Search NASA⌕ Search

SEARCH · Search NASA

Results for “Programming Practices”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

A computationally efficient algorithm for computing convex hull prices

Electricity markets worldwide allow participants to bid non-convex production offers. While non-convex offers can more accurately reflect a resource's capabilities, they create challenges for market clearing processes. For example, system operators may be required to execute side payments to participants whose costs are not covered through energy sales as determined via traditional locational marginal pricing schemes. Convex hull pricing minimizes this and other types of side payments while providing uniform (i.e., locationally and temporally consistent) prices. Computing convex hull prices involves solving either a large-scale linear program or the Lagrangian dual of the corresponding non-convex scheduling problem. Further, the former approach requires explicit descriptions of market participants' convex hulls. While linear programs for computing convex hull prices are large, their structure is naturally decomposable by generators. Here, in this work, we propose and empirically analyze a Benders decomposition approach to computing convex hull prices that leverages recent advances in convex hull formulations for thermal generating units. We demonstrate across a large set of test instances that our decomposition approach only requires modest computational effort, obtaining solutions at least an order of magnitude faster than the equivalent large-scale linear programming approach. Overall, we provide a computationally feasible method for computing convex hull prices for industrial scale market clearing problems, enabling the possibility of practical adoption of this advanced pricing mechanism.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Updated Stormwater Management Program Plan: For coverage under the National Pollutant Discharge Elimination System Municipal Separate Storm Sewer System Permit for stormwater discharges within the Middle Rio Grande Watershed (v.3)

The SWMPP describes the best management practices (BMPs) employed at SNL, measurable goals, and anticipated implementation dates for compliance with the Permit requirements to ensure that stormwater discharges from the SNL MS4 do not contribute pollutants to Waters of the United States (WOTUS), namely the Tijeras Arroyo and the Rio Grande. The SWMPP is updated annually, and as necessary, to include new information and/or document the development, implementation and assessment of program elements, as required in Part III.B of the Permit. Version 3 of the SWMPP documents compliance activities and program elements developed and implemented between July 1, 2016 and June 30, 2017; it is required to be submitted on or before December 1, 2017.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ESPC ESA Webinar Series: ESPC IDIQ Contract Vehicle Overview

This webinar provides instructions and resources for financing distributed energy projects (e.g. on-site renewable energy, storage, and combined heat and power) using an energy savings performance contract (ESPC) energy sales agreement (ESA) through the U.S. Department of Energy (DOE) indefinite-delivery, indefinite-quantity (IDIQ) energy savings performance contract (ESPC) vehicle. The DOE IDIQ ESPC contract vehicle uses a streamlined master contract that allows federal agencies to work with 21 energy service companies holding the current DOE IDIQ ESPC. Topics covered in the webinar include: An overview of the DOE IDIQ contract vehicle; ESA-specific considerations for IDIQ contracts; and Specific use cases. The webinar also provides an overview of the resources available on the Federal Energy Management Program website, such as IDIQ tools and templates. This webinar is the fifth in a series that provides information, best practices, and resources for implementing an ESPC ESA project. ESPC ESAs are a great option for federal sites that are motivated to reduce site costs, have no capital investment funding, and cannot use the U.S. Department of Defense 10 USC 2922a authority for long-term contracting.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Connecting Minds: AI Use Cases to Bridge Power Systems and Large Language Models for Practical Applications

Recent advances in artificial intelligence (AI) and development of large language models (LLMs) present the opportunity to develop a new generation of power systems applications. In contrast with early power system AI applications based on structured numerical data, LLMs offer unique capabilities to perform logical reasoning using text documents, unstructured data, and application programming interface (API) calls to computational software. This paper seeks to bridge the knowledge gap between power systems engineers and LLM developers through a crosscutting explanation of use cases, characteristics, requirements, practical considerations from the perspectives of both LLM capabilities and industry needs. Specific focus is given to applications that can be realistically deployed by electric utilities. After introducing the architecture of LLMs and unique challenges of the power systems domain, this paper proposes twenty representative LLM applications grouped into categories of 1) power system operations, 2) asset management, 3) system planning and analytics, and 4) energy management and protection systems. Five use cases are presented within each category with descriptions of the motivation, objectives, approaches, example inputs / outputs, and benefits of each use case.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Noisy-Intermediate-Scale Quantum Electromagnetic Transients Program

Quantum-empowered electromagnetic transients program (QEMTP) is a promising paradigm for tackling EMTP's computational burdens. Nevertheless, no existing studies truly achieve a practical and scalable QEMTP operable on today's noisy-intermediate-scale quantum (NISQ) computers. The strong reliance on noise-free and fault-tolerant quantum devices--which appears to be decades away--hinder practical applications of current QEMTP methods. Here, we devise a NISQ-QEMTP methodology which for the first time transitions the QEMTP operations from ideal, noise-free quantum simulators to real, noisy quantum computers. The main contributions lie in: (1) a shallow-depth QEMTP quantum circuit for mitigating noises on NISQ quantum devices; (2) practical QEMTP linear solvers incorporating executable quantum state preparation and measurements for nodal voltage computations; (3) a noise-resilient QEMTP algorithm leveraging quantum resources logarithmically scaled with power system dimension; (4) a quantum shifted frequency analysis (QSFA) for accelerating QEMTP by exploiting dynamic phasor simulations with larger time steps; (5) a systematical analysis on QEMTPs performance under various noisy quantum environments. Extensive experiments systematically verify the accuracy, efficacy, universality and noise-resilience of QEMTP on both noise-free simulators and IBM real quantum computers.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Sampling Low-Level Waste - Building a Program - 16101

Low level radioactive waste is routinely sampled and analyzed to demonstrate compliance with Title 10 Code of Federal Regulations Part 61. The sample results are frequently used to create scaling factors to relate the activity of hard to detect (HDT) radionuclides to gamma emitting activity if there is a correlation between the key and scaled radionuclide pair. The activity of gamma emitters can be used with these scaling factors to calculate activity of the low level waste generated in the plant. Another method is to use the sample results directly and scale the total activity to the volume or weight of the waste in the container. Either method assumes that the sample results are representative of the total waste in the container. This requires that the waste streams be accurately defined and that the samples contain radionuclides at ratios that are representative of the bulk waste. This is not always the case and deviations between the sample results and the actual radionuclide concentrations in the waste can lead to miss-classification of the waste resulting in regulatory non-compliance, increased waste disposal costs or both. A deliberate sampling methodology that considers the context of the waste generation and the inherent limitations in practical sampling methodologies will enhance the licensee's ability to demonstrate the analytical results from the sample are representative and defendable. A good sampling program starts with the establishment of waste streams that are consistent with both production mechanisms and plant systems. Once waste streams have been established, data quality objectives can be determined and then the methods for obtaining an appropriate sample can be developed along with the identification of sample points and sample schedules. Sometimes it may not be practical or even possible to obtain a truly representative sample in which case the results from the measurement of the sample must be evaluated within the context of the expected values and the factors inhibiting the collection of a truly representative sample. This paper will explore objectives of a sampling program in relation to the regulations and identify methods that can be used to obtain and evaluate sample data that can be defended as 'representative'. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investigation of criticality safety control infraction data at a nuclear facility

Chemical and metallurgical operations involving plutonium and other nuclear materials account for most activities performed at the LANL's Plutonium Facility (PF-4). Here, the presence of large quantities of fissile materials in numerous forms at PF-4 makes it necessary to maintain an active criticality safety program. The LANL Nuclear Criticality Safety (NCS) Program provides guidance to enable efficient operations while ensuring prevention of criticality accidents in the handling, storing, processing and transportation of fissionable material at PF-4. In order to achieve and sustain lower criticality safety control infraction (CSCI) rates, PF-4 operations are continuously improved, through the use of Lean Manufacturing and Six Sigma (LSS) business practices. Employing LSS, statistically significant variations (trends) can be identified in PF-4 CSCI reports. In this study, trends have been identified in the NCS Program using the NCS Database. An output metric has been developed that measures ADPSM Management progress toward meeting its NCS objectives and goals. Using a Pareto Chart, the primary CSCI attributes have been determined in order of those requiring the most management support. Data generated from analysis of CSCI data help identify and reduce number of corresponding attributes. In-field monitoring of CSCI's contribute to an organization's scientific and technological excellence by providing information that can be used to improve criticality safety operation safety. This increases technical knowledge and augments operational safety.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

As Permanent as Practicable: The reality of Permanent Markers - 16191

The regulatory requirements in the United States do not require any specific time frame for the duration of permanent marker systems to inform future generations of the presence of deep geologic nuclear waste repositories. The requirement is for markers to be 'as permanent as practicable'. For the Waste Isolation Pilot Plant in New Mexico, the U.S. Department of Energy chose a 10,000 year Passive Institutional Controls program goal. Passive Institutional Controls are to be designed prior to facility closure and implemented prior to the completion of the Active Institutional Controls program. Nuclear waste repositories across the world are actively developing marker and message systems, as required by their own regulations, for time frames either specified in those regulations or to be proposed to the regulator by the implementing organization. Time frames may be based upon the radioactive characteristics of the various isotopes being disposed of in the repository under consideration, or they may be based on some utility function that balances investment, practicability and risk. Scientifically, there are a number of time frames that make sense. However, an important determinant of effectiveness that has not been taken into consideration is the impact of the human connection, the receiver of the message. The major obstacle that the permanent marker systems need to overcome is the impact that humans will have over time. Historically, no monument has ever survived more than a few thousand years when humans come in contact with it. No matter what size of monument or topic the monument represents, humans have a history of destroying monuments beginning just a few generations after the monument's construction. The only way to ensure that a monument system can endure long time frames is to isolate it from humans. Eliminating contact with humans for whom the messages are meant defeats the very purpose of having an informative marker and message system. A more reasonable and historically supported time frame of 1,000 years would assure that no unreasonable cost would be incurred by current generations. Future generations could decide to continue maintaining the message, or not; and the likelihood of destruction of the markers by subsequent generations would be reduced since the knowledge of the markers and messages would have been transmitted within a more reasonable time frame over which language continuity, for example, would likely be manageable. Future preservation of the marker system and future human actions cannot be controlled, but the goal is to build a marker and message delivery system that reduces the likelihood of inadvertent future human disturbance of a deep geologic repository. This is the typical regulatory requirement on future information systems. Regulators who insist on an extremely long time frame for marker effectiveness should consider the historical realities of 'permanent' markers and monuments and propose a more reasonable time frame. Perhaps it would be more practicable to require 1,000 years for informing future generations and then allow them to determine what they wish to do to protect the future for another, perhaps similar, period of time. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TH-E-209-01: Fluoroscopic Dose Monitoring and Patient Follow-Up Program at Massachusetts General Hospital

Radiation dose monitoring solutions have opened up new opportunities for medical physicists to be more involved in modern clinical radiology practices. In particular, with the help of comprehensive radiation dose data, data-driven protocol management and informed case follow up are now feasible. Significant challenges remain however and the problems faced by medical physicists are highly heterogeneous. Imaging systems from multiple vendors and a wide range of vintages co-exist in the same department and employ data communication protocols that are not fully standardized or implemented making harmonization complex. Many different solutions for radiation dose monitoring have been implemented by imaging facilities over the past few years. Such systems are based on commercial software, home-grown IT solutions, manual PACS data dumping, etc., and diverse pathways can be used to bring the data to impact clinical practice. The speakers will share their experiences with creating or tailoring radiation dose monitoring/management systems and procedures over the past few years, which vary significantly in design and scope. Topics to cover: (1) fluoroscopic dose monitoring and high radiation event handling from a large academic hospital; (2) dose monitoring and protocol optimization in pediatric radiology; and (3) development of a home-grown IT solution and dose data analysis framework. Learning Objectives: Describe the scope and range of radiation dose monitoring and protocol management in a modern radiology practice Review examples of data available from a variety of systems and how it managed and conveyed. Reflect on the role of the physicist in radiation dose awareness.

60 APPLIED LIFE SCIENCES↗

TU-AB-BRD-03: Fault Tree Analysis

Current quality assurance and quality management guidelines provided by various professional organizations are prescriptive in nature, focusing principally on performance characteristics of planning and delivery devices. However, published analyses of events in radiation therapy show that most events are often caused by flaws in clinical processes rather than by device failures. This suggests the need for the development of a quality management program that is based on integrated approaches to process and equipment quality assurance. Industrial engineers have developed various risk assessment tools that are used to identify and eliminate potential failures from a system or a process before a failure impacts a customer. These tools include, but are not limited to, process mapping, failure modes and effects analysis, fault tree analysis. Task Group 100 of the American Association of Physicists in Medicine has developed these tools and used them to formulate an example risk-based quality management program for intensity-modulated radiotherapy. This is a prospective risk assessment approach that analyzes potential error pathways inherent in a clinical process and then ranks them according to relative risk, typically before implementation, followed by the design of a new process or modification of the existing process. Appropriate controls are then put in place to ensure that failures are less likely to occur and, if they do, they will more likely be detected before they propagate through the process, compromising treatment outcome and causing harm to the patient. Such a prospective approach forms the basis of the work of Task Group 100 that has recently been approved by the AAPM. This session will be devoted to a discussion of these tools and practical examples of how these tools can be used in a given radiotherapy clinic to develop a risk based quality management program. Learning Objectives: Learn how to design a process map for a radiotherapy process Learn how to perform failure modes and effects analysis analysis for a given process Learn what fault trees are all about Learn how to design a quality management program based upon the information obtained from process mapping, failure modes and effects analysis and fault tree analysis. Dunscombe: Director, TreatSafely, LLC and Center for the Assessment of Radiological Sciences; Consultant to IAEA and Varian Thomadsen: President, Center for the Assessment of Radiological Sciences Palta: Vice President of the Center for the Assessment of Radiological Sciences.

60 APPLIED LIFE SCIENCES↗

TU-AB-BRD-04: Development of Quality Management Program

Current quality assurance and quality management guidelines provided by various professional organizations are prescriptive in nature, focusing principally on performance characteristics of planning and delivery devices. However, published analyses of events in radiation therapy show that most events are often caused by flaws in clinical processes rather than by device failures. This suggests the need for the development of a quality management program that is based on integrated approaches to process and equipment quality assurance. Industrial engineers have developed various risk assessment tools that are used to identify and eliminate potential failures from a system or a process before a failure impacts a customer. These tools include, but are not limited to, process mapping, failure modes and effects analysis, fault tree analysis. Task Group 100 of the American Association of Physicists in Medicine has developed these tools and used them to formulate an example risk-based quality management program for intensity-modulated radiotherapy. This is a prospective risk assessment approach that analyzes potential error pathways inherent in a clinical process and then ranks them according to relative risk, typically before implementation, followed by the design of a new process or modification of the existing process. Appropriate controls are then put in place to ensure that failures are less likely to occur and, if they do, they will more likely be detected before they propagate through the process, compromising treatment outcome and causing harm to the patient. Such a prospective approach forms the basis of the work of Task Group 100 that has recently been approved by the AAPM. This session will be devoted to a discussion of these tools and practical examples of how these tools can be used in a given radiotherapy clinic to develop a risk based quality management program. Learning Objectives: Learn how to design a process map for a radiotherapy process Learn how to perform failure modes and effects analysis analysis for a given process Learn what fault trees are all about Learn how to design a quality management program based upon the information obtained from process mapping, failure modes and effects analysis and fault tree analysis. Dunscombe: Director, TreatSafely, LLC and Center for the Assessment of Radiological Sciences; Consultant to IAEA and Varian Thomadsen: President, Center for the Assessment of Radiological Sciences Palta: Vice President of the Center for the Assessment of Radiological Sciences.

60 APPLIED LIFE SCIENCES↗

TU-AB-BRD-00: Task Group 100

Current quality assurance and quality management guidelines provided by various professional organizations are prescriptive in nature, focusing principally on performance characteristics of planning and delivery devices. However, published analyses of events in radiation therapy show that most events are often caused by flaws in clinical processes rather than by device failures. This suggests the need for the development of a quality management program that is based on integrated approaches to process and equipment quality assurance. Industrial engineers have developed various risk assessment tools that are used to identify and eliminate potential failures from a system or a process before a failure impacts a customer. These tools include, but are not limited to, process mapping, failure modes and effects analysis, fault tree analysis. Task Group 100 of the American Association of Physicists in Medicine has developed these tools and used them to formulate an example risk-based quality management program for intensity-modulated radiotherapy. This is a prospective risk assessment approach that analyzes potential error pathways inherent in a clinical process and then ranks them according to relative risk, typically before implementation, followed by the design of a new process or modification of the existing process. Appropriate controls are then put in place to ensure that failures are less likely to occur and, if they do, they will more likely be detected before they propagate through the process, compromising treatment outcome and causing harm to the patient. Such a prospective approach forms the basis of the work of Task Group 100 that has recently been approved by the AAPM. This session will be devoted to a discussion of these tools and practical examples of how these tools can be used in a given radiotherapy clinic to develop a risk based quality management program. Learning Objectives: Learn how to design a process map for a radiotherapy process Learn how to perform failure modes and effects analysis analysis for a given process Learn what fault trees are all about Learn how to design a quality management program based upon the information obtained from process mapping, failure modes and effects analysis and fault tree analysis. Dunscombe: Director, TreatSafely, LLC and Center for the Assessment of Radiological Sciences; Consultant to IAEA and Varian Thomadsen: President, Center for the Assessment of Radiological Sciences Palta: Vice President of the Center for the Assessment of Radiological Sciences.

60 APPLIED LIFE SCIENCES↗

TU-AB-BRD-01: Process Mapping

Current quality assurance and quality management guidelines provided by various professional organizations are prescriptive in nature, focusing principally on performance characteristics of planning and delivery devices. However, published analyses of events in radiation therapy show that most events are often caused by flaws in clinical processes rather than by device failures. This suggests the need for the development of a quality management program that is based on integrated approaches to process and equipment quality assurance. Industrial engineers have developed various risk assessment tools that are used to identify and eliminate potential failures from a system or a process before a failure impacts a customer. These tools include, but are not limited to, process mapping, failure modes and effects analysis, fault tree analysis. Task Group 100 of the American Association of Physicists in Medicine has developed these tools and used them to formulate an example risk-based quality management program for intensity-modulated radiotherapy. This is a prospective risk assessment approach that analyzes potential error pathways inherent in a clinical process and then ranks them according to relative risk, typically before implementation, followed by the design of a new process or modification of the existing process. Appropriate controls are then put in place to ensure that failures are less likely to occur and, if they do, they will more likely be detected before they propagate through the process, compromising treatment outcome and causing harm to the patient. Such a prospective approach forms the basis of the work of Task Group 100 that has recently been approved by the AAPM. This session will be devoted to a discussion of these tools and practical examples of how these tools can be used in a given radiotherapy clinic to develop a risk based quality management program. Learning Objectives: Learn how to design a process map for a radiotherapy process Learn how to perform failure modes and effects analysis analysis for a given process Learn what fault trees are all about Learn how to design a quality management program based upon the information obtained from process mapping, failure modes and effects analysis and fault tree analysis. Dunscombe: Director, TreatSafely, LLC and Center for the Assessment of Radiological Sciences; Consultant to IAEA and Varian Thomadsen: President, Center for the Assessment of Radiological Sciences Palta: Vice President of the Center for the Assessment of Radiological Sciences.

60 APPLIED LIFE SCIENCES↗

TU-AB-BRD-02: Failure Modes and Effects Analysis

Current quality assurance and quality management guidelines provided by various professional organizations are prescriptive in nature, focusing principally on performance characteristics of planning and delivery devices. However, published analyses of events in radiation therapy show that most events are often caused by flaws in clinical processes rather than by device failures. This suggests the need for the development of a quality management program that is based on integrated approaches to process and equipment quality assurance. Industrial engineers have developed various risk assessment tools that are used to identify and eliminate potential failures from a system or a process before a failure impacts a customer. These tools include, but are not limited to, process mapping, failure modes and effects analysis, fault tree analysis. Task Group 100 of the American Association of Physicists in Medicine has developed these tools and used them to formulate an example risk-based quality management program for intensity-modulated radiotherapy. This is a prospective risk assessment approach that analyzes potential error pathways inherent in a clinical process and then ranks them according to relative risk, typically before implementation, followed by the design of a new process or modification of the existing process. Appropriate controls are then put in place to ensure that failures are less likely to occur and, if they do, they will more likely be detected before they propagate through the process, compromising treatment outcome and causing harm to the patient. Such a prospective approach forms the basis of the work of Task Group 100 that has recently been approved by the AAPM. This session will be devoted to a discussion of these tools and practical examples of how these tools can be used in a given radiotherapy clinic to develop a risk based quality management program. Learning Objectives: Learn how to design a process map for a radiotherapy process Learn how to perform failure modes and effects analysis analysis for a given process Learn what fault trees are all about Learn how to design a quality management program based upon the information obtained from process mapping, failure modes and effects analysis and fault tree analysis. Dunscombe: Director, TreatSafely, LLC and Center for the Assessment of Radiological Sciences; Consultant to IAEA and Varian Thomadsen: President, Center for the Assessment of Radiological Sciences Palta: Vice President of the Center for the Assessment of Radiological Sciences.

60 APPLIED LIFE SCIENCES↗

TU-B-19A-01: Image Registration II: TG132-Quality Assurance for Image Registration

AAPM Task Group 132 was charged with a review of the current approaches and solutions for image registration in radiotherapy and to provide recommendations for quality assurance and quality control of these clinical processes. As the results of image registration are always used as the input of another process for planning or delivery, it is important for the user to understand and document the uncertainty associate with the algorithm in general and the Result of a specific registration. The recommendations of this task group, which at the time of abstract submission are currently being reviewed by the AAPM, include the following components. The user should understand the basic image registration techniques and methods of visualizing image fusion. The disclosure of basic components of the image registration by commercial vendors is critical in this respect. The physicists should perform end-to-end tests of imaging, registration, and planning/treatment systems if image registration is performed on a stand-alone system. A comprehensive commissioning process should be performed and documented by the physicist prior to clinical use of the system. As documentation is important to the safe implementation of this process, a request and report system should be integrated into the clinical workflow. Finally, a patient specific QA practice should be established for efficient evaluation of image registration results. The implementation of these recommendations will be described and illustrated during this educational session. Learning Objectives: Highlight the importance of understanding the image registration techniques used in their clinic. Describe the end-to-end tests needed for stand-alone registration systems. Illustrate a comprehensive commissioning program using both phantom data and clinical images. Describe a request and report system to ensure communication and documentation. Demonstrate an clinically-efficient patient QA practice for efficient evaluation of image registration.

60 APPLIED LIFE SCIENCES↗

Optimal allocation of series FACTS devices in large‐scale systems

Series flexible AC transmission systems devices, such as the variable series reactor, have the ability to continuously regulate the transmission line reactance so as to control power flow. This study presents a new approach to optimally locating such devices in the transmission network considering multiple operating states and contingencies. To investigate optimal investment, a single target year planning with three different load patterns is considered. The transmission contingencies may occur under any of the three load conditions and the coupling constraints between base case and contingencies are included. A reformulation technique transforms the original mixed integer non‐linear programming model into mixed integer linear programming model. To further relieve the computational burden and enable the planning model to be directly applied to practical large‐scale systems, a two‐phase decomposition algorithm is introduced. Detailed numerical simulation results on IEEE 118‐bus system and the Polish 2383‐bus system illustrate the efficient performance of the proposed algorithm.

Zhang, Xiaohu↗