Search NASA⌕ Search

SEARCH · Search NASA

Results for “configuration management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Enhancement of the NMSU Channel Error Simulator to Provide User-Selectable Link Delays

This is the third in a continuing series of reports describing the development of the Space-to-Ground Link Simulator (SGLS) to be used for testing data transfers under simulated space channel conditions. The SGLS is based upon Virtual Instrument (VI) software techniques for managing the error generation, link data rate configuration, and, now, selection of the link delay value. In this report we detail the changes that needed to be made to the SGLS VI configuration to permit link delays to be added to the basic error generation and link data rate control capabilities. This was accomplished by modifying the rate-splitting VIs to include a buffer the hold the incoming data for the duration selected by the user to emulate the channel link delay. In sample tests of this configuration, the TCP/IP(sub ftp) service and the SCPS(sub fp) service were used to transmit 10-KB data files using both symmetric (both forward and return links set to 115200 bps) and unsymmetric (forward link set at 2400 bps and a return link set at 115200 bps) link configurations. Transmission times were recorded at bit error rates of 0 through 10(exp -5) to give an indication of the link performance. In these tests. we noted separate timings for the protocol setup time to initiate the file transfer and the variation in the actual file transfer time caused by channel errors. Both protocols showed similar performance to that seen earlier for the symmetric and unsymmetric channels. This time, the delays in establishing the file protocol also showed that these delays could double the transmission time and need to be accounted for in mission planning. Both protocols also showed a difficulty in transmitting large data files over large link delays. In these tests, there was no clear favorite between the TCP/IP(sub ftp) and the SCPS(sub fp). Based upon these tests, further testing is recommended to extend the results to different file transfer configurations.

Horan, Stephen↗

Computer-Aided Systems Engineering for Flight Research Projects Using a Workgroup Database

An online systems engineering tool for flight research projects has been developed through the use of a workgroup database. Capabilities are implemented for typical flight research systems engineering needs in document library, configuration control, hazard analysis, hardware database, requirements management, action item tracking, project team information, and technical performance metrics. Repetitive tasks are automated to reduce workload and errors. Current data and documents are instantly available online and can be worked on collaboratively. Existing forms and conventional processes are used, rather than inventing or changing processes to fit the tool. An integrated tool set offers advantages by automatically cross-referencing data, minimizing redundant data entry, and reducing the number of programs that must be learned. With a simplified approach, significant improvements are attained over existing capabilities for minimal cost. By using a workgroup-level database platform, personnel most directly involved in the project can develop, modify, and maintain the system, thereby saving time and money. As a pilot project, the system has been used to support an in-house flight experiment. Options are proposed for developing and deploying this type of tool on a more extensive basis.

Mizukami, Masahi↗

Space Transportation System Liftoff Debris Mitigation Process Overview

Liftoff debris is a top risk to the Space Shuttle Vehicle. To manage the Liftoff debris risk, the Space Shuttle Program created a team with in the Propulsion Systems Engineering & Integration Office. The Shutt le Liftoff Debris Team harnesses the Systems Engineering process to i dentify, assess, mitigate, and communicate the Liftoff debris risk. T he Liftoff Debris Team leverages off the technical knowledge and expe rtise of engineering groups across multiple NASA centers to integrate total system solutions. These solutions connect the hardware and ana lyses to identify and characterize debris sources and zones contribut ing to the Liftoff debris risk. The solutions incorporate analyses sp anning: the definition and modeling of natural and induced environmen ts; material characterizations; statistical trending analyses, imager y based trajectory analyses; debris transport analyses, and risk asse ssments. The verification and validation of these analyses are bound by conservative assumptions and anchored by testing and flight data. The Liftoff debris risk mitigation is managed through vigilant collab orative work between the Liftoff Debris Team and Launch Pad Operation s personnel and through the management of requirements, interfaces, r isk documentation, configurations, and technical data. Furthermore, o n day of launch, decision analysis is used to apply the wealth of ana lyses to case specific identified risks. This presentation describes how the Liftoff Debris Team applies Systems Engineering in their proce sses to mitigate risk and improve the safety of the Space Shuttle Veh icle.

Mitchell, Michael↗

Launch Vehicle Control Center Architectures

This analysis is a survey of control center architectures of the NASA Space Launch System (SLS), United Launch Alliance (ULA) Atlas V and Delta IV, and the European Space Agency (ESA) Ariane 5. Each of these control center architectures have similarities in basic structure, and differences in functional distribution of responsibilities for the phases of operations: (a) Launch vehicles in the international community vary greatly in configuration and process; (b) Each launch site has a unique processing flow based on the specific configurations; (c) Launch and flight operations are managed through a set of control centers associated with each launch site, however the flight operations may be a different control center than the launch center; and (d) The engineering support centers are primarily located at the design center with a small engineering support team at the launch site.

Watson, Michael D.↗

Ground Operations Autonomous Control and Integrated Health Management

The Ground Operations Autonomous Control and Integrated Health Management plays a key role for future ground operations at NASA. The software that is integrated into this system is called G2 2011 Gensym. The purpose of this report is to describe the Ground Operations Autonomous Control and Integrated Health Management with the use of the G2 Gensym software and the G2 NASA toolkit for Integrated System Health Management (ISHM) which is a Computer Software Configuration Item (CSCI). The decision rationale for the use of the G2 platform is to develop a modular capability for ISHM and AC. Toolkit modules include knowledge bases that are generic and can be applied in any application domain module. That way, there's a maximization of reusability, maintainability, and systematic evolution, portability, and scalability. Engine modules are generic, while application modules represent the domain model of a specific application. Furthermore, the NASA toolkit, developed since 2006 (a set of modules), makes it possible to create application domain models quickly, using pre-defined objects that include sensors and components libraries for typical fluid, electrical, and mechanical systems.

Computer Programs↗

Optical Testing and Verification Methods for the James Webb Space Telescope Integrated Science Instrument Module Element

NASA's James Webb Space Telescope (JWST) is a 6.6m diameter, segmented, deployable telescope for cryogenic IR space astronomy (~40K). The JWST Observatory includes the Optical Telescope Element (OTE) and the Integrated Science Instrument Module (ISIM) that contains four science instruments (SI) and the fine guider. The SIs are mounted to a composite metering structure. The SI and guider units were integrated to the ISIM structure and optically tested at the NASA Goddard Space Flight Center as a suite using the Optical Telescope Element SIMulator (OSIM). OSIM is a full field, cryogenic JWST telescope simulator. SI performance, including alignment and wave front error, were evaluated using OSIM. We describe test and analysis methods for optical performance verification of the ISIM Element, with an emphasis on the processes used to plan and execute the test. The complexity of ISIM and OSIM drove us to develop a software tool for test planning that allows for configuration control of observations, associated scripts, and management of hardware and software limits and constraints, as well as tools for rapid data evaluation, and flexible re-planning in response to the unexpected. As examples of our test and analysis approach, we discuss how factors such as the ground test thermal environment are compensated in alignment. We describe how these innovative methods for test planning and execution and post-test analysis were instrumental in the verification program for the ISIM element, with enough information to allow the reader to consider these innovations and lessons learned in this successful effort in their future testing for other programs.

spaceborne telescopes↗

Post-Flight Assessment Review (PFAR): Advanced Colloids Experiment (ACE) ACE-T7-1,2

The objective of this PFAR is to: • Provide closure to ZIN DO-237 ACE-T7work and close NASA NPR 7123.1 requirements as listed in the SpaceDOC-II (S2) contract (the S2 CDRL DID No. PM-09 calls for a SEMP which refers backto NPR 7123.1) • Provide closure of SEMP (ZIN’s P40025) requirements for Technical Reviews • Provide plan to complete Informatics requirements. • Provide milestone closure to sponsoring organization. • Document property re-use and transfer decisions. • Transfer raw science data to the designated repository at MSFC. • Transfer required documents to Informatics • Opens an Informatics folder at MSFC to officially receive ACE-T7 information. • Capture open action items. • Create a formal presentation in configuration control. • Provide directions (in a Project Manager Report) how to contact the Project and Science teams through NASA when follow-on grants are awarded by Informatics.

microgravity↗

Effects of Communication Modality on Pilot-Controller Coordination during a Simulated m:N Operation

The last decade or so has seen growing interest in new control paradigms and concepts of operation for uncrewed aircraft systems (UAS) in which multiple aircraft are piloted remotely by a single or relatively small number of people. Referred to as “one-to-many” and “many-to- many” (alternatively, “multi-operator, multi-vehicle”)—and frequently expressed as the corresponding ratios, 1:N and m:N—such novel configurations of aircraft and the people who manage them are seen as critical to the path to future operations involving UAS. Examples of industry domains interested in these control paradigms are small package delivery services utilizing small UAS and passenger-carrying, short-range “Urban Air Mobility” (UAM) operations. Stakeholders in such operations have identified communication and coordination of flight activity with air traffic controllers (ATC) as a barrier to operations. In contrast to present-day flight operations, in which a pilot communicates with one ATC on one radio frequency for one aircraft, multi-vehicle operations potentially entail a significant increase in pilot task load for management of comms. New concepts, such as UAS Service Suppliers (USSs) and Providers of Services to UAM (PSUs), have been proposed to address the known bottleneck for Air Traffic Management (ATM) presented by multi-vehicle operations. While progress has been steadily made over years developing USSs and PSUs, it is generally expected that initial UAM operations will rely on traditional voice-over-radio communication with ATC for purposes of ATM. The current study was a human-in-the-loop simulation that had participants, each possessing a Private Pilot License, act as the ground-based pilot-in- command for multiple vehicles in a hypothetical UAM service in the San Francisco Bay Area. The experiment utilized a 2-by-3, within-subjects design in which the pilot’s Vehicle Load (4 vs. 12) and Comm System (Voice, Datalink, and a Hybrid) were manipulated. The task given to pilots was to use the Comm System to coordinate flight activity for all aircraft with appropriate controllers, having to obtain departure and arrival clearances at “vertiport” facilities and transition clearances for any intermediate airspaces along the route. Pilots were additionally responsible for compliance with vectoring instructions issued by ATC. Subjective workload questionnaires (NASA-TLX) were administered following each experimental trial. Screen recordings of the pilot’s Ground Control Station (GCS) and audio recordings of trials were subsequently coded to obtain performance metrics: response times and error rates. Presented in this paper are results related to pilot responses to vectoring instructions issued by ATC. Workload was found to be significantly higher in the 12-Vehicle condition compared to the 4-Vehicle condition, nearly maxing out the NASA-TLX overall workload scale. There was no significant difference made by the Comm System on workload ratings. Pilots’ response times to communications were fastest in the Voice condition, although overall “service time” for compliance was shorter in Datalink and Hybrid conditions in most cases. Errors by pilots were frequent in both Vehicle Load conditions, most perniciously when using the Voice system. The results of this study suggest tradeoffs in advantages and disadvantages of the three comm systems. Recommendations for communication system design are provided taking the tradeoffs into account.

Garrett G Sadler↗

Effects of Communication Modality on Pilot-Controller Coordination during a Simulated m:N Operation

The last decade or so has seen growing interest in new control paradigms and concepts of operation for uncrewed aircraft systems (UAS) in which multiple aircraft are piloted remotely by a single or relatively small number of people. Referred to as “one-to-many” and “many-to- many” (alternatively, “multi-operator, multi-vehicle”)—and frequently expressed as the corresponding ratios, 1:N and m:N—such novel configurations of aircraft and the people who manage them are seen as critical to the path to future operations involving UAS. Examples of industry domains interested in these control paradigms are small package delivery services utilizing small UAS and passenger-carrying, short-range “Urban Air Mobility” (UAM) operations. Stakeholders in such operations have identified communication and coordination of flight activity with air traffic controllers (ATC) as a barrier to operations. In contrast to present-day flight operations, in which a pilot communicates with one ATC on one radio frequency for one aircraft, multi-vehicle operations potentially entail a significant increase in pilot task load for management of comms. New concepts, such as UAS Service Suppliers (USSs) and Providers of Services to UAM (PSUs), have been proposed to address the known bottleneck for Air Traffic Management (ATM) presented by multi-vehicle operations. While progress has been steadily made over years developing USSs and PSUs, it is generally expected that initial UAM operations will rely on traditional voice-over-radio communication with ATC for purposes of ATM. The current study was a human-in-the-loop simulation that had participants, each possessing a Private Pilot License, act as the ground-based pilot-in- command for multiple vehicles in a hypothetical UAM service in the San Francisco Bay Area. The experiment utilized a 2-by-3, within-subjects design in which the pilot’s Vehicle Load (4 vs. 12) and Comm System (Voice, Datalink, and a Hybrid) were manipulated. The task given to pilots was to use the Comm System to coordinate flight activity for all aircraft with appropriate controllers, having to obtain departure and arrival clearances at “vertiport” facilities and transition clearances for any intermediate airspaces along the route. Pilots were additionally responsible for compliance with vectoring instructions issued by ATC. Subjective workload questionnaires (NASA-TLX) were administered following each experimental trial. Screen recordings of the pilot’s Ground Control Station (GCS) and audio recordings of trials were subsequently coded to obtain performance metrics: response times and error rates. Presented in this paper are results related to pilot responses to vectoring instructions issued by ATC. Workload was found to be significantly higher in the 12-Vehicle condition compared to the 4-Vehicle condition, nearly maxing out the NASA-TLX overall workload scale. There was no significant difference made by the Comm System on workload ratings. Pilots’ response times to communications were fastest in the Voice condition, although overall “service time” for compliance was shorter in Datalink and Hybrid conditions in most cases. Errors by pilots were frequent in both Vehicle Load conditions, most perniciously when using the Voice system. The results of this study suggest tradeoffs in advantages and disadvantages of the three comm systems. Recommendations for communication system design are provided taking the tradeoffs into account.

urban air mobility↗

An Overview of Renewable Energy Desk Activities for Power Grid Operations and Planning

This document summarizes how grid operators can address gaps in their planning and operations to maintain reliability as they pursue clean energy goals. When transitioning to higher renewable energy levels, many system operators configure a dedicated renewable energy desk to manage variable renewable energy resource operation. Establishing such a desk in the control room can be a key step in the modernization effort. A renewable energy desk in a control room is a specialized hub focused solely on monitoring, predicting, and managing the influx of energy from renewable sources.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

Tangible Solutions for Grid Operation Upgrade

Many countries worldwide are setting clean energy targets to decarbonize the energy sector and add higher wind and solar capacities. Given their distributed nature, variable renewable energy (VRE) assets can have unique grid integration considerations, and require grid operation practices to be modernized. When transitioning to higher renewable energy levels, many system operators configure a dedicated renewable energy desk to manage renewable energy resource operation in the system control center. Further, system operation planning is conducted with VRE and load forecasting to enable reliable real-time system operation. NREL has partnered with many system operators in the region to identify appropriate technology and grid modernization solutions. NREL and partners from system operators in the region will present on the challenges and some solutions that have been applied and share best practices such as energy management system upgrades, VRE forecasting framework, grid flexibility improvements, and staff training.

emerging economies↗

Efficient Power Management of an Active Phased Array Antenna Via Circular Aperture Reduction

Significant commercial investments in terrestrial 5G communication systems have matured state-of-the-art Ka-band active phased array (APA) antennas, and their entrance into integrated SATCOM terminals provides space mission designers with new trades and considerations. Newly available Ka-band APAs could provide future missions with a small form factor terminal (<1000 cm3) that can perform rapid beam steering without any moving components. However, APA systems generally consume more power than alternative terminal configurations, which motivates our investigation into a power management technique that leverages the APA’s ability to disable individual antenna elements to rapidly trade excess signal strength for reduced power consumption. Our algorithm strategically maps a desired transmitter effective isotropic radiated power (EIRP) to a binary element mask that simultaneously minimizes the number of active elements and circularizes the antenna’s aperture. We deployed our algorithm on a Cesium Nightingale 1 terminal and emulated a 1.05 Gbps constant-rate link between a low Earth orbit (LEO) satellite and a ground station in an over-the-air test. During the 7m42s pass, the aperture reduction algorithm reduced the average power consumption of the terminal by 27%, the average number of active elements by 56%, and saved 3.9 Wh of energy.

satellite communications↗

Cyber Security for the Spaceport Command and Control System: Vulnerability Management and Compliance Analysis

With the rapid development of the Internet, the number of malicious threats to organizations is continually increasing. In June of 2015, the United States Office of Personnel Management (OPM) had a data breach resulting in the compromise of millions of government employee records. The National Aeronautics and Space Administration (NASA) is not exempt from these attacks. Cyber security is becoming a critical facet to the discussion of moving forward with projects. The Spaceport Command and Control System (SCCS) project at the Kennedy Space Center (KSC) aims to develop the launch control system for the next generation launch vehicle in the coming decades. There are many ways to increase the security of the network it uses, from vulnerability management to ensuring operating system images are compliant with securely configured baselines recommended by the United States Government.

Cyber Security↗

Comparison of Deterministic and Statistical Models for Water Quality Compliance Forecasting in the San Joaquin River Basin, California

Model selection for water quality forecasting depends on many factors including analyst expertise and cost, stakeholder involvement and expected performance. Water quality forecasting in arid river basins is especially challenging given the importance of protecting beneficial uses in these environments and the livelihood of agricultural communities. In the agriculture-dominated San Joaquin River Basin of California, real-time salinity management (RTSM) is a state-sanctioned program that helps to maximize allowable salt export while protecting existing basin beneficial uses of water supply. The RTSM strategy supplants the federal total maximum daily load (TMDL) approach that could impose fines associated with exceedances of monthly and annual salt load allocations of up to $1 million per year based on average year hydrology and salt load export limits. The essential components of the current program include the establishment of telemetered sensor networks, a web-based information system for sharing data, a basin-scale salt load assimilative capacity forecasting model and institutional entities tasked with performing weekly forecasts of river salt assimilative capacity and scheduling west-side drainage export of salt loads. Web-based information portals have been developed to share model input data and salt assimilative capacity forecasts together with increasing stakeholder awareness and involvement in water quality resource management activities in the river basin. Two modeling approaches have been developed simultaneously. The first relies on a statistical analysis of the relationship between flow and salt concentration at three compliance monitoring sites and the use of these regression relationships for forecasting. The second salt load forecasting approach is a customized application of the Watershed Analysis Risk Management Framework (WARMF), a watershed water quality simulation model that has been configured to estimate daily river salt assimilative capacity and to provide decision support for real-time salinity management at the watershed level. Analysis of the results from both model-based forecasting approaches over a period of five years shows that the regression-based forecasting model, run daily Monday to Friday each week, provided marginally better performance. However, the regression-based forecasting model assumes the same general relationship between flow and salinity which breaks down during extreme weather events such as droughts when water allocation cutbacks among stakeholders are not evenly distributed across the basin. A recent test case shows the utility of both models in dealing with an exceedance event at one compliance monitoring site recently introduced in 2020.

54 ENVIRONMENTAL SCIENCES↗

Time-Sensitive Quantum Key Distribution (TSQKD)

This is the final report for the Time-Sensitive Quantum Key Distribution (TSQKD) project and summarizes the demonstration and longer-term field testing at an electric utility, EPB of Chattanooga, in Chattanooga, TN. The demonstration was held virtually (due to the COVID pandemic) and successfully executed the tests outlined in a prior report, “Task 10: Develop a QKD Time-Sensitive Networking Test Suite” submitted 9/30/2020. The portable test equipment explained in Task 10 and earlier task reports was tested at GE Research remotely connected with Qubitekk’s QKD equipment in San Diego, CA. Then the equipment was shipped to Qubitekk for physical integration with Qubitekk’s Quantum DataLoc™ Key Server 1570nm (http://qubitekk.com/products/qkd-for-industrial-control-systems-ics/). The portable test equipment was shipped from Qubitekk to EPB for demonstration and extended field testing. A summary of the demonstration and test results are described in this report. The demo and extended field test results are enabled by the NETCONF/YANG IEEE P1913 data management model developed as part of this project (Task 5). The NETCONF/YANG IEEE P1913 data management model demonstrated significant practical utility in providing a common means of monitoring and configuring the QKD system. All data in this report comes from the IEEE P1913 data management model.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cryogenic Fluid Management Facility

The Cryogenic Fluid Management Facility (CFMF) is a reusable test bed which is designed to be carried into space in the Shuttle cargo bay to investigate systems and technologies required to efficiently and effectively manage cryogens in space. The facility hardware is configured to provide low-g verification of fluid and thermal models of cryogenic storage, transfer concepts and processes. Significant design data and criteria for future subcritical cryogenic storage and transfer systems will be obtained. Future applications include space-based and ground-based orbit transfer vehicles (OTV), space station life support, attitude control, power and fuel depot supply, resupply tankers, external tank (ET) propellant scavenging, space-based weapon systems and space-based orbit maneuvering vehicles (OMV). This paper describes the facility and discusses the cryogenic fluid management technology to be investigated. A brief discussion of the integration issues involved in loading and transporting liquid hydrogen within the Shuttle cargo bay is also included.

Eberhardt, R. N.↗

Concentric Split Flow Filter

A concentric split flow filter may be configured to remove odor and/or bacteria from pumped air used to collect urine and fecal waste products. For instance, filter may be designed to effectively fill the volume that was previously considered wasted surrounding the transport tube of a waste management system. The concentric split flow filter may be configured to split the air flow, with substantially half of the air flow to be treated traveling through a first bed of filter media and substantially the other half of the air flow to be treated traveling through the second bed of filter media. This split flow design reduces the air velocity by 50%. In this way, the pressure drop of filter may be reduced by as much as a factor of 4 as compare to the conventional design.

Stapleton, Thomas J.↗

ICAROUS: Integrated Configurable Architecture for Unmanned Systems

NASA's Unmanned Aerial System (UAS) Traffic Management (UTM) project aims at enabling near-term, safe operations of small UAS vehicles in uncontrolled airspace, i.e., Class G airspace. A far-term goal of UTM research and development is to accommodate the expected rise in small UAS traffic density throughout the National Airspace System (NAS) at low altitudes for beyond visual line-of-sight operations. This video describes a new capability referred to as ICAROUS (Integrated Configurable Algorithms for Reliable Operations of Unmanned Systems), which is being developed under the auspices of the UTM project. ICAROUS is a software architecture comprised of highly assured algorithms for building safety-centric, autonomous, unmanned aircraft applications. Central to the development of the ICAROUS algorithms is the use of well-established formal methods to guarantee higher levels of safety assurance by monitoring and bounding the behavior of autonomous systems. The core autonomy-enabling capabilities in ICAROUS include constraint conformance monitoring and autonomous detect and avoid functions. ICAROUS also provides a highly configurable user interface that enables the modular integration of mission-specific software components.

Consiglio, Maria C.↗