Search NASA⌕ Search

SEARCH · Search NASA

Results for “STATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Suggestion of typical phases of in-vessel fuel-debris by thermodynamic calculation for decommissioning technology of Fukushima-Daiichi nuclear power station

For the decommissioning of the Fukushima-Daiichi Nuclear Power Station (1F), the characterization of fuel-debris in cores of Units 1-3 is necessary. In this study, typical phases of the in-vessel fuel-debris were estimated using a thermodynamic equilibrium (TDE) calculation. The FactSage program and NUCLEA database were applied to estimate the phase equilibria of debris. It was confirmed that the TDE calculation using the database can reproduce the phase separation behavior of debris observed in the Three Mile Island accident. In the TDE calculation of 1F, the oxygen potential [G(O{sub 2})] was assumed to be a variable. At low G(O{sub 2}) where metallic zirconium remains, (U,Zr)O{sub 2}, UO{sub 2}, and ZrO{sub 2} were found as oxides, and oxygen-dispersed Zr, Fe{sub 2}(Zr,U), and Fe{sub 3}UZr{sub 2} were found as metals. With an increase in zirconium oxidation, the mass of those metals, especially Fe{sub 3}UZr{sub 2}, decreased, but the other phases of metals hardly changed qualitatively. Consequently, (U,Zr)O{sub 2} is suggested as a typical phase of oxide, and Fe{sub 2}(Zr,U) is suggested as that of metal. However, a more detailed estimation is necessary to consider the distribution of Fe in the reactor pressure vessel through core-melt progression. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Direction on characterization of fuel debris for defueling process in Fukushima Daiichi Nuclear Power Station

For the decommissioning of Fukushima Daiichi Nuclear Power Station (1F), defueling of the fuel debris in the reactor core of Units 1-3 is planned to start within 10 years. Preferential items in the characterization of the fuel debris were identified for this work, in which the procedure and handling tools were assumed on the basis of information on 1F and experience after the Three Mile Island Unit 2 (TMI-2) accident. The candidates for defueling tools for 1F were selected from among the TMI- 2 defueling tools. It was found that they could be categorized into six groups according to their operating principles. The important properties of the fuel debris for defueling were selected considering the effect of the target materials on the tool performance. The selected properties are shape, size, density, thermal conductivity, heat capacity, melting point, hardness, elastic modulus, and fracture toughness. Of these properties, the mechanical properties (hardness, elastic modulus, fracture toughness) were identified as preferential items, because too few data on these characteristics of fuel debris are available in past severe accident studies. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The application of MAMMOTH for a detailed tightly coupled fuel pin simulation with a station blackout

The accurate calculation of desired quantities to predict fuel behavior in a nuclear reactor requires the solution of inter linked equations representing different physics phenomena. Traditional fuels performance codes often rely on internal empirical models for the pin power density and a simplified boundary condition on the cladding outer surface. These simplifications are performed because of the difficulty of coupling applications or codes on differing domains and mapping the required data. In this work the MAMMOTH application is employed in the demonstration of an approach that more consistent with first principles, in a simulation that couples the neutronics application Rattlesnake, the thermal fluids application RELAP-7 and the fuels performance application BISON. A single fuel pin was modeled based on the dimensions of a fuel rod from a Westinghouse 17*17 optimized PWR fuel assembly. The simulation consisted of a depletion period of 1343 days, representing three full operating cycles, followed by a station blackout (SBO) event. The fuel rod was depleted with a total pin power of 65.81 kW. After 1343 days the fission power was reduced to zero (simulating a reactor shutdown). Decay heat calculations provided the time-varying energy source after this time. For this problem, Rattlesnake, BISON, and RELAP-7 are coupled under MAMMOTH in a tightly coupled approach. Each system solves its physics on a separate mesh and, for RELAP-7 and BISON, on only a subset of the full problem domain. Rattlesnake solves the neutronics over the whole domain, which includes the fuel, cladding, gaps, water, and top and bottom rod holders. Here BISON is applied to the fuel and cladding with a 2-D axisymmetric domain, and RELAP-7 is applied to the flow of the circular outer water channel with a set of 1-D flow equations. For this work, the mesh on the Rattlesnake side is either be 3-D (for low order PN transport or diffusion) or 2-D axisymmetric (for diffusion). BISON has a matching ring structure mesh for the fuel so both the power density and local burnup are transferred accurately from Rattlesnake. At each depletion time step, Rattlesnake calculates a power density, fission density rate, burnup distribution and fast flux based on the current water density and fuel temperature. These are then mapped to the BISON mesh to perform a fuels performance solution. BISON calculates the fuel temperature and cladding surface temperature based upon the current power density and bulk fluid temperature. RELAP-7 then calculates the fluid temperature, water density fraction and water phase velocity based upon the cladding surface temperature. The fuel temperature and the fluid density are then passed back to Rattlesnake for another neutronics calculation. For this paper, sets of results from the detailed calculation are provided for both depletion and the SBO event. We demonstrate that a detailed simulation akin to first principles can be achieved using MAMMOTH and the various MOOSE application on differing domains. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Frozen Soil Barrier to Control Groundwater Inflow into Damaged Reactors at the Fukushima Daiichi Nuclear Power Station - 16613

Reactor buildings and support facilities at the Fukushima Daiichi Nuclear Power Station (F1 Site) were damaged by a March 2011 tsunami. In response, the Tokyo Electric Power Company (TEPCO) is implementing a number of countermeasures to limit the releases and impacts of contaminated water to the surrounding environment. The diverse countermeasures work together in an integrated manner to provide different types, and several levels, of environmental protection. In general, the strategy represents an example of a 'defense in depth' concept that is used for nuclear facilities around the world. One of the key countermeasures is a frozen soil barrier encircling the damaged reactor facilities. The frozen barrier is intended to limit the flow of water into the area, reduce the amount of water entering damaged reactors, and reduce the resulting volume of contaminated water that requires treatment and storage. The frozen soil barrier was designed and installed by a team from TEPCO and Kajima Corporation. A group of scientists and engineers from US Department of Energy National Laboratories provided independent evaluation of the frozen barrier design and operational plans along with technical recommendations to the TEPCO team. The frozen soil barrier design extends to about 30 m depth; the bottom of the barrier is in a low permeability interval, and the total barrier length around the reactors is just over 1.5 km. The barrier required 1927 total boreholes: 1568 for freeze pipes plus 359 for temperature monitoring arrays. Drilling of all of the boreholes was completed November 9, 2015. Construction of the refrigeration plant is complete and all of the above ground piping/manifolds are in the final stages of construction. The DOE laboratory independent assessment of the frozen soil barrier concluded that the technical characteristics of a frozen barrier are relatively well suited to Fukushima-specific hydrogeologic conditions and the need for reducing the inflow of water into damaged reactors at the F1 Site. The scale of the Fukushima barrier is bounded by industry experience and the equipment and infrastructure proposed for the ground freezing is well understood. The on-site pilot test at Fukushima indicated predictable ground freezing and supported the full scale design parameters. These factors increase the confidence in the frozen soil barrier project underway at Fukushima. TEPCO is currently working with the Japanese Nuclear Regulatory Authority (NRA), providing operational plans/strategies for the frozen soil barrier and modeling results of the projected performance. Full scale frozen soil barrier operations are to begin after authorization from NRA. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

New Project on the Analysis of Contamination Mechanisms of Concrete at the Fukushima Daiichi Nuclear Power Station - 19511

For the decommissioning of a nuclear power station (NPS) after a severe accident, estimation of contamination depth and radioactivity level in concrete is essential. This paper outlines a recently begun project on the analysis of the contamination mechanisms of concrete in the Fukushima Daiichi NPS. For this analysis, data on various parameters are required, such as the materials used in the NPS, the environmental conditions of the exposed concrete, the conditions of exposure during the accident and until decommissioning, and the fundamental transport characteristics of nuclides in concrete. These aspects of this project are illustrated with some examples. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Electrical Cross-Tie Option and Issues to Cope With Extended Station Blackout

The electrical cross-tie option was proposed to cope with extended station blackout event (Ext-SBO) for Barakah NPP in UAE, the EDG Cross-Tie consider a donor Unit EDG as a power source for an Ext-SBO Unit under specific conditions. The cross-tie option is discussed and the issues related to this option are generated in systematic approach as a part of dependencies between multiple units. The applied approach benefited from the previous classification of the historical occurred events as site risk that has dependencies with an enhancement of the approach by adding the operation dimension to the dependencies risk.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Integral Effect Test of ATLAS Facility on Multiple Failure in a Prolonged Station Blackout

Since the Fukushima accident, the design extension conditions (DECs) in a nuclear power plant (NPP) have attracted more importance with respect to nuclear reactor safety, and a consensus has been developed such that these high-risk multiple failure accidents should be revisited from the viewpoint of a reinforcement of the 'defense in depth' concept. In particular, a station blackout (SBO) is one of the most important DECs because a loss of the heat sink without an appropriate accident measure might lead to a core uncovery, core damage, and ultimately, a core meltdown under high pressure. SBO has been recognized to be one of the risk-contributing sequences when combined with additional failure of components such as a reactor coolant pump (RCP) seal leakage or a steam generator tube rupture (SGTR). The RCP seal failure could occur due to a loss of continuous cooling through the seal during SBO. The SGTR during SBO can be a potentially important risk due to the release of the fission product with bypassing the containment boundary. The objective of this study is to experimentally simulate and analyze a prolonged SBO scenario in a thermal hydraulic integral effect test facility, ATLAS. As test items in OECD-ATLAS project, two tests for the SBO condition were conducted with additional failures, that is, a RCP seal failure (A2.1 test) and a SGTR (A2.2 test). In those tests, both the effect of the additional failure on reactor safety and the natural circulation characteristics during prolonged SBO conditions could be investigated. The present test can provide physical insight into the system response during the prolonged SBO scenario combined with the multiple failure.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Criticality characteristics of MCCI products possibly produced in reactors of Fukushima Daiichi nuclear power station - 14408

The damaged Unit 1-3 reactors of the Fukushima Daiichi Nuclear Power Station may contain fuel debris of a significant amount that is in a form of molten-core-concrete-interaction (MCCI) product with porous structure. Such low density MCCI product including fissile material is a great concern for its criticality control, especially under submerged condition, due to its fairly good neutron moderation. This report shows computation results of basic criticality characteristics of the MCCI product, which will facilitate criticality risk assessments during decommissioning of the reactors. The results imply that water bound in concrete may raise the risk from the viewpoints of possibility of criticality events and of effectiveness of mitigation measures such as neutron poison injection into coolant water. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Proposed SPAR Modeling Method for Quantifying Time Dependent Station Blackout Cut Sets

Abstract: The U.S. Nuclear Regulatory Commission’s (USNRC’s) Standardized Plant Analysis Risk (SPAR) models and industry risk models take similar approaches to analyzing the risk associated with loss of offsite power and station blackout (LOOP/SBO) events at nuclear reactor plants. In both SPAR models and industry models, core damage risk resulting from a LOOP/SBO event is analyzed using a combination of event trees and fault trees that produce cut sets that are, in turn, quantified to obtain a numerical estimate of the resulting core damage risk. A proposed SPAR method for quantifying the time-dependent cut sets is sometimes referred to as a convolution method. The SPAR method reflects assumptions about the timing of emergency diesel failures, the timing of subsequent attempts at emergency diesel repair, and the timing of core damage that may be different than those often used in industry models. This paper describes the proposed SPAR method.

99 GENERAL AND MISCELLANEOUS↗

Full Device Evaluation of Metal Halide Perovskite Solar Cells in Low Earth Orbit Aboard the International Space Station

This study investigates how sustained low Earth orbit (LEO) exposure affects metal halide perovskite (MHP) thin films and perovskite solar cells (PSCs). It examines samples deployed on the Materials International Space Station Experiment (MISSE) 15 and 16 missions. Five methylammonium lead iodide (MAPI) thin films are deployed on MISSE-16, each with distinct UV filters to selectively attenuate AM0 spectral bands. While post-flight optical analysis reveals that the least UV-exposed film exhibits the highest emission and lowest non-radiative recombination rate, no clear correlation is observed among the rest, and all MAPI films maintained excellent integrity throughout the mission. MISSE-15 deployed eight PSCs with diverse structures, MHP compositions, and contact materials. Post-flight analysis reveals stable, highly emissive MHPs, but damaged contacts due to ion migration, which caused loss of electrical response. The MISSE missions demonstrate MHPs' suitability for space applications, while highlighting the need for improved interfacial layers and contact materials to enhance charge carrier mobility, prevent ion migration, and improve charge carrier extraction efficiency.

14 SOLAR ENERGY↗

Overview of MARS: The Multimodal Advanced Radiography Station at the High-Flux Isotope Reactor

Neutron imaging is a powerful tool used for inspecting internal structures and studying macroscale particle dynamics. This work is performed at the Multimodal Advanced Radiography Station (MARS), which is the cold-neutron imaging beamline at the High-Flux Isotope Reactor at Oak Ridge National Laboratory. Herein is a summary of recent upgrades to instrumentation, software, and methods, driven by needs from the user community. Planned upgrades within the next decade are included that will significantly enhance instrument capability and performance.

Torres, James [ORNL] (ORCID:0000000289407610)↗

Common station system for voltage and reactive power regulation at the Mosenergo TETs-27 heating and electric power plant

The system for common station regulation of the voltage and reactive power at the Mosenergo TETs-27 heating and electric power plant is described briefly. Features of the algorithms for this system, which uses programs and instrumentation from the automatic control system for the electrical equipment in the 450 MW power generation unit No. 3, are examined.

42 ENGINEERING↗

A Combined Experimental-Computational Confirmation of the Seismic Stability of the Branched Pipelines of Systems of Nuclear Power Stations

The increase in the extent and degree of complication of the geometry of the branched pipelines of nuclear power stations has led to the appearance of natural forms of vibrations with frequencies that cannot be determined by the traditional combined experimental-computational method. This has made it necessary to develop new approaches to the experimental determination of the dynamic characteristics and to the selection of the boundaries of the design plans. Through use of the proposed correction to the technique and algorithm used in the estimation of the seismic stability of pipelines it has been possible to increase the precision with which the lowest frequencies of the natural vibrations are determined and, in certain cases, to also reduce the volume of operations through “targeted” testing performed at sites of expected maximal amplitudes of the lowest forms of vibrations.

42 ENGINEERING↗

Effect of the muon component of cosmic rays on the results of hadron experiments with the big ionization calorimeter (BIC) of the Tien Shan station

A full-scale simulation of the response of the big ionization calorimeter (BIC) at the Tien Shan station to the passage of single protons and muons was performed on the basis of the GEANT4 package in order to estimate the contribution of the muon cosmic-ray component to the generation of unusual events (such as Anti-Centauros), which were recorded by this facility, and to the imitation of the long-flying component, which changes the shape of the average cascade curve. A comparison of the results of this simulation with experimental data reveals that the appearance of Anti-Centauros may be reasonably explained by the contribution of multiple interactions of single muons, but that muon events are insufficient for explaining the change in the shape of the cascade curve (in particular, the emergence of a second maximum)

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

A Stochastic Programming Formulation for Disinfectant Booster Station Placement to Protect Large-Scale Water Distribution Networks

We introduce a methodology for optimally locating fixed disinfectant booster stations for response to contamination incidents in water distribution networks. In this work a stochastic programming problem considering uncertainty in both the location and time of the contamination incident is formulated, resulting in a large Mixed Integer Linear Programming problem. While the original full-space problem is intractably large, we show a series of reductions that decrease the size of the problem by up to five orders of magnitude and allow solutions of the optimal placement problem for realistically-sized water network models.

42 ENGINEERING↗

Energy Production Demonstrator and Material Testing Station optimization for Megawatt proton beams

A simulation study of the Energy Production Demonstrator (EPD) concept – a solid heavy metal target irradiated by GeV-range intense proton beams and producing more energy than consuming – is carried out. Neutron production, fission, energy deposition, energy gain, testing volume and helium production are simulated using the MARS15 code for tungsten, thorium, and natural uranium targets in the proton energy range 0.5–120 GeV. This study shows that the proton energy range of 2–4 GeV is optimal for both a nat U EPD and the tungsten-based testing station for proton accelerator facilities. Simulation-based conservative estimates not including breeding and fission of plutonium suggest the proton beam current sufficient to produce 1 GW of thermal output power with the nat U EPD while supplying a relatively small fraction of that power to operate the accelerator. The thermal analysis has been performed and has shown that the EPD with a parallel proton beam feeding the core has a potential problem due to a possible core meltdown. In conclusion, a scheme has been proposed with a beam steering on the outer surface of the target; its thermal analysis indicates that slicing the target in shorter parts and maintaining a temperature of 25 °C on their surfaces would to avoid the target meltdown.

43 PARTICLE ACCELERATORS↗

Sustainable hydrogen manufacturing via renewable-integrated intensified process for refueling stations

The widescale consumer adoption of hydrogen fuel cell electric vehicles (HFCEVs) is currently hindered by the high cost of small-scale hydrogen generation and the lack of extensive hydrogen refueling infrastructure. Natural gas-based hydrogen is cheaper when produced in large volumes but is also associated with high CO 2 emissions. To counter these challenges, we propose a hybrid approach where both natural gas and renewables are integrated in a synergistic manner using a dynamic process intensification technology that can be deployed on-site for meeting local demands of refueling stations. The technology is based on sorption enhanced steam methane reforming (SE-SMR) that utilizes a combination of reaction with in-situ CO 2 adsorption for enhancing process modularity, productivity and efficiency thereby outperforming conventional SMR at small scale. We develop a mixed integer linear programming (MILP)-based optimization framework for simultaneous design and scheduling of the SE-SMR process. The simultaneous optimization provides a synergistic combination whereby the renewables allow sustainable hydrogen manufacturing and the dynamic SE-SMR allows optimal use of the intermittency of the renewables. The U.S. nationwide analysis indicates that for futuristic renewable prices and a hydrogen production capacity of 2 ton/day, hydrogen can be produced at 50% less cost compared to the current cost of small-scale hydrogen generation. Finally, the city-wise analysis with varying hydrogen demand shows that even with just 5% HFCEV market penetration level, hydrogen production cost less than $3/kg can be obtained at small scales across the United States with even cheaper hydrogen for large cities.

08 HYDROGEN↗