Search NASA⌕ Search

SEARCH · Search NASA

Results for “System reliability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Droop Compensation for the High Voltage Converter Modulators at the Spallation Neutron Source.

The Spallation Neutron Source (SNS) has been in operation since 2006 and routinely operates at 1 MW of beam power. At 1 MW, the High Voltage Converter Modulators (HVCMs) are delivering 8-11 MW pulsed power to the Klystrons for up to 1185 us at 60 Hz. The pulsed output of the modulator has a substantial voltage droop operating in open-loop mode. Achieving 1.4 MW operations require an increase in the output pulse width of the HVCM, resulting in loss of LLRF control margin due to modulator voltage reduction at the end of the pulse. Initially, the HVCM was designed with a pulse width modulation scheme for droop compensation but early operations at full duty revealed this technique unreliable. Increasing the output voltage of the modulator would likely compromise system reliability. This paper proposes the use of alternate modulation schemes to address the voltage droop. The effect of frequency modulation and phase modulation on voltage droop is studied. Experimental results will also be presented.

43 PARTICLE ACCELERATORS↗

Decision-Support Software for Grid Operators: Transmission Topology Control for Infrastructure Resilience to the Integration of Renewable Generation

GENI Project: The CRA team is developing control technology to help grid operators more actively manage power flows and integrate renewables by optimally turning on and off entire power lines in coordination with traditional control of generation and load resources. The control technology being developed would provide grid operators with tools to help manage transmission congestion by identifying the facilities whose on/off status must change to lower generation costs, increase utilization of renewable resources and improve system reliability. The technology is based on fast optimization algorithms for the near to real-time change in the on/off status of transmission facilities and their software implementation.

ARPA-E↗

Metrics for Evaluating the Accuracy of Solar Power Forecasting: Preprint

Forecasting solar energy generation is a challenging task due to the variety of solar power systems and weather regimes encountered. Forecast inaccuracies can result in substantial economic losses and power system reliability issues. This paper presents a suite of generally applicable and value-based metrics for solar forecasting for a comprehensive set of scenarios (i.e., different time horizons, geographic locations, applications, etc.). In addition, a comprehensive framework is developed to analyze the sensitivity of the proposed metrics to three types of solar forecasting improvements using a design of experiments methodology, in conjunction with response surface and sensitivity analysis methods. The results show that the developed metrics can efficiently evaluate the quality of solar forecasts, and assess the economic and reliability impact of improved solar forecasting.

14 SOLAR ENERGY↗

BPA Facts

The Bonneville Power Administration is a federal nonprofit power marketing administration based in the Pacific Northwest . Although BPA is part of the U .S . Department of Energy, it is self-funding and covers its costs by selling its products and services . BPA markets wholesale electrical power from 31 federal hydro projects in the Columbia River Basin, one nonfederal nuclear plant and several small nonfederal power plants . The dams are operated by the U .S . Army Corps of Engineers and the Bureau of Reclamation . About 30 percent of the electric power used in the Northwest comes from BPA . BPA’s resources — primarily hydroelectric — make its power nearly carbon free . BPA also operates and maintains about three- fourths of the high-voltage transmission in its service territory . BPA’s service territory includes Idaho, Oregon, Washington, western Montana and small parts of eastern Montana, California, Nevada, Utah and Wyoming . BPA promotes energy efficiency, renewable resources and new technologies that improve its ability to deliver on its mission . BPA also funds regional efforts to protect and enhance fish and wildlife populations affected by hydropower development in the Columbia River Basin . BPA is committed to public service and seeks to make its decisions in a manner that provides opportunities for input from stakeholders . In its vision statement, BPA dedicates itself to providing high system reliability, low rates consistent with sound business principles, environmental stewardship and accountability

BPA Vision, BPA Mission, Pacific Northwest, dams, ↗

2012 Annual Report [WESTERN AREA POWER ADMINISTRATION]

Fiscal Year 2012 brought some tumultuous and uncertain times to Western. The utility industry and technology continued to evolve, and the demand for constant flow of power and transmission system reliability continued to increase. Western kept pace by continuing to deliver reliable, cost-based hydropower while reviewing and updating business practices that took into account how the energy industry is evolving. During this time of exponential change, Western tackled many challenges, including: Reviewing the Transmission Infrastructure Program processes and procedures; Responding to Secretary of Energy Steven Chu’s memorandum to create a modern, efficient and reliable transmission grid; Weathering record-breaking natural disasters in our service territory; Completing our role in TIP’s flagship project—the Montana Alberta Tie Ltd. transmission line; Incorporating new, far-reaching regulations and industry trends.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Forecasting Wind and Solar Generation: Improving System Operations, Greening the Grid

This document discusses improving system operations with forecasting and solar generation. By integrating variable renewable energy (VRE) forecasts into system operations, power system operators can anticipate up- and down-ramps in VRE generation in order to cost-effectively balance load and generation in intra-day and day-ahead scheduling. This leads to reduced fuel costs, improved system reliability, and maximum use of renewable resources.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Forecasting Wind and Solar Generation: Improving System Operations, Greening the Grid (Spanish Version)

This document is the Spanish version of 'Greening the Grid- Forecasting Wind and Solar Generation Improving System Operations'. It discusses improving system operations with forecasting with and solar generation. By integrating variable renewable energy (VRE) forecasts into system operations, power system operators can anticipate up- and down-ramps in VRE generation in order to cost-effectively balance load and generation in intra-day and day-ahead scheduling. This leads to reduced fuel costs, improved system reliability, and maximum use of renewable resources.

24 POWER TRANSMISSION AND DISTRIBUTION↗

openECA Platform and Analytics Alpha Test Results

The objective of the Open and Extensible Control and Analytics (openECA) Platform for Phasor Data project is to develop an open source software platform that significantly accelerates the production, use, and ongoing development of real-time decision support tools, automated control systems, and off-line planning systems that (1) incorporate high-fidelity synchrophasor data and (2) enhance system reliability while enabling the North American Electric Reliability Corporation (NERC) operating functions of reliability coordinator, transmission operator, and/or balancing authority to be executed more effectively.

24 POWER TRANSMISSION AND DISTRIBUTION↗

openECA Platform and Analytics Beta Demonstration Results

The objective of the Open and Extensible Control and Analytics (openECA) Platform for Phasor Data project is to develop an open source software platform that significantly accelerates the production, use, and ongoing development of real-time decision support tools, automated control systems, and off-line planning systems that (1) incorporate high-fidelity synchrophasor data and (2) enhance system reliability while enabling the North American Electric Reliability Corporation (NERC) operating functions of reliability coordinator, transmission operator, and/or balancing authority to be executed more effectively.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Providing Ancillary Services with Photovoltaic Generation in Multi-Timescale Grid Operation: Preprint

With photovoltaic (PV) generation substantially increases, electric power systems need more flexible resources that can provide ancillary services to mitigate the variability and uncertainty of the PV generation. On the one hand, the increase of PV generation necessitates the needs of more flexible resources. On the other hand, PV generation, because of its low operation cost, has been replacing the conventional generation in the system which is the main flexible resources in the current system. Consequently, there is a trend to require the renewable generation including PV to provide flexible ancillary services to further accommodate more PV integration. This paper proposes a multi-timescale grid operation model considering the various control strategies of PV providing different ancillary services. Numerical case studies demonstrate that with PV providing both regulation reserve and primary frequency reserve, the system operating costs and PV curtailment will be reduced significantly. It shows that not only the system reliability but also PV's profitability can be improved with PV providing more ancillary services.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Modular High Temperature Gas-cooled Reactor: Accident Analysis

Types of Potential Accidents and Reactor Response Codes and Tools Experimental Validation Safety Analysis Approach Licensing Modernization Project Use of PRA in LMP, ASME/ANS, Non-LWR PRA Standard Methods for Incorporating Passive System Reliability into a PRA

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Emulation and Adversarial Analysis of EV Charging Networks

In the effort of decarbonization and evolution of the modern electrical grid, electric vehicles (EVs) play a key part to transform the grid. However, due to the rapid adoption of EVs and the demand of the charging infrastructure required to power said EVs, risk of a cyber-attack may impose serious consequences. There is a need to analyze and protect the charging ecosystem infrastructure from cyber threats before it reaches wide-scale deployment. In an effort to secure vehicle to grid (V2G) communications, standardization is necessary for continued reliable system operation. The protocol ISO 15118 outlines controls and practices that should be implemented for secure vehicle to grid (V2G) communications. The standard is gaining momentum for American markets as the demand for EV infrastructure grows. The adoption of ISO 15118 in American markets poses several challenges: the deployment of a public key infrastructure (PKI) as outlined within the standard, interoperability of charging different EVs with chargers from different manufactures using the PKI, and scaling the ecosystem to meet the demand while managing risks. This project was created to understand potential cyber and scaling challenges of PKI for EV infrastructure through utilizing a series of emulated components mapping to what exists in the EV ecosystem today, and the components of the PKI that are under development. The key nodes within the emulation that are under development are: electric vehicle (EV), electric vehicle supply equipment (EVSE), charge network operator (CNO), certificate authority (CA), and online certificate status protocol (OCSP) that must all interact using secure and trusted communications. With these emulated components and utilizing orchestration methods to rapidly deploy and scale the components, the ability to analyze risks of the ecosystem and address gaps before the PKI ecosystem is fully deployed to production should yield a more robust and mature production charging infrastructure. Our approach will use a modular architecture of virtual machines within an orchestration platform and will target scales of 100s, 1000s, and 10,000s of entities interacting. The core research questions trying to be answered with this scope of work are: what are the impacts of a rogue CA, what are the risks of certificate revocation list (CRL) management, what is the value of OCSP stapling, what components are vulnerable to DOS attacks, and what test effective payloads may impact the components.

charging ecosystem↗

Data-Driven Scalable Emulation of Hydropower Using Real-Time Hardware-in-the-Loop

This presentation covers Motivation: (1) With the increased grid integration of inverter-based resources, hydropower plays a crucial role in maintaining the bulk power system reliability and resilience; and (2) A more dynamic response and new control designs are required to meet the grid requirements. To evaluate any modification, control-prototyping, performance validation and de-risking grid integration of hydropower, a high-fidelity environment is required. Also covers Objectives: (1) To develop data-driven emulation of hydropower using hardware-in-the-loop for different size, types of hydro plants; and (2) To characterize hardware and obtain accurate dynamic response for shaft speed, torque, and power. Provide a mechanical power interface with emulated dynamics of a hydro-turbine shaft that can be coupled to electrical generators for mechanical and electrical PHIL.

electrical↗

ICRH operations and experiments during the JET-ILW tritium and DTE2 campaigns

2021 has culminated with the completion of the JET-ILW DTE2 experimental campaign. This contribution summarizes Ion Cyclotron Resonance Heating (ICRH) operations from system and physics point of view. Improvements to the (ICRH) system, to operation procedures and to real time RF power control were implemented to address specific constraints from tritium and deuterium-tritium operations and increase the system reliability and power availability during D-T pulses. ICRH was operated without the ITER-Like Antenna (ILA) because water leaked from an in-vessel capacitor into the vessel on day-2 of the D-T campaign. Three weeks were required to identify and isolate the leak and resume plasma operations. Dedicated RF-Plasma Wall Interaction (PWI) experiments were conducted; tritium plasmas exhibit a higher level of Be sputtering on the outer wall and impurity content when compared to deuterium or hydrogen plasmas. The JET-DTE2 campaigns provided the opportunity to characterize ICRH schemes foreseen for the ITER operation, in the ITER like wall environment in ELMy H-mode scenarios aiming at maximizing fusion performance. The second harmonic tritium resonance heating and to a lesser extent minority 3He heating (ITER D-T ICRH reference schemes) lead to improved ion temperature and fusion performance when compared to hydrogen minority ICRH. However, these discharges suffered from a lack of stationarity and gradual impurity accumulation potentially because of a deficit of ICRH power when using JET antennas at lower frequencies. Fundamental deuterium ICRH was used in tritium-rich plasmas and with deuterium Neutral Beam Heating; this ICRH scheme proved to be very efficient boosting ion temperature and fusion performance in these plasmas.

Klepper, C. Christopher↗

Insights from the WGRISK workshop on the PSA of advanced and new reactors

Probabilistic Safety Assessment /Probabilistic Risk Assessment for new and advanced reactors is recognized as an essential complement of the deterministic approaches to achieve improved safety and performances of new nuclear power plants, comparing to the operating plants. However, the development of PSA to these reactors is encountered to concurrent challenges, mainly due to the limited available design information, as well as due to potentially new initiating events, accident sequences and phenomena. The use of PSA in the decision making process is also challenging since the resulting PSA may not sufficiently reflect the future as-built, as-operated plant information. In order to address these aspects, the OECD/NEA/WGRISK initiated two coordinated tasks on 'PSA for Advanced Reactors' and 'PSA in the frame of Design and Commissioning of New NPPs'. In this context, a joint workshop was organized by OECD, during which related subjects were presented and discussed, including PSA for generation IV reactors, PSA for evolutionary reactors, PSA for small modular reactors, severe accidents and Level 2 PSA, Level 3 PSA and consequences analysis, digital I and C modeling, passive systems reliability, safety-security interface, as well as the results of the surveys performed in the frame of theses WGRISK tasks. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Deep Borehole Disposal Waste Emplacement Mode Cost-Risk Study - 16346

An engineering study has developed alternative concepts for waste packaging and for emplacing/retrieving packages in deep boreholes. The study compared costs and risks associated with emplacement using wire-line vs. drill-string technologies. Selection of a method is needed to proceed with demonstration as part of the Deep Borehole Field Test being conducted by the U.S. Department of Energy, Office of Used Nuclear Fuel Disposition. Each emplacement method was described as a series of steps, and each step was analyzed for potential to cause any of four off-normal events including drops and getting stuck. Each such event was supported by a fault tree. The hazard analysis identified a number of improvements including: 1) impact limiters; 2) safety systems; 3) instrumentation; and 4) methods to mitigate casing collapse or borehole debris during operations. Off-normal events were related in a top-level event tree with normal and off-normal outcomes. Costs were estimated for each outcome (including recovery and decontamination). A panel of subject matter experts was convened to review the study and provide key inputs. The wire-line method is less costly for normal operations, while the drill-string method has advantages if waste packages become stuck. The wire-line method has a lower aggregate probability of accidents resulting in waste package breach. The integrated probability of off-normal events is on the order of a few percent per borehole, and engineered measures are quite important to prevent and mitigate accidents, limiting radiological consequences. Development of these measures during design will help to further improve system reliability. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of Inspection Tools for the AY-102 Double-Shell Tank at the Hanford DOE Site - 16383

Florida International University (FIU) has been developing inspection tools to assist in identifying the location of the leak in the primary tank of AY-102. This effort has led to the development of a magnetic miniature rover and a pneumatic pipe crawler. The rover will travel through the refractory cooling channels and the crawler will travel through the air supply lines to the central plenum underneath the primary tank. Both tools will provide visual feedback and potentially identify the location of the leak. The magnetic miniature tool is a remote controlled rover with four wheels driven by independent micro DC motors. The rover will have to navigate through over 40 feet of channel that vary in width from 1.5 to 3.0 inches with four 90 deg. turns to reach the center of the tank. To avoid debris in the channel, the device will travel upside down magnetically attached to the bottom of the primary tank. The pneumatic pipe crawler is a worm type robot with a modular design, composed of interchangeable cylindrical modules connected with flexible links. The design is an evolution of previous peristaltic crawlers developed at FIU, and uses pneumatic actuators to emulate the contractions of the peristaltic movement. The crawler must travel approximately 100 feet through three and four inch piping and traverse through vertical risers, elbows and reducers to reach the central plenum. Prototypes for both the rover and the crawler have been designed and manufactured. Initial bench scale testing has validated the design concepts, demonstrating their ability to navigate through complex geometries. Future work will include full scale testing and evaluation of the systems' reliability. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗