Search NASA⌕ Search

SEARCH · Search NASA

Results for “Pre-Launch”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

In-Flight Operation of the Dawn Ion Propulsion System Through Survey Science Orbit at Ceres

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt objects, Vesta and Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H- 9.5 (Delta-II Heavy) rocket that placed the 1218-kg spacecraft onto an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory which will provide a total delta V of 11 km/s for the heliocentric transfer to Vesta, orbit capture at Vesta, transfer between Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer between Ceres science orbits. Full-power thrusting from December 2007 through October 2008 was used to successfully target a Mars gravity assist flyby in February 2009 that provided an additional delta V of 2.6 km/s. Deterministic thrusting for the heliocentric transfer to Vesta resumed in June 2009 and concluded with orbit capture at Vesta on July 16, 2011. From July 2011 through September 2012 the IPS was used to transfer to all the different science orbits at Vesta and to escape from Vesta orbit. Cruise for a rendezvous with Ceres began in September 2012 and concluded with the start of the approach to Ceres phase on December 26, 2015, leading to orbit capture on March 6, 2015. Deterministic thrusting continued during approach to place the spacecraft in its first science orbit, called RC3, which was achieved on April 23, 2015. Following science operations at RC3 ion thrusting was resumed for twenty-five days leading to arrival to the next science orbit, called survey orbit, on June 3, 2015. The IPS will be used for all subsequent orbit transfers and trajectory correction maneuvers until completion of the primary mission in approximately June 2016. To date the IPS has been operated for over 46,774 hours, consumed approximately 393 kg of xenon, and provided a delta V of over 10.8 km/s to the spacecraft. The IPS performance characteristics are very close to the expected performance based on analysis and testing performed pre-launch. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations through arrival at the second science orbit at Ceres.

Garner, Charles E.↗

Analysis of Particulate Contamination During Launch of MMS Mission

NASA's Magnetospheric MultiScale (MMS) is an unmanned constellation of four identical spacecraft designed to investigate magnetic reconnection by obtaining detailed measurements of plasma properties in Earth's magnetopause and magnetotail. Each of the four identical satellites carries a suite of instruments which characterize the ambient ion and electron energy spectrum and composition. Some of these instruments utilize microchannel plates and are sensitive to particulate contamination. In this paper, we analyze the transport of particulates during pre-launch, launch and ascent events, and use the analysis to obtain quantitative predictions of contamination impact on the instruments. Viewfactor calculation is performed by considering the gravitational and aerodynamic forces acting on the particles.

Brieda, Lubos↗

A Quick Summary of IMERG Versions and Features

This talk will summarize the shifts in IMERG (Integrated Multi-satellitE Retrievals for GPM (Global Precipitation Measurement)) from Version 03 to 04 in early Spring 2016, and to Version 05 in late Summer 2017. For example, Version 04 replaced approximate pre-launch calibrations with GPM Core Observatory-based calibrations, while Version 05 introduced improved estimates for the primary GPM instrument products (DPR, GMI, and Combined Instrument). In Version 04 the IR estimates were routinely calibrated to the passive microwave estimates. As analysis showed that the Combined Instrument estimates (the IMERG calibration standard) tend to be biased high over land and low over ocean at higher latitudes, in Version 04 we climatologically calibrated IMERG to the Global Precipitation Climatology Project (GPCP) monthly Satellite-Gauge product, except in low- and mid-latitude ocean regions. This calibration leaves the relative time series intact, and only adjusts the mean of the entire series. In Version 05 the primary GPM instrument products have reduced biases, but calibration to GPCP continues to be necessary to achieve the most realistic estimates. Finally, retrospective processing back into the TRMM (Tropical Rainfall Measuring Mission) era is expected in early 2018, after which the legacy TMPA (TRMM Multi-satellite Precipitation Analysis) dataset will be retired.

Huffman, George J.↗

On-orbit Validation of the Geolocation Accuracy of the GOES-16 Geostationary Lightning Mapper (GLM) Flashes Using Ground-based Laser Beacons

As part of the geolocation accuracy assessment of lightning flashes detected by the Geostationary Lightning Mapper (GLM) on the GOES-16 and GOES-17 satellites (Geostationary Operational Environmental Satellite), two satellite laser ranging stations employed laser beacon systems to generate transient light pulses that simulate natural lightning around 777.4 nm to validate the pre-launch spec of 5 km. The pulse width, repetition rate, wavelength, and power of the laser-pulses were configured to produce sufficient instrument response to be detected as synthetic lightning events by the GLM instrument. During the testing period from April 2017 to January 2018, the laser systems illuminated the GOES-16 satellite to observe diurnal variation of the GLM system response, with particular emphasis on geolocation accuracy. The final GOES-16 laser beacon tests, which used the latest updates of the geolocation algorithms implemented by the GOES-R Ground Segment, showed the offsets between the GLM geolocated location and the known laser locations were within 5 km.

Lightning↗

MMS Extended Mission Design: Evaluation of a Lunar Gravity Assist Option

This paper will describe a study that was carried out on the design of a set of maneuvers that were considered for the later stages of an extended mission of the Magnetospheric Multiscale (MMS) mission. The goal of these maneuvers was to put MMS into a significantly different orbit from those flown heretofore, so allowing science collection in a different region of the magnetosphere. This study was made feasible by the fact that the rate at which fuel is being consumed to maintain small formations on the MMS high-apogee orbit is less than expected pre-flight: the current consumption rate is only about 2 kg/yr/spacecraft. In addition, the spacecraft finished the prime mission with a significant amount of fuel remaining: this was about 1-sigma above the mean when compared with pre-launch Monte Carlo simulations. The resulting situation is similar to that of a libration orbit mission, where station-keeping requires so little fuel that any margin at all will lead to an extensive mission lifetime. In the case of MMS, the spacecraft could, if desired, perform formation flying in the current orbit for several decades. Alternatively, the spacecraft could use a significant fraction of the remaining fuel to perform major orbit modifications, while still leaving enough to conduct formation flying for on the order of a decade. The extended mission maneuvers studied here are further apogee-raises, with the goal of setting up one or more lunar gravity assists. Geometry dictates that a lunar encounter is only achievable when the MMS apogee vector lies approximately in the lunar orbit plane: this limits the possible dates to mid-2021 or early 2027.

Design↗

Modeling In-Space Aborts for NASA Human Exploration Missions

NASA is developing capabilities for crewed missions beyond Low Earth Orbit (LEO) for the first time in nearly 50 years. Given the greater distances from Earth that these missions will entail, it is prudent to develop in-space abort capabilities in order to save the crew in the event of critical life-threatening failures that may occur. NASA has developed a Cross Program PRA (XPRA) of the integrated vehicle, from pre-launch through landing and rescue of the crew. An ascent abort model has already been developed as part of this XPRA model to assess the risk associated with failures during prelaunch and ascent. The scope of the analysis discussed here is focused on aborts associated with the in-space portion of the mission up to and including the Trans-Lunar Injection (TLI) burn, which places the Orion spacecraft on a trajectory to the Moon.

Bigler, Mark A.↗

In-Flight Operation of the Dawn Ion Propulsion System Through the Low Altitude Mapping Orbit at Ceres

The Dawn mission, part of NASA’s Discovery Program, has as its goal the scientific exploration of the two most massive main-belt objects, Vesta and Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H- 9.5 (Delta-II Heavy) rocket that placed the 1218-kg spacecraft onto an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory for the heliocentric transfer to Vesta, orbit capture at Vesta, transfer between Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, transfer between Ceres science orbits, and orbit maintenance maneuvers. Full-power thrusting from December 2007 through October 2008 was used to successfully target a Mars gravity assist flyby in February 2009 that provided an additional ΔV of 2.6 km/s. Deterministic thrusting for the heliocentric transfer to Vesta resumed in June 2009 and concluded with orbit capture at Vesta on July 16, 2011. From July 2011 through September 2012 the IPS was used to transfer to all the different science orbits at Vesta and to escape from Vesta orbit. Cruise for a rendezvous with Ceres began in August 2012 and completed in late December 2014. From December 2014 through June 2016 the IPS was used for transiting the spacecraft to the Approach phase, survey orbit, the high altitude mapping orbit (HAMO), and the low altitude mapping orbit (LAMO) with arrival to LAMO on December 13, 2015, almost eight years after the start of deterministic thrusting to Vesta. The LAMO orbit, at a mean altitude above Ceres of approximately 385 km, is the spacecraft’s final destination and there are no plans to move the spacecraft from LAMO once science operations there are completed. Since arrival at LAMO Dawn’s IPS has been used for occasional orbit maintenance maneuvers while the spacecraft performs scientific investigations. Dawn has successfully completed its science goals and Dawn’s primary mission is scheduled to end June 30, 2016. To date the IPS has been operated for approximately 48,458 hours, consumed approximately 401 kg of xenon, and provided a delta-V of over 11.0 km/s, a record for an on-board propulsion system. The IPS performance characteristics are close to the expected performance based on analysis and testing performed pre-launch. Dawn’s IPS continues to be fully operational as of June 2016. This paper provides an overview of Dawn’s mission objectives and the results of Dawn IPS mission operations from Survey orbit through the completion of Dawn’s primary mission.

Garner, Charles E.↗

VIIRS Thermal Emissive Bands L1B Calibration Uncertainty

The Visible Infrared Imaging Radiometer Suite (VIIRS) is a key instrument on-board the Suomi National Polar-orbiting Partnership (S-NPP) spacecraft. The S-NPP launched in October 2011 and it has been collecting valuable Earth science data with VIIRS and four other instruments for more than five years. The VIIRS Characterization Support Team (VCST) of the National Aeronautics and Space Administration (NASA) Science Investigator-led Processing Systems (SIPS) is designed to support the VIIRS sensor pre-launch geometric and radiometric characterization and to access on-orbit long-term Level-1B (L1B) calibration and performance. This paper reviews the VIIRS thermal emissive bands (TEB), covering wavelengths from 3.7 to 12.0 μm, L1B radiometric calibration algorithms and presents the calibration uncertainty methodology which will be implanted in the L1B processing software. Discussions will be focused on the key uncertainty parameters and the application in L1B.

S-NPP VIIRS TEB Uncertainty↗

MODIS and VIIRS On-Orbit Calibration and Characterization Using Observations from Spacecraft Pitch Maneuvers

Two MODIS instruments (Terra and Aqua) and two VIIRS instruments (S-NPP and JPSS-1) are currently operated inspace, continuously making global earth observations in the spectral range from visible (VIS) to long-wave infrared(LWIR). These observations have enabled a broad range of environmental data records to be generated and distributed insupport of both operational and scientific community. Despite extensive pre-launch calibration and characterizationperformed for both MODIS and VIIRS instruments and routine on-orbit calibration activities carried out using their onboardcalibrators (OBC), various spacecraft maneuvers have also been designed and implemented to further enhance thesensor on-orbit calibration and data quality. This paper focuses on the use of observations made during spacecraft pitchmaneuvers of MODIS and VIIRS in support of their on-orbit characterization of thermal emissive bands (TEB) responseversus scan-angle (RVS). In the case of Terra MODIS, lunar observations made from instrument nadir view duringspacecraft pitch maneuvers are used to compare with that made regularly through instrument space view (SV) port toevaluate on-orbit changes in RVS and band-to-band registration (BBR) for the reflective solar bands (RSB). In additionto results derived from spacecraft pitch maneuvers performed for MODIS and VIIRS, discussion is provided on theadvantages, challenges, and lessons for future considerations and improvements.

Xiong, Xiaoxiong↗

In-flight Operation of the Dawn Ion Propulsion System Through the Low Altitude Mapping Orbit at Ceres

The Dawn mission, part of NASA’s Discovery Program, has as its goal the scientific exploration of the two most massive main-belt objects, Vesta and Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H- 9.5 (Delta-II Heavy) rocket that placed the 1218-kg spacecraft onto an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory for the heliocentric transfer to Vesta, orbit capture at Vesta, transfer between Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, transfer between Ceres science orbits, and orbit maintenance maneuvers. Full-power thrusting from December 2007 through October 2008 was used to successfully target a Mars gravity assist flyby in February 2009 that provided an additional ΔV of 2.6 km/s. Deterministic thrusting for the heliocentric transfer to Vesta resumed in June 2009 and concluded with orbit capture at Vesta on July 16, 2011. From July 2011 through September 2012 the IPS was used to transfer to all the different science orbits at Vesta and to escape from Vesta orbit. Cruise for a rendezvous with Ceres began in August 2012 and completed in late December 2014. From December 2014 through June 2016 the IPS was used for transiting the spacecraft to the Approach phase, survey orbit, the high altitude mapping orbit (HAMO), and the low altitude mapping orbit )LAMO) with arrival to LAMO on December 13, 2015, almost eight years after the start of deterministic thrusting to Vesta. The LAMO orbit, at a mean altitude above Ceres of approximately 385 km, is the spacecraft’s final destination and there are no plans to move the spacecraft from LAMO once science operations there are completed. Since arrival at LAMO Dawn’s IPS has been used for occasional orbit maintenance maneuvers while the spacecraft performs scientific investigations. Dawn has successfully completed its science goals and Dawn’s primary mission is scheduled to end in the summer of 2016. To date the IPS has been operated for over 48,454 hours, consumed approximately 401 kg of xenon, and provided a delta-V of over 11.0 km/s, a record for an on-board propulsion system. The IPS performance characteristics are close to the expected performance based on analysis and testing performed pre-launch. Dawn’s IPS continues to be fully operational as of June 2016. This paper provides an overview of Dawn’s mission objectives and the results of Dawn IPS mission operations from Survey orbit through June 2016.

Garner, Charles E.↗

Orbit Determination Covariance Analyses for the Parker Solar Probe Mission

This paper details pre-launch navigation covariance analyses for the Parker Solar Probe mission. Baseline models and error assumptions are outlined. The results demonstrate how navigation will satisfy requirements and are used to define operational plans. A few sensitivities are identified and the accompanying investigations are described. Predicted state uncertainty results show that most requirements are met with substantial margin. Moreover, navigation sensitivities may be accommodated operationally and this has been incorporated into project planning. Detailed results are presented only for select launch dates, however twenty unique trajectories (one per launch opportunity) have been assessed.

Jones, Drew Ryan↗

Kepler Instrument Performance: An In-Flight Update

The Kepler Mission is designed to detect the 80 parts per million (ppm) signal from an Earth-Sun equivalent transit. Such precision requires superb instrument stability on time scales up to 2 days and systematic error removal to better than 20 ppm. The sole scientic instrument is the Photometer, a 0.95 m aperture Schmidt telescope that feeds the 94.6 million pixel CCD detector array, which contains both Science and Fine Guidance Sensor (FGS) CCDs. Since Kepler's launch in March 2009, we have been using the commissioning and science operations data to characterize the instrument and monitor its performance. We find that the in-flight detector properties of the focal plane, including bias levels, read noise, gain, linearity, saturation, FGS to Science crosstalk,and video crosstalk between Science CCDs, are essentially unchanged from their pre-launch values. Kepler'sunprecedented sensitivity and stability in space have allowed us to measure both short- and long- term effects from cosmic rays, see interactions of previously known image artifacts with starlight, and uncover several unexpected systematics that affect photometric precision. Based on these results, we expect to attain Kepler's planned photometric precision over 90% of the field of view.

CCD↗

Data Preservation: Final Step in the Life Cycle of a Mission

Many NASA Earth Observing System (EOS) have either already reached the end of their active life or are nearing it. Preservmissionsation of data products is a fairly well defined task for the NASA EOS Data Centers or DAACs.The Goddard Earth Sciences Data and Information Services Center (GES-DISC) has implemented a repository system, which is capable of long-term archive of documentation artifacts and other associated digital content. The existing GES-DISC Repository System is based on Fedora Commons, an open-source repository management software, for cost savings and flexibility.The first mission to utilize the GES-DISC Repository System was the High Resolution Dynamics Limb Sounder (HIRDLS) on the Aura spacecraft. Since then, the GES DISC has gathered documentation from the UARS and TOMS into the Repository. The Microwave Limb Sounder (MLS) team has begun delivering some early pre-launch documents to the GES-DISC Repository System as well. Other missions in planning or progress include AIRS, OMI, SORCE, SNPP Sounder, and TRMM.

Johnson, J.↗

Overview of the TOPEX/Poseidon Platform Harvest Verification Experiment

An overview is given of the in situ measurement system installed on Texaco's Platform Harvest for verification of the sea-level measurement from the TOPEX/POSEIDON satellite. The pre-launch error budget suggested that the total root mean square (RMS) error due to measurements made at this verification site would be less than four centimeters.

satellite↗

TOPEX/Poseidon Electrical Power System - Performance

This paper shows that the power system performance (batteries, solar array, power regulator) on-board the TOPEX/Poseidon satellite has met or exceeded pre-launch predicitons and has successfully managed the performance of NiCd batteries which had shown anomalous performance on other missions such as UARS and GRO.

batteries↗

Ground-based Validation of the EOS Multi-angle Imaging SpectroRadiometer (MISR) Aerosol Retrieval Algorithms and Science Data Products

A plan for the ground-based validation of MISR aerosol retrieval is outlined. Activities occur in two phases: (1) pre-launch, work is focused on technique development and MISR algorithm validation using conventional ground-base methods and a MISR simulator (AirMISR) operating from the ER-2 aircraft to simulate MISR on-orbit observations. (2) Post-launch, the validation program relies on ground campaigns, underflights wit the MISR simulator and the use of local measurements fo aerosol loading and properties and irradiance measurements derived from the AERONET and ISIS networks.

algorithm↗

Mission Summary of Cassini Spacecraft Guidance and Control Hardware Health and Performance

The Cassini-Huygens mission ended on September 15, 2017, after nearly two decades in ight. The well-designed Cassini spacecraft had robust hardware that permitted two extended missions, lasting nine years longer than the expected prime mission. At the end of the mission, the Attitude and Articulation Control Subsystem (AACS) was using two pieces of redundant back-up of hardware, one reaction wheel and the hydrazine thruster branch, due to hardware anomalies earlier in the mission. The back-up hardware performed nominally through the rest of mission. The prime reaction wheels at the end of the mission had reached more than 130% of the consumable limit for number of revolutions. No thruster on either thruster branch accumulated more than 45% of the consumable limits. The inertial reference unit slightly exceeded the pre-launch requirements on bias error, but as the software continuously estimated this value in ight, the attitude estimation was not adversely a ected. The star trackers performed nominally, and though there was a spacecraft anomaly in 1998 related to the star trackers, the origin was not in hardware itself. The Sun sensors and accelerometer both performed as expected and met all requirements throughout the mission. Ultimately, the lifetime of the Cassini spacecraft was not limited by hardware performance. Planetary protection requirements necessitated the end of the mission as the spacecraft's propellant reserves depleted, and Cassini plunged into Saturn's atmosphere with a healthy attitude control system.

Stupik, Joan↗

An Overview of Experiments and Modeling of Polysiloxane-Coated Thermal Protection Systems for Missions to Mars, Titan, and Beyond.

Phenolic Impregnated Carbon Ablator (PICA) gained heritage during the historic Stardust mission, where it successfully returned samples from a comet’s tail and has since been instrumental in delivering payloads to the surface of Mars [1-3]. Most recently, PICA enabled the safe return of samples collected from asteroid Bennu as part of the OSIRIS-REx mission. This rich legacy underscores PICA’s critical role in allowing NASA’s most ambitious exploration missions. However, the friable nature of its phenolic phase presents challenges during handling and pre-launch activities. To mitigate this issue, PICA is coated with a polysiloxane resin system, which serves to suppress particulate dispersion and thereby safeguard spacecraft components. A comprehensive understanding of the polysiloxane resin’s behavior is imperative, as it profoundly shapes the material response of PICA during atmospheric entry by influencing its thermal and oxidative stability. This influence extends to thermocouple plugs embedded within thermal protection systems. These plugs have demonstrated their significance in missions such as Mars Science Laboratory (MSL) and Mars 2020, where the MEDLI and MEDLI2 instrumentation suites delivered in-valuable insights into the performance of thermal protection systems during entry into the Martian atmosphere [4]. Looking ahead, missions such as Dragonfly, set to descend into Titan’s dense atmosphere, aim to leverage advanced sensor technologies to further refine our understanding of thermal protection response [5]. Moreover, thermocouple plugs play an essential role in validating cutting-edge material response models, such as those pioneered under NASA’s Entry Systems Modeling Project (ESM), designed, in-part, to predict the operational integrity of thermal protection systems under the extreme stresses of atmospheric entry. To achieve these modeling goals, ground-based experiments are crucial to provide the foundational data necessary for developing and refining these predictive tools. To this end, an extensive test campaign was conducted at the Hypersonic Materials Environmental Test System (HyMETS) to investigate the high-temperature behavior of the polysiloxane resin in an air environment [6]. These experiments revealed critical phenomena, including the formation of a silicon oxycarbide layer that enhances oxidation resistance, moderates surface temperatures, and alters in-depth thermal response. Building on these findings, subsequent tests were designed to simulate atmospheric entry conditions in reactive gases, such as CO2 and N2, to mimic the environments of Mars and Titan, respectively, as well as non-reactive gases representing the atmospheres of the Ice Giants (Neptune and Uranus). A heating rate dependent decomposition mechanism has been identified for the polysiloxane resin under oxidizing conditions (Fig. 1). In the initial stage, the resin and the underlying thermal protection system undergo pyrolysis, rapidly generating a thin amorphous silicon oxycarbide interwoven with carbonaceous char and residual fibers from PICA. During the second stage, the nascent oxide layer establishes a robust, oxidation-resistant thermal barrier coating, which significantly impedes heat transfer to the underlying carbonaceous char, resulting in a stagnation of the surface temperature. A key factor contributing to this thermal resistance is the low recombination efficiency of atomic oxygen (γ), which further diminishes the heat load on the material’s interior layers [7]. Moreover, as the surface temperature stagnates, the silicon oxycarbide phase separates into distinct regions of silica and free graphite. Ultimately, when the heat flux reaches a critical threshold, a third stage is triggered, leading to the breakdown of the coating through carbothermal reduction, exposing the underlying char layer. This exposure leads to a dramatic surface temperature spike, driven by highly exothermic reactions between atomic oxygen and the char layer, further accelerating material degradation. A detailed mass and heat transfer model of PICA coated with polysiloxane resin was implemented in the Porous material Analysis Toolbox based on OpenFOAM, PATO [8]. The initial stage was considered negligible in this model because the resin decomposition occurs rapidly within a thin surface layer. Instead, the coating was directly considered as an oxygen-resistant thermal barrier coating. For the second stage, the thin amorphous silicon oxycarbide was treated as a pure silica surface to simplify the thermochemical behavior. The model ac-counts for surface equilibrium processes using representative elements of the coating-environment system. For the third stage, specific boundary conditions were developed to estimate the onset and progression of the coating removal. Two-dimensional material response simulations were conducted to compare uncoated and coated PICA using boundary conditions calibrated with HyMETS data. Fig. 2 illustrates that the simulations closely align with experimental data, successfully reproducing measured temperature profiles. This work will include the latest advancements in the coating model, including the calibration of recombination of atomic oxygen at the surface during the second phase. These simulated results will be further validated against additional CO2 data points from HyMETS, reinforcing the models’ predictive capabilities. These mechanisms and their effects on thermal protection systems, including thermochemical behavior and thermocouple probe performance in extreme environments, provide crucial insights for optimizing spacecraft designs that safeguard scientific payload and ensure mission success in future planetary exploration endeavors.

Active Oxidation↗