Search NASA⌕ Search

SEARCH · Search NASA

Results for “coordinated scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Geolocation Assessment Algorithm for CALIPSO Using Coastline Detection

Cloud-Aerosol Lidar Infrared Pathfinder Satellite Observations (CALIPSO) is a joint satellite mission between NASA and the French space agency CNES. The investigation will gather long-term, global cloud and aerosol optical and physical properties to improve climate models. The CALIPSO spacecraft is scheduled to launch in 2004 into a 98.2 inclination, 705 km circular orbit approximately 3 minutes behind the Aqua spacecraft. The payload consists of a two-wavelength polarization-sensitive lidar, and two passive imagers operating in the visible (0.645 mm) and infrared (8.7 - 12.0 mm) spectral regions. The imagers are nadir viewing and co-aligned with the lidar. Earth viewing measurements are geolocated to the Earth fixed coordinate system using satellite ephemeris, Earth rotation and geoid, and instrument pointing data. The coastline detection algorithm will assess the accuracy of the CALIPSO geolocation process by analyzing Wide Field Camera (WFC) visible ocean land boundaries. Processing space-time coincident MODIS and WFC scenes with the coastline algorithm will help verify the co-registration requirement with Moderate Resolution Imaging Spectrometer (MODIS) data. This paper quantifies the accuracy of the coastline geolocation assessment algorithm.

Currey, J. Chris↗

Charlotte - EDC Evaluation and Demonstration (CEED) Human-in-the-Loop Results Briefing to ATD-2 FAA Partners

The Charlotte EDC Evaluation and Demonstration (CEED) was the first Human-In-The-Loop experiment under the Air Traffic Management Technology Demonstration-2 (ATD-2) project. The purpose of the study was fourfold: 1) to establish a simulation environment (Charlotte) for airspace operations for ATD-2 technology, 2) to simulate current-day departures and arrival operations, 3) to assess the impact of current Traffic Management Initiatives (TMI) on Charlotte (CLT) departure flows and en route operations in Washington (ZDC) and Atlanta Centers (ZTL), and 4) to assess the impact of departure takeoff time compliance on airspace operations. The experimental design compared 3 TMIs and 2 compliance levels. Fourteen FAA retired controllers participated in the simulation. In addition, two Traffic Management Coordinators from ZTL and ZDC managed traffic flows. Surface and airborne delays, control efficiency, throughput, realism, workload, and acceptability were assessed and will be compared across the experimental conditions. Participants rated the simulation as very realistic. Results indicate that different TMIs have different impacts on surface and airspace delay. Departure compliance indicates partial benefits to sector complexity and controller workload. This simulation will provide an initial assessment of the tactical scheduling problems that the ATD-2 technology will address in the near term.

airspace technology demonstration 2↗

Effects of Nighttime Light Radiance on the Sleep of the General Population

The objectives of this study is to verify if the exposure to greater nighttime radiance is associated with changes in the sleep/wake schedule and with greater sleep disturbances. Methods: The target population was the adults (18 years and older) living in California, USA. This represents 24 million of inhabitants. A total of 3,104 subjects participated in the survey (participation rate 85.6%). The participants were interviewed by telephone using the Sleep-EVAL system. The interviews covered several topics including sleeping habits, sleep quality, sleep disturbances, physical symptoms related to menopause. Chronic insomnia was defined as difficulty initiating or maintaining sleep for at least 3 months. Global nighttime light emissions have been collected by the Defense Meteorological Satellite Program's Operational Linescan System (DMSP/OLS) sensors. We extracted the radiance calibrated nighttime lights corresponding to the date of the interviews for a three by three window centered on each coordinate corresponding to an interview address. Results: Dissatisfaction with sleep quantity and/or quality was associated with an increased nighttime radiance (p=0.02). Similarly, excessive sleepiness accompanied with impaired functioning was significantly associated with an increased nighttime radiance (p (is) less than 0.0001). The association remained significant after controlling for age, gender and use of a night lamp in the bedroom. Confusional arousals were also significantly associated with an increased nighttime radiance (p (is) less than 0.0001). Bedtime hour was linearly increasing with the intensity of nighttime radiance: the later the bedtime, the greater the nighttime radiance (p (is) less than 0.0001). Similarly, wakeup time became progressively later as the nighttime radiance increased (p (is) less than 0.0001). Both associations remained significant after controlling for age, gender and use of a night lamp in the bedroom. Circadian Rhythm Disorders were the only sleep disorder significantly associated with increased nighttime radiance (p (is) less than 0.0001). Exposure to increased nighttime light radiance appeared to cause a shift in the sleep/wake schedule, excessive sleepiness and Circadian Rhythm Disorders.

Excessive Sleepiness↗

Lunar Atmosphere and Dust Environment Explorer Integration and Test

Integration and test (I&T) of the Lunar Atmosphere and Dust Environment Explorer (LADEE) is presented. A collaborative NASA project between Goddard Space Flight Center and Ames Research Center, LADEE's mission is to explore the low lunar orbit environment and exosphere for constituents. Its instruments include two spectrometers, a dust detector, and a laser communication technology demonstration. Although a relatively low-cost spacecraft, LADEE has I&T requirements typical of most planetary probes, such as prelaunch contamination control, sterilization, and instrument calibration. To lead to a successful mission, I&T at the spacecraft, instrument, and observatory level must include step-by-step and end-to-end functional, environmental, and performance testing. Due to its compressed development schedule, LADEE I&T planning requires adjusting test flows and sequences to account for long-lead critical-path items and limited spares. A protoflight test-level strategy is also baselined. However, the program benefits from having two independent but collaborative teams of engineers, managers, and technicians that have a wealth of flight project experience. This paper summarizes the LADEE I&T planning, flow, facilities, and probe-unique processes. Coordination of requirements and approaches to I&T when multiple organizations are involved is discussed. Also presented are cost-effective approaches to I&T that are transferable to most any spaceflight project I&T program.

Wright, Michael R.↗

Virus Evolution Serial

This is the first code, designed to run on a desktop, which models the intracellular replication and the cell-to-cell infection and demonstrates virus evolution at the molecular level. This code simulates the infection of a population of "idealized biological cells" (represented as objects that do not divide or have metabolism) with "virus" (represented by its genetic sequence), the replication and simultaneous mutation of the virus which leads to evolution of the population of genetically diverse viruses. The code is built to simulate single-stranded RNA viruses. The input for the code is 1. the number of biological cells in the culture, 2. the initial composition of the virus population, 3. the reference genome of the RNA virus, 4. the coordinates of the genome regions and their significance and, 5. parameters determining the dynamics of virus replication, such as the mutation rate. The simulation ends when all cells have been infected or when no more infections occurs after a given number of attempts. The code has the ability to simulate the evolution of the virus in serial passage of cell "cultures", i.e. after the end of a simulation, a new one is immediately scheduled with a new culture of infected cells. The code outputs characteristics of the resulting virus population dynamics and genetic composition of the virus population, such as the top dominant genomes, percentage of a genome with specific characteristics.

Vassilevska, Tanya↗

Implementation and Operation of Power Flow Control Solutions for Transmission Systems

Power-flow controls (PFCs) technologies provide a suite of alternatives to more-efficiently direct the flow of power on the grid, improving flexibility and enabling the grid to be more responsive and resilient. PFCs can be used in many cases to mitigate overloads and consequently defer the installation of grid-expansion projects. They can also be suitable options in situations where new transmission lines cannot be built because of environmental constraints, land use, or other types of restrictions. Other uses include mitigation of loop or unintended flows, forcing of contractual or scheduled flows, reduction of congestion, and mitigation solutions during large maintenance or construction projects. While many studies have demonstrated the potential economic benefits of PFC for different types of applications, the implementation implications of using multiple PFCs for system operation and reliability have not been analyzed in detail. The lack of information and practical experience on these aspects hinders adoption of this technology. One use case would be that multiple PFCs are required to coordinate congestion management. In such cases, multiple PFCs are deployed in a meshed power system to control power flows across a wide area. The challenges are associated with PFC interaction—namely, the self and mutual power-flow sensitivity of each PFC, which must be accounted for in the calculation of the respective operating setpoints. This report analyzes implementation and operation that must be considered in evaluating transmission solutions using PFCs. The report first analyzes attributes with which PFC-based solutions should comply, based on the objective and characteristics of each particular use case. It then describes different approaches for coordinated control of multiple PFC devices for different applications, including options to avoid adverse interactions and reduce risks due to inappropriate coordination. Control and operation are illustrated through case studies performed on both generic and actual power system models. This report provides insights for transmission planners and operation engineers about the implementation of PFC-based transmission solutions; consequently, it will help them make informed decisions about the adoption of the technology.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluation of a Dynamic Weather-Avoidance Rerouting Tool in Adjacent-Center Arrival Metering

Dynamic Reroutes for Arrivals in Weather (DRAW) is a NASA-developed decision-support tool for Traffic Management Coordinators (TMCs) at the Federal Aviation Administration's Air Route Traffic Control Centers ("Centers"). DRAW proposes weather-avoidance reroutes for en route arrival flights subject to metering restrictions when transitioning into a busy terminal airspace. The prior DRAW study demonstrated that TMCs' use of DRAW promotes earlier reroutes of arrivals, and reduces the number of routes conflicting with weather in the Center. The present paper focuses on how DRAW benefits metering delivery accuracy when schedule freeze horizon distance was altered. A human-in-the-loop simulation was conducted at NASA Ames Research Center in October-November 2018, where retired TMCs and controllers performed simulated metering operations for southeast arrivals through the Atlanta and Jacksonville Centers to the Hartsfield-Jackson Atlanta International Airport during convective weather periods. Results demonstrated that DRAW use reduced the frequency of manual adjustments of Scheduled Times of Arrival and lowered TMC workload. DRAW use also made the metering accuracy, the number of reroute amendments after the freeze horizon, and the en route sector controller workload more robust to the effect of different freeze horizon distance.

Hayashi, Miwa↗

Evaluation of a Dynamic Weather-Avoidance Rerouting Tool in Adjacent-Center Arrival Metering

Dynamic Reroutes for Arrivals in Weather (DRAW) is a NASA-developed decision-support tool for Traffic Management Coordinators (TMCs) at the Federal Aviation Administration's Air Route Traffic Control Centers ("Centers"). DRAW proposes weather-avoidance reroutes for en route arrival flights subject to metering restrictions when transitioning into a busy terminal airspace. The prior DRAW study demonstrated that TMCs' use of DRAW promotes earlier reroutes of arrivals, and reduces the number of routes conflicting with weather in the Center. The present paper focuses on how DRAW benefits metering delivery accuracy when schedule freeze horizon distance was altered. A human-in-the-loop simulation was conducted at NASA Ames Research Center in October-November 2018, where retired TMCs and controllers performed simulated metering operations for southeast arrivals through the Atlanta and Jacksonville Centers to the Hartsfield-Jackson Atlanta International Airport during convective weather periods. Results demonstrated that DRAW use reduced the frequency of manual adjustments of Scheduled Times of Arrival and lowered TMC workload. DRAW use also made the metering accuracy, the number of reroute amendments after the freeze horizon, and the en route sector controller workload more robust to the effect of different freeze horizon distance.

Air Traffic Management (ATM)↗

Coincident Aerosol and H2O Retrievals versus HSI Imager Field Campaign ReportH2O Retrievals versus HSI Imager Field Campaign Report

Two spectrally calibrated tarpaulins (tarps) were co-located at a fixed Global Positioning System (GPS) position on the gravel antenna field at the U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) Climate Research Facility’s Southern Great Plains (SGP) site. Their placement was timed to coincide with the overflight of a new hyperspectral imaging satellite. The intention was to provide an analysis of the data obtained, including the measured and retrieved spectral albedos for the calibration tarps. Subsequently, a full suite of retrieved values of H2O column, and the aerosol overburden, were to be compared to those determined by alternate SGP ground truth assets. To the extent possible, the down-looking cloud images would be assessed against the all-sky images. Because cloud contamination above a certain level precludes the inversion processing of the satellite data, coupled with infrequent targeting opportunities, clear-sky conditions were imposed. The SGP site was chosen not only as a target of opportunity for satellite validation, but as perhaps the best coincident field measurement site, as established by DOE’s ARM Facility. The satellite team had every expectation of using the information obtained from the SGP to improve the inversion products for all subsequent satellite images, including the cloud and radiative models and parameterizations and, thereby, the performance assessment for subsequent and historic image collections. Coordinating with the SGP onsite team, four visits, all in 2009, to the Central Facility occurred: • June 6-8 (successful exploratory visit to plan tarp placements, etc.) • July 18-24 (canceled because of forecast for heavy clouds) • Sep 9-12 (ground tarps placed, onset of clouds) • Nov 7-9 (visit ultimately canceled because of weather predictions). As noted, in each instance, any significant overcast prediction precluded image collection from the satellite. Given the long task-scheduling procedures (which were in place for each time period), coupled with other priorities and the satellite lifetime, no alternate SGP images could be obtained.

54 ENVIRONMENTAL SCIENCES↗

Actuator and Motor Control End-to-End V&V on the Mars 2020 Rover

The Mars 2020 Perseverance rover is the most advanced robotic exploration system ever sent to another planet. To support the complex scientific and mobility needs of the mission, the rover utilizes 33 actuators, three multi-degree-of-freedom force-torque sensors, fifteen single or dual-speed resolvers, two solenoid valves, and twelve contact switches. The control for these actuators and sensors is achieved by several levels of flight software, coordinated between two computers with varying bandwidth control loops. Furthermore, the actuators and sensors were integrated into multiple larger robotic mechanisms that were delivered by different organizations at various points in the Integration and Test (I&T) timeline. All of this created a very complex Verification and Validation (V&V) scenario involving multiple subsystems and teams, several hardware and software testbeds with varying levels of fidelity, and significant systems engineering to ensure the overall I&T schedule could be maintained while ensuring system hardware safety.This paper details the integrated V&V effort across multiple teams and venues to provide full coverage of all necessary functionality, performance, and fault protection. First, it provides an overview of how the V&V campaign was subdivided among teams and venues and provides descriptions of the various hardware configurations used to support the testing. The Mars 2020 implementation of the plan incorporates many of the lessons learned from Mars Science Laboratory’s test campaign, and these value-added modifications are discussed here. Also included in this section is the system-level environmental testing approach used for mechanisms. Second, the paper describes the phased approach used by the teams to support new hardware and software deliveries to testbed and Systems I&T. In this approach the test campaign was built upon higher-level mechanism needs for performance, functionality, and safety at specific times in the campaign. Finally, the paper discusses lessons learned from the V&V campaign that should be applied to future large-scale motion control testing efforts.

Borne, Davis↗

Adaptive building load control to enable high penetration of solar photovoltaic generation

This paper investigates the ability of a collection of deferrable heating, ventilation and air conditioning (HVAC) loads to directly emulate energy storage devices (ESD), that is, to absorb any low frequency fluctuations in solar generation. We find the optimal number of aggregated HVAC loads to absorb solar fluctuation in the same frequency band based on frequency analysis. To guarantee quality of service in afleet of residential buildings, an optimization problem is formed to compute optimal schedule of the HVAC loads considering temperature comfort band and available solar generation. By minimizing the tracking error between solar generation and total consumption, the proposed method also quantifies the minimum capacity of ESD (battery or fly-wheel) . The simulation results show that the proposed techniques are able to achieve good solar tracking performance as well as obtain a minimal ESD capacity. Therefore, we show that most of the renewable generation can be consumed locally through an intelligent coordination of HVAC loads, their impacts on the grid would be minimal and the required ESD capacity can be minimized.

Dong, Jin↗

Planning for the semiconductor manufacturer of the future

Texas Instruments (TI) is currently contracted by the Air Force Wright Laboratory and the Defense Advanced Research Projects Agency (DARPA) to develop the next generation flexible semiconductor wafer fabrication system called Microelectronics Manufacturing Science & Technology (MMST). Several revolutionary concepts are being pioneered on MMST, including the following: new single-wafer rapid thermal processes, in-situ sensors, cluster equipment, and advanced Computer Integrated Manufacturing (CIM) software. The objective of the project is to develop a manufacturing system capable of achieving an order of magnitude improvement in almost all aspects of wafer fabrication. TI was awarded the contract in Oct., 1988, and will complete development with a fabrication facility demonstration in April, 1993. An important part of MMST is development of the CIM environment responsible for coordinating all parts of the system. The CIM architecture being developed is based on a distributed object oriented framework made of several cooperating subsystems. The software subsystems include the following: process control for dynamic control of factory processes; modular processing system for controlling the processing equipment; generic equipment model which provides an interface between processing equipment and the rest of the factory; specification system which maintains factory documents and product specifications; simulator for modelling the factory for analysis purposes; scheduler for scheduling work on the factory floor; and the planner for planning and monitoring of orders within the factory. This paper first outlines the division of responsibility between the planner, scheduler, and simulator subsystems. It then describes the approach to incremental planning and the way in which uncertainty is modelled within the plan representation. Finally, current status and initial results are described.

Fargher, Hugh E.↗

The Optical Fiber Array Bundle Assemblies for the NASA Lunar Reconnaissance Orbiter

The United States, National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC), Fiber Optics Team in the Electrical Engineering Division of the Applied Engineering and Technology Directorate, designed, developed and integrated the space flight optical fiber array hardware assemblies for the Lunar Reconnaissance Orbiter (LRO). The two new assemblies that were designed and manufactured at NASA GSFC for the LRO exist in configurations that are unique in the world for the application of ranging and lidar. These assemblies were developed in coordination with Diamond Switzerland, and the NASA GSFC Mechanical Systems Division. The assemblies represent a strategic enhancement for NASA's Laser Ranging and Laser Radar (LIDAR) instrument hardware by allowing light to be moved to alternative locations that were not feasible in past space flight implementations. An account will be described of the journey and the lessons learned from design to integration for the Lunar Orbiter Laser Altimeter and the Laser Ranging Application on the LRO. The LRO is scheduled to launch end of 2008.

Ott, Melanie N.↗

Progress on the International Space Station - We're Part Way up the Mountain

The first phase of the International Space Station construction has been completed, and research has begun. Russian, U.S., and Canadian hardware is on orbit, and Italian logistics modules have visited often. With the delivery of the U.S. Laboratory, Destiny, significant research capability is in place, and dozens of U.S. and Russian experiments have been conducted. Crew members have been on orbit continuously since November 2000. Several "bumps in the road" have occurred along the way, and each has been systematically overcome. Enormous amounts of hardware and software are being developed by the International Space Station partners and participants around the world and are largely on schedule for launch. Significant progress has been made in the testing of completed elements at launch sites in the United States and Kazakhstan. Over 250,000 kilograms of flight hardware have been delivered to the Kennedy Space Center and integrated testing of several elements wired together has progressed extremely well. Mission control centers are fully functioning in Houston, Moscow, and Canada, and operations centers Darmstadt, Tsukuba, Turino, and Huntsville will be going on line as they are required. Extensive coordination efforts continue among the space agencies of the five partners and two participants, involving 16 nations. All of them continue to face their own challenges and have achieved significant successes. This paper will discuss the contributions of the International Space Station partners and participants, their accomplished milestones, and upcoming events. The International Space Station program, the largest and most complicated peacetime project in history, has progressed part way up the mountain, and the partners are continuing their journey to the top. The International Space Station (ISS) is unprecedented in its technological, engineering, and management complexity, and is one of the largest international collaborations ever undertaken. The ISS is a dramatic example of the ability of nations to work together as a team toward common goals and dreams. The challenges encountered and overcome by the international ISS team have been likened to climbing a mountain. Construction of the ISS has progressed rapidly in the past year. ISS is now a functioning microgravity laboratory in space hosting a permanent human presence, prompting the characterization that we are "part way up the mountain, and the team continues its climb."

Fortenberry, Lindy↗

Prosumer-Based Distributed Autonomous Cyber-Physical Architecture for Ultra-reliable Green Electricity Internetworks

This project, the first of its kind, proposes a new architecture for decentralized management and control of future electricity grids with millions of decision-makers. These economically motivated decision-makers are called prosumers (producer-consumers). Prosumers can produce, consume, and/or store electricity and make strategic decisions enabled by communication networks. Prosumers can be as large as a utility or as small as an electric vehicle or a smart house with a home energy management system. The report first provides an impression of the functionality envisioned in prosumer-based smart grids and the philosophy behind their design. The architecture is intended to provide a platform for many possibilities in service definition and trading. The functionality of the architecture is identified by functional and non-functional requirements related to decentralized control and optimization. In this report, three key technologies are proposed for enabling distributed operation and control in prosumer-based smart grids. The first technology is a cyber-infrastructure model, which provides an underlying framework for distributed communication and computation in smart grids. The model is based on service-oriented computing paradigm and is compatible with the existing service-oriented technologies, used in enterprise computing, such as Web Services. However, it extends these technologies for handling the hard-to-predict real-time aspects of smart grids by introducing resource-aware service deployment and quality-of-service (QoS)-aware service monitoring phases. The second technology is a distributed frequency regulation (DFR) framework, which can ensure midterm frequency stability while avoiding inter-area oscillations and using a limited control effort. DFR can complement today’s Automatic Generation Control (AGC) systems by providing an advanced protocol for coordination between AGC systems of different prosumers. The main advantage of the DFR technology is that each frequency regulator only needs to communicate with its neighbors in the network. The efficacy of DFR is shown through simulations on real-world electric energy systems of different scale and complexity. The third technology introduced in this project is decentralized unit commitment (DUC) for heterogeneous prosumers. The DUC technology is a new scalable method for formulating and solving a distributed energy scheduling problem. The algorithm extends the alternating direction method of multipliers (ADMM) and includes several heuristics to mitigate oscillations and traps in local optimality that result from the nonconvexity of unit commitment. The main advantages of DUC is that it can solve the unit commitment problem for large-scale power systems of more than 3,000 nodes faster than the state-of-the-art, centralized methods, and that it is scalable to energy scheduling problems of prosumer systems of any size. In summary, this report illustrates that the distributed architecture for prosumer-based power grids is an enabler of transforming aging power grids into sustainable, resilient, reliable, and efficient smart grids with some desirable functionalities similar to the Internet.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Coordination of Behind-the-Meter Energy Storage and Building Loads: Optimization with Deep Learning Models*

With the increasing penetration of renewable energy systems and energy storage systems in buildings, it is critical to optimize system operation. In this paper, we develop an optimization strategy to minimize the operation cost as well as maintain indoor thermal comfort, for a building integrated with battery and PV. A Recurrent Neural Network (RNN) is used to predict building thermal load and zone temperatures. A black-box optimization algorithm known as nonlinear optimization by mesh adaptive direct search (NOMADS) is employed in simulation to provide look-ahead optimal battery dispatch and zone temperature set-point schedules so that the operation cost is minimized. Field data collected from a medium sized office building at Pacific Northwest National Laboratory (PNNL) integrated with Photovoltaic (PV) system model and battery storage system model is used to demonstrate the proposed methodology. Compared with rule based methods, the optimization strategy obtained a lower cost of operation while satisfying comfort constraints.

Chen, Yimin↗

Redesign of the Timeline Generator at Fermilab using a web-based Flutter application, GraphQL API and an IOC

The control system at Fermilab is undergoing an evolution with a shift towards web-based applications with connections to the EPICS infrastructure. The Timeline Generator (TLG) is an application that serves to coordinate events across the lab using different timing links. These links include the Tevatron clock (TCLK), a 10 MHz serial link with events encoded at 20Hz and Machine Data (MDAT), a communication link with states encoded at 720Hz. This paper covers the redesign of the major components of the TLG. This includes a web-based Flutter application for building timelines. A placement service is in use that has a GraphQL interface and uses a timeline input to compute a schedule of events and states. The Flutter application sends this computed schedule to the TLG IOC via a GraphQL interface to the Data Pool Manager (DPM). The TLG IOC runs on an Arria FPGA, the Accelerator Clock Generator (ACLK-GEN), which is responsible for writing the events and states on to the different timing links.

Carmichael, Linden [Fermilab]↗

Regulatory Risk Reduction for Advanced Reactor Technologies: FY 2017 Framework Modernization Proposals and Status

The regulatory framework governing the licensing of commercial nuclear power plants in the U.S. developed over recent decades with a strong emphasis towards assessing large light water reactor (LWR) safety. However, recent shifts in energy market needs and priorities has brought new and different types of nuclear technologies into consideration for applications that include but are not limited to electric power generation. In order to realize the benefits in efficiency, reliability and safety that advanced (non-LWR) can potentially offer, efforts are needed to modernize the existing regulatory framework to make technical licensing requirements more compatible with radically new nuclear technologies. To serve the needs of the energy market, this update should be performed on a schedule conducive to deployments projected to begin as early as 2025. Beginning in 2016, an initiative was launched to amend the U.S. nuclear power reactor licensing framework by making the technical requirements contained therein more generically compatible with non LWR technology. The Licensing Modernization Project (LMP) was established as an industry-led team of subject matter experts managed by Southern Company Services and supported through a cost sharing arrangement with the U.S. Department of Energy (DOE). Technical and programmatic coordination for the effort was also provided by the Nuclear Energy Institute (NEI), the Licensing Department of the Advanced Reactor Technologies (ART) Program located at the Idaho National Laboratory (INL), and others.

42 ENGINEERING↗