Search NASA⌕ Search

SEARCH · Search NASA

Results for “collaborative analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Measurement of $t\overline{t}$ production in association with additional b -jets in the eμ final state in proton–proton collisions at $\sqrt{s}$ = 13 TeV with the ATLAS detector

This paper presents measurements of top-antitop quark pair ($t\overline{t}$) production in association with additional b-jets. The analysis utilises 140 fb -1 of proton–proton collision data collected with the ATLAS detector at the Large Hadron Collider at a centre-of-mass energy of 13 TeV. Fiducial cross-sections are extracted in a final state featuring one electron and one muon, with at least three or four b-jets. Results are presented at the particle level for both integrated cross-sections and normalised differential cross-sections, as functions of global event properties, jet kinematics, and b-jet pair properties. Observable quantities characterising b-jets originating from the top quark decay and additional b-jets are also measured at the particle level, after correcting for detector effects. The measured integrated fiducial cross sections are consistent with $t\overline{t}$$b\overline{b}$ predictions from various next-to-leading-order matrix element calculations matched to a parton shower within the uncertainties of the predictions. State of-the-art theoretical predictions are compared with the differential measurements; none of them simultaneously describes all observables. Differences between any two predictions are smaller than the measurement uncertainties for most observables.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

exoALMA. V. Gaseous Emission Surfaces and Temperature Structures

An analysis of the gaseous component in protoplanetary disks can inform us about their thermal and physical structure, chemical composition, and kinematic properties, all of which are crucial for understanding various processes within the disks. By exploiting the asymmetry of the line emission, or via line profile analysis, we can locate the emitting surfaces. Here, we present the emission surfaces of the exoALMA sources in 12 CO J = 3–2, 13 CO J = 3–2, and CS J = 7–6. We find that 12 CO traces the upper disk atmosphere, with mean $\langle$ z/r $\rangle$ values of ≈0.28, while 13 CO and CS trace lower regions of the disk with mean $\langle$ z/r $\rangle$ values of ≈0.16 and ≈0.18, respectively. We find that 12 CO $\langle$ z/r $\rangle$ and the disk mass are positively correlated with each other; this relationship offers a straightforward way to infer the disk mass. We derive 2D r – z temperature distributions of the disks. Additionally, we search for substructure in the surfaces and radial intensity profiles; we find evidence of localized substructure in the emission surfaces and peak intensity profiles of nearly every disk, with this substructure often being coincident between molecular tracers, intensity profiles, and kinematic perturbations. Four disks display evidence of potential photodesorption, implying that this effect may be common even in low far-ultraviolet star-forming regions. For most disks, we find that the physical and thermal structure is more complex than analytical models can account for, highlighting a need for more theoretical work and a better understanding of the role of projection effects on our observations.

79 ASTRONOMY AND ASTROPHYSICS↗

DESI 2024 V: Full-Shape galaxy clustering from galaxies and quasars

We present the measurements and cosmological implications of the galaxy two-point clustering using over 4.7 million unique galaxy and quasar redshifts in the range 0.1 < z < 2.1 divided into six redshift bins over a ∼ 7,500 square degree footprint, from the first year of observations with the Dark Energy Spectroscopic Instrument (DESI Data Release 1). By fitting the full power spectrum, we extend previous DESI DR1 baryon acoustic oscillation (BAO) measurements to include redshift-space distortions and signals from the matter-radiation equality scale. For the first time, this Full-Shape analysis is blinded at the catalogue-level to avoid confirmation bias and the systematic errors are accounted for at the two-point clustering level, which automatically propagates them into any cosmological parameter. When analyzing the data in terms of compressed model-agnostic variables, we obtain a combined precision of 4.7% on the amplitude of the redshift space distortion (RSD) signal reaching a similar precision with just one year of DESI data than with twenty years of observation from the previous generation survey. We also analyze the data to directly constrain the cosmological parameters within the ΛCDM model using perturbation theory and combine this information with the reconstructed DESI DR1 galaxy BAO. Using a Big Bang Nucleosynthesis Gaussian prior on the baryon density parameter, ω b , and a weak Gaussian prior on the spectral index, n s , we constrain the matter density is Ω m = 0.296±0.010 and the Hubble constant H 0 = (68.63 ± 0.79)[km s -1 Mpc -1 ]. Additionally, we measure the amplitude of clustering σ 8 = 0.841±0.034. The DESI DR1 galaxy clustering results are in agreement with the ΛCDM model based on general relativity with parameters consistent with those from Planck. The cosmological interpretation of these results in combination with DESI DR1 Ly-α forest data and external datasets are presented in the companion paper [1].

79 ASTRONOMY AND ASTROPHYSICS↗

A Parameter-masked Mock Data Challenge for Beyond-two-point Galaxy Clustering Statistics

The past few years have seen the emergence of a wide array of novel techniques for analyzing high-precision data from upcoming galaxy surveys, which aim to extend the statistical analysis of galaxy clustering data beyond the linear regime and the canonical two-point (2pt) statistics. We test and benchmark some of these new techniques in a community data challenge named “Beyond-2pt,” initiated during the Aspen 2022 Summer Program “Large-Scale Structure Cosmology beyond 2-Point Statistics,” whose first round of results we present here. The challenge data set consists of high-precision mock galaxy catalogs for clustering in real space, in redshift space, and on a light cone. Participants in the challenge have developed end-to-end pipelines to analyze mock catalogs and extract unknown (“masked”) cosmological parameters of the underlying ΛCDM models with their methods. The methods represented are density-split clustering, nearest neighbor statistics, BACCO power spectrum emulator, void statistics, LEFTfield field-level inference using effective field theory (EFT), and joint power spectrum and bispectrum analyses using both EFT and simulation-based inference. In this work, we review the results of the challenge, focusing on problems solved, lessons learned, and future research needed to perfect the emerging beyond-2pt approaches. The unbiased parameter recovery demonstrated in this challenge by multiple statistics and the associated modeling and inference frameworks supports the credibility of cosmology constraints from these methods. The challenge data set is publicly available, and we welcome future submissions from methods that are not yet represented.

Krause, Elisabeth [Univ. of Arizona, Tucson, AZ (U↗

Lens Modeling of STRIDES Strongly Lensed Quasars Using Neural Posterior Estimation

Strongly lensed quasars can be used to constrain cosmological parameters through time-delay cosmography. Models of the lens masses are a necessary component of this analysis. To enable time-delay cosmography from a sample of $\mathcal{O}(10^3)$ lenses, which will soon become available from surveys like the Rubin Observatory’s Legacy Survey of Space and Time and the Euclid Wide Survey, we require fast and standardizable modeling techniques. To address this need, we apply neural posterior estimation (NPE) for modeling galaxy-scale strongly lensed quasars from the Strong Lensing Insights into the Dark Energy Survey (STRIDES) sample. NPE brings two advantages: speed and the ability to implicitly marginalize over nuisance parameters. We extend this method by employing sequential NPE to increase precision of mass model posteriors. We then fold individual lens models into a hierarchical Bayesian inference to recover the population distribution of lens mass parameters, accounting for out-of-distribution shift. After verifying our method using simulated analogs of the STRIDES lens sample, we apply our method to 14 Hubble Space Telescope single-filter observations. We find the population mean of the power-law elliptical mass distribution slope, γ lens , to be $\mathcal{M}_γ$ lens = 2.13 ± 0.06. Our result represents the first population-level constraint for these systems. This population-level inference from fully automated modeling is an important stepping stone toward cosmological inference with large samples of strongly lensed quasars.

79 ASTRONOMY AND ASTROPHYSICS↗

Evaluation of methods for characterizing the fine particulate matter emissions from aircraft and other diffusion flame combustion aerosol sources

The U. S. Environmental Protection Agency in collaboration with the U. S. Air Force Arnold Engineering Development Complex conducted the VAriable Response In Aircraft nvPM Testing (VARIAnT) 3 and 4 test campaigns to compare nvPM emissions measurements from a variety of diffusion flame combustion aerosol sources (DFCASs), including a Cummins diesel engine, a diesel powered generator, two gas turbine start carts, a J85-GE-5 turbojet engine burning multiple fuels, and a Mini-CAST soot generator. The VARIAnT research program has conducted four test campaigns to date with the VARIAnT 3 and 4 test campaigns focusing on BC mass instrument performance, use of gas turbine engine sources for BC mass instrument calibration, and the characterization of the aerosols produced from the combustion sources. Results from both campaigns revealed agreement of about 20% between the AVL Micro-Soot Sensor, the Cavity Attenuated Phase Shift (CAPS PMSSA) monitor and the thermal-optical reference method for elemental carbon (EC), independent of the calibration source used. For the Artium LII-300, the measured mass concentrations in VARIAnT3 fall within 18% and in VARIAnT4 fall within 32% of the reference EC mass concentration when calibrated on a combustor rig in VARIAnT3 and on a LGT-60 start cart in VARIAnT4, respectively. It was also found that the three mass instrument types (MSS, CAPS PMSSA, and LII-300) can exhibit different BC to reference EC ratios depending on the emission source that appear to correlate to particle geometric mean mobility diameter, morphology, or some other parameter associated with particle geometric mean diameter (GMD) with the LII-300 showing a slightly stronger apparent trend with GMD. Systematic differences in LII-300 measured mass concentrations have been reduced by calibrating with a turbine combustion source (combustor or turbine engine). With respect to the particle size measurements made, the sizing instruments (TSI SMPS, TSI EEPS, and Cambustion DMS 500) were found to be in general agreement in terms of size distributions and concentrations with some exceptions. Teflon filter measurements of the total aerosol mass produced by the various DFCASs differed from the reference EC, BC, and integrated particle sized distribution measured aerosol masses. The Teflon filter measured mass was 30 to 40% greater than the reference EC and 50 to 60% greater than the BC mass for the J85 in both test campaigns. The measurements of particle size distributions and single particle analysis by miniSPLAT indicated the presence of large particles (>100 nm) having more compact morphologies, higher effective density, and a composition dominated by OC and ash. This increased large particle fraction is also associated with higher values of single scattering albedo measured by the CAPS PMSSA instrument and higher OC/EC measurements. These measurements indicate gas turbine engine emissions can be a more heterogeneous mix of particle types beyond the original E31 assumption that it is mainly composed of black carbon.

33 ADVANCED PROPULSION SYSTEMS↗

Queued Up: 2025 Edition – Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2024 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with interconnection.fyi, Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 49 non-ISO balancing areas), which collectively represent ~97% of currently installed U.S. electric generating capacity. The dataset includes requests submitted to queues through the end of 2024, and only includes requests seeking to connect to the transmission grid (not distribution-connected or behind-the-meter projects). The files below include both a PDF report and an Excel data file. The PDF report analyzes interconnection data and metrics through the end of 2024. The Excel data file includes (a) the full project-level interconnection queue dataset through 2024, (b) a codebook (data dictionary) describing each data field, and (c) 35 additional tabs featuring tables summarizing a range of interconnection metrics. Key highlights from the Queued Up: 2025 Edition (featuring data through 2024) include: • As of the end of 2024, there were ~10,300 projects actively seeking grid interconnection in the U.S., representing 1,400 GW of generation and approximately 890 GW of storage. • Historic withdrawal rates alongside relatively fewer new requests resulted in a 12% decrease in total active queue volume compared to the prior year. • Active natural gas capacity (136 GW, +72% year-over-year) increased in 2024, while solar (956 GW, -12%), storage (890 GW, -13%), and wind (271 GW, -26%) capacity decreased. • 408 GW of capacity already has a draft or executed interconnection agreement (IA) but has not yet reached commercial operations. • The time projects spend in queues before reaching COD is increasing. For the regions with available data, the median duration from IR to COD has doubled from <2 years for projects built in 2000-2007 to over 4 years for those built in 2018-2024. • Ultimately, most of this proposed capacity will not be built. Only 13% of capacity that submitted interconnection requests from 2000-2019 had reached commercial operations by the end of 2024; 77% of that capacity had been withdrawn and 10% was still active. • FERC Order 2023 and various other reforms are being implemented. These are important measures to reduce interconnection bottlenecks and enhance grid system reliability, but it is too early to measure and assess their full impact. • New additions for the 2025 edition include: (a) additional detail on data processing and gaps; (b) updates on interconnection reforms; (c) new analysis on interconnection agreements, and more.

24 POWER TRANSMISSION AND DISTRIBUTION↗

All-sky Neutrino Point-source Search with IceCube Combined Track and Cascade Data

Despite extensive efforts, discovery of high-energy astrophysical neutrino sources remains elusive. We present an event-level simultaneous maximum likelihood analysis of tracks and cascades using IceCube data collected from 2008 April 6 to 2022 May 23 to search the whole sky for neutrino sources, and using a source catalog, for coincidence of neutrino emission with gamma-ray emission. This is the first time a simultaneous fit of different detection channels is used to conduct a time-integrated all-sky scan with IceCube. Combining all-sky tracks, with superior pointing power and sensitivity in the northern sky, with all-sky cascades, with good energy resolution and sensitivity in the southern sky, we have developed the most sensitive point-source search to date by IceCube that targets the entire sky. The most significant point in the northern sky aligns with NGC 1068, a Seyfert II galaxy, which, from the catalog search, shows a 3.5σ excess over background after accounting for trials. The most significant point in the southern sky does not align with any source in the catalog and is not significant after accounting for trials. A search for the single most significant Gaussian flare at the locations of NGC 1068, PKS 1424+240, and the southern highest-significance point shows results consistent with expectations for steady emission. Notably, this is the first time that a flare shorter than four years has been excluded as being responsible for NGC 1068’s emergence as a neutrino source. Our results show that combining tracks and cascades when conducting neutrino source searches improves sensitivity and can lead to new discoveries.

Abbasi, R. [Loyola University, Chicago, IL (United↗

Investigating the Effects of Bars on Star Formation and Nuclear Activity of Galaxies Using DESI Survey Data

We present a statistical analysis of the connections between galactic bars, star formation, and active galactic nucleus (AGN) activity using 33,201 disk galaxies (0.01 < z < 0.05) from Dark Energy Spectroscopic Instrument Data Release 1 (DESI DR1) cross-matched with Galaxy Zoo DESI. Based on morphological classifications, we identify 3508 strongly barred and 8335 weakly barred systems. We find that barred galaxies exhibit a clear bimodal distribution in color–mass space: weak bars are preferentially found in bluer, lower-mass disks, whereas strong bars are more common in massive, redder systems. Strongly barred galaxies are on average more massive and metal rich than unbarred systems. In addition, strong bars enhance central star formation rates (SFRs) in low-mass galaxies but reduce specific SFRs in massive systems, reflecting a dual role where bars initially trigger central star formation but eventually promote quenching by accelerating gas consumption. In terms of nuclear activity, barred galaxies display a higher incidence of AGN activity. The presence of a bar is also associated with an increased fraction of powerful AGN, with the highest proportions found in strongly barred systems. However, the correlations between AGN activity and detailed bar structural parameters are weak, suggesting that the link between bars and nuclear activity is indirect and regulated by multiple factors. Overall, our results support a scenario in which bars facilitate angular momentum transport and gas inflow, thereby driving central star formation and fueling supermassive black hole accretion while operating alongside other processes that shape galaxy evolution.

Liu, Jianfei [Chinese Academy of Sciences (CAS), B↗

Land of Opportunity: Potential for Renewable Energy on Federal Lands

Renewable energy (RE) in the United States has historically been deployed primarily on private lands, but the growing interest in RE development, generally across the country and specifically on federal lands, raises questions about the potential for RE on public lands. This study seeks to estimate RE technical potential on federal lands and project the amount of RE to be developed on federal lands under decarbonization scenarios for the contiguous United States. The study applied a combination of high-resolution geospatial analysis and power sector modeling and relied on multiple partner federal agencies and land administrators from the Bureau of Land Management, the U.S. Fish and Wildlife Service, the U.S. Forest Service, the U.S. Department of Defense, and the U.S. Department of Energy. In our reference siting access case, we estimate 44 million acres of federal land across the contiguous United States is potentially suitable for UPV development, which corresponds to a capacity technical potential of 5,750 gigawatts (GW) (Figure ES-1). Federal land area available for wind development is similar to UPV but wind’s generating capacity technical potential is lower (875 GW). The technical potential is estimated for two geothermal technologies, hydrothermal and enhanced geothermal systems (EGS), both of which have a smaller amount of federal land available for development (12 and 27 million acres, respectively). However, in terms of capacity, the technical potential for EGS (975 GW) is approximately equal to wind’s technical potential and there is an estimated 130 GW of hydrothermal potential. We also developed cases with more-limited land available for UPV and wind (for federal and non-federal lands) resulting in 96% reduction of wind capacity potential and 70% reduction for UPV. In a case with additional constraints applied to non-federal lands only (Limited Private), the overall (federal and non-federal) technical potential declines but the share of that technical potential on federal lands is higher than in the other siting cases. The technical potential is the maximum amount that could be developed, but only a small fraction would be developed or needed in the future. Across seven scenarios that achieve 100% carbon-free electricity by 2035, we estimate 26 GW to 270 GW of RE capacity could be deployed on federal lands by 2035. The three central scenarios have 51–84 GW of RE deployed by 2035 and requiring about 500,000 to 1,000,000 acres of total land area. Direct land consumption is less than total land use required, thus enabling co-use opportunities. The large technical potential estimates and the increasing deployment projections from the collection of scenarios show the opportunities for RE development on federal lands. Capturing these opportunities-while minimizing conflicts with other land uses, federal department or agency missions, and public interest, and simultaneously maximizing the economic, grid, and social value of the projects-would require collaborative planning among federal land administrators, grid planners, project developers, the public, and other stakeholders.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Advanced Processing of Coal and Coal Waste to Produce Graphite for Fast-Charging Lithium-Ion Battery Anode

The University of North Dakota (UND) Energy & Environmental Research Center (EERC), in collaboration with the UND Center for Process Engineering Research (CPER), conducted a project to validate two technologies capable of converting North Dakota lignite and lignite coal waste to high-quality graphite for fast-charging lithium-ion battery (LIB) anode. The project was conducted over about 3 years from April 7, 2022, to July 6, 2025. The two technological paths pursued in this project include path A – direct conversion of coal or coal waste to graphite by the upgraded carbon ores to products (UCOP) process being developed at the EERC and path B – lignite-derived coal tar pitch (CTP) conversion to graphite (CTP2G) process being developed at CPER. The results from this project validate the two technological approaches and are expected to be an integral part of a portfolio of emerging technologies for making high-quality graphite not only from North Dakota lignite, but from all ranks of U.S. domestic coal and coal waste resources. The quality of the graphite produced by these technologies is high enough for various applications, including batteries for the fast-growing electric vehicle industry, energy storage applications, electric arc furnace electrodes for steel production, and graphene production, among others. Although the two technologies can produce high-quality graphite, they are fundamentally different in that the UCOP technology provides a direct path to transform coal to graphite, while the CTP2G technology needs to go through a CTP intermediate and a coking process for the intermediate, which requires a special facility to accomplish. For application in the industry, the UCOP process is designed to be more flexible, with feedstock to include potentially any carbonaceous material such as all coal ranks and biochar, while the CTP2G process is designed to utilize CTP as the starting precursor. The key project accomplishments include the following: • Successful preparation of high-quality synthetic graphite from North Dakota lignite coal/coal wastes and lignite-derived CTP. • Patent application has been filed for the UCOP process and an internal invention disclosure has been filed for the CTP2G process. • The produced graphite performs better than a commercial battery-grade sample in LIB coin cells, especially fast-charging capability, stability, and long-duration cycling. • Coin-type Li-ion half-cells with CTP2G graphite showed excellent performance, with >370 mAh/g capacity, >90% initial coulombic efficiency, and 93%/67% retention at 1C/2C rate, which outperforms commercial graphite in charging speed, stability, and cycling. • Results of fabricated 18650 cells were consistent with the observations in coin cells. • Preliminary techno-economic analysis (TEA) estimates for the UCOP technology indicate a manufacturing cost of about $\$$39/kg based on 50-metric ton/year capacity. • Preliminary TEA estimates for the CTP2G technology indicate a market price of about $\$$7107/ton ($\$$7/kg) based on 22,000-ton/year production capacity.

01 COAL, LIGNITE, AND PEAT↗

A joint analysis of 3D clustering and galaxy × CMB-lensing cross-correlations with DESI DR1 galaxies

The spectroscopic data from DESI Data Release 1 (DR1) galaxies enables the analysis of 3D clustering by fitting galaxy power spectra and reconstructed correlation functions in redshift space. Given low measurements of the amplitude of structure from cosmic shear at z ∼ 1, redshift space distortions (RSD) + Baryon Acoustic Oscillation (BAO) signals from DESI galaxies combined with weak lensing can break degeneracies and provide a tight alternative constraint on the z ∼ 1 amplitude of structure. In this paper we perform joint analyses that combine full-shape + post-reconstruction information from the DESI DR1 BGS and LRG samples along with angular cross-correlations with Planck PR4 and ACT DR6 CMB lensing maps. We show that adding galaxy-lensing cross-correlations tightens clustering amplitude constraints, improving σ 8 uncertainties by 30% over RSD+BAO alone. We also include angular galaxy-galaxy and galaxy-lensing spectra using photometric samples from the DESI Legacy Survey to further improve constraints. Our headline results are σ 8 = 0.803 ± 0.017, Ω m = 0.3037 ± 0.0069, and S 8 = 0.808 ± 0.017. Given DESI's preference for higher σ 8 compared to lower values from BOSS, we perform a catalog-level comparison of LRG samples from both surveys. We test sensitivity to dark energy assumptions by relaxing our ΛCDM prior and allowing for evolving dark energy via the w 0 - w a parameterization. We find our S 8 constraints to be relatively unchanged despite a 3.5σ tension with the cosmological constant model when combining with the Union3 supernova likelihood. Finally we test general relativity (GR) by allowing the gravitational slip parameter (γ) to vary, and find γ = 1.17 ± 0.11 in mild (∼ 1.5σ) tension with the GR value of 1.0.

cosmological parameters from LSS↗

Measurement of the Full Shape of the Thermal Sunyaev–Zel’dovich Power Spectrum from the South Pole Telescope and Herschel–SPIRE Observations

We present a measurement of the full shape of the power spectrum of the thermal Sunyaev–Zel’dovich (tSZ) effect down to arcminute scales using cosmic microwave background (CMB) data from the South Pole Telescope (SPT) over a roughly 100 deg 2 field. The analysis incorporates data from the 2019–2020 seasons of the SPT-3G survey in bands centered at 95, 150, and 220 GHz; from the full SPTpol dataset at 150 GHz; and from the Herschel–SPIRE survey in bands centered at 600 and 857 GHz. We combine data from all the above bands using linear combination (LC) techniques to produce a tSZ or Compton-y map. We modify the LC weights to produce multiple versions of the Compton-y map, including minimum-variance (MV) and foreground-minimized (-min) maps. We measure the auto- and cross-power spectra of a subset of these maps in the range ℓ ∈ [500, 5000]. While this power spectrum includes contributions from signals other than tSZ, we present numerous checks to show that the most challenging foreground signal, the cosmic infrared background (CIB), is much lower than the desired tSZ signal in the scales of interest in this work. The final tSZ power spectrum is measured at 9.3σ with both the MV and CIB-min maps. Our results are consistent with those reported in other CMB surveys across the literature. Using the difference in the tSZ power spectrum from the MV and CIB-min maps, we reconstruct the scale-dependent tSZ–CIB cross correlation $ρ^{\textrm{tSZ}}_{ℓ}$ x CIB, finding 3.1σ evidence for a nonzero correlation coefficient that is positive on large scales and approaches zero for ℓ > 2500. This result represents the deepest tSZ maps ever produced and provides new constraints that can help refine astrophysical feedback mechanisms and models of the intracluster medium.

Raghunathan, S. [Univ. of California, Davis, CA (U↗

Photovoltaic Analysis and Response Support (PARS) Platform for Solar Situational Awareness and Resiliency Services

The project's primary objective is to develop a digital-twin based Photovoltaic (PV) Analysis and Response Support (PARS) platform, which aims to provide real-time situational awareness and optimal response plans. This platform is designed to enhance the performance of hybrid PV systems, making them competitive with or even superior to conventional generation resources. The PARS platform enabled the project team to develop and evaluate an extensive suite of grid support functionalities for the hybrid PV systems to enhance grid performance, across key areas including visibility, dispatchability, security, resilience, and reliability. Given the global push toward achieving 100% clean energy by 2035, there is a significant increase in the integration of inverter-based resources (IBRs) throughout the energy grid. Effectively managing the inherent variability and uncertainty associated with IBRs is crucial for ensuring cost-effectiveness, reliability, and security in both the main grid and islanded microgrids. Constrained to a limited array of IEEE test systems or standard feeder models, traditional IBR modeling struggles to assimilate new field data, accurately reflect system dynamics, and adapt to the evolving energy landscape. In our project, we embraced a Digital Twin (DT) strategy for crafting the PARS platform. A digital twin acts as a precise virtual counterpart of a physical system, built on historical data and continuously honed with real-time insights. This enables the high-fidelity DT to accurately mirror current system operations and forecast future scenarios. Consequently, the PARS platform becomes an ideal environment for testing and refining monitoring, control, power, and energy management algorithms designed to boost hybrid PV system performance. The defining feature of the PARS platform, distinguishing it from other advanced simulation tools, is its exceptional adaptability. This is achieved by employing actual network topologies and utilizing real-time field data for fine-tuning and calibration, ensuring a close emulation of real-world conditions. The project deliverables include: 1) High-fidelity IBR models and tools for real-time parameterization, utilizing real-time field measurements to refine IBR models for enhanced accuracy and performance; 2) Grid-forming and Grid-following capabilities to deliver resilience services, including blackstart, voltage and frequency support, cold-load pick-up, power reserves, and three-phase load balancing across grid-connected and microgrid settings; 3) Machine learning-based forecasting tools and methods for generating synthetic data and topologies, creating diverse and realistic simulation environments for evaluating varied operational scenarios; 4) Advanced microgrid power and energy management algorithms for optimizing the integration and operation of PV, storage, and demand response resources within both feeder and community scales. The power grid data sets are provided by four utility companies in North Carolina and the New York Power Administration. Acting as industry advisors, our industry partners communicated stakeholder needs and regulatory standards to the research teams, aiding technology transfer by incorporating the developed methodologies into their daily operations. This collaboration ensures that the PARS platform, functioning as a power system digital twin, enhances our understanding of IBR dynamic behaviors and enables the development and evaluation of IBR control functions that match or exceed the capabilities of conventional synchronous generators.

14 SOLAR ENERGY↗

Potential Availability of Alternative Fuel to Supply Maritime Activities in Pacific Northwest Ports

The international shipping sector represented 3% of global greenhouse gas emissions in 2023 (Office of Energy Efficiency & Renewable Energy 2024). International shipping has been classified as a difficult-to-decarbonize industry (IRENA 2024). In an effort to drive decarbonization, the U.S. Department of Energy has partnered with Mission Innovation to co-lead the Zero-Emission Shipping Mission, which launched in 2021(Office of Energy Efficiency & Renewable Energy 2021). In addition, the U.S. Department of State partnered with Norway to launch the Green Shipping Challenge in 2022 (Office of the Spokesperson 2022b). As part of the ZESM and Green Shipping Challenge, the United States is collaborating with the Republic of Korea (ROK) to develop a green shipping corridor (U.S. Mission Korea 2023). The United States and ROK have conducted a pre-feasibility study as the first step in developing a green shipping corridor between the countries. The ports included in the study are Seattle, Tacoma, and Everette in the U.S. Pacific Northwest (PNW) and Busan, Ulsan, and Masan in ROK. The National Renewable Energy Laboratory's role in the study was to analyze the availability and technical potential of alternative marine fuels in proximity to U.S. PNW ports. The findings show most of the existing alternative fuel capacity within the region is from renewable diesel, biodiesel, and sustainable aviation fuel facilities. The largest growth in fuel capacity in the region by 2030 is projected to be in renewable diesel and hydrogen. The overall technical readiness of non-drop-in alternative fuel production and conversion technologies is more developed than alternative-fueled ships and associated fueling infrastructure. However, much of the fuel capacity in the region is comprised of drop-in fuels, making it technically possible to use existing infrastructure for transporting and bunkering to the existing fleet. Data to inform regional alternative fuel quantity estimations were collected from an extensive review of databases, reports, announcements, and other publicly available resources. A maturity index and sector competition factor were applied to announced fuel projects to determine the quantity of alternative fuel available to the marine sector in the region by 2030. Demand data were collected from fuel bunkering logs covering the PNW seaports (State of Washington 2021). Both supply and demand data were converted to very-low sulfur fuel oil gallon equivalents (VLSFO-GE) for better comparison. Qualitative data were gathered through interviews with stakeholders, project developers, and industry experts. Total alternative fuel capacity available to the marine sector in the region is estimated to be 824 million VLSFO-GE per year by 2030. This is sufficient to cover the requirements of a green shipping corridor between the United States and ROK. The findings from this report are being used to inform detailed feasibility studies for several U.S. PNW -ROK green shipping corridors. Updates from the U.S. PNW - ROK feasibility studies will continue to be published on Mission Innovation's green corridor tracking website (Zero Emission Shipping Mission, n.d.). In addition, this report has helped to inform further work on shipping decarbonization in the U.S. PNW, including the Pacific Northwest to Alaska Green Corridor focused on cruise vessels.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

RTN-095: The Vera C. Rubin Observatory Data Preview 1

We present Rubin Data Preview 1 (DP1), the first release of data from the NSF-DOE Vera C. Rubin Observatory, consisting of raw and calibrated single-epoch images, coadds, difference images, detection catalogs, and other derived data products. DP1 is based on 1792 science-grade optical/near-infrared exposures acquired over 48 distinct nights by the Rubin Commissioning Camera, LSSTComCam, on the Simonyi Survey Telescope at the Summit Facility on Cerro Pachón, Chile during the first on-sky commissioning campaign in late 2024. DP1 covers a total of ~15 sq. deg. over seven roughly equally-sized non-contiguous fields, each independently observed in six broad photometric bands, ugrizy, spanning a range of stellar densities and latitudes and overlapping with external reference datasets. The median image quality across all bands, measured by the FWHM of the point-spread function, is approximately 1.13 arcseconds, with the sharpest images reaching about 0.65 arcseconds. DP1 contains approximately 2.3 million distinct astrophysical objects, of which 1.6 million are extended in at least one band, and 431 solar system objects, of which 93 are new discoveries. DP1 is approximately 3.5 TB in size and available to Rubin data rights holders via the Rubin Science Platform, a cloud-based environment for the analysis of petascale astronomical data. While small compared to future LSST releases, its high quality and diversity of data support a broad range of early science investigations across all four LSST themes, providing a valuable opportunity to engage with Rubin data ahead of the start of full operations in late 2025.

79 ASTRONOMY AND ASTROPHYSICS↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The Vera C. Rubin Observatory Data Preview 1

We present Rubin Data Preview 1 (DP1), the first data from the National Science Foundation–Department of Energy Vera C. Rubin Observatory, comprising raw and calibrated single-epoch images, coadds, difference images, detection catalogs, and ancillary data products. DP1 is based on 1792 optical–near-infrared exposures acquired over 48 distinct nights by the Rubin Commissioning Camera (LSSTComCam) on the Simonyi Survey Telescope at the Summit Facility on Cerro Pachón, Chile in late 2024. DP1 covers ∼15 deg 2 distributed across seven roughly equal-sized noncontiguous fields, each independently observed in six broad photometric bands, ugrizy. The median FWHM of the point-spread function across all bands is approximately 1"14, with the sharpest images reaching about 0." 58. The 5σ point-source depths for coadded images in the deepest field, the Extended Chandra Deep Field South, are u = 24.55, g = 26.18, r = 25.96, i = 25.71, z = 25.07, and y = 23.1. Other fields are no more than 2.2 mag shallower in any band, where they have nonzero coverage. DP1 contains approximately 2.3 million distinct astrophysical objects, of which 1.6 million are extended in at least one band in coadds, and 431 solar system objects, of which 93 are new discoveries. DP1 is approximately 3.5 TB in size and is available to Vera C. Rubin Observatory data rights holders via the Rubin Science Platform, a cloud-based environment for the analysis of petascale astronomical data. While small compared to future LSST releases, its high quality and diversity of data support a broad range of early science investigations ahead of full operations in 2026.

Ground-based astronomy↗