Search NASA⌕ Search

SEARCH · Search NASA

Results for “Test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

NEXT Single String Integration Tests in Support of the Double Asteroid Redirection Test Mission

A system integration test has been performed utilizing a prototype model NEXT ion thruster, an engineering model power processing unit, and a laboratory model command and data handling system. The objectives of the test were to: a) verify that the integrated system meets performance requirements, b) demonstrate that the integrated system is functional across the anticipated thermal, power processor, and Xe propellant ranges for the DART mission, and to c) evaluate fault detection and operation of the command and data handling system. Measurements made during this test included: thruster performance, PPU input voltages, PPU electrical and thermal telemetry, software states, and fault flags. Additionally, a far-field electrostatic probe diagnostic was used to infer relative changes in the thrust vector across the various propellant flow splits. This manuscript presents the results of these tests, which include integrated ion propulsion system demonstrations of performance, details on the execution of DART flight algorithms, and software fault handling.

Thomas, Robert E.↗

NEXT Single String Integration Tests in Support of the Double Asteroid Redirection Test Mission

A system integration test has been performed utilizing a prototype model NEXT ion thruster, an engineering model power processing unit, and a laboratory model command and data handling system. The objectives of the test were to: a) verify that the integrated system meets performance requirements, b) demonstrate that the integrated system is functional across the anticipated thermal, power processor, and Xe propellant ranges for the DART mission, and to c) evaluate fault detection and operation of the command and data handling system. Measurements made during this test included: thruster performance, PPU input voltages, PPU electrical and thermal telemetry, software states, and fault flags. Additionally, a far-field electrostatic probe diagnostic was used to infer relative changes in the thrust vector across the various propellant flow splits. This manuscript presents the results of these tests, which include integrated ion propulsion system demonstrations of performance, details on the execution of DART flight algorithms, and software fault handling.

Thomas, Robert↗

NEXT Ion Propulsion System Risk Mitigation Tests in Support of the Double Asteroid Redirection Test Mission

Risk mitigation tests have been conducted by the NASA Glenn Research Center and The Aerospace Corporation in support of the DART Mission. The tests focused on NEXT performance characterizations intended to ensure its operations and characteristics are compatible with the DART mission operations, and to assist in the definition of the propulsion system. Tests were performed at the Aerospace Corporation and they involved: flow sensitivity-analyses, steady-state performance characterizations, and measurements of thruster erosion. The tests also involved defining, demonstrating, verifying, and evaluating the start-up sequences and a beam current regulation algorithm consistent with DART mission requirements. It was found that NEXT thruster operations are compatible with the proposed relaxation of flow control ranges for ignition and for steady-state operation.

Thomas, Robert E.↗

NEXT Ion Propulsion System Risk Mitigation Tests in Support of the Double Asteroid Redirection Test Mission

Risk mitigation tests have been conducted by the NASA Glenn Research Center and The Aerospace Corporation in support of the DART Mission. The tests focused on NEXT performance characterizations intended to ensure its operations and characteristics are compatible with the DART mission operations, and to assist in the definition of the propulsion system. Tests were performed at the Aerospace Corporation and they involved: flow sensitivity-analyses, steady-state performance characterizations, and measurements of thruster erosion. The tests also involved defining, demonstrating, verifying, and evaluating the start-up sequences and a beam current regulation algorithm consistent with DART mission requirements. It was found that NEXT thruster operations are compatible with the proposed relaxation of flow control ranges for ignition and for steady-state operation.

Thomas, Robert E.↗

Flight Test Methodology for NASA Advanced Inlet Liner on 737MAX-7 Test Bed (Quiet Technology Demonstrator 3)

This paper describes the acoustic flight test results of an advanced nacelle inlet acoustic liner concept designed by NASA Langley, in a campaign called Quiet Technology Demonstrator 3 (QTD3). NASA has been developing multiple acoustic liner concepts to benefit acoustics with multiple-degrees of freedom (MDOF) honeycomb cavities, and lower the excrescence drag. Acoustic and drag performance were assessed at a lab-scale, flow duct level in 2016. Limitations of the lab-scale rig left open-ended questions regarding the in-flight acoustic performance. This led to a joint project to acquire acoustic flyover data with this new liner technology built into full scale inlet hardware containing the NASA MDOF Low Drag Liner. Boeing saw an opportunity to collect the acoustic flyover data on the 737 MAX-7 between certification tests at no impact to the overall program schedule, and successfully executed within the allotted time. The flight test methodology and the test configurations are detailed and the acoustic analysis is summarized in this paper. After the tone and broadband deltas associated with the inlet hardware were separated and evaluated, the result was a significant decrease in cumulative EPNL (Effective Perceived Noise Level).

Wong, Jackie W.↗

Overview of Plume-Surface Interaction Data from Subscale Inert Gas Testing at NASA MSFC Test Stand 300 Vacuum Facilities

Maturation and validation of predictive modeling capabilities for plume-surface interactions and their effects requires relevant, highly characterized ground test data. The National Aeronautics and Space Administration has developed a test bed for these behaviors under its Game Changing Developments Plume Surface Interactions project, and has undertaken testing at the Marshall Space Flight Center to address critical data needs. This manuscript provides a high-level overview of the testing and its associated data.

Chad J Eberhart↗

Extended Wear Testing of the 12-kW Advanced Electric Propulsion System Engineering Test Unit Hall Thruster

This work presents a summary of the first wear test of the 12 kW Advanced Electric Propulsion System (AEPS) intended to isolate the impact of discharge current on component wear rates. Testing was led by Aerojet Rocketdyne and performed with the AEPS Engineering Test Unit 2 (ETU-2) thruster. In total, approximately 860 hours of operation were accumulated split between operating conditions of 600 V/9 kW, 600 V/11 kW, and 600 V/12 kW. Thruster performance and stability were invariant throughout the wear test for all thruster throttle conditions and shown to be equal to the values previously measured with ETU-2. Inner front pole cover erosion rates were found to be invariant to discharge current as the measurements at all three operating conditions were equal to within the empirical uncertainty. Outer front pole cover erosion rates were found to be equal for the 600 V/9 kW and 600 V/12 kW conditions with operation at 600 V/11 kW yielding elevated erosion rates. Overall, the data shows that the AEPS thruster design has a high probability of meeting lifetime and performance requirements as the design proceeds to flight production and qualification.

Jason D Frieman↗

Extended Wear Testing of the 12-kW Advanced Electric Propulsion System Engineering Test Unit Hall Thruster

This work presents a summary of the first wear test of the 12 kW Advanced Electric Propulsion System (AEPS) intended to isolate the impact of discharge current on component wear rates. Testing was led by Aerojet Rocketdyne and performed with the AEPS Engineering Test Unit 2 (ETU-2) thruster. In total, approximately 860 hours of operation were accumulated split between operating conditions of 600 V/9 kW, 600 V/11 kW, and 600 V/12 kW. Thruster performance and stability were invariant throughout the wear test for all thruster throttle conditions and shown to be equal to the values previously measured with ETU-2. Inner front pole cover erosion rates were found to be invariant to discharge current as the measurements at all three operating conditions were equal to within the empirical uncertainty. Outer front pole cover erosion rates were found to be equal for the 600 V/9 kW and 600 V/12 kW conditions with operation at 600 V/11 kW yielding rates that were comparable to those on the inner front pole cover. Overall, the data shows that the AEPS thruster design has a high probability of meeting lifetime and performance requirements as the design proceeds to flight production and qualification.

HERMeS↗

Ruggedness Evaluation of ASTM International Standard Test Methods for Shape Memory Materials: E3097 Standard Test Method for Mechanical Uniaxial Constant Force Thermal Cycling of Shape Memory Alloys

This paper evaluates the ruggedness testing of the newly released ASTM International E3097 Standard Test Method for Mechanical Uniaxial Constant Force Thermal Cycling of Shape Memory Alloys. The ruggedness experiment was designed with eight runs in two replicates, consisting of seven factors of strain rate (ė), heating and cooling rates (Ṫ(heat) and Ṫ(cool), respectively), upper and lower cycle temperatures (UCT and LCT, respectively), hold time (thold), and minimum load (Fmin) imparted on the samples. The results indicate that the hold time factor had no effect on any result variable. The minimum load factor, alternatively, had the greatest effect on several result variables, with the greatest influence on the strains at martensite start and finish (strain variation ~0.1 percent), and the strains at the upper and lower cycle temperatures (strain variation of 0.14 percent). The UCT was found to have a large effect on the austenite and martensite finish tangent line and data intersect, denoted by Af* and Mf*, by ~17 and 4 °C, respectively. The testing methodology, analysis techniques, and resulting conclusions on the ruggedness of the test methods are presented.

shape memory alloy↗

Mechanical Testing of Soils from the South Range of the Utah Test and Training Range: Derivation of Soil Properties to Support the Earth Entry System Landing for Mars Sample Return

This report summarizes results from laboratory tests conducted by Applied Research Associates, Inc. (ARA) on soil samples collected from multiple sites within the South Range of the U.S. Air Force Utah Test and Training Range (UTTR). The goal of the laboratory tests was to establish soil constitutive properties and develop computational soil models enabling NASA to simulate impact landings of the Earth Entry System (EES) for the Mars Sample Return (MSR) mission. Test methods and results are presented describing the strength, compressibility, and stiffness of soils in the UTTR South Range including methods to incorporate the measured properties into Ansys LS-DYNAÒ constitutive material models for EES landing simulations.

Soil↗

NASA’s Space Launch System: Comprehensive Test Program Leads to Mission Success during Artemis I Flight Test

NASA’s SLS (Space Launch System) rocket had a successful first launch on Nov. 16, 2022, sending an uncrewed Orion spacecraft to the Moon on the agency’s Artemis I mission. Ten 6U CubeSats were also deployed from SLS during the mission. Orbital insertion parameters, including insertion velocity and altitude, were within hundredths and tenths of a percent from predicted values, corroborating data collected from the individual elements that showed similar performance accuracy. While launch remains the main test – and Artemis I was a true test flight – to collect data, confirm and refine computer models, and validate hardware test data, multiple test programs led up to the first flight and enabled the historic launch. Additionally, SLS was designed from the beginning to be a crew-rated launch vehicle, and teams put the astronauts who will fly on it at the forefront of the development process. This paper and presentation will cover the SLS design and development programs that led to the successful Artemis I mission, and which have set the stage to send the first astronauts back to cislunar space since the Apollo 17 crew in 1972.

John Honeycutt↗

Qualifying the Instrument Thimble 11 Test Position in the Advanced Test Reactor Critical

The Advanced Test Reactor (ATR) is a versatile nuclear research reactor located at the Idaho National Laboratory (INL) in Eastern Idaho, United States of America. It is one of the most powerful and flexible research reactors in the world and is primarily used for materials testing, isotope production and basic nuclear science research. The ATR is a light-water-cooled, beryllium-moderated reactor with a nominal thermal power capacity of 250 MW utilizing specially designed fuel, arranged in a serpentine pattern to create 9 flux traps. The special design of ATR allows for the neutron flux within each of the flux traps providing flexibility for experiments, programs and allowing experiments with different dose requirements to be irradiated simultaneously. The Advance Test Reactor Critical (ATRC) is a full-scale replica of the ATR core but is housed in a pool instead of a pressure vessel. ATRC is usually operated at less than 600 watts [1]. There are 12 dry instrument thimbles located around the outside of the core tank where a variety of measurement equipment is housed to facilitate reactor operations. Currently Instrument Thimble 11 (IT-11) is not utilized in ATR or ATRC. A range of measurements is ongoing to qualify IT-11 as a test platform for nuclear instrumentation research, development and further experimentation.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Cold Test Results of Pre-Production PIP-II SSR2 Cavities with High-Power Couplers in the Fermilab Spoke Test Cryostat

As part of the PIP-II project at Fermilab, a pre-production cryomodule featuring 325 MHz Single Spoke Resonator type 2 (SSR2) superconducting RF cavities is under construction. These SSR2 cavities are fabricated by industry partners and undergo initial cold testing at our collaborating institution, IJCLab in France, utilizing low-power coupler. Subsequently, the cavities are subjected to final qualification at Fermilab, complete with tuner and high-power coupler assemblies. This paper provides an overview of the ongoing efforts dedicated to high-power testing of jacketed SSR2 cavities in the Spoke Test Cryostat (STC) at Fermilab. Performance parameters obtained from these tests are presented, offering valuable insights into the cavities operational characteristics and readiness for integration into the PIP-II cryomodule.

43 PARTICLE ACCELERATORS↗

Ground Vibration Testing at NASA Armstrong, Emphasizing on Passive Aeroelastic Tailored Wing Ground Vibration Test Using Fixed Base Correction Method

How does experimental mechanics contribute to aircraft aeroelastic airworthiness? The aviation community is always improving analysis and testing techniques to realize quicker, cheaper, reliable solutions. A ground vibration test (GVT) is conducted to identify structural mode shapes, frequencies, and damping values to validate analytical models used for flutter analysis, which shows whether a structure has acceptable aeroelastic flutter margins for airworthiness. The FLL recently conducted a GVT of the Passive Aeroelastic Tailored (PAT) Wing using an experimental modal technique called Fixed Base Correction (FBC). The GVT objective was to obtain the PAT wing modal characteristics to compare test results with finite element model (FEM) results for the tow-steered wingbox.

loads testing↗

High Temperature Test Facility At Scale Testing, Validation, and Demonstration

Theses slides will be used to brief the Tribal DOE and Council Chairman for the project listed below. The High Temperature Test Facility (HTTF) is a demonstration-scale high temperature electrolysis (HTE) system that provides the ability to produce, process, store, and dispense electrolytically produced hydrogen. The system will be designed to accommodate electrolysis systems from various industry partners. The HTTF will be supplied up to 10 MW of power for electrolysis at 5 separate test article locations, each up to 2MW. The system will include post-processing and compression, storage, and capabilities to provide hydrogen for consumption by future end users. The HTTF will also provide the ability to test and demonstrate an HTE system in a configuration that would simulate the use of a nuclear generated steam supply for the high temperature heat source. The HTTF will be located at the Central Facilities Area (CFA) adjacent to CFA-686 on the INL site, 45 miles west of Idaho Falls.

08 HYDROGEN↗

NASA Scout ST-1 Flight-Test Results and Analyses, Launch Operations, and Test Vehicle Description

The first of a series of flight tests for the development of the four-stage, solid-propellant Scout vehicle was conducted at the NASA Wallops Station under the direction of the Langley Research Center. Vehicle designation for the test was NASA Scout ST-1. Performance characteristics of the vehicle and components were recorded during a high-altitude probe mission. Flight-simulation studies are presented and show that the accuracy of the guidance system during the flight was within control-system design specifications. The control system functioned normally during the flight with the exception of an overpowering of the reaction-control roll jets near burnout of the third-stage rocket motor. The resulting roll displacement of the vehicle is shown to have caused the monitor tracking radar which had been erroneously tracking a radar beacon in the vehicle on a side lobe to reorient to the major lobe of the receiving antenna. This tracking switch falsely indicated a violent turning maneuver on the monitor plot board and resulted in a hold-fire decision for the fourth-stage rocket motor. Although data for the final thrusting and coast phase of the flight were not obtained, the majority of the test objectives were achieved. In-flight thrust misalignment angles for the second- and third-stage rocket motors derived from control-system error data and for the first-stage motor determined from flight-simulation studies are presented. All rocket-motor thrust misalignment angles were well within the tolerances used for control-system design. Rocket-motor flight performance is presented, and velocity increments attained from the first three stages substantiated the predicted nominal performance. Operation of the rocket motors was satisfactory with the exception of high-level vibrations which were encountered during third-stage motor burning. Rolling moments which overpowered the reaction-control jets are also attributed to the burning characteristics of the third-stage motor. A discussion of the premature loss of the third-stage heat shield is given and shows that the heat-shield latching mechanism failed from pressure loads as the vehicle entered the transonic speed range. Although venting was provided to relieve the high negative pressures known to exist on the heat shield at these speeds, a field modification of the wiring tunnel had the same effect as opening the inside of the heat shield to ambient pressures. Consequently, the latching mechanism failed from pressure loads which were of about the same magnitude as the latching-mechanism yield loads. Skin temperatures were recorded at several locations on the vehicle and were generally in good agreement with theoretical values. Aerodynamic heating presented no problem during the flight since the maximum temperatures recorded during the flight were only about half the design values because of the high-launch-angle trajectory. Environmental vibrations recorded in the vicinity of the guidance package showed that no significant continuous amplitude levels above the general instrumentation noise level were present during first- and second-stage burning. Large vibration amplitudes were recorded during third-stage burning which coincided with the large roll disturbance experienced by the vehicle near burnout of the third-stage motor.

Scout Launch Vehicle↗

End-of-test Performance and Wear Characterization of NASA's Evolutionary Xenon Thruster (NEXT) Long-Duration Test

This presentation describes results from the end-of-test performance characterization of NASA's Evolutionary Xenon Thruster (NEXT) Long-Duration Test (LDT). Sub-component performance as well as overall thruster performance is presented and compared to results over the course of the test. Overall wear of critical thruster components is also described, and an update on the first failure mode of the thruster is provided.

Wear Tests↗

Post-Test Inspection of Nasa's Evolutionary Xenon Thruster Long Duration Test Hardware: Ion Optics

A Long Duration Test (LDT) was initiated in June 2005 as a part of NASAs Evolutionary Xenon Thruster (NEXT) service life validation approach. Testing was voluntarily terminated in February 2014, with the thruster accumulating 51,184 hours of operation, processing 918 kg of xenon propellant, and delivering 35.5 MN-s of total impulse. This presentation will present the post-test inspection results to date for the thrusters ion optics.

Ion Engine↗