electrical, electronic and electromechanical (EEE) parts suited to this application, a qualification path for potential non-Grade 1 EEE parts that could be used in these designs, and pathfinder testing to validate aspects of the proposed qualification plan. Advances in the state of the art in high power electric power systems enable high horsepower electric actuators, such as the electromechnical actuator (EMA) and the electro-hydrostatic actuator (EHA), to be used in launch vehicle TVC systems, dramaticly reducing weight, complexity and operating costs. Designs typically use high voltage insulated gate bipolar transistors (HV-IGBT). However, no Grade 1 HV-IGBT exists and it is unlikely that market factors alone will produce such high quality parts. Furthermore, the perception of risk, the lack of qualification methodoloy, the absence of manned space flight heritage and other barriers impede the adoption of commercial grade parts onto the critical path. The method of approach is to identify high voltage electronic component types and key parameters for parts currently used in high horsepower EMA/EHA applications, to search for higher quality substitutes and custom manufacturers, to create a database for these parts, and then to explore ways to qualify these parts for use in human spaceflight launch critical application, including grossly derating and possibly treating hybrid parts as modules. This effort is ongoing, but results thus far include identification of over 60 HV-IGBT from four manufacturers, including some with a high reliability process flow. Voltage ranges for HV-IGBT have been identified, as has screening tests used to characterize HV-IGBT. BSI BS ISO 21350 Space systems Off-the-shelf item utilization, developed from Marshall Work Instruction MWI8060.1 OFF-THE-SHELF HARDWARE UTILIZATION IN FLIGHT HARDWARE DEVELOPMENTwas found to provide guidance for including commercial off-the-shelf (COTS) hardware for use in critical applications.

Griffin, Trent↗

Lunar Terrain Vehicle (LTV) Remote Teleoperation Studies Under Four Lunar Communication Latencies

Remotely operating a lunar rover from Earth while subject to an Earth-Moon time delay of multiple seconds could result in a dangerous state where the roving vehicle is either damaged or lost, thereby potentially compromising an entire mission or series of missions. Providing the right capabilities to the remote operator to manage inherent communication latencies will be important for remote driving to be successful. The National Aeronautics and Space Administration (NASA) conducted two studies to investigate the average speed and number of kilometers per day that an operator on Earth could teleoperate a notional Artemis unpressurized rover with minimal remote operator capabilities under 0- and 4-second communication delays (April 2023 study) and 6- and 8-second delays (August 2023 study). A primary goal of these studies was to understand if an Artemis Lunar Terrain Vehicle (LTV) could cover 6 kilometers (km) in 24 hours when operated remotely. During the April 2023 evaluation, eight test operators used an in-house simulation of the lunar surface South Pole to teleoperate a NASA government reference LTV. Each operator received approximately 30 minutes of remote driving familiarization/training prior to their test run. Operators viewed the surrounding terrain via a single, rover mast-mounted, high-resolution camera with pan/tilt/zoom capabilities; continuous communication was provided throughout all testing. In the August 2023 evaluation, remote operators received approximately 3 hours of familiarization training in each latency, and the simulation environment provided remote operators with an operator-selected rate limiter to enable finer sensitivity in the hand controller and a predictive circle function to better assist operators with predicting the path the vehicle could take. All test operators were able to successfully navigate and drive through six different types of terrain and five planned traverse scenarios using natural lighting under all communication delays. Results for average speeds for each communication delay, computed by averaging the data from all test conditions for that latency and all operators, are shown in the table below. The average speed data was then used to derive the total time needed to cover 6 km, 8 km, and 20 km. Remote operators drove slower and used the brake more frequently when subject to a communication latency as opposed to no communication latency. Subjective workload assessments revealed that while operating in a latency the overall workload significantly increased when compared to a 0-s delay with mental demand, frustration, and performance being the primary contributing factors. Driving strategies in the 0-s delay did not vary significantly among subjects; however, in the 4-s delay condition, three different driving strategies were identified. In the 6-s and 8-s latency conditions the operator’s use of the cruise control to maintain speed was more apparent. Additionally, over the course of the August study, the operator took advantage of the predictive circle indicator on the navigation display and over 95% of the operator’s navigation used the mast camera 180-degree panning function for ground truthing in terms of boulders and craters. Operators started to define more specific parameters in driving strategies for general operations. This consisted of setting the vehicle into a low-speed cruise mode of approximately 1–1.5 kph and noticing driving performance of the vehicle seemed to be much harder at slower speeds 0.4–0.8 kph; however, the vehicle was more responsive at speeds of 2.9–3.6 kph. Regardless of communication delay, operators used both the horizontal translation rails and the vehicle fenders as guides to predict a path for the vehicle through heavily concentrated terrain features. Test operators acknowledged that the teleoperations training for this study was substantially less than what an actual LTV remote operator will ultimately receive. They estimated a minimum of 20 to 100 hours spread across multiple days and weeks (e.g., strategies included immersion training over a 3-day period, to a short 8-week starter program) would be needed to get an operator ~ 60% proficient (i.e., able to complete a subset of remote driving tasks), to a yearlong program for full proficiency in remote driving tasks under all terrain types and natural lighting conditions. Remotely operating a vehicle on another planetary body while subject to communication latency is a complex task. Speed, distance covered, time spent driving, time spent navigating, brake usage and rock contacts are all affected by operator workload, driving strategies, workstation ergonomics and training. These studies provided a “firstlook” answer to a potential system requirement (namely if a remote operator could cover a given distance in a given amount of time); however, considerable general knowledge was gained to begin to understand what it will take to make a successful lunar rover teleoperator.

LTV↗

Lunar Terrain Vehicle (LTV) Remote Teleoperation Studies Under Four Lunar Communication Latencies

Remotely operating a lunar rover from Earth while subject to an Earth-Moon time delay of multiple seconds could result in a dangerous state where the roving vehicle is either damaged or lost, thereby potentially compromising an entire mission or series of missions. Providing the right capabilities to the remote operator to manage inherent communication latencies will be important for remote driving to be successful. NASA conducted two studies to investigate the average speed and number of kilometers per day that an operator on Earth could teleoperate a notional Artemis unpressurized rover with minimal remote operator capabilities under 0- and 4-second communication delays (April 2023 study) and 6- and 8-second delays (August 2023 study). A primary goal of these studies was to understand if an Artemis Lunar Terrain Vehicle (LTV) could cover 6 kilometers (km) in 24 hours when operated remotely. During the April 2023 evaluation, eight test operators used an in-house simulation of the lunar surface South Pole to teleoperate a NASA government reference LTV. Each operator received approximately 30 minutes of remote driving familiarization/training prior to their test run. Operators viewed the surrounding terrain via a single, rover mast-mounted, high-resolution camera with pan/tilt/zoom capabilities; continuous communication was provided throughout all testing. In the August 2023 evaluation, remote operators received approximately 3 hours of familiarization training in each latency, and the simulation environment provided remote operators with an operator-selected rate limiter to enable finer sensitivity in the hand controller and a predictive circle function to better assist operators with predicting the path the vehicle could take. All test operators were able to successfully navigate and drive through six different types of terrain and five planned traverse scenarios using natural lighting under all communication delays. Results for average speeds for each communication delay, computed by averaging the data from all test conditions for that latency and all operators, are shown in the table below. The average speed data was then used to derive the total time needed to cover 6 km, 8 km, and 20 km (distances relevant to LTV-SYS071 and -029 requirements). Remote operators drove slower and used the brake more frequently when subject to a communication latency as opposed to no communication latency. Subjective workload assessments revealed that while operating in a latency the overall workload significantly increased when compared to a 0-s delay with mental demand, frustration, and performance being the primary contributing factors. Driving strategies in the 0-s delay did not vary significantly among subjects; however, in the 4-s delay condition, three different driving strategies were identified. In the 6-s and 8-s latency conditions the operator’s use of the cruise control to maintain speed was more apparent. Additionally, over the course of the August study, the operator took advantage of the predictive circle indicator on the navigation display and over 95% of the operator’s navigation used the mast camera 180-degree panning function for ground truthing in terms of boulders and craters. Operators started to define more specific parameters in driving strategies for general operations. This consisted of setting the vehicle into a low-speed cruise mode of approximately 11.5 kph and noticing driving performance of the vehicle seemed to be much harder at slower speeds 0.4–0.8 kph; however, the vehicle was more responsive at speeds of 2.9–3.6 kph. Regardless of communication delay, operators used both the horizontal translation rails and the vehicle fenders as guides to predict a path for the vehicle through heavily concentrated terrain features. Test operators acknowledged that the teleoperations training for this study was substantially less than what an actual LTV remote operator will ultimately receive. They estimated a minimum of 20 to 100 hours spread across multiple days and weeks (e.g., strategies included immersion training over a 3-day period, to a short 8-week starter program) would be needed to get an operator ~ 60% proficient (i.e., able to complete a subset of remote driving tasks), to a yearlong program for full proficiency in remote driving tasks under all terrain types and natural lighting conditions. Remotely operating a vehicle on another planetary body while subject to communication latency is a complex task. Speed, distance covered, time spent driving, time spent navigating, brake usage and rock contacts are all affected by operator workload, driving strategies, workstation ergonomics and training. These studies provided a “first-look” answer to a potential system requirement (namely if a remote operator could cover a given distance in a given amount of time); however, considerable general knowledge was gained to begin to understand what it will take to make a successful lunar rover teleoperator.

LTV↗

Interactive mission planning for a Space Shuttle flight experiment - A case history

Scientific experiments which use the Space Shuttle as a platform require the development of new operations techniques for the command and control of the instrument. Principal among these is the ability to simulate the complex maneuvers of the orbiter's path realistically. Computer generated graphics provide a window into the actual and predicted performance of the instrument and allow sophisticated control of the instrument under varying conditions. In October of 1984 the Shuttle carried a synthetic aperture radar built by JPL for the purpose of recording images of the earth surface. The mission deviated from planned operation in almost every conceivable way and provided an exacting test bed for concepts of interactive mission planning.

Harris, H. M.↗