Search NASA⌕ Search

SEARCH · Search NASA

Results for “TEST FACILITY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

CARS temperature measurements in a hypersonic propulsion test facility

Static-temperature measurements performed in a reacting vitiated air-hydrogen Mach-2 flow in a duct in Test Cell 2 at NASA LaRC by using a coherent anti-Stokes Raman spectroscopy (CARS) system are discussed. The hypersonic propulsion Test Cell 2 hardware is outlined with emphasis on optical access ports and safety features in the design of the Test Cell. Such design considerations as vibration, noise, contamination from flow field or atmospheric-borne dust, unwanted laser- and electrically-induced combustion, and movement of the sampling volume in the flow are presented. The CARS system is described, and focus is placed on the principle and components of system-to-monochromator signal coupling. Contour plots of scramjet combustor static temperature in a reacting-flow region are presented for three stations, and it is noted that the measurements reveal such features in the flow as maximum temperature near the model wall in the region of the injector footprint.

Jarrett, O., Jr.↗

A unique flight test facility - Description and results

The Dryden Flight Research Facility has developed a unique research facility for conducting aerodynamic and fluid mechanics experiments in flight. A low aspect ratio fin, referred to as the flight test fixture (FTF), is mounted on the underside of the fuselage of an F-104G aircraft. The F-104/FTF facility is described, and the capabilities are discussed. The capabilities include (1) a large Mach number envelope (0.4 to 2.0), including the region through Mach 1.0; (2) the potential ability to test articles larger than those that can be tested in wind tunnels; (3) the large chord Reynolds number envelope (greater than 40 million); and (4) the ability to define small increments in friction drag between two test surfaces. Data are presented from experiments that demonstrate some of the capabilities of the FTF, including the shuttle thermal protection system airload tests, instrument development, and base drag studies. Proposed skin friction experiments and instrument evaluation studies are also discussed.

Meyer, R. R., Jr.↗

A unique flight test facility: Description and results

The Dryden Flight Research Facility has developed a unique research facility for conducting aerodynamic and fluid mechanics experiments in flight. A low aspect ratio fin, referred to as the flight test fixture (FTF), is mounted on the underside of the fuselage of an F-104G aircraft. The F-104G/FTF facility is described, and the capabilities are discussed. The capabilities include (1) a large Mach number envelope (0.4 to 2.0), including the region through Mach 1.0; (2) the potential ability to test articles larger than those that can be tested in wind tunnels; (3) the large chord Reynolds number envelope (greater than 40 million); and (4) the ability to define small increments in friction drag between two test surfaces. Data are presented from experiments that demonstrate some of the capabilities of the FTF, including the shuttle thermal protection system airload tests, instrument development, and base drag studies. Proposed skin friction experiments and instrument evaluation studies are also discussed.

Meyer, R. R., Jr.↗

Modularized instrument system for turbojet engine test facilities

A new modular instrument system is being developed to handle the many channels of data commonly encountered in turbojet engine testing. Each module contains a group of transducers and all the signal conditioning, multiplexing, and digitizing electronics necessary for direct interface with a digital computer. The digital interface within each module is the same for all modules. Each module provides a controlled environment for its contents. A minicomputer in the control room gathers the data, performs some on-line calculation and display, and interfaces with a shared recording and computing system. The advantages of this system are (1) reduced manpower for system installation, setup, and checkout; (2) standardized equipment interfaces; (3) increased reliability through automatic system testing and through minimization of manual adjustments; and (4) reduced cost through minimization of wiring and simplification of control room display.

Nieberding, W. C.↗

Model investigation of inlet plenum flow straightening techniques for altitude test facility

An investigation was conducted to evaluate and improve the quality of the airflow to be supplied to the engine in altitude test chambers 3 and 4 of the Propulsion Systems Laboratory at the Lewis Research Center. One-twentieth-scale models of the inlet plenum chamber of the two test chambers were used in the investigation to minimize time and cost. It was possible to reduce the velocity spread in the inlet plenum from approximately 100 m/sec (330 ft/sec) to approximately 10 m/sec (30 ft/sec) through the combined use of flow diverters, multiple spaced screens, flow straighteners, and turning vanes.

Riddlebaugh, S. M.↗

Hardware Progress Made in the Early Flight Fission Test Facilities (EFF-TF) To Support Near-Term Space Fission Systems

The EFF-TF provides a facility to experimentally evaluate thermal hydraulic issues through the use of highly effective non-nuclear testing. These techniques provide a rapid, more cost effective method of evaluating designs and support development risk mitigation when concerns are associated with non-nuclear aspects of space nuclear systems. For many systems, electrical resistance thermal simulators can be used to closely mimic the heat deposition of the fission process, providing axial and radial profiles. A number of experimental and design programs were underway in 2004. Initial evaluation of the SAFE-100a (19 module stainless steel/sodium heat pipe reactor with integral gas neat exchanger) was performed with tests up to 17.5 kW of input power at core temperatures of 1000 K. A stainless steel sodium SAFE-100 heat pipe module was placed through repeated freeze/thaw cyclic testing accumulating over 200 restarts to a temperature of 1000 K. Additionally, the design of a 37-fuel pin stainless steel pumped sodium/potassium (NaK) loop was finalized and components procured. Ongoing testing at the EFF-TF is geared towards facilitating both research and development necessary to field a near term space nuclear system. Efforts are coordinated with DOE laboratories, industry, universities, and other NASA centers. This paper describes some of the 2004 efforts.

VanDyke, Melissa↗

Test Facilities in Support of High Power Electric Propulsion Systems

Successful development of space fission systems requires an extensive program of affordable and realistic testing. In addition to tests related to design/development of the fission system, realistic testing of the actual flight unit must also be performed. If the system is designed to operate within established radiation damage and fuel burn up limits while simultaneously being designed to allow close simulation of heat from fission using resistance heaters, high confidence in fission system performance and lifetime can be attained through non-nuclear testing. Through demonstration of systems concepts (designed by DOE National Laboratories) in relevant environments, this philosophy has been demonstrated through hardware testing in the High Power Propulsion Thermal Simulator (HPPTS). The HPPTS is designed to enable very realistic non-nuclear testing of space fission systems. Ongoing research at the HPPTS is geared towards facilitating research, development, system integration, and system utilization via cooperative efforts with DOE labs, industry, universities, and other NASA centers. Through hardware based design and testing, the HPPTS investigates High Power Electric Propulsion (HPEP) component, subsystem, and integrated system design and performance.

VanDyke, Melissa↗

Monitoring Helium Cryogen Usage with iFix Software at IB1 Test Facility

At the IB1 facility of the Applied Physics and Superconducting Technology Directorate within the Cryogenic Division at Fermilab, Liquid Helium is essential to the testing activities. The test stands require large amounts of Helium to test the thermal and superconducting cavities and magnets. The Liquid Helium that enters the test stand is monitored through a series of valves and controls to determine the start and stop for monitoring time. There are 3 phases of cryogen usage that must be considered for each stand, cooldown, warming and overnight mode. With a new system in place, cold hour tracking will be more objective and precise within each test stand ensuring better calculations for User s fees which are charged to various groups that employ the facility and aid replenishment of Helium and continual operation at IB1.

Trillo, Angelica↗

Automation and Upgrade of Thermal System for Large 38-Year-Young Test Facility

The Goddard Space Flight Center's Space Environment Simulator (SES) facility has been improved by the upgrade of its thermal control hardware and software. This paper describes the preliminary design process, funding constraints, and the proposed enhancements as well as the installation details, the testing difficulties, and the overall benefits realized from this upgrade. The preliminary design process was discussed in a paper presented in October 1996 and will be recapped in this paper to provide background and comparison to actual product. Structuring the procurement process to match the funding constraints allowed Goddard to enhance its capabilities in an environment of reduced budgets. The installation of the new system into a location that has been occupied for over 38 years was one of the driving design factors for the size of the equipment. The installation was completed on time and under budget. The tuning of the automatic sequences for the new thermal system to the existing shroud system required more time and ultimately presented some setbacks to the vendor and the final completion of the system. However, the end product and its benefits to Goddard's thermal vacuum test portfolio will carry the usefulness of this facility well into the next century.

Webb, Andrew T.↗

Automation and Upgrade of Thermal System for Large 38-Year Young Test Facility

The Goddard Space Flight Center's Space Environment Simulator (SES) facility has been improved by the upgrade of its thermal control hardware and software. This paper describes the preliminary design process, funding constraints, and the proposed enhancements as well as the installation details, the testing difficulties, and the overall benefits realized from this upgrade. The preliminary design process was discussed in a paper presented in October 1996 and will be recapped in this paper to provide background and comparison to actual product. Structuring the procurement process to match the funding constraints allowed Goddard to enhance its capabilities in an environment of reduced budgets. The installation of the new system into a location that has been occupied for over 38-years was one of the driving design factors for the size of the equipment. The installation was completed on-time and under budget. The tuning of the automatic sequences for the new thermal system to the existing shroud system required more time and ultimately presented some setbacks to the vendor and the final completion of the system. However, the end product and its benefits to Goddard's thermal vacuum test portfolio will carry the usefulness of this facility well into the next century.

Webb, Andrew↗

Operational Experience of the NML Cryogenic Plant at the FAST Test Facility

The NML cryogenic plant cools two individually cryostated superconducting radio frequency (SRF) capture cavities and one prototype ILC cryomodule with eight SRF cavities. This complex accelerates electrons at 150 MeV for the Integrable Optics Test Accelerator (IOTA) ring, located at the Fermilab Accelerator Science and Technology (FAST) facility. The cryogenic plant is composed of two nitrogen precooled Tevatron satellite refrigerators, two Mycom 2016C compressors, a cryogenic distribution system, a Frick purifier compressor, two charcoal bed adsorber purifiers, and a liquid ring vacuum pump with a roots booster. The SRF cavities are immersed in a 2.0 K liquid helium bath, shielded with a 5 K gaseous helium shield and a liquid nitrogen cooled thermal shield. Since 2019, this R&D accelerator complex has gone through four science runs with an average duration of 12 months. Operational experience for each run, availability metrics, performance data and common outages are presented in this paper.

Wallace, Timothy [Fermilab] (ORCID:000900051589302↗

Unique Tuft Test Facility Dramatically Reduces Brush Seal Development Costs

Brush seals have been incorporated in the latest turbine engines to reduce leakage and improve efficiency. However, the life of these seals is limited by wear. Studies have shown that optimal sealing characteristics for a brush seal occur before the interference fit between the brush and shaft is excessively worn. Research to develop improved tribopairs (brush and coating) with reduced wear and lower friction has been hindered by the lack of an accurate, low-cost, efficient test methodology. Estimated costs for evaluating a new material combination in an engine company seal test program are on the order of $100,000. To address this need, the NASA Lewis Research Center designed, built, and validated a unique, innovative brush seal tuft tester that slides a single tuft of brush seal wire against a rotating shaft under controlled loads, speeds, and temperatures comparable to those in turbine engines. As an initial screening tool, the brush seal tuft tester can tribologicaly evaluate candidate seal materials for 1/10th the cost of full-scale seal tests. Previous to the development of the brush seal tuft tester facility, most relevant tribological data had been obtained from full-scale seal tests conducted primarily to determine seal leakage characteristics. However, from a tribological point of view, these tests included the confounding effects of varying contact pressures, bristle flaring, high-temperature oxidation, and varying bristle contact angles. These confounding effects are overcome in tuft testing. The interface contact pressures can be either constant or varying depending on the tuft mounting device, and bristle wear can be measured optically with inscribed witness marks. In a recent cooperative program with a U.S. turbine engine manufacturer, five metallic wire candidates were tested against a plasma-sprayed Nichrome-bonded chrome carbide. The wire materials used during this collaboration were either nickel-chrome- or cobaltchrome-based superalloys. These tests corroborated full-scale seal test results and provided insight into previously untested combinations. As the cycle temperature for improved efficiency turbine engines increases, new brush seal materials combinations must be considered. Future brush seal tuft testing will include both metallic and ceramic bristles versus commercial and NASA-developed shaft coatings. The ultimate goal of this work is to expand the current data base so that seal designers can tailor brush seal materials to specific applications.

Fellenstein, James A.↗

Development of a digital control system for a spacecraft propulsion test facility

A digital computer control and abort system which is used at NASA-Lewis research center is described. The system was designed to control test operations such as rocket engine testing, structure testing, and wind tunnel tests. Because of the nature of spacecraft system testing, particularly rocket engine testing, the unique features of the system are, control function updating at a 20 millisecond rate, continuous abort monitoring and a software system designed for short duration tests rather than continuous on-line control. To accomplish these system requirements, special hardware was designed. The presentation includes a description of the computer system and special interface hardware as well as a general description of the software used.

Smalley, R. R.↗

Ames T-3 fire test facility - Aircraft crash fire simulation

There is a need to characterize the thermal response of materials exposed to aircraft fuel fires. Large scale open fire tests are costly and pollute the local environment. This paper describes the construction and operation of a subscale fire test that simulates the heat flux levels and thermochemistry of typical open pool fires. It has been termed the Ames T-3 Test and has been used extensively by NASA since 1969 to observe the behavior of materials exposed to JP-4 fuel fires.

Fish, R. H.↗

Operational Experience of the NML Cryogenic Plant at the FAST Test Facility

The New Muon Laboratory (NML) cools two individually cryostated superconducting radio frequency (SRF) capture cavities (CC) and one prototype ILC cryomodule (CM) with eight SRF cavities. This complex accelerates electrons at 150 MeV for the Integrable Optics Test Accelerator (IOTA) ring, located at the Fermilab Accelerator Science and Technology (FAST) facility. Since 2019, this R&D accelerator complex has gone through four science runs.

Wallace, T. [Fermilab]↗

Modeling Potential Carbon Monoxide Exposure Due to Operation of a Major Rocket Engine Altitude Test Facility Using Computational Fluid Dynamics

This viewgraph presentation reviews computational fluid dynamics as a tool for modelling the dispersion of carbon monoxide at the Stennis Space Center's A3 Test Stand. The contents include: 1) Constellation Program; 2) Constellation Launch Vehicles; 3) J2X Engine; 4) A-3 Test Stand; 5) Chemical Steam Generators; 6) Emission Estimates; 7) Located in Existing Test Complex; 8) Computational Fluid Dynamics; 9) Computational Tools; 10) CO Modeling; 11) CO Model results; and 12) Next steps.

Blotzer, Michael J.↗

Validation & Verification of Electrical Components B2 Test Facility

The research focus of this project is to assist in the closure of Measurement, Monitoring and Control System (MMCS) and other electrical requirements in support of the B2 Space Launch System (SLS) Core Stage Green Run Test Project. Alongside this goal I am to understand project management tools to analyze and control activities/tasks associated with those items. The project I am working on will assist electrical engineers in developing and or identifying closure rationale for the MMCS and electrical requirements. Also as serving the role of a training project manager, I am to develop and maintain a method for tracking progress with estimate completion dates specifically identifying those items during this performance window. The methods I used in order to perform the research consisted of worddocuments, excel sheets, and pdf documents needed for review. For example, documents consisted of: a SLS Core Stage Green Run Facility Requirement Document (FRD) identifying the SSC MMCS and electrical requirements, a Stage Controller to SSC Interface Control Document (ICD) identifying the SSC requirements, and the B2 SLS Core Stage Green Run Test project System Requirements Document (SRD) which identifies the MMCS and electrical requirements. The files were sent to me by both mentors, Mr. Barry Robinson and Ms. Dawn Davis. Overall, the review process for the word documents and excel spreadsheets proved to be successful. The data for the electrical components were accurate and were consistent with the original recorded data. However, the consistency with the pdf documents did not follow up all the way. Attention to this mistake was made and further revisions were done in order for the data to agree with each other. Furthermore, an itinerary was designed using Microsoft Outlook in order to track progress with estimated completion dates. This project contributes to NASA/Center Missions and Goals through the Waterfall Model. The Waterfall Model is a linear system used for engineering design. In the Waterfall Model, the fourth step is Verification and Validation. This involves installation, testing, and debugging of the B2 SLS Core Stage electrical components. For the SLS Core Stage Green Run Test Project, each requirement contained in this approved requirements set will have at least one Verification Item (VI) assigned to it. During the design phase, VIs will mostly consist of Analysis or Inspection types. Design phase VIs and closure information will be documented in Dynamics Data Management System (DDMS) in the form of analysis reports and design documentation.

Bastian, Tyler↗