Search NASA⌕ Search

SEARCH · Search NASA

Results for “Uplink”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

The Mars surveyor operations project command generation process

The methods employed by the Mars surveyor operations project (MSOP) flight team to accelerate the command generation process are described. The approach adopted was to develop a ground system which could simultaneously support as many as three spacecraft in various phases of flight and two in development. The uplink element of the MSOP is discussed, including the control of the science instruments and the spacecraft bus using real-time commands as well as time-tagged stored sequences. The non-interactive payload command process, the express command process, the coordinated command process and the stored sequence process are described. The automation of these processes resulted in flight operations cost savings while maintaining a minimum of risk.

Brooks, Robert N., Jr.↗

Multimission Software Reuse in an Environment of Large Paradigm Shifts

The ground data systems provided for NASA space mission support are discussed. As space missions expand, the ground systems requirements become more complex. Current ground data systems provide for telemetry, command, and uplink and downlink processing capabilities. The new millennium project (NMP) technology testbed for 21st century NASA missions is discussed. The program demonstrates spacecraft and ground system technologies. The paradigm shift from detailed ground sequencing to a goal oriented planning approach is considered. The work carried out to meet this paradigm for the Deep Space-1 (DS-1) mission is outlined.

Wilson, Robert K.↗

The MARS pathfinder end-to-end information system: A pathfinder for the development of future NASA planetary missions

The development of the Mars pathfinder is considered with emphasis on the End-to-End Information System (EEIS) development approach. The primary mission objective is to successfully develop and deliver a single flight system to the Martian surface, demonstrating entry, descent and landing. The EEIS is a set of functions distributed throughout the flight, ground and Mission Operation Systems (MOS) that inter-operate in order to control, collect, transport, process, store and analyze the uplink and downlink information flows of the mission. Coherence between the mission systems is achieved though the EEIS architecture. The key characteristics of the system are: a concurrent engineering approach for the development of flight, ground and mission operation systems; the fundamental EEIS architectural heuristics; a phased incremental EEIS development and test approach, and an EEIS design deploying flight, ground and MOS operability features, including integrated ground and flight based toolsets.

Cook, Richard A.↗

Gravitational Wave Search with the Clock Mission

Doppler tracking of distant spacecraft is the only method currently available to search for gravitational waves in the low-frequency (approx. 0.0001-0.1 Hz) band. In this technique the Doppler system measures the relative dimensionless velocity 2(delta)v/c = (delta)f/f(sub o) between the earth and the spacecraft as a function of time, where (delta)f is the frequency perturbation and f(sub o) is the nominal frequency of the radio link. A gravitational wave of amplitude h incident on this system causes small frequency perturbations, of order h in (delta)f/f(sub o), replicated three times in the observed record (Estabrook and Wahlquist 1975). All experiments to date and those planned for the near future involve only 'two-way' Doppler-i.e., uplink signal coherently transponded by the spacecraft with Doppler measured using a frequency standard common to the transmit and receive chains of the ground station. If, as on the proposed Clock Mission, there is an additional frequency standard on the spacecraft and a suitable earth-spacecraft radio system, some noise sources can be isolated and removed from the data (Vessot and Levine 1978). Supposing that the Clock Mission spacecraft is transferred into a suitable interplanetary orbit, I discuss here how the on-board frequency standard could be employed with an all-Ka-band radio system using the very high stability Deep Space Network station DSS 25 being instrumented for Cassini. With this configuration, the Clock Mission could search for gravitational waves at a sensitivity limited by the frequency standards, rather than plasma or tropospheric scintillation effects, whenever the sun-earth-spacecraft angle is greater than 90 degrees.

Armstrong, J. W.↗

Rain Fade Compensation for Ka-Band Communications Satellites

This report provides a review and evaluation of rain fade measurement and compensation techniques for Ka-band satellite systems. This report includes a description of and cost estimates for performing three rain fade measurement and compensation experiments. The first experiment deals with rain fade measurement techniques while the second one covers the rain fade compensation techniques. The third experiment addresses a feedback flow control technique for the ABR service (for ATM-based traffic). The following conclusions were observed in this report; a sufficient system signal margin should be allocated for all carriers in a network, that is a fixed clear-sky margin should be typically in the range of 4-5 dB and should be more like 15 dB in the up link for moderate and heavy rain zones; to obtain a higher system margin it is desirable to combine the uplink power control technique with the technique that implements the source information rate and FEC code rate changes resulting in a 4-5 dB increase in the dynamic part of the system margin. The experiments would assess the feasibility of the fade measurements and compensation techniques, and ABR feedback control technique.

Mitchell, W. Carl↗

A Prototype Ka-/Ka-Band Dichroic Plate With Stepped Rectangular Apertures

A prototype five-layer Ka-/Ka-band dichroic plate was fabricated and measured. This dichroic plate was designed to pass Ka-band uplink (34.2-34.7 GHz) and to reflect Ka-band downlink (31.8-32.3 GHz) for dual-frequency operation in the Deep Space Network to support the future Cassini mission. The theoretical calculation and the experimental measurement of the reflected resonant frequencies were within 0.24 percent for circular polarization. The computer program, which was used to design the dichroic plate with stepped apertures, was then verified.

Chen, J. C.↗

Navigation of the space VLBI mission-HALCA

In February 1997, the Japanese Space Agency ISAS launched the first space VLBI satellite, HALCA, with an 8 meter diameter wire mesh antenna and radio astronomy receivers capable of observing at 1.6, 4.8, and 22 Ghz. In a 560 by 21000 km orbit with a 6 hour period and 31 degree inclination, it observes celestial radio sources in conjunction with a world wide network of ground radio telescopes as part of an international collaborative effort which includes facilities in Japan, the U.S., Canada, Australia, and Europe. JPL is providing tracking and navigation support using a dedicated subnet of 11 meter antennas as well as co-observations using the DSN 70 meter antennas. This paper describes the spacecraft dynamics model and orbit determination strategies developed to meet the stringent trajectory accuracy requirements for generating predictions for the transfer of a stable uplink frequency to the spacecraft and for determining reconstructed orbits for delivery to the NRAO VLBI correlator and the international VLBI science community.

You, Tung Han↗

Defining the ATC Controller Interface for Data Link Clearances

The Controller Interface (CI) is the primary method for Air Traffic Controllers to communicate with aircraft via Controller-Pilot Data Link Communications (CPDLC). The controller, wearing a microphone/headset, aurally gives instructions to aircraft as he/she would with today's voice radio systems. The CI's voice recognition system converts the instructions to digitized messages that are formatted according to the RTCA DO-219 Operational Performance Standards for ATC Two-Way Data Link Communications. The DO-219 messages are transferred via RS-232 to the ATIDS system for uplink using a Mode-S datalink. Pilot acknowledgments of controller messages are downlinked to the ATIDS system and transferred to the Cl. A computer monitor is used to convey information to the controller. Aircraft data from the ARTS database are displayed on flight strips. The flight strips are electronic versions of the strips currently used in the ATC system. Outgoing controller messages cause the respective strip to change color to indicate an unacknowledged transmission. The message text is shown on the flight strips for reference. When the pilot acknowledges the message, the strip returns to its normal color. A map of the airport can also be displayed on the monitor. In addition to voice recognition, the controller can enter messages using the monitor's touch screen or by mouse/keyboard.

Rankin, James↗

X-33 Integrated Test Facility Extended Range Simulation

In support of the X-33 single-stage-to-orbit program, NASA Dryden Flight Research Center was selected to provide continuous range communications of the X-33 vehicle from launch at Edwards Air Force Base, California, through landing at Malmstrom Air Force Base Montana, or at Michael Army Air Field, Utah. An extensive real-time range simulation capability is being developed to ensure successful communications with the autonomous X-33 vehicle. This paper provides an overview of various levels of simulation, integration, and test being developed to support the X-33 extended range subsystems. These subsystems include the flight termination system, L-band command uplink subsystem, and S-band telemetry downlink subsystem.

Sharma, Ashley↗

Pioneer Venus Orbiter Ultraviolet Spectrometer: Operations and Data Analysis

The Pioneer Venus spacecraft orbited Venus 5,055 times between 4th December 1978 and 6th October 1992, before entering Venus' atmosphere and burning up on the latter date. On 255 of these orbits, science operations were suspended because of superior conjunction (Venus' proximity to the Sun as seen from Earth). Of the remaining 4800 orbits, about 85% yielded good-quality OUVS science data; 15% were lost to various problems, including loss of uplink (commands) to and downlink (data) from the spacecraft, errors in commanding OUVS, and one or other of the two instrument anomalies mentioned below.

Stewart, A. I. F.↗

SEDSAT

Under this contract the Students for the Exploration and Development of Space Satellite number One (SEDSAT-1 or just SEDSAT) was completed and launched on 24-Oct-98. It achieved nominal orbit and activated its transponders after Delta II separation. Telemetry has indicated the internal systems are normal. However, SEDSAT has not responded to subsequent uplink commands. Telemetry has continued to be received allowing evaluation of bus performance and attempts at anomaly resolution. Anomaly resolution will continue during 1999 subsequent to the end of this contract. This final report documents activities under the contract period.

Source record↗

Extended Range Communications Support for the X-33

Communications support for the X-33 requires addressing several interesting challenges to meet program and range safety requirements. In addition, the heavily cost driven program has provided concessions to the communications support to reduce the cost of networking the extended range. Cost trade-offs showed that by lowering the telemetry data rate from 2 Megabits per second to 1440 Megabits per second that significant cost avoidance could be realized. Also, by adopting standard telecommunications data rate for the uplink data stream, an efficient and integrated solution for the extended range communications could be supported. Meeting the program requirements as well as range safety requirements for this effort are critical to the success of the program. This paper describes some of the important requirements driving the design of the extended range communications support and the design of the system to meet those requirements.

Eslinger, Brian↗

Design Description of the X-33 Avionics Architecture

In this paper, we provide a design description of the X-33 avionics architecture. The X-33 is an autonomous Single Stage to Orbit (SSTO) launch vehicle currently being developed by Lockheed Martin for NASA as a technology demonstrator for the VentureStar Reusable Launch Vehicle (RLV). The X-33 avionics provides autonomous control of die vehicle throughout takeoff, ascent, descent, approach, landing, rollout, and vehicle safing. During flight the avionics provides communication to the range through uplinked commands and downlinked telemetry. During pre-launch and post-safing activities, the avionics provides interfaces to ground support consoles that perform vehicle flight preparations and maintenance. The X-33 Avionics is a hybrid of centralized and distributed processing elements connected by three dual redundant Mil-Std 1553 data buses. These data buses are controlled by a central processing suite located in the avionics bay and composed of triplex redundant Vehicle Mission Computers (VMCs). The VMCs integrate mission management, guidance, navigation, flight control, subsystem control and redundancy management functions. The vehicle sensors, effectors and subsystems are interfaced directly to the centralized VMCs as remote terminals or through dual redundant Data Interface Units (DIUs). The DIUs are located forward and aft of the avionics bay and provide signal conditioning, health monitoring, low level subsystem control and data interface functions. Each VMC is connected to all three redundant 1553 data buses for monitoring and provides a complete identical data set to the processing algorithms. This enables bus faults to be detected and reconfigured through a voted bus control configuration. Data is also shared between VMCs though a cross channel data link that is implemented in hardware and controlled by AlliedSignal's Fault Tolerant Executive (FTE). The FTE synchronizes processors within the VMC and synchronizes redundant VMCs to each other. The FTE provides an output-voting plane to detect, isolate and contain faults due to internal hardware or software faults and reconfigures the VMCs to accommodate these faults. Critical data in the 1553 messages are scheduled and synchronized to specific processing frames in order to minimize data latency. In order to achieve an open architecture, military and commercial off-the-shelf equipment is incorporated using common processors, standard VME backplanes and chassis, the VxWorks operating system, and MartixX for automatic code generation. The use of off-the-shelf tools and equipment helps reduce development time and enables software reuse. The open architecture allows for technology insertion, while the distributed modular elements allow for expansion to increased redundancy levels to meet the higher reliability goals of future RLVs.

Reichenfeld, Curtis J.↗

The Transition from Spacecraft Development Ot Flight Operation: Human Factor Considerations

In the field of aeronautics and astronautics, a paradigm shift has been witnessed by those in academia, research and development, and private industry. Long development life cycles and the budgets to support such programs and projects has given way to aggressive task schedules and leaner resources to draw from all the while challenging assigned individuals to create and produce improved products of processes. however, this "faster, better, cheaper" concept cannot merely be applied to the design, development, and test of complex systems such as earth-orbiting of interplanetary robotic spacecraft. Full advantage is not possible without due consideration and application to mission operations planning and flight operations, Equally as important as the flight system, the mission operations system consisting of qualified personnel, ground hardware and software tools, and verified and validated operational processes, should also be regarded as a complex system requiring personnel to draw upon formal education, training, related experiences, and heuristic reasoning in engineering an effective and efficient system. Unquestionably, qualified personnel are the most important elements of a mission operations system. This paper examines the experiences of the Deep Space I Project, the first in a series of new technology in-flight validation missions sponsored by the United States National Aeronautics and Space Administration (NASA), specifically, in developing a subsystems analysis and technology validation team comprised of former spacecraft development personnel. Human factor considerations are investigated from initial concept/vision formulation; through operational process development; personnel test and training; to initial uplink product development and test support. Emphasis has been placed on challenges and applied or recommended solutions, so as to provide opportunities for future programs and projects to address and disposition potential issues and concerns as early as possible to reap the benefits associated with learning from other's past experiences.

Basilio, Ralph R.↗

Deep Space Network Revitalization: Operations for the 21st Century

The National Aeronautics and Space Administration (NASA) supports unmanned space missions through a Deep Space Network (DSN) that is developed and operated by the Jet Propulsion Laboratory (JPL and its subcontractors. The DSN capabilities have been incrementally upgraded since its establishment in the late '50s and are delivered from three Deep Space Communications Complexes (DSCC's) near Goldstone, California, Madrid, Spain, and Canberra, Australia. At present each DSCC includes large antennas with diameters from 11 meters to 70 meters, that operate largely in S-band and X-band frequencies. In addition each DSCC includes all the associated electronics to receive and process the low-level telemetry signals, and radiate the necessary command with high-power transmitters. To accommodate support of the rapidly increasing number of missions by NASA and other space agencies, and to facilitate maintaining and increasing the level of service in a shrinking budget environment, JPL has initiated a bold road map with three key components: 1. A Network Simplification Project (NSP) to upgrade aging electronics, replacing them with modem commercially based components. NSP and related replacement tasks are projected to reduce the cost of operating the DSN by 50% relative to the 1997 levels. 2. Upgrade of all 34-m and 70-m antennas to provision of Ka-Band telemetry downlink capability, complemented by an existing X-band uplink capability. This will increase the effective telemetry downlink capacity by a factor of 4, without building any new antennas. 3. Establishment of an optical communications network to support for high data rate unmanned missions that cannot be accommodated with radiofrequency (RF) communications, as well as establish a path toward support of manned missions at Mars. In this paper we present the mission loading projected for 1998-2008 and the elements of the JPL road map that will enable supporting it with a reduced budget. Particular emphasis will be on streamlining the architecture and to reduce the DSN cost for operations, maintenance and sustaining engineering while at the same time also simplifying and reducing the operations cost for the flight missions.

Statman, Joseph I.↗

Pointing and Tracking Concepts for Deep Space Missions

This paper summarizes part of a FY1998 effort on the design and development of an optical communications (Opcomm) subsystem for the Advanced Deep Space System Development (ADSSD) Project. This study was funded by the JPL X2000 program to develop an optical communications (Opcomm) subsystem for use in future planetary missions. The goal of this development effort was aimed at providing prototype hardware with the capability of performing uplink, downlink, and ranging functions from deep space distances. Such a system was envisioned to support future deep space missions in the Outer Planets/Solar Probe (OPSP) mission set such as the Pluto express and Europa orbiter by providing a significant enhancement of data return capability. A study effort was initiated to develop a flyable engineering model optical terminal to support the proposed Europa Orbiter mission - as either the prime telecom subsystem or for mission augmentation. The design concept was to extend the prototype lasercom terminal development effort currently conducted by JPL's Optical Communications Group. The subsystem would track the sun illuminated Earth at Europa and farther distances for pointing reference. During the course of the study, a number of challenging issues were found. These included thermo-mechanical distortion, straylight control, and pointing. This paper focuses on the pointing aspects required to locate and direct a laser beam from a spacecraft (S/C) near Jupiter to a receiving station on Earth.

Alexander, J. W.↗

The Mars Surveyor '01 Rover and Robotic Arm

The Mars Surveyor 2001 Lander will carry with it both a Robotic Arm and Rover to support various science and technology experiments. The Marie Curie Rover, the twin sister to Sojourner Truth, is expected to explore the surface of Mars in early 2002. Scientific investigations to determine the elemental composition of surface rocks and soil using the Alpha Proton X-Ray Spectrometer (APXS) will be conducted along with several technology experiments including the Mars Experiment on Electrostatic Charging (MEEC) and the Wheel Abrasion Experiment (WAE). The Rover will follow uplinked operational sequences each day, but will be capable of autonomous reactions to the unpredictable features of the Martian environment. The Mars Surveyor 2001 Robotic Arm will perform rover deployment, and support various positioning, digging, and sample acquiring functions for MECA (Mars Environmental Compatibility Assessment) and Mossbauer Spectrometer experiments. The Robotic Arm will also collect its own sensor data for engineering data analysis. The Robotic Arm Camera (RAC) mounted on the forearm of the Robotic Arm will capture various images with a wide range of focal length adjustment during scientific experiments and rover deployment

Bonitz, Robert G.↗

Nozomi Cis-Lunar Phase Orbit Determination

Japan's Institute of Space and Astronautical Science (ISAS) launched Nozomi, its first mission to the planet Mars using the newly developed M-V launch vehicle on July 3, 1998. Scientific objectives of the mission are to study the structure and dynamics of the Martian upper atmosphere and its interaction with the solar wind. Nozomi is a cooperative mission between ISAS and the National Aeronautics and Space Administration (NASA). The NASA contribution includes navigation and tracking services provided by the Jet Propulsion Laboratory (JPL). The spacecraft also serves as an engineering demonstration of basic technology for planetary exploration. One of the new technologies was a unique trajectory, developed by ISAS, which used solar gravitational perturbations at the weak stability boundary as an aid to achieve an Earth-Mars transfer orbit. This trajectory saves approximately 120 m/s of Delta V compared to direct hyperbolic insertion and is considered an enabling technology for the mission. Nozomi was the first spacecraft to employ this trajectory and provided on-orbit validation of the technique. The trajectory was achieved by initially placing the spacecraft in a highly elliptical cis-lunar phasing orbit. Six maneuvers were performed during this period to correct injection errors and target an outbound lunar swingby in September 1998. The gravity assist from the lunar swingby raised apogee to the vicinity of the weak stability boundary. After three more targeting maneuvers, Nozomi performed an inbound lunar swingby followed immediately by a powered Earth swingby in late December 1998. A 420 m/s Trans Mars Insertion (TMI) burn at the final Earth periapsis was intended to place the spacecraft on a heliocentric trajectory leading to Mars orbit insertion in October 1999. Orbit determination for Nozomi is performed in parallel by both ISAS and the Multi-Mission Navigation (MMNAV) group at JPL. This was an advantage for the mission because each group would generate solutions based on data collected from their respective tracking networks. Spacecraft events, such as sequence uplinks and maneuvers, were generally scheduled during passes at the Usuda tracking station in Japan. As a result, maneuver design and reconstruction was derived from MMNAV solutions based on JPL tracking data obtained immediately prior to or following maneuvers. Data was also exchanged between ISAS and MMNAV so orbit determination could be performed on joint data sets in support of critical targeting late in the cis-lunar phase. In this paper, information regarding the MMNAV orbit determination effort for the first six months of the mission is presented. The spacecraft trajectory is characterized first, followed by a discussion of the orbit determination estimation procedure and models. Results from selected orbit solutions are presented and compared against reconstructed trajectories. One area of emphasis in this paper is orbit determination in the vicinity of the weak stability boundary. Precise navigation was necessary to target the second lunar swingby and the powered Earth swingby. Delivery accuracy of 150 m was required for these critical encounters, but a number of factors contributed to the general degradation of orbit determination accuracy. This included the fact that the spacecraft was at apogee, at a range of 1.7 million km and moving at less than I km/sec perpendicular to the line of sight. Nozomi was also close to zero degrees declination where there are known limitations on orbit determination performance. Finally, S-band tracking data was acquired through the Nozomi backup low gain antenna. This antenna is offset from the axis of this spin stabilized spacecraft and superimposed large signatures in the Doppler and range data. These difficulties were overcome by combining long data arcs, spanning several maneuvers, with a high fidelity solar pressure model. The model included a physically accurate representation of the spacecraft structure and a high time resolution orientation model. Observation modeling included the removal of the spin induced Doppler bias, spin signature and per pass correction of range calibration errors applied for data leading up to critical events. As a result, all orbit determination goals were met. A second area of emphasis in this paper is the JPL tracking and orbit determination effort in support of the TMI maneuver. TMI occurred out of contact with ground stations and the JPL Goldstone tracking complex had the first pass following the bum. As a result, MMNAV had the responsibility to make a rapid assessment of the maneuver performance. MMNAV made the determination that a 100 m/s under bum had occurred and promptly informed ISAS via voice lines. ISAS immediately began preparations for a correction maneuver (TMIc), which had to be performed during the next Usuda pass. The near real time assessment by MMNAV provided accurate antenna frequency and pointing updates for the spacecraft acquisition at Usuda and the close coordination between the two agencies enabled the design and successful execution of the TMc maneuver. Propellant consumption during the correction burn dictated that the mission be redesigned. ISAS developed a new plan which adds 3 full solar orbits, two Earth swingbys and one lunar swingby with arrival at Mars in January 2004. The final Mars orbit will still enable the mission to achieve all of its science objectives.

Ryne, Mark↗