Search NASA⌕ Search

SEARCH · Search NASA

Results for “Scenario Development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Space Station Power Generation Investigated in Support of the Beta Gimbal Anomaly Resolution

The International Space Station (ISS) is the largest and most complex spacecraft ever assembled and operated in orbit. The first U.S. photovoltaic module, containing two solar arrays, was launched, installed, and activated in early December 2000. After the first week of continuously rotating the U.S. solar arrays, engineering personnel in the ISS Mission Evaluation Room observed higher than expected electrical currents on the drive motor in one of the Beta Gimbal Assemblies (BGA), the mechanism used to maneuver a U.S. solar array (see the on-orbit photograph). The magnitude of the motor currents continued to increase over time on both BGAs, creating concerns about the ability of the gimbals to continue pointing the solar arrays towards the Sun, a function critical for continued assembly of the ISS. The BGA provides two critical capabilities to the ISS: (1) transfer of electrical power across a rotating joint and (2) positioning of the solar arrays. A number of engineering disciplines convened in May 2001 to address this on-orbit hardware anomaly. Over the course of a year, many scenarios were developed and used. Only two are discussed here: parked arrays and dual-angle mode.

Delleur, Ann M.↗

Comparative Assessment and Decision Support System for Strategic Military Airlift Capability

The Lockheed Martin Aeronautics Company has been awarded several programs to modernize the aging C-5 military transport fleet. In order to ensure its continuation amidst budget cuts, it was important to engage the decision makers by providing an environment to analyze the benefits of the modernization program. This paper describes an interface that allows the user to change inputs such as the scenario airfields, take-off conditions, and reliability characteristics. The underlying logistics surrogate model was generated using data from a discrete-event simulation. Various visualizations such as intercontinental flight paths illustrated in 3D, have been created to aid the user in analyzing scenarios and performing comparative assessments for various output logistics metrics. The capability to rapidly and dynamically evaluate and compare scenarios was developed enabling real time strategy exploration and trade-offs.

Salmon, John↗

Orion Flight Test Architecture Benefits of MBSE Approach

Exploration Flight Test 1 (EFT-1) is an unmanned first orbital flight test of the Multi Purpose Crew Vehicle (MPCV) Mission s purpose is to: Test Orion s ascent, on-orbit and entry capabilities Monitor critical activities Provide ground control in support of contingency scenarios Requires development of a large scale end-to-end information system network architecture To effectively communicate the scope of the end-to-end system a model-based system engineering approach was chosen.

Exploration Flight Test 1 (EFT-1)↗

Use of Machine Learning Techniques for Iidentification of Robust Teleconnections to East African Rainfall Variability in Observations and Models

Providing advance warning of East African rainfall variations is a particular focus of several groups including those participating in the Famine Early Warming Systems Network. Both seasonal and long-term model projections of climate variability are being used to examine the societal impacts of hydrometeorological variability on seasonal to interannual and longer time scales. The NASA / USAID SERVIR project, which leverages satellite and modeling-based resources for environmental decision making in developing nations, is focusing on the evaluation of both seasonal and climate model projections to develop downscaled scenarios for using in impact modeling. The utility of these projections is reliant on the ability of current models to capture the embedded relationships between East African rainfall and evolving forcing within the coupled ocean-atmosphere-land climate system. Previous studies have posited relationships between variations in El Niño, the Walker circulation, Pacific decadal variability (PDV), and anthropogenic forcing. This study applies machine learning methods (e.g. clustering, probabilistic graphical model, nonlinear PCA) to observational datasets in an attempt to expose the importance of local and remote forcing mechanisms of East African rainfall variability. The ability of the NASA Goddard Earth Observing System (GEOS5) coupled model to capture the associated relationships will be evaluated using Coupled Model Intercomparison Project Phase 5 (CMIP5) simulations.

Roberts, J. Brent↗

Pre-Study Walkthrough with a Commercial Pilot for a Preliminary Single Pilot Operations Experiment

The number of crew members in commercial flights has decreased to two members, down from the five-member crew required 50 years ago. One question of interest is whether the crew should be reduced to one pilot. In order to determine the critical factors involved in safely transitioning to a single pilot, research must examine whether any performance deficits arise with the loss of a crew member. With a concrete understanding of the cognitive and behavioral role of a co-pilot, aeronautical technologies and procedures can be developed that make up for the removal of the second aircrew member. The current project describes a pre-study walkthrough process that can be used to help in the development of scenarios for testing future concepts and technologies for single pilot operations. Qualitative information regarding the tasks performed by the pilots can be extracted with this technique and adapted for future investigations of single pilot operations.

Single Pilot Operations↗

Identification and Analysis of National Airspace System Resource Constraints

This analysis is the deliverable for the Airspace Systems Program, Systems Analysis Integration and Evaluation Project Milestone for the Systems and Portfolio Analysis (SPA) focus area SPA.4.06 Identification and Analysis of National Airspace System (NAS) Resource Constraints and Mitigation Strategies. "Identify choke points in the current and future NAS. Choke points refer to any areas in the en route, terminal, oceanic, airport, and surface operations that constrain actual demand in current and projected future operations. Use the Common Scenarios based on Transportation Systems Analysis Model (TSAM) projections of future demand developed under SPA.4.04 Tools, Methods and Scenarios Development. Analyze causes, including operational and physical constraints." The NASA analysis is complementary to a NASA Research Announcement (NRA) "Development of Tools and Analysis to Evaluate Choke Points in the National Airspace System" Contract # NNA3AB95C awarded to Logistics Management Institute, Sept 2013.

Smith, Jeremy C.↗

Probabilistic Round Trip Contamination Analysis of a Mars Sample Acquisition and Handling Process Using Markovian Decompositions

A method for evaluating the probability of a Viable Earth Microorganism (VEM) contaminating a sample during the sample acquisition and handling (SAH) process of a potential future Mars Sample Return mission is developed. A scenario where multiple core samples would be acquired using a rotary percussive coring tool, deployed from an arm on a MER class rover is analyzed. The analysis is conducted in a structured way by decomposing sample acquisition and handling process into a series of discrete time steps, and breaking the physical system into a set of relevant components. At each discrete time step, two key functions are defined: The probability of a VEM being released from each component, and the transport matrix, which represents the probability of VEM transport from one component to another. By defining the expected the number of VEMs on each component at the start of the sampling process, these decompositions allow the expected number of VEMs on each component at each sampling step to be represented as a Markov chain. This formalism provides a rigorous mathematical framework in which to analyze the probability of a VEM entering the sample chain, as well as making the analysis tractable by breaking the process down into small analyzable steps.

Hudson, Nicolas↗

Decision Analysis Tool to Compare Energy Pathways for Transportation

With the goals of reducing greenhouse gas emissions, oil imports, and energy costs, a wide variety of automotive technologies are proposed to replace the traditional gasoline-powered internal combustion engine (g-ICE). Biomass is seen as an important domestic energy feedstock, and there are multiple pathways in which it can be linked to the transport sector. Contenders include the use of cellulosic ethanol from biomass to replace gasoline or the use of a biomass-fueled combined cycle electrical power generation facility in conjunction plug-in hybrid electric vehicles (PHEVs). This paper reviews a project that is developing a scenario decision analysis tool to assist policy makers, program managers, and others to obtain a better understanding of these uncertain possibilities and how they may interact over time.

Bloyd, Cary N.↗

Incorporating Resilience into Transportation Planning

To aid decision making for developing transportation infrastructure, the National Renewable Energy Laboratory has developed the Scenario Evaluation, Regionalization and Analysis (SERA) model. The SERA model is a geospatially and temporally oriented model that has been applied to determine optimal production and delivery scenarios for hydrogen, given resource availability and technology cost and performance, for use in fuel cell vehicles. In addition, the SERA model has been applied to plug-in electric vehicles.

30 DIRECT ENERGY CONVERSION↗

Implementation of Information Management System for Radiation Safety of Personnel at the Russian Northwest Center for Radioactive Waste Management 'SevRAO' - 13131

The report is an overview of the information-analytical system designed to assure radiation safety of workers. The system was implemented in the Northwest Radioactive Waste Management Center 'SevRAO' (which is a branch of the Federal State Unitary Enterprise 'Radioactive Waste Management Enterprise RosRAO'). The center is located in the Northwest Russia. In respect to 'SevRAO', the Federal Medical-Biological Agency is the regulatory body, which deals with issues of radiation control. The main document to regulate radiation control is 'Reference levels of radiation factors in radioactive wastes management center'. This document contains about 250 parameters. We have developed a software tool to simplify control of these parameters. The software includes: input interface, the database, dose calculating module and analytical block. Input interface is used to enter radiation environment data. Dose calculating module calculates the dose on the route. Analytical block optimizes and analyzes radiation situation maps. Much attention is paid to the GUI and graphical representation of results. The operator can enter the route at the industrial site or watch the fluctuations of the dose rate field on the map. Most of the results are presented in a visual form. Here we present some analytical tasks, such as comparison of the dose rate in some point with control levels at this point, to be solved for the purpose of radiation safety control. The program helps to identify points making the largest contribution to the collective dose of the personnel. The tool can automatically calculate the route with the lowest dose, compare and choose the best route. The program uses several options to visualize the radiation environment at the industrial site. This system will be useful for radiation monitoring services during the operation, planning of works and development of scenarios. The paper presents some applications of this system on real data over three years - from March 2009 to February 2012. (authors)

61 RADIATION PROTECTION AND DOSIMETRY↗

Safety Assessment of El Cabril, the Spanish Surface Disposal facility for LILW and VLLW - 17233

El Cabril project was launched in 1986, for Low and Intermediate Level Waste (LILW) disposal, based on concrete barriers and concrete disposal units. The operation of a Very Low Leve Waste (VLLW) complementary facility based on clay and High Density Polyethylene (HDPE) barriers and different types of disposal units started in 2008. Two main objectives are considered in the design: Immediate and post-closure protection and no radiological restrictions, after institutional control period. To fulfil these objectives several design criteria like waste isolation through a multi-barrier system, surveillance period no longer than 300 years and limitation of activity are applied. The Safety Assessment process follows a methodology which, taking into account important facts like safety and design criteria, time frame, radiological protection criteria, waste characteristics, environment, FEPs (features, events and processes), etc., develops different scenarios, models and calculations to define the safety approach. This safety approach follows the current guides and recommendations of international organizations, it covers the potential impact of the facility for the operational and long-term periods and it includes normal evolution and less likely accidental and inadvertent human intrusion events. All the studies and considerations done for the Safety Assessment have to be included in a safety Report, required for getting the Operation License for Nuclear Installations in Spain. The content of this Report is defined by the Spanish regulation and it has to be revised if there is a change in the facility that may affect the safety. It is also mandatory making a Safety Periodic Review (every 10 years in the case of El Cabril) that has to be presented to the Regulatory Council. This paper outlines the principles, objectives and criteria of El Cabril's disposal installation and it explains the safety assessment performed, for both LILW and VLLW disposal, as part of the documentation produced to obtain the authorization to operate. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of Potential Dose to Off-site Receptors from On-site Removable Contamination - 18521

Calculations used in making corrective action decisions estimate the maximum potential dose to on-site receptors exposed to contamination from nuclear testing activities at U.S. Department of Energy, Environmental Management Nevada Program Soils Activity release sites. At many of these release sites, removable contamination is present at levels that require controls to be in place under Title 10 Code of Federal Regulations Part 835, 'Occupational Radiation Protection.' When significant levels of removable contamination are present at a release site, it may be necessary to evaluate the potential dose to off-site receptors from removable contamination that has the potential to be transported off the contaminated site. The protocols described herein could be used to evaluate the potential dose to off-site receptors to ensure that corrective action decisions consider both on-site and off-site potential receptors. The calculation of estimated dose to a receptor can be accomplished by establishing a scenario that describes the exposure (e.g., time and pathway) of the individual to the radiological contamination and by using the properties of the contaminants (e.g., dose conversion factors). Radiological contamination transported from the site has the potential to expose off-site receptors under a potentially large number of exposure scenarios that cannot be comprehensively defined. However, a scenario was developed to represent a maximally exposed off-site receptor. Because the estimated dose to the maximally exposed off-site receptor based on maximum post-closure release site activity levels is less than the on-site dose decision level, corrective action decisions at the Nevada National Security Site Soils Activity release sites are also protective of potential off-site receptors when significant levels of removable contamination are present. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Utilizing the SACADA system to collect simulator training data to inform human reliability analyses - 169

Lack of appropriate human performance data for the development of human reliability analysis (HRA) methods has been identified as a key issue contributing to the method-to-method variability among the HRA methods. The United States Nuclear Regulatory Commission (NRC) worked with domain experts to develop the Scenario Authoring, Characterization, and Debriefing Application (SACADA) system to collect nuclear power plants' licensed operator simulator training and examination data to inform HRA. In the past two decades, significant improvements in understanding and modelling human performance in HRA have affected the perspectives of the types of data to be collected for HRA. A significant change is that human performance is strongly dependent on the context of the tasks to be performed. To incorporate this understanding, the SACADA data taxonomy collects the context and actual performance information of the training objective elements (TOEs) in nuclear plant operator simulator training. This provides a framework consistent with HRA to use context to estimate human error probabilities. It is recognized that measuring crew performance is equally important as improving operator training. SACADA is designed to support the nuclear trainers in capturing this important information that is used to identify training weaknesses and drive continuous improvement. This paper discusses the SACADA taxonomy, the SACADA system's functions, and the supporting software design to enable the SACADA system to be practically implemented in the nuclear power plants' operator simulator training program to collect data for tracking operator performance and HRA analysis. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Development of cyber security test scenario for non-safety display system - 226

In order to test the cyber security of NPP related to safety, the results of probabilistic safety assessment were used. The fault tree (FT) is used to reflect the impact of the cyber-attack on the operator. The cyber security test should be performed focusing on the scenario derived from the FT. The concept of a security case has been introduced. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Hierarchical Resilience Planning for Networked Microgrids: A Case Study of Puerto Rico

Microgrids can be designed to enhance the energy resilience of communities and critical infrastructures, such as hospitals, data centers, and communication networks, which are vulnerable to frequent weather-related disruption. Coordinating multiple microgrids in a network can leverage the geographical diversity of load and generation resources while enabling resilient and cost-effective planning of the distribution system. Designing a networked microgrid is complex, involving intricate technical assessment, cost-benefit analysis, site-specific requirements, and the evaluation of existing resources. Therefore, this paper proposes a hierarchical resilience planning framework and performs an extensive techno-economic analysis for the design of a networked microgrid. Hierarchical resilience planning involves technology sizing at an individual community level to meet the critical load and satisfy resilience criteria, and resource optimization at networked microgrid level to provide a higher level of resilience and energy adequacy. A real-world case of Puerto Rico's cooperative microgrid “Microrred de la Montaña” is investigated considering localized electricity tariffs, site-specific demand profiles, solar generation, and existing hydro resources. Multiple optimization scenarios are developed based on the resiliency requirement to estimate the capacity of solar photovoltaic and battery energy storage (BES) to be installed at each substation. The results provide the optimal sizing for individual community and networked microgrid to withstand 1day and 3-day outages along with the criteria for critical load.

13 - HYDRO ENERGY↗