Search NASA⌕ Search

SEARCH · Search NASA

Results for “Waste Description”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Y-12 Groundwater Protection Program Groundwater And Surface Water Sampling And Analysis Plan For Calendar Year 2011

This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2011 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2011 will be in accordance with requirements of DOE Order 540.1A and the following goals: (1) to protect the worker, the public, and the environment; (2) to maintain surveillance of existing and potential groundwater contamination sources; (3) to provide for the early detection of groundwater contamination and determine the quality of groundwater and surface water where contaminants are most likely to migrate beyond the Oak Ridge Reservation property line; (4) to identify and characterize long-term trends in groundwater quality at Y-12; and (5) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2011 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge along the boundary of the Oak Ridge Reservation. Modifications to the CY 2011 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 GWPP manager and documented as addenda to this sampling and analysis plan. The following sections of this report provide details regarding the CY 2011 groundwater and surface water monitoring activities. Section 2 describes the monitoring locations in each regime and the processes used to select the sampling locations. A description of the field measurements and laboratory analytes is provided in Section 3. Sample collection methods and procedures are described in Section 4, and Section 5 lists the documents cited for more detailed operational and technical information. The narrative sections of the report reference several appendices. Figures (maps and diagrams) and tables (excluding data summary tables presented in the narrative sections) are in Appendix A and Appendix B, respectively. Groundwater Monitoring Schedules (when issued throughout CY 2011) will be inserted in Appendix C, and addenda to this plan (if issued) will be inserted in Appendix D. Laboratory requirements (bottle lists, holding times, etc.) are provided in Appendix E, and an approved Waste Management Plan is provided in Appendix F.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Evaluation of Co-precipitation Processes for the Synthesis of Mixed-Oxide Fuel Feedstock Materials

The focus of this report is the evaluation of various co-precipitation processes for use in the synthesis of mixed oxide feedstock powders for the Ceramic Fuels Technology Area within the Fuels Cycle R&D (FCR&D) Program's Advanced Fuels Campaign. The evaluation will include a comparison with standard mechanical mixing of dry powders and as well as other co-conversion methods. The end result will be the down selection of a preferred sequence of co-precipitation process for the preparation of nuclear fuel feedstock materials to be used for comparison with other feedstock preparation methods. A review of the literature was done to identify potential nitrate-to-oxide co-conversion processes which have been applied to mixtures of uranium and plutonium to achieve recycle fuel homogeneity. Recent studies have begun to study the options for co-converting all of the plutonium and neptunium recovered from used nuclear fuels, together with appropriate portions of recovered uranium to produce the desired mixed oxide recycle fuel. The addition of recycled uranium will help reduce the safeguard attractiveness level and improve proliferation resistance of the recycled fuel. The inclusion of neptunium is primarily driven by its chemical similarity to plutonium, thus enabling a simple quick path to recycle. For recycle fuel to thermal-spectrum light water reactors (LWRs), the uranium concentration can be {approx}90% (wt.), and for fast spectrum reactors, the uranium concentration can typically exceed 70% (wt.). However, some of the co-conversion/recycle fuel fabrication processes being developed utilize a two-step process to reach the desired uranium concentration. In these processes, a 50-50 'master-mix' MOX powder is produced by the co-conversion process, and the uranium concentration is adjusted to the desired level for MOX fuel recycle by powder blending (milling) the 'master-mix' with depleted uranium oxide. In general, parameters that must be controlled for co-precipitation processes include (1) feed solution concentration adjustment, (2) precipitant concentration and addition methods, (3) pH, temperature, mixing method and time, (4) valence adjustment, (5) solid precipitate separation from the filtrate 'mother liquor,' generally by means of centrifugation or filtration, and (6) temperatures and times for drying, calcination, and reduction of the MOX product powder. Also a recovery step is necessary because of low, but finite solubility of the U/TRU metals in the mother liquor. The recovery step usually involves destruction of the residual precipitant and disposal of by-product wastes. Direct denitrations of U/TRU require fewer steps, but must utilize various methods to enable production of MOX with product characteristics that are acceptable for recycle fuel fabrication. The three co-precipitation processes considered for evaluation are (1) the ammonia co-precipitation process being developed in Russia, (2) the oxalate co-precipitation process, being developed in France, and (3) the ammonium-uranyl-plutonyl-carbonate (AUPuC) process being developed in Germany. Two direct denitration processes are presented for comparison: (1) the 'Microwave Heating (MH)' automated multi-batch process developed in Japan and (2) the 'Modified Direct Denitration (MDD)' continuous process being developed in the USA. Brief comparative descriptions of the U/TRU co-conversion processes are described. More complete details are provided in the references.

Collins, Emory D↗

Y-12 Groundwater Protection Program Groundwater And Surface Water Sampling And Analysis Plan For Calendar Year 2012

This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2012 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2012 is in accordance with the following goals: (1) to protect the worker, the public, and the environment; (2) to maintain surveillance of existing and potential groundwater contamination sources; (3) to provide for the early detection of groundwater contamination and determine the quality of groundwater and surface water where contaminants are most likely to migrate beyond the Oak Ridge Reservation property line; (4) to identify and characterize long-term trends in groundwater quality at Y-12; and (5) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring will be performed in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge along the boundary of the Oak Ridge Reservation. Modifications to the CY 2012 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. Each modification to the monitoring program will be approved by the Y-12 GWPP manager and documented as an addendum to this sampling and analysis plan. The following sections of this report provide details regarding the CY 2012 groundwater and surface water monitoring activities. Section 2 describes the monitoring locations in each regime and the processes used to select the sampling locations. A description of the field measurements and laboratory analytes is provided in Section 3. Sample collection methods and procedures are described in Section 4, and Section 5 lists the documents cited for more detailed operational and technical information. The narrative sections of the report reference several appendices. Figures (maps and diagrams) and tables (excluding a data summary table presented in Section 4) are in Appendix A and Appendix B, respectively. Groundwater Monitoring Schedules (when issued throughout CY 2012) will be inserted in Appendix C, and addenda to this plan (if issued) will be inserted in Appendix D. Laboratory requirements (bottle lists, holding times, etc.) are provided in Appendix E, and an approved Waste Management Plan is provided in Appendix F.

54 ENVIRONMENTAL SCIENCES↗

Y-12 Groundwater Protection Program Groundwater and Surface Water Sampling and Analysis Plan (CY 2021)

This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2021 at the U.S. Department of Energy Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring is performed by the GWPP. Groundwater and surface water monitoring will be performed in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley and the Chestnut Ridge Regime is located south of Y-12. Additional surface water monitoring will be performed north of Pine Ridge along the boundary of the Oak Ridge Reservation. The following sections of this report provide details regarding the CY 2021 groundwater and surface water monitoring activities. Section 2 describes the monitoring locations in each regime and the processes used to select the sampling locations. A description of the field measurements and laboratory analytes is provided in Section 3. Sample collection methods and procedures are described in Section 4, and Section 5 lists the documents cited for more detailed operational and technical information. The narrative sections of the report reference several appendices. Figures (maps and diagrams) and tables (excluding a data summary table presented in Section 4) are in Appendix A and Appendix B, respectively. Groundwater Monitoring Schedules (when issued throughout CY 2021) will be inserted in Appendix C, and addenda to this plan (if issued) will be inserted in Appendix D. Laboratory requirements (bottle lists, holding times, etc.) are provided in Appendix E, and an approved Waste Management Plan is provided in Appendix F. Modifications to the CY 2021 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. Each modification to the monitoring program will be approved by the Y-12 GWPP manager and documented as an addendum to this sampling and analysis plan.

54 ENVIRONMENTAL SCIENCES↗

Y-12 Groundwater Protection Program Groundwater And Surface Water Sampling And Analysis Plan For Calendar Year 2010

This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2010 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2010 will be in accordance with requirements of DOE Order 540.1A and the following goals: (1) to protect the worker, the public, and the environment; (2) to maintain surveillance of existing and potential groundwater contamination sources; (3) to provide for the early detection of groundwater contamination and determine the quality of groundwater and surface water where contaminants are most likely to migrate beyond the Oak Ridge Reservation property line; (4) to identify and characterize long-term trends in groundwater quality at Y-12; and (5) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2010 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley, and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge, along the boundary of the Oak Ridge Reservation. Modifications to the CY 2010 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 GWPP manager and documented as addenda to this sampling and analysis plan. The following sections of this report provide details regarding the CY 2010 groundwater and surface water monitoring activities. Section 2 describes the monitoring locations in each regime and the processes used to select the sampling locations. A description of the field measurements and laboratory analytes is provided in Section 3. Sample collection methods and procedures are described in Section 4, and Section 5 lists the documents cited for more detailed operational and technical information. The narrative sections of the report reference several appendices. Figures (maps and diagrams) and tables (excluding data summary tables presented in the narrative sections) are in Appendix A and Appendix B, respectively. Groundwater Monitoring Schedules (when issued throughout CY 2010) will be inserted in Appendix C, and addenda to this plan (if issued) will be inserted in Appendix D. Laboratory requirements (bottle lists, holding times, etc.) are provided in Appendix E, and an approved Waste Management Plan is provided in Appendix F.

54 ENVIRONMENTAL SCIENCES↗

COYOTE : a finite element computer program for nonlinear heat conduction problems. Part I, theoretical background.

The need for the engineering analysis of systems in which the transport of thermal energy occurs primarily through a conduction process is a common situation. For all but the simplest geometries and boundary conditions, analytic solutions to heat conduction problems are unavailable, thus forcing the analyst to call upon some type of approximate numerical procedure. A wide variety of numerical packages currently exist for such applications, ranging in sophistication from the large, general purpose, commercial codes, such as COMSOL, COSMOSWorks, ABAQUS and TSS to codes written by individuals for specific problem applications. The original purpose for developing the finite element code described here, COYOTE, was to bridge the gap between the complex commercial codes and the more simplistic, individual application programs. COYOTE was designed to treat most of the standard conduction problems of interest with a user-oriented input structure and format that was easily learned and remembered. Because of its architecture, the code has also proved useful for research in numerical algorithms and development of thermal analysis capabilities. This general philosophy has been retained in the current version of the program, COYOTE, Version 5.0, though the capabilities of the code have been significantly expanded. A major change in the code is its availability on parallel computer architectures and the increase in problem complexity and size that this implies. The present document describes the theoretical and numerical background for the COYOTE program. This volume is intended as a background document for the user's manual. Potential users of COYOTE are encouraged to become familiar with the present report and the simple example analyses reported in before using the program. The theoretical and numerical background for the finite element computer program, COYOTE, is presented in detail. COYOTE is designed for the multi-dimensional analysis of nonlinear heat conduction problems. A general description of the boundary value problems treated by the program is presented. The finite element formulation and the associated numerical methods used in COYOTE are also outlined. Instructions for use of the code are documented in SAND2010-0714.

99 GENERAL AND MISCELLANEOUS↗

Prototype Design, Analysis, and Results for a Liquid Radiological Waste Control Room

Human factors researchers at Idaho National Laboratory are collaborating with a utility partner to address human factors in the modernization of their radiological waste control room. The collaborating utility, Palo Verde, plans to remove all control boards associated with the liquid radiological waste system, which include controls, indicators, and alarm systems, and replace them with modernized digital instrumentation and controls and displays. To be sure the new system either supports current operational performance or enhances it, researchers have carried out three planning and analysis activities: expert operator review, function allocation analysis, and human factor principles and design applications. Researchers utilized access to expert operators to gain information about the system. Operators were asked to detail a procedure exemplifying typical interactions with the liquid radiological waste system and provide it to Idaho National Laboratory with a list of functionalities to incorporate (Section 4.1). Later, operators were asked to provide additional feedback to inform a prototype with adequate realism to support sound analysis of the system design (Section 4.2). Other operators not associated with the utility partner were also involved in experiment design and prototype evaluation (Section 4.2). Due to the extent of the upgrade, care was given to measure the change in the operator’s role (Section 7). As part of the modernization, some plant systems are expected to be equipped with automation or sensors that send information directly to the control where previously operators were required to enter controlled areas to find the information. Such updates made slight changes to operator role requirements, but the impact was negligible. The way the system is operated will remain largely the same, but operator convenience and safety is expected to increase. Additionally, to map operator tasks during the selected procedure, an Operational Sequence Diagram was created (Section 7.1). The diagram helped to account for every interaction and piece of equipment needed to create the prototype design. Alternatively, the diagram can be created following the final design to identify any function reallocations due to redesign. Human factors principles were also applied to the design. An ergonomic assessment was performed on the workspace resulting in various recommendations for placing and designing the new workstation (Section 6). A 3 D mockup of the control room was created to depict the options available with in-depth descriptions of each. Furthermore the prototype design incorporates well known human factors principles. However, to be sure the principles are sound in the control room context, the researches have designed an experiment to measure the impact design decision has on operator performance. The experiment is described in detail in Section 5. Lastly, a tool emerged as this effort began called the NUREG 0711 Crosswalk (Section 8). The tool has multiple uses, but it was primarily intended to communicate how the researcher’s action directly mapped to specific results suggested in the Nuclear Regulatory Commission review guideline. The tool also maps how current results impact future decisions in the modernization process.

47 OTHER INSTRUMENTATION↗

2011 Annual Wastewater Reuse Report for the Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant

This report describes conditions, as required by the state of Idaho Wastewater Reuse Permit (LA-000141-03), for the wastewater land application site at Idaho National Laboratory Site's Central Facilities Area Sewage Treatment Plant from November 1, 2010, through October 31, 2011. The report contains the following information: (1) Site description; (2) Facility and system description; (3) Permit required monitoring data and loading rates; (4) Status of special compliance conditions and activities; and (5) Discussion of the facility's environmental impacts. During the 2011 permit year, approximately 1.22 million gallons of treated wastewater was land-applied to the irrigation area at Central Facilities Area Sewage Treatment plant.

99 GENERAL AND MISCELLANEOUS↗

Modelling radionuclide transport in fractured media with a dynamic update of K d values

Radionuclide transport in fractured crystalline rocks is a process of interest in evaluating long term safety of potential disposal systems for radioactive wastes. Given their numerical efficiency and the absence of numerical dispersion, Lagrangian methods (e.g. particle tracking algorithms) are appealing approaches that are often used in safety assessment (SA) analyses. In these approaches, many complex geochemical retention processes are typically lumped into a single parameter: the distribution coefficient (Kd). Usually, the distribution coefficient is assumed to be constant over the time frame of interest. However, this assumption could be critical under long-term geochemical changes as it is demonstrated that the distribution coefficient depends on the background chemical conditions (e.g. pH, Eh, and major chemistry). In this study, we provide a computational framework that combines the efficiency of Lagrangian methods with a sound and explicit description of the geochemical changes of the site and their influence on the radionuclide retention properties.

58 GEOSCIENCES↗

Scientific Opportunity to Reduce Risk in Groundwater and Soil Remediation

In this report, we start by examining previous efforts at linking science and DOE EM research with cleanup activities. Many of these efforts were initiated by creating science and technology roadmaps. A recurring feature of successfully implementing these roadmaps into EM applied research efforts and successful cleanup is the focus on integration. Such integration takes many forms, ranging from combining information generated by various scientific disciplines, to providing technical expertise to facilitate successful application of novel technology, to bringing the resources and creativity of many to address the common goal of moving EM cleanup forward. Successful projects identify and focus research efforts on addressing the problems and challenges that are causing “failure” in actual cleanup activities. In this way, basic and applied science resources are used strategically to address the particular unknowns that are barriers to cleanup. The brief descriptions of the Office of Science basic (Environmental Remediation Science Program [ERSP]) and EM’s applied (Groundwater and Soil Remediation Program) research programs in subsurface science provide context to the five “crosscutting” themes that have been developed in this strategic planning effort. To address these challenges and opportunities, a tiered systematic approach is proposed that leverages basic science investments with new applied research investments from the DOE Office of Engineering and Technology within the framework of the identified basic science and applied research crosscutting themes. These themes are evident in the initial portfolio of initiatives in the EM groundwater and soil cleanup multi-year program plan. As stated in a companion document for tank waste processing (Bredt et al. 2008), in addition to achieving its mission, DOE EM is experiencing a fundamental shift in philosophy from driving to closure to enabling the long-term needs of DOE and the nation.

54 ENVIRONMENTAL SCIENCES↗

Predictive Contaminant Transport Simulation with P2R Model for the Composite Analysis Limited Source Sensitivity Case.

The Plateau to River (P2R) is a groundwater flow and contaminant fate and transport (F&T) simulation model used to support remedial activities conducted by the Central Plateau Cleanup Company at the Hanford Site in Washington State. Figure 1 illustrates the P2R Model extents, discretization, and boundary conditions. The P2R Model is utilized in the Composite Analysis (CA) for the Hanford Site as the computational engine for computing F&T predictions as described in CP-60406, Hanford Site Composite Analysis Technical Approach Description: Groundwater. The model simulates contaminants of concern within the saturated zone of the uppermost aquifer beneath the Central Plateau and downgradient to the Columbia River. CP-57037, Model Package Report for the Plateau to River Model Version 8.3 documents the current version of the P2R Model including a description of the conceptual site model, model development and calibration, and limitations to the model application. Simulations conducted to support the dose calculations required by the CA are documented in ECF-HANFORD-19-0119, Predictive Flow Simulation with the P2R Model for the Composite Analysis Base Case and ECF-HANFORD-19-0120, Contaminant Transport Simulation with the P2R Model for the Composite Analysis Base Case.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

International Collaborations Activities on Disposal in Argillite R&D: Characterization Studies and Modeling Investigations

This interim report is an update of ongoing experimental and modeling work on bentonite material described in Jové Colón et al. (2019, 2020) from past international collaboration activities. As noted in Jové Colón et al. (2020), work on international repository science activities such as FEBEX-DP and DECOVALEX19 is either no longer continuing by the international partners. Nevertheless, research activities on the collected sample materials and field data are still ongoing. Descriptions of these underground research laboratory (URL) R&D activities are described elsewhere (Birkholzer et al. 2019; Jové Colón et al. 2020) but will be explained here when needed. The current reports recent reactive-transport modeling on the leaching of sedimentary rock.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nevada National Security Site Industrial Sites Project Closeout - 12498

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office is responsible for environmental restoration (ER) at the Nevada National Security Site (NNSS). This includes remediation at Industrial Sites where past nuclear testing activities and activities that supported nuclear testing may have or are known to have resulted in the release of contaminants into the environment. Industrial Sites at the NNSS have included nuclear facilities that supported the nuclear rocket/missile development programs, gas stations, landfills, spill sites, ordnance sites, and numerous other waste disposal and release sites. The NNSS Industrial Sites activities neared completion at the end of fiscal year 2011 while other activities required under the Federal Facility Agreement and Consent Order (FFACO) and part of the same NNSS ER Project are forecasted to extend to 2027 or beyond. With the majority of Industrial Sites corrective action units (CAUs) completed (more than 250 CAUs and over 1,800 corrective action sites), it was determined that an activity closeout process should be implemented to ensure that the work completed over the past 15 years is well documented in a comprehensive and concise summary. While the process used to close each individual CAU is described in approved documents, no single document describes in summary fashion the work completed to close the many individual Industrial Sites. The activity closeout process will be used to develop an Industrial Sites closeout document that describes these years of work. This document will summarize the number of Industrial Sites closed under the FFACO and provide general descriptions of projects, contaminants removed, and sites closed in place with corresponding Use Restrictions. Other pertinent information related to Industrial Sites work such as the project history, closure decisions, historical declarations, remediation strategies, and final CAU status will be included in the closeout document, along with a table listing each CAU and corresponding corrective action sites within each CAU. Using this process of conducting the activity closeout and developing a closeout document may prove useful for other ER projects within the DOE complex in describing how a long period of ER can be summarized in a single document. The NNSS Industrial Sites activities were completed over the span of 15 years and involved the investigation, cleanup or Use Restriction, and closure of more than 260 CAUs and over 1,800 sites. These activities will conclude in FY 2012 (with the exception of one CAU). In order to capture the work completed over this length of time and document decisions made during the activities, a closeout effort was initiated. The closeout will review the work conducted during the Industrial Sites activities and produce a single document that summarizes Industrial Sites activities. This closeout is being conducted at an interim stage in the overall NNSA/NSO ER Project since the Soils and UGTA activities will continue for a number of years, but the completion of the Industrial Sites project warrants conducting a closeout now while personnel are available and information is still current. The process followed by NNSA/NSO in conducing project closeout for the Industrial Sites portion of the ER program may prove useful within the DOE complex in demonstrating how a large ER project can be summarized. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ILAW PCT, VHT, Viscosity, and Electrical Conductivity Model Development (Final Report)

This report describes the results of work and testing specified by the Test Specifications (24590-LAW-TSP-RT-01-013 Rev.1 and 24590-WTP-TSP-RT-02-001 Rev.0), Test Plans (VSL-02T4800-1 Rev.1 & TP-RPP-WTP-179 Rev.1), and Text Exception (24590-WTP-TEF-RT-03-040). The work and any associated testing followed established quality assurance requirements and conducted as authorized. The descriptions provided in this test report are an accurate account of both the conduct of the work and the data collected. Results required by the Test Plans are reported. Also reported are any unusual or anomalous occurrences that are different from the starting hypotheses. The test results and this report have been reviewed and verified.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress toward cleanup of operable unit 1 groundwater at the US DOE0 Mound, Ohio, site: success of a phased-combined remedy - 15310

Industrial solvents (primarily trichloroethene) and other volatile organic compounds (VOCs) that originated from the former solid waste landfill contaminated the groundwater in the Buried Valley Aquifer beneath the Mound, Ohio, Site. The landfill was used from 1948 to 1974 for the disposal of trash, debris, and liquid waste. In 1977, much of the waste was relocated and encapsulated onsite. The landfill site and surrounding area (Operable Unit 1 [OU-1]) occupy approximately 1.6 hectares (4 acres) in the southwestern portion of the site. The historical pathway of concern consisted of leaching of contaminants from site soils or disposed wastes down into the groundwater, entrainment in the flowing groundwater, and migration toward former Mound site water-production wells. A groundwater pump-and-treat (P and T) system was initiated in 1996 to interdict the plume and a soil vapor extraction system was installed and operated from 1997 to 2003 to remove the bulk of the VOC sources from the vadose zone. Physical removal of the landfill waste and contaminated soil was performed between 2006 and 2010. Approximately 76,000 cubic meters (99,400 cubic yards) of material were removed from the OU-1 landfill area; the remaining soils in the OU-1 area meet the site cleanup objectives for future industrial or commercial use. Operation of the groundwater P and T system continued throughout this period. During the remediation time frame, groundwater monitoring and a number of innovative characterization campaigns were completed to assess the contaminant and biogeochemical conditions in the subsurface at OU-1. For example, in 2013 an integral pumping test was performed to characterize the amount (mass) of the low-level VOCs in groundwater. Soil and groundwater were also collected to obtain site-specific data to identify if geochemical conditions support natural attenuation reactions. Contaminant and hydrogeologic data collected from this test, as well as historical data, were evaluated to identify the distribution and potential sources of VOCs, refine the hydrogeologic description, update the conceptual model of VOC fate and transport, and determine if monitored natural attenuation remains a viable option to address VOCs in groundwater. To date, the performance of the phased-combined remedy has resulted in significant reductions in the concentrations of VOCs in the groundwater. For example, in 2013 the trichloroethene in all wells was less than 40 micrograms per liter, with a plurality of the wells near or below maximum contaminant levels. The generally observed declining concentration trends and the low concentrations for 2013 represent the net impact of source removal actions, P and T operation, and natural attenuation. In accordance with the current conditions, the joint US DOE and regulator Core Team is proceeding with a field demonstration of enhanced attenuation-an engineering and regulatory strategy that was recently developed by the Interstate Technology and Regulatory Council. Enhanced attenuation strategies focus on altering a target site in such a way that it can transition to natural attenuation. The combination of technologies to be deployed includes neat (pure) vegetable oil deployment in the deep vadose zone of the former landfill area and emulsified vegetable oil deployment within the footprint of the groundwater plume. In the first part of the deployment, neat oil spreads laterally and forms a thin layer on the water table beneath residual soil sources to intercept and reduce future VOC loading and to reduce oxygen inputs to the local groundwater. In the second part of the deployment, emulsified oil forms active bioremediation treatment zones within the plume footprint to degrade existing groundwater contaminants (via reductive dechlorination, co-metabolism, or both) and stimulates long-term attenuation capacity in the down-gradient plume (via co-metabolism). If the proposed activities are successful, they will accelerate the progress of the Mound OU-1 toward remedial goals and convert the current active P and T remedy into a passive attenuation-based remedy that represents a cost-effective final step in a phased remediation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dose Modeling Evaluations and Technical Support Document for the Authorized Limits Request for the C-746-U Landfill at the Paducah Gaseous Diffusion Plant, Paducah, Kentucky

This report contains the technical basis in support of the DOE's derivation of Authorized Limits (ALs) for the DOE Paducah C-746-U Landfill. A complete description of the methodology, including an assessment of the input parameters, model inputs, and results is provided in this report. This report also provides initial recommendations on applying the derived soil guidelines. The ORISE-derived soil guidelines are specifically applicable to the Landfill at the end of its operational life. A suggested 'upper bound' multiple of the derived soil guidelines for individual shipments is provided.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cataloguing Past Incidents in Transporting Spent Nuclear Fuel

Shipments of spent nuclear fuel (SNF) and high level radioactive waste (HLW) have a history of more than 50 years, during which tens of thousands of tons of material have been transported in tens of thousands of shipments worldwide. The vast majority of these have been completed without incident. This safety record has been made possible by establishing robust regulatory requirements for the casks used in transport, studying past shipments and incidents, and improving equipment and procedures to lessen the probability and impacts of future events. The authors recently collected a wide array of publicly available information on transportation incidents involving SNF and HLW worldwide. This presented a challenge, as no international or US databases currently exist which are dedicated to SNF and HLW transportation incidents. Thus, sources for this research included national database reports from nations that publish them; technical reports and archival journal papers focused on the solutions to particular transportation problems; and news reports of SNF and HLW transportation incidents, including transportation accidents and protests of shipments. Based on the survey of past transportation incidents, of which several representative descriptions are included in this paper, the authors conclude that (1) the casks in which SNF and HLW are shipped are able to contain their radioactive cargoes in severe accidents because of their robust construction and their being in compliance with regulatory requirements; and (2) most incidents in transporting SNF and HLW have been minor ones, primarily resulting from procedural compliance deficiencies. Furthermore, recent incidents suggest that public information and engagement challenges outweigh technical challenges in SNF and HLW transportation, since the most significant challenges surrounding shipments in recent years have been the results of public demonstrations and protests. This paper discusses some SNF and HLW transportation incidents, as well as the process used in cataloguing them. In general, there have been few transportation incidents worldwide in the history of transporting SNF and HLW. The transportation of SNF and HLW has an excellent safety record; by learning from past incidents, shippers of SNF and HLW can continue to make safe shipments while avoiding mistakes made in the past. Despite the safe and successful record of SNF and HLW transportation, information on its record is not easy to find. Few incidents are detailed as thoroughly as the truck accident that occurred in 1971. Several anti-nuclear organizations publish pamphlets that make reference to transportation accidents involving radioactive material and imply that transporting SNF and HLW is an intrinsically dangerous activity whose history is fraught with accidents. The absence of a clear, complete, official record on transportation incidents allows these claims to continue to be unanswered and uncorrected. For these reasons, it would be beneficial to develop a database detailing incidents involving SNF and HLW internationally. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Materials and Fuels Complex Operations Management Improvement Strategy for Fiscal Year 2023

The Materials and Fuels Complex (MFC) has experienced substantial growth in terms of staff, research, and production in recent years. MFC operational performance has effectively kept pace with this growth. However, to capture the continuous improvement actions needed to improve effectiveness and increase the efficiency of our management systems, a broad operations management strategy is necessary. The MFC Operations Management Improvement (OMI) Strategy is complementary to the MFC Five-Year Mission and Investment Strategies and the MFC Management Plan. The OMI strategy is structured to address the management systems outlined in the Nuclear Facility Management Standard Operations Model. Selected management systems are evaluated independently in chapters that describe the prior 5 years of performance improvement, a description of improvement actions for the MFC staff that directly perform within or contribute to the management system, process improvements, and any needed equipment improvements. Chapter selection is based on a management system’s need for improvement. In some cases, management systems may be combined in a single chapter. Additional chapters are added to address subject areas not formally described in the standard operations model.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗