Search NASA⌕ Search

SEARCH · Search NASA

Results for “SPACE LOGISTICS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Phase 111A Crew Interface Specifications Development for Inflight Maintenance and Stowage Functions

This report presents the findings and data products developed during the Phase IIIA Crew Interface Specification Study for Inflight Maintenance and Stowage Functions, performed by General Electric for the NASA, Johnson Space Center with a set of documentation that can be used as definitive guidelines to improve the present process of defining, controlling and managing flight crew interface requirements that are related to inflight maintenance (including assembly and servicing) and stowage functions. During the Phase IIIA contract period, the following data products were developed: 1) Projected NASA Crew Procedures/Flight Data File Development Process. 2) Inflight Maintenance Management Process Description. 3) Preliminary Draft, General Specification, Inflight Maintenance Management Requirements. 4) Inflight Maintenance Operational Process Description. 5) Preliminary Draft, General Specification, Inflight Maintenance Task and Support Requirements Analysis. 6) Suggested IFM Data Processing Reports for Logistics Management The above Inflight Maintenance data products have been developed during the Phase IIIA study after review of Space Shuttle Program Documentation, including the Level II Integrated Logistics Requirements and other DOD and NASA data relative to Payloads Accommodations and Satellite On-Orbit Servicing. These Inflight Maintenance data products were developed to be in consonance with Space Shuttle Program technical and management requirements.

Carl, John G.↗

Launch Vehicle/Carrier Interaction, Improving the Analytical Integration Process

A goal of the aerospace industry is to reduce the cost of space transportation by a significant within the next decade. The present cost of launching a space transportation system which includes propulsion system, vehicle, carrier, and payload integrated together to form a system, encompasses much more than the design of the propulsion system and vehicle. The total cost includes the recurring cost of the process of integrating carriers, and payloads into the vehicle for each flight. The recurring cost of the integration of carrier/payloads systems is driven by the interaction of the vehicle. If the interaction can be well characterized and made to be very predictable for a range of payloads, or if it can be minimized then the cost of integrating a payload can be reduced significantly from today's levels. The Space Shuttle is very interactive with the payload. The interaction has been well characterized through finite element modeling and is reasonably predictable for a specific payload. Experience has shown, however, that the interaction is very manifest dependent, and small changes in one portion of a payload complement can change the interaction significantly in another portion. That is the affects of one on the other are such that if one or the other is changed slightly the environment at the interfaces can change significantly. To date the Shuttle has made in excess of one hundred flights. For each of these flights several iterations of dynamic analyses have been required in the development of each vehicle/carrier/payload system. The iterative analyses are needed because of the sensitivity of the interaction of the launch vehicle to the attached carrier/payload. The Multi Purpose Logistics Module (MPLM) is a carrier designed for flight in the Space Shuttle carrying a wide variation of cargo, supplies, and experiments to and from Space Station. Its integration process provides a unique area for improvement in the template in use today for transporting items to space. Discussion of the present MPLM integration analysis requirements and possible areas for improvement of the process are provided in the subject paper. Special emphasis is placed on reduction of requirements based on similarity of items being transported, and the use of carrier hardware for protection of the Shuttle Orbiter.

Shariett, Charles A.↗

Integrating O/S models during conceptual design, part 3

Space vehicles, such as the Space Shuttle, require intensive ground support prior to, during, and after each mission. Maintenance is a significant part of that ground support. All space vehicles require scheduled maintenance to ensure operability and performance. In addition, components of any vehicle are not one-hundred percent reliable so they exhibit random failures. Once detected, a failure initiates unscheduled maintenance on the vehicle. Maintenance decreases the number of missions which can be completed by keeping vehicles out of service so that the time between the completion of one mission and the start of the next is increased. Maintenance also requires resources such as people, facilities, tooling, and spare parts. Assessing the mission capability and resource requirements of any new space vehicle, in addition to performance specification, is necessary to predict the life cycle cost and success of the vehicle. Maintenance and logistics support has been modeled by computer simulation to estimate mission capability and resource requirements for evaluation of proposed space vehicles. The simulation was written with Simulation Language for Alternative Modeling II (SLAM II) for execution on a personal computer. For either one or a fleet of space vehicles, the model simulates the preflight maintenance checks, the mission and return to earth, and the post flight maintenance in preparation to be sent back into space. THe model enables prediction of the number of missions possible and vehicle turn-time (the time between completion of one mission and the start of the next) given estimated values for component reliability and maintainability. The model also facilitates study of the manpower and vehicle requirements for the proposed vehicle to meet its desired mission rate. This is the 3rd part of a 3 part technical report.

Ebeling, Charles E.↗

Space shuttle operations at the NASA Kennedy Space Center: the role of emergency medicine

The Division of Emergency Medicine at the University of Florida coordinates a unique program with the NASA John F. Kennedy Space Center (KSC) to provide emergency medical support (EMS) for the United States Space Transportation System. This report outlines the organization of the KSC EMS system, training received by physicians providing medical support, logistic and operational aspects of the mission, and experiences of team members. The participation of emergency physicians in support of manned space flight represents another way that emergency physicians provide leadership in prehospital care and disaster management.

Emergency Medicine/education/organization & admini↗

Optimization of space manufacturing systems

Four separate analyses are detailed: transportation to low earth orbit, orbit-to-orbit optimization, parametric analysis of SPS logistics based on earth and lunar source locations, and an overall program option optimization implemented with linear programming. It is found that smaller vehicles are favored for earth launch, with the current Space Shuttle being right at optimum payload size. Fully reusable launch vehicles represent a savings of 50% over the Space Shuttle; increased reliability with less maintenance could further double the savings. An optimization of orbit-to-orbit propulsion systems using lunar oxygen for propellants shows that ion propulsion is preferable by a 3:1 cost margin over a mass driver reaction engine at optimum values; however, ion engines cannot yet operate in the lower exhaust velocity range where the optimum lies, and total program costs between the two systems are ambiguous. Heavier payloads favor the use of a MDRE. A parametric model of a space manufacturing facility is proposed, and used to analyze recurring costs, total costs, and net present value discounted cash flows. Parameters studied include productivity, effects of discounting, materials source tradeoffs, economic viability of closed-cycle habitats, and effects of varying degrees of nonterrestrial SPS materials needed from earth. Finally, candidate optimal scenarios are chosen, and implemented in a linear program with external constraints in order to arrive at an optimum blend of SPS production strategies in order to maximize returns.

Akin, D. L.↗

Swamp Works: A New Approach to Develop Space Mining and Resource Extraction Technologies at the National Aeronautics Space Administration (NASA) Kennedy Space Center (KSC)

The first steps for In Situ Resource Utilization (ISRU) on target bodies such as the Moon, Mars and Near Earth Asteroids (NEA), and even comets, involve the same sequence of steps as in the terrestrial mining of resources. First exploration including prospecting must occur, and then the resource must be acquired through excavation methods if it is of value. Subsequently a load, haul and dump sequence of events occurs, followed by processing of the resource in an ISRU plant, to produce useful commodities. While these technologies and related supporting operations are mature in terrestrial applications, they will be different in space since the environment and indigenous materials are different than on Earth. In addition, the equipment must be highly automated, since for the majority of the production cycle time, there will be no humans present to assist or intervene. This space mining equipment must withstand a harsh environment which includes vacuum, radical temperature swing cycles, highly abrasive lofted dust, electrostatic effects, van der Waals forces effects, galactic cosmic radiation, solar particle events, high thermal gradients when spanning sunlight terminators, steep slopes into craters / lava tubes and cryogenic temperatures as low as 40 K in permanently shadowed regions. In addition the equipment must be tele-operated from Earth or a local base where the crew is sheltered. If the tele-operation occurs from Earth then significant communications latency effects mandate the use of autonomous control systems in the mining equipment. While this is an extremely challenging engineering design scenario, it is also an opportunity, since the technologies developed in this endeavor could be used in the next generations of terrestrial mining equipment, in order to mine deeper, safer, more economical and with a higher degree of flexibility. New space technologies could precipitate new mining solutions here on Earth. The NASA KSC Swamp Works is an innovation environment and methodology, with associated laboratories that uses lean development methods and creativity-enhancing processes to invent and develop new solutions for space exploration. This paper will discuss the Swamp Works approach to developing space mining and resource extraction systems and the vision of space development it serves. The ultimate goal of the Swamp Works is to expand human civilization into the solar system via the use of local resources utilization. By mining and using the local resources in situ, it is conceivable that one day the logistics supply train from Earth can be eliminated and Earth independence of a space-based community will be enabled.

Resource Extraction↗

The International Space Station and the Space Debris Environment: 10 Years On

For just over a decade the International Space Station (ISS), the most heavily protected vehicle in Earth orbit, has weathered the space debris environment well. Numerous hypervelocity impact features on the surface of ISS caused by small orbital debris and meteoroids have been observed. In addition to typical impacts seen on the large solar arrays, craters have been discovered on windows, hand rails, thermal blankets, radiators, and even a visiting logistics module. None of these impacts have resulted in any degradation of the operation or mission of the ISS. Validating the rate of small particle impacts on the ISS as predicted by space debris environment models is extremely complex. First, the ISS has been an evolving structure, from its original 20 metric tons to nearly 300 metric tons (excluding logistics vehicles) ten years later. Hence, the anticipated space debris impact rate has grown with the increasing size of ISS. Secondly, a comprehensive visual or photographic examination of the complete exterior of ISS has never been accomplished. In fact, most impact features have been discovered serendipitously. Further complications include the estimation of the size of an impacting particle without knowing its mass, velocity, and angle of impact and the effect of shadowing by some ISS components. Inadvertently and deliberately, the ISS has also been the source of space debris. The U.S. Space Surveillance Network officially cataloged 65 debris from ISS from November 1998 to November 2008: from lost cameras, sockets, and tool bags to intentionally discarded equipment and an old space suit. Fortunately, the majority of these objects fall back to Earth quickly with an average orbital lifetime of less than two months and a maximum orbital lifetime of a little more than 15 months. The cumulative total number of debris object-years is almost exactly 10, the equivalent of one piece of debris remaining in orbit for 10 years. An unknown number of debris too small to be tracked and cataloged have also been generated, but normally with even shorter orbital lifetimes. Finally, eight collision avoidance maneuvers have been performed to avoid potential collisions between ISS and large, tracked space debris. The most recent such maneuver was accomplished by ESA's Automated Transfer Vehicle, the Jules Verne, just three months before the 10th anniversary of the launch of ISS's first element.

Johnson, Nicholas↗

Operations analysis (study 2.1): Payload designs for space servicing

Potential modes of operating in space in the space shuttle era are documented. The October 1973 NASA Mission Model provides a definition of various NASA and non-DOD automated payload configurations when employed in an expendable mode. The model also specifies a launch schedule for initial deployment of payloads as well as for subsequent replacements at periodic cycles. This model and its associated payload definitions serve as a foundation for the data presented in this report. The reference model has been revised to reflect automated space servicing of payloads as an operational concept instead of the existing expendable approach. The indication is that the bulk of a payload's subsystems and mission equipment require no support over the lifetime of the program. However, failure of a single unit could result in loss of the mission objectives. When space servicing is employed, the approach is to replace only that unit causing the anomaly. This concept affords an opportunity to standardize space replacable units, as well as to reduce the expense of logistics support, by allowing multiple servicing on any single upper stage/shuttle flight.

Wolfe, R. R.↗

Preliminary analysis of an integrated logistics system for OSSA payloads. Volume 4: Supportability analysis of the 1.8m centrifuge

Supportability issues for the 1.8 meter centrifuge in the Life Science Research Facility are addressed. The analysis focuses on reliability and maintainability and the potential impact on supportability and affordability. Standard logistics engineering methodologies that will be applied to all Office of Space Science and Applications' (OSSA) payload programs are outlined. These methodologies are applied to the 1.8 meter centrifuge.

Palguta, T.↗

Electrochemically regenerable carbon dioxide/moisture control technology for an Advanced Extravehicular Mobility Unit

Regenerable CO2/moisture removal techniques that reduce the expendables and logistics requirements are needed to sustain people undertaking EVAs for the Space Station. Here, the development of electrochemically regenerable CO2 absorption (ERCA) technology to replace the nonregenerable LiOH absorber for the advanced Portable Life Support System (PLSS) is reported. During EVA the ERCA uses a mechanism involving gas absorption into a liquid absorbent for the removal and storage of the metabolically produced CO2 and moisture. Following the EVA, the expended absorbent is regenerated onboard the Space Station by an electrochemical CO2 concentrator. The ERCA concept has the ability to effectively satisfy the high metabolic CO2 and moisture removal requirements of PLSS applications. This paper defines the ERCA concept and its advantages for the PLSS application, reviews breadboard test data, and presents physical characteristics of the breadboard and projected flight hardware.

Lee, M. C.↗

NASA newsletters for the Weber Student Shuttle Involvement Project

Biweekly reports generated for the Weber Student Shuttle Involvement Project (SSIP) are discussed. The reports document the evolution of science, hardware, and logistics for this Shuttle project aboard the eleventh flight of the Space Transportation System (STS-41B), launched from Kennedy Space Center on February 3, 1984, and returned to KSC 8 days later. The reports were intended to keep all members of the team aware of progress in the project and to avoid redundancy and misunderstanding. Since the Weber SSIP was NASA's first orbital rat project, documentation of all actions was essential to assure the success of this complex project. Eleven reports were generated: October 3, 17 and 31; November 14 and 28; and December 12 and 17, 1983; and January 3, 16, and 23; and May 1, 1984. A subject index of the reports is included. The final report of the project is included as an appendix.

Morey-Holton, E. R.↗

Lunar orbiting microwave beam power system

A microwave beam power system using lunar orbiting solar powered satellite(s) and surface rectenna(s) was investigated as a possible energy source for the Moon's surface. The concept has the potential of reduced system mass by placing the power source in orbit. This can greatly reduce and/or eliminate the 14 day energy storage requirement of a lunar surface solar system. Also propellants required to de-orbit to the surface are greatly reduced. To determine the practicality of the concept and the most important factors, a zero-th order feasibility analysis was performed. Three different operational scenarios employing state of the art technology and forecasts for two different sets of advanced technologies were investigated. To reduce the complexity of the problem, satellite(s) were assumed in circular equatorial orbits around the Moon, supplying continuous power to a single equatorial base through a fixed horizontal rectenna on the surface. State of the art technology yielded specific masses greater than 2500 kg/kw, well above projections for surface systems. Using advanced technologies the specific masses are on the order of 100 kg/kw which is within the range of projections for surface nuclear (20 kg/kw) and solar systems (500 kg/kw). Further studies examining optimization of the scenarios, other technologies such as lasers transmitters and nuclear sources, and operational issues such as logistics, maintenance and support are being carried out to support the Space Exploration Initiative (SEI) to the Moon and Mars.

Fay, Edgar H.↗

Lunar orbiting microwave beam power system

A microwave-beam power system using lunar orbiting solar-powered satellite(s) and surface rectenna(s) is investigated as a possible energy source for the moon's surface. The concept has the potential of achieving reduced system mass by placing the power source in orbit. This can greatly reduce and/or eliminate the 14-d energy storage requirement of a lunar surface solar system. Also, propellants required to de-orbit to the surface are greatly reduced. To determine the practicality of the concept and the most important factors, a zeroth-order feasibility analysis is performed. Three different operation scenarios employing state of the art technology and forecasts for two different sets of advanced technologies are investigated. To reduce the complexity of the problem, satellite(s) are assumed to be in circular equatorial orbits around the moon, supplying continuous power to a single equatorial base through a fixed horizontal rectenna on the surface. State of the art technology yields specific masses greater than 2500 kg/kw, well above projections for surface systems. The specific masses are on the order of 100 kg/kW using advanced technologies, which is within the range of projections for surface nuclear (20 kg/kW) and solar systems (500 kg/kW). Further studies examining optimization of the scenarios, other technologies, such as laser transmitters and nuclear sources, and operational issues, such as logistics, maintenance, and support, are being carried out to support the Space Exploration Initiative (SEI) to the moon and Mars.

Fay, Edgar H.↗

STS-100 Flight Day 9 Highlights

On this ninth day of the STS-100 mission, Commander Kent Rominger and Mission Specialist Chris Hadfield answer questions about the mission in an on-orbit press conference. The Expedition 2 crew, Commander Yuriy Usachev and Flight Engineers James Voss and Susan Helms, answer questions about their mission and the Canadian Robotic Arm in another on-orbit press conference. The Rafaello Logistics Module is removed from the Unity Module on the International Space Station and transfers it to the payload bay of Atlantis.

Source record↗

Rack Distribution Effects on MPLM Center of Mass

This research was in support of exploring the need for more flexible "center of gravity (CG) specifications than those currently established by NASA for the Multi-Purpose Logistics Module (MPLM). The MPLM is the cargo carrier for International Space Station (ISS) missions. The MPLM provides locations for 16 standard racks, as shown in Figure 1; not all positions need to be filled in any given flight. The MPLM coordinate system (X(sub M), Y(sub M), Z(sub M)) is illustrated as well. For this project, the primary missions of interest were those which supply the ISS and remove excess materials on the return flights. These flights use a predominate number of "Resupply Stowage Racks" (RSR) and "Resupply Stowage Platforms" (RSP). In these two types of racks, various smaller items are stowed. Hence, these racks will exhibit a considerable range of mass values as well as a range as to where their individual CG are located.

Tester, John T.↗

Space Station and Shuttle Payloads: Rack Insertion Device Pneumatic Assembly Setup and Test

As part of my KSC summer internship, I was given the very cool task of writing a test preparation sheet (TPS). A TPS is a set of instructions for certain procedures or tasks, and serves as the documentation for the tasks. TPSs guide task leaders and technicians throughout the work procedures, safely, informing them of what steps will be hazardous, what precautions must be taken, and what to do in the case of an accident or emergency. I was placed in Boeing's Resupply & Return Division (R&R). R&R is responsible for sending up food and supplies to the International Space Station (ISS) with the use of three Italian Multi Purpose Logistics Modules - Leonardo, Donatello, and Raffaello. The supplies are loaded into Resupply Stowage Racks (RSRs) or Resupply Stowage Platforms (RSPs) (though, both are usually referred to as racks), depending on their size and shape. These racks are loaded into the modules with the help of a specialized crane known as the Rack Insertion Device (RID). The RID rests on four pneumatic air jacks, these allow for an operator to raise or lower the RID. The pneumatic air system supplies the air jacks with the necessary air pressure required to lift the RID.

Conde, Nathan↗