Search NASA⌕ Search

SEARCH · Search NASA

Results for “development timelines”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Quantifying Investment Risk: Analysis of the Purchase Decision of a Nuclear Power Plant

Cost overruns are an ill-fated part of the deployment history of nuclear power plants (NPPs) in the United States, and yet studies increasingly show the important role nuclear technologies must play in decarbonizing the U.S. economy. Paradoxically, then, a key piece of a coherent decarbonization strategy depends on attracting investor action to a purchase where historical cost overruns have been sizeable. To address this challenge, this study aims to develop a financial model that quantifies risk of cost overruns in the decision-making process for purchasing advanced reactor concepts. Using the concept of Value at Risk (VaR), the model is built to evaluate financial risk nuclear construction with the aim to identify risk mitigation strategies. The objective is to identify strategies to mitigate cost-risk challenges and to assess the potential reduction in investor risk exposure. The paper presents the initial development and preliminary verification of the financial risk analysis model. The development of this model involved a comprehensive approach to estimating financial risk over the operating life of NPP that stems from construction uncertainties. By utilizing net present value (NPV) with discounted cash flows, the model captures the complex interconnections of project costs, construction timelines, revenue, and uncertainties. Verification of the model involved testing historical data from previous reactor construction projects against the construction project of Vogtle 3 and 4. The results of this paper present the comparison of the preconstruction cost overrun prediction with the current cost estimates from a nearly complete Vogtle 3 and 4.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Numerical Simulation of No Vent Chill and Fill of a Large Liquid Hydrogen Tank

On orbit transfer of cryogenic liquids is necessary for many future space missions. The techniques required to transfer cryogens in micro gravity are quite different from ground system applications. In normal gravity, cryogenic tanks are usually filled from the bottom at nearly atmospheric pressure. The vapor generated due to heat transfer from warm tank walls, is allowed to vent from the top of the tank while the tank is being filled. If the normal gravity technique is used on orbit, the uncertainty of liquid and vapor distributions in unsettled condition may result in dumping of large amounts of liquid propellant overboard. The Vented Chill and No Vent Fill (VCNVF) process is a methodology [1] used to reduce propellant loss by holding the vent valve open during initial wall chilldown, preventing over-pressurization of the tank and stalling of the incoming flow, but closing the tank vent valve after chilling the tank wall sufficiently. An accurate simulation of no vent tank chill and fill is necessary to estimate the amount of propellant necessary to chill the tank, determine the maximum sustainable flowrate to fill the tank without stalling, and establish a timeline for the filling process. Numerical modeling of filling a cryogenic tank is complex because the flow is two-phase and the process involves both boiling and condensation with heat transfer between solid and fluid. In recent years, progress has been made to develop a numerical modeling technique [2,3,4] that has been verified by comparing with the test data from a small flight tank using liquid nitrogen [5]. The purpose of the present paper is to apply this technique in a larger tank with liquid hydrogen and compare with the test data of Chato [1]. The K-site Test Facility [1], shown in Figure 1, consists of a Test Tank, spray system, instrumentation, and the vacuum chamber. The test tank selected was ellipsoidal with an 87 inch major diameter and a 1.2 to 1 major to minor axis ratio. The two ends are joined by a short 1.5 inch cylindrical section. The tank is made of 2219 aluminum chemically milled to a nominal thickness of 0.087 inches. The tank weighs 329.25 pounds, and the tank volume is 175 ft 3 . The GFSSP model of the Test Tank is shown in Figure 2. Node 13 is a boundary node that represents the supply tank which is supplying liquid hydrogen at a given pressure and temperature. The total measured flowrate is evenly distributed through Branches 131 through 139. Nodes 1 through 9 represent the test tank and they are connected with metal solid nodes 14 through 22 through fluid-to-solid conductors that allow convective heat transfer between the solid and fluid nodes. The predicted tank pressure, filling rate, wall temperature and fluid temperature will be compared with test data.

Alok Majumdar↗

Risk-Reduction Autonomy Implementation to Enable NASA Artemis Missions

To achieve NASA’s Artemis program mission objectives a high level of autonomy that is ubiquitous throughout the systems that are being developed will be necessary. The autonomous systems of Artemis will require a distributed autonomy capability, with autonomous systems organized functionally in a hierarchical architecture, where systems at higher levels of the hierarchy have authority over systems at lower levels. The challenge of developing autonomy technologies and Concepts of Operations (ConOps) for Artemis has been undertaken by the NASA Gateway Working Group. This group has developed requirements, architectures, ConOps, and interface control documents (ICDs), in the context of a hierarchical distributed architecture that includes the following: a Vehicle System Manager (VSM) that autonomously manages the entire Gateway; Module System Managers (MSMs) that autonomously manage each module; and System Managers (SMs) that autonomously manage systems within a module (i.e. ECLSS). A substantially high level of autonomy needs to be achieved by each element of the hierarchy (VSM, MSM, SM) to meet requirements for uncrewed operations; this includes conditions that will have minimal and/or delayed ground intervention (i.e. requirements for sustainability for months of operation without crew or ground support). To advance an implementation of this autonomy design (Gateway Autonomy Design – GAD), a collaboration was established between the Autonomous Systems Laboratory (ASL) at NASA Stennis Space Center and Lockheed Martin. The objectives of this partnership were the following: (1) to implement autonomy at the VSM, MSM, and SM levels; (2) to implement communications among a VSM, 2 MSMs, ORION (a visiting vehicle somewhat equivalent to a module) and 1 SM (a power system), and (3) test autonomous operations with representative use cases. A SM backed by a high-fidelity simulation was created to facilitate demonstrations of use cases that originated in a system of a module. Communication between the VSM and MSMs was implemented according to Concepts of Operations and Interface Control Documents (ICDs). Demonstrations were conducted to address nominal and off-nominal operations and multi-module interactions with the VSM. Additionally, user interfaces were created to provide awareness about ongoing processes and results while enhancing the demonstration. Demonstrations included the following use cases: (1) Orion as visiting vehicle registers with VSM; (2) VSM reschedules a module’s timelines when another module’s MSM task fails; and (3) a module’s Power System Manager (PSM) demonstration that included component failure diagnostics, tracing component failure to effected components, which in turn, reports failure information up to the VSM for acknowledgement and display. This paper will describe the detailed technology and autonomous systems developed, and the integrated multi-module demonstrations conducted. Also, challenges that must be met to fully implement the GAD defined by Gateway will be addressed.

Fernando Figueroa↗

COVID-19 Vaccine-Induced Radiation Recall Phenomenon

Radiation recall phenomenon (RRP) is an uncommon, late occurring, acute inflammatory skin reaction that emerges in localized areas coincident with previously irradiated radiation therapy (RT) treatment fields. RRP has been known to be triggered by a number of chemotherapy agents. To the best of our knowledge, this report is the first description of RRP after administration of the Pfizer-BioNTech vaccine for COVID-19, or any other currently available vaccine against COVID-19. Acute skin reactions were observed in 2 RT patients with differing timelines of RT and vaccinations. In both cases however, the RRP presented within days of the patient receiving the second dose of vaccine. For each RT course, the treatment planning dosimetry of the radiation fields was compared with the area of the observable RRP. RRP developed within the borders of treatment fields where prescription dose constraints were prioritized over skin sparing. Our observation is currently limited to 2 patients. The actual incidence of RRP in conjunction with Pfizer-BioNTech vaccine or any other vaccine against COVID-19 is unknown. For patients with cancer being treated with radiation with significant dose to skin, consideration should be given to the probability of RRP side effects from vaccinations against COVID-19.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Self-consistent integrated modeling of combined hybrid discharge-laser produced plasma devices for extreme ultraviolet metrology

Discharge- and laser-produced plasma (DLPP) devices are being used as light sources for extreme ultraviolet (EUV) generation. A key challenge for both, DPP and LPP, is achieving sufficient brightness to support the throughput requirements of nanometrology tools. To simulate the environment of a hybrid DLPP device and optimize the EUV output, we have developed an integrated HEIGHTS-DLPP computer simulation package. The package integrates simulation of two evolving plasmas (DPP and LPP) and includes modeling of a set of integrated self-consistent processes: external power source and plasma energy balance, plasma resistive magnetohydrodynamics, plasma heat conduction, detailed radiation transport (RT), and laser absorption and refraction. We simulated and optimized DLPP devices using Xe gas as a target material. We synchronized the external circuit parameters, chamber gas parameters, and laser beam temporal and spatial profiles to achieve maximum EUV output. The full 3D Monte Carlo scheme was integrated for detailed RT and EUV output calculations in Xe using more than 3600 spectral groups. The modeling results are in good agreement with Julich Forschungszentrum experimental data. Theoretical models, developed and integrated into the HEIGHTS package, showed wide capabilities and flexibility. In conclusion, the models and package can be used for optimization of the experimental parameters and settings, investigation of DLPP devices with complex design, analyzing the impact of integrated spatial effects and working timeline arrangement on the final EUV output, and EUV source size, shape, and angular distribution.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Artificial Intelligence for Multiphysics Nuclear Design Optimization with Additive Manufacturing

The geometric flexibility of additively manufactured metals and ceramics generates a very large and open design space that requires advanced modeling and simulation tools for physics simulations and the rigorous definition of design problems. This effort deploys artificial intelligence (AI) and machine learning (ML) algorithms to understand the design space, evaluate potential designs, and more efficiently generate optimized results. The Transformational Challenge Reactor (TCR) program is leveraging advances in several scientific areas—including materials, manufacturing, sensors and control systems, data analytics, and high-fidelity modeling and simulation—to accelerate the design, manufacturing, qualification, and deployment of advanced nuclear energy systems. Through a manufacturing-informed design approach, the TCR program seeks to integrate digital data for rapid nuclear innovation; accelerate the adoption of advances in manufacturing, materials, and computational sciences for nuclear applications; and dramatically reduce deployment costs and timelines for new nuclear reactor technologies. This report documents efforts under the TCR program to leverage advanced modeling and simulation techniques driven by AI/ML algorithms on high-performance computing (HPC) systems to yield more optimized TCR core designs. A multiphysics ML surrogate model was developed to run on the HPC architectures. The surrogate model is trained on high-fidelity simulation data of coupled neutronics and thermofluidics and is used to quickly evaluate thousands of candidate core designs in parallel, which drives the evolution of the cooling channel shapes to minimize temperature peaking and material stress. Outcomes from these activities provide design information and feedback into the core design efforts.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Technology Assessment in Support of the Presidential Vision for Space Exploration

This paper discusses the process and results of technology assessment in support of the United States Vision for Space Exploration of the Moon, Mars and Beyond. The paper begins by reviewing the Presidential Vision: a major endeavor in building systems of systems. It discusses why we wish to return to the Moon, and the exploration architecture for getting there safely, sustaining a presence, and safely returning. Next, a methodology for optimal technology investment is proposed with discussion of inputs including a capability hierarchy, mission importance weightings, available resource profiles as a function of time, likelihoods of development success, and an objective function. A temporal optimization formulation is offered, and the investment recommendations presented along with sensitivity analyses. Key questions addressed are sensitivity of budget allocations to cost uncertainties, reduction in available budget levels, and shifting funding within constraints imposed by mission timeline.

technology↗

A Human-in-the Loop Evaluation of a Coordinated Arrival Departure Scheduling Operations for Managing Departure Delays at LaGuardia Airport

LaGuardia (LGA) departure delay was identified by the stakeholders and subject matter experts as a significant bottleneck in the New York metropolitan area. Departure delay at LGA is primarily due to dependency between LGA's arrival and departure runways: LGA departures cannot begin takeoff until arrivals have cleared the runway intersection. If one-in one-out operations are not maintained and a significant arrival-to-departure imbalance occurs, the departure backup can persist through the rest of the day. At NASA Ames Research Center, a solution called "Departure-sensitive Arrival Spacing" (DSAS) was developed to maximize the departure throughput without creating significant delays in the arrival traffic. The concept leverages a Terminal Sequencing and Spacing (TSS) operations that create and manage the arrival schedule to the runway threshold and added an interface enhancement to the traffic manager's timeline to provide the ability to manually adjust inter-arrival spacing to build precise gaps for multiple departures between arrivals. A more complete solution would include a TSS algorithm enhancement that could automatically build these multi-departure gaps. With this set of capabilities, inter-arrival spacing could be controlled for optimal departure throughput. The concept was prototyped in a human-in-the- loop (HITL) simulation environment so that operational requirements such as coordination procedures, timing and magnitude of TSS schedule adjustments, and display features for Tower, TRACON and Traffic Management Unit could be determined. A HITL simulation was conducted in August 2014 to evaluate the concept in terms of feasibility, controller workload impact, and potential benefits. Three conditions were tested, namely a Baseline condition without scheduling, TSS condition that schedules the arrivals to the runway threshold, and TSS+DSAS condition that adjusts the arrival schedule to maximize the departure throughput. The results showed that during high arrival demand period, departure throughput could be incrementally increased under TSS and TSS+DSAS conditions without compromising the arrival throughput. The concept, operational procedures, and summary results were originally published in ATM20151 but detailed results were omitted. This paper expands on the earlier paper to provide the detailed results on throughput, conformance, safety, flight time/distance, etc. that provide extra insights into the feasibility and the potential benefits on the concept.

trajectory-based operations↗

Risk-Reduction Autonomy Implementation to Enable NASA Artemis Missions

To achieve NASA’s Artemis program mission objectives a high level of autonomy and ubiquitous autonomy throughout the systems that are being developed will be necessary. The autonomous systems of Artemis will require a distributed autonomy capability, with autonomous systems organized functionally in a hierarchical architecture, where systems at higher levels of the hierarchy have authority over systems at lower levels. The challenge of developing autonomy technologies and concepts of operations for Artemis has been undertaken by the NASA Gateway Working Group. This group has developed requirements, architectures, concepts of operations, and interface control documents, in the context of a hierarchical distributed architecture that includes the following: a Vehicle System Manager (VSM) that autonomously manages the entire Gateway; Module System Managers (MSMs) that autonomously manage each module; and System Managers (SMs) that autonomously manage systems within a module(i.e. ECLSS).A substantially high level of autonomy needs to be achieved by each element of the hierarchy (VSM, MSM, SM)to meet requirements for uncrewed operations; this includes conditions that will have minimal and/or delayed ground intervention (i.e. requirements for sustainability for months of operation without crew or ground support). To advance an implementation of this autonomy design (Gateway Autonomy Design –GAD), a collaboration was established between the Autonomous Systems Laboratory (ASL) at NASA Stennis Space Center and Lockheed Martin. The objectives of this partnership were the following: (1)to implement autonomy at the VSM, MSM, and SM levels;(2) to implement communications among a VSM, 2 MSMs, ORION (a visiting vehicle somewhat equivalent to a module) and 1 SM (a power system), and (3) test autonomous operations with representative use cases. A SM backed by a high-fidelity simulation was created to facilitate demonstrations of use cases that originated in a system of a module. Communication between the VSM and MSMs was implemented according to Concepts of Operations and Interface Control Documents (ICDs). Demonstrations were conducted to address nominal and off-nominal operations and multi-module interactions with VSM. Additionally, user interfaces were created to provide awareness about ongoing processes and results while enhancing the demonstration. Demonstrations included the following use cases: (1)Orion as visiting vehicle registers with VSM;(2) VSM reschedules a module’s timelines when another module’s MSM task fails; and (3) a module’s Power System Manager (PSM) standalone demonstration that included component failure diagnostics, tracing component failure to effected components, which in turn, reports failure information up to the VSM for acknowledgement and display. This paper will describe the detailed technology and autonomous systems developed, and the integrated multi-module demonstrations conducted. Also, challenges that must be met to fully implement the GAD defined by Gateway will be addressed.

Autonomous Systems↗

Expanding Scientific Horizons Through High Field Dynamic Nuclear Polarization with Advanced Organic BiRadicals

This project aimed to advance the capabilities of high-field Dynamic Nuclear Polarization (DNP) Nuclear Magnetic Resonance (NMR) spectroscopy at 800 MHz through the synthesis and evaluation of novel biradicals. While the targeted HyTEK biradical synthesis faced significant challenges, alternative efforts focused on synthesizing intermediate compounds and exploring alternative biradicals. A portion of the BDPA precursor was successfully converted into BDPA-TEMPO, though further DNP testing could not be completed within the project timeline. Benchmarking experiments with existing biradicals, including TEKPol and M-TinyPol, were conducted to evaluate their performance under high-field conditions. These efforts provided valuable insights into DNP enhancements, refined operational protocols for high-field experiments, and established benchmarks for future polarizing agent development.

36 MATERIALS SCIENCE↗

Microgravity science experiment integration - When the PI and the PED differ

This paper addresses issues related to the integration of principal investigators (PIs) and payload-element developers (PEDs) for conducting effective microgravity experiments. The Crystal Growth Furnace (CGF) is used as an example to demonstrate the key issues related to the integration of a PI's sample into a facility run by a different organization. Attention is given to the typical preflight timeline, documentation required for experimental implementation, and hardware deliverables. A flow chart delineates the payload-integration process flow, and PI inputs required for an experiment include equipment and procedure definitions, detailed design and fabrication of the experiment-specific equipment, and specifications of the contract-end item. The present analysis is of interest to the coordination of effective microgravity experiments on the Space Station Freedom that incorporate PIs and PEDs from different organizations.

Baer-Peckham, M. S.↗

An Airborne Communications Roadmap for the U.S. Federal Air Marshal Service: Overview and Status

Following the events of September 11, 2001, the responsibilities, operations and numbers of the U.S. Federal Air Marshal Service (FAMS) wer e greatly expanded. With this expansion, new critical research and te chnology needs were identified, including the need for air to ground telecommunications capabilities. To address this need, the FAMS has cr eated a working group to develop, deploy and enhance aviation communi cations with respect to security and law enforcement. This paper presents the working group's progress to date in generating a FAMS air-gro und communications roadmap identifying expected communications servic es, technology maturity, and technology gaps over a timeline. The paper includes a communications preliminary requirements summary and syst em performance characteristics needed to meet identified operational needs. The system engineering process utilized is presented beginning with the identification of users, their operational needs and relevant constraints. The operational needs are translated to desired airbor ne communications services. System technical performance requirements associated with the identified services are summarized. In addition, notional communications architectures addressing the requirements are presented. Finally, future plans to identify and assess potential ca ndidate systems and their associated technical architectures, gaps and barriers to implementation are discussed. The paper addresses the cu rrent, near term (within 5 years) and far term (10 years) timeframes for such an airborne communications system.

Martzaklis, Konstantinos S.↗

Integrated Medical Model (IMM) 4.0 Enhanced Functionalities

The Integrated Medical Model is a probabilistic simulation model that uses input data on 100 medical conditions to simulate expected medical events, the resources required to treat, and the resulting impact to the mission for specific crew and mission characteristics. The newest development version of IMM, IMM v4.0, adds capabilities that remove some of the conservative assumptions that underlie the current operational version, IMM v3. While IMM v3 provides the framework to simulate whether a medical event occurred, IMMv4 also simulates when the event occurred during a mission timeline. This allows for more accurate estimation of mission time lost and resource utilization. In addition to the mission timeline, IMMv4.0 features two enhancements that address IMM v3 assumptions regarding medical event treatment. Medical events in IMMv3 are assigned the untreated outcome if any resource required to treat the event was unavailable. IMMv4 allows for partially treated outcomes that are proportional to the amount of required resources available, thus removing the dichotomous treatment assumption. An additional capability IMMv4 is to use an alternative medical resource when the primary resource assigned to the condition is depleted, more accurately reflecting the real-world system. The additional capabilities defining IMM v4.0the mission timeline, partial treatment, and alternate drug result in more realistic predicted mission outcomes. The primary model outcomes of IMM v4.0 for the ISS6 mission, including mission time lost, probability of evacuation, and probability of loss of crew life, are be compared to those produced by the current operational version of IMM to showcase enhanced prediction capabilities.

Spae Adaptation Syndrome↗

System for Photogrammetric Imaging, Detection, and Ranging (SPIDR)

The System for Photogrammetric Imaging, Detection, and Ranging (SPIDR) project aims to advance the state-of-the-art (SOA) technology in camera tracking. SPIDR will advance this technology in the following ways: 1) perform autonomous tracking of rocket launches, 2) allow modularity for camera payloads to enable various types of imagery capture (standard video, high-speed, infrared, etc.), 3) enable additional imagery assets for increased scope of imagery analysis, and 4) serve as a viable tracking replacement for the existing Kineto Tracking Mount (KTM) system used by the Exploration Ground Systems (EGS) program. The project initially aimed to build an in-house mechanical design and control system, but realigned to a commercial off-the-shelf (COTS) mechanical design. During the FY23 CIF timeline, the SPIDR team made significant advances in building a machine-learning (ML) based object detection model for various rockets and their plumes. The team will continue advancing the model, and begin work on the pan and tilt unit (PTU) control system and tracking algorithm development.

Alden Param↗

Acquisition and Implementation of a Comprehensive Environmental Permits Linking Tool at Savannah River Site - 20234

Historically, Savannah River Nuclear Solutions LLC (SRNS) tracked environmental regulatory commitments and the requirements from hundreds of permits at the Savannah River Site (SRS) using several separate methods, making integrated compliance assurance cumbersome and labor-intensive. When SRNS experienced an increase in environmental issues in 2017, SRNS management and U.S. Department of Energy - Savannah River (DOE-SR) management decided a single, proactive approach was needed to capture environmental permit information (including regulations, Consent Orders, DOE Orders, and any other state or federally issued statement of requirements), track the tasks necessary to ensure compliance with these requirements, and thereby mitigate the risk of noncompliance. SRNS developed a list of mandatory objectives that the tool must meet to function as a Comprehensive Environmental Permits Linking Tool (CEPLT). A key requirement was the ability to map Site permits to their governed locations and display the associated requirements at the compliance point (e.g., outfall, stack, waste unit, etc.). Several options included modifying existing onsite resources, building a custom onsite solution, purchasing an off-the-shelf solution, and contracting an offsite developer to build a custom solution. SRNS concluded an off-the-shelf solution with configuration and customization options would provide the flexibility to fit the unique needs of Savannah River Site (SRS) while taking advantage of industry-tested software and providing a reduced deployment timeline. SRNS chose Gensuite{sup R} a, a cloud-based solution that offers numerous a la carte applications in the environmental, health, and safety arenas, as the best candidate. SRNS selected three (3) integrated applications (Compliance Calendar, Permit Manager, and Mapper) to function as the CEPLT. The Compliance Calendar module allows for creation and tracking of regulatory commitment tasks assigned to responsible environmental professionals. Permit Manager organizes permits and other requirement documents, linking the commitments in each to Compliance Calendar tasks and/or implementing procedures. Mapper provides GIS capability for mapping the data from the other two modules to their physical onsite locations. The CEPLT was configured to allow for other SRS Site Tenants to eventually utilize the applications. Additionally, DOE-SR uses the CEPLT to provide an overview of contractor environmental compliance activities and to organize DOE-specific documents and tasks. The CEPLT fulfilled the requirement of meeting current compliance needs as well as providing the ability to grow as new organizations are incorporated and functionality is expanded. SRNS now uses the CEPLT to more effectively manage permit requirements, improve knowledge transfer, and increase the Site's overall protection of the environment, the Site worker, and the public. Possible future uses of the system include integration of mobile applications for timely communication of potential non-compliant conditions and DOE complex-wide deployment allowing for enhanced DOE site and Head Quarters oversight. Implementation of CEPLT will result in cost savings, both in terms of dollars and man-hours. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Solar Automated Permit Processing Software for Distributed PV (Cooperative Research and Development Final Report, CRADA Number CRD-19-00825)

NREL and its project partners built and commercialized the novel Solar Automated Permitting Processing Plus (SolarAPP+) software platform that delivers instant residential rooftop solar permits. The tool provides installers with a standard portal for entering permit information for residential solar systems across all Authorities Having Jurisdiction (AHJs) using SolarAPP+, thereby providing a streamlined plan review form, transparency into permitting timelines, and required specifications. The project has proven to reduce permitting timelines from as many as 20 business days to zero, delivering solar projects faster in the four participating AHJs using the platform. Streamlining permitting timelines, all else equal, results in consumers installing their systems and reducing their electricity bills faster. The continued expansion of SolarAPP+ features and adoption nationwide will expand the benefits of the SolarAPP+ beyond the current user base.

14 SOLAR ENERGY↗

Microchannel-based Membrane-less Extraction of Li from Unconventional Lithium Sources & the Separation of REE

This final report provides an overview of the Project's entire duration, covering July 1, 2021 to December 31, 2023. It primarily focuses on the achievements, technological developments, and unique challenges the team faced while working on separating and extracting Lithium from produced waters. The project's primary aim was to create an integrated, high-throughput, membrane-less, and modular microfluidic platform that could extract Lithium from unconventional sources. We have successfully met all goals and milestones envisioned in the SOPO document. The most critical primary milestones, including the Go-No-Go milestone (refer to the Gantt chart in the Appendices), were successfully accomplished. We demonstrated phase separation (>90%) and extraction (>85%) performance in the MPSE using synthetic, and representative produced water composition feed at 50 ml/min total flow through MPSE 36. We have also performed a parametric study of the MPSE operations, beyond the scope of SOPO, exploring operating conditions of current and broader interest. The extended investigation of operational parameters is concurrent with our efforts to seek further development of the MPSE technology beyond the scope of the Project. Along these lines of development, we have made efforts to be responsive to DOE calls for technological developments of other types of resources (beyond PW) for the recovery of Critical Materials and higher TRL development (beyond TRL 4). During the work on this Project, we developed and implemented three innovative technical approaches that emerged from our efforts to successfully meet the Project milestones. The innovative & original technical approaches developed and implemented in this Project are now the contributions to process engineering that could be clearly credited to the Project. First, Convergent Design Approach is a comprehensive feedforward & feedback loop of four design phases: i) design for functionality, ii) design for manufacturing, iii) design for sustainability, and iv) design for market. Next was Process Intensification. A major aim of this Project was to create an innovative phase separation & extraction microscale-based technology for Li separation – thus the words microchannel-based in the Project title. A microscale-based technology is intrinsically in the center of the Process Intensification domain as defined by its unique principles. Therefore, Process Intensification was implicitly envisioned in the Project’s SOPO. Lastly, Time Scale Analysis is a novel tool for discovering the needs and directions of Process Intensification implementations in any process technology. This Project is fully credited for developing and implementing the three novel technical approaches mentioned above. These are general contributions to process engineering that emerged from this Project. Beyond the original SOPO scope, the OSU-U.Pitt research group utilized a Convergent Design methodology, integrating first-principles mathematical modeling with experimental validation on the Minimum Development Vehicle. By creating these Digital Twins, the team rapidly assessed manufacturing iterations to support TEA analysis. This framework further enabled the development of advanced Surface Modification Techniques, where hydrophobic and oleophobic coating strategies were optimized via Digital Twin tools and validated through rigorous 100-hour longevity testing. TEA Analysis: The closing efforts of this Project were focused on the TEA analysis. TEA analysis had two primary functions: i) enabling critical assessments of design variations withing 10 the Concurrent Design Approach, thus enabling evolution of the MPSE design to reach faster- better-cheaper alternatives; and ii) to create a bridge between the accomplishments of this Project and future projects of higher TRL, beyond TRL 6 level. It is important to note that the TEA model created in the Project stirred the technological solutions for the recovery of critical materials toward a vision of a very profitable modular plant that has unique zero-waste water discharge signature. More importantly, thanks to our experimental performance data and conservative assumptions, the TEA model predicts minimal technological and investment risks. Low cost of a modular unit of a nominal capacity of [1000 tons of Li 2 CO 3 /year] positions the MPSE based technology within the reach of community investors, thus offering a paradigm shift in the development of critical technologies. The project successfully navigated two primary challenges: solvent selection and manufacturing adaptation. Restricted by the SOPO to existing literature for lithium recovery, the team identified a critical need for a "material excellence program" to develop next-generation solvents, eventually concluding with a preliminary investigation into promising Ionic Liquids (ILs). Simultaneously, COVID-19 supply chain disruptions forced a pivot from traditional manufacturing to advanced additive methods at ATAMI-OSU. By transitioning from stainless steel to 3D-printed polymer substrates, the team achieved a transformative three-order-of- magnitude reduction in manufacturing costs and compressed prototyping timelines from several months to just two days. The MPSE technology offers significant energy, environmental, and economic advantages by overcoming the traditional bottlenecks of phase-separation hardware and contactor size. Unlike conventional mixer-settlers or membrane-based systems, MPSE operates without moving parts or fouling-prone membranes, achieving robust performance even with challenging, viscous, or particulate-heavy feeds. Key performance metrics include an energy intensity reduction of 5–50x (3–40 kJ/m 3 ) compared to incumbent technologies and a dramatic reduction of processing time to under 60 seconds, which drastically reduces the physical plant footprint. These technical efficiencies translate into superior economic outcomes; for a 100 t/year Li 2 CO 3 facility, implementing MPSE is projected to nearly halve contactor CAPEX (from $\$$6.08M to $\$$3.01M) and significantly increase the project's Net Present Value (NPV), derisking new investment and enabling distributed critical-mineral processing configurations. The commercialization of MPSE technology is being spearheaded by Vigsur Dynamics Inc., which has adopted a structured, parallel approach to technical and business development since its formation in January 2026. Following extensive customer discovery and engagement with the Oregon State University accelerator, Vigsur Dynamics is working to establish a business model that transitions from pilot demonstrations to modular hardware sales, ultimately aiming for a "build-own-operate" service strategy. Current technical milestones—including 100 hours of continuous operation, superior energy efficiency, and successful 6-unit modular scale-up— provide a foundation for this transition. Backed by ongoing IP licensing and a growing network of industrial and venture advisors, the company is actively de-risking the platform to replace conventional mixer-settler systems in the critical minerals market.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Experiments and Project-Based Enhancements for STEM Learning

Motivating K-12 students to pursue careers in science, technology, engineering, and mathematics (STEM) is an effort that requires consistent engagement. Throughout the K-12 student timeline, STEM educators need to continuously pivot their teaching and update their educational materials to motivate the next generation of students. Once students begin their undergraduate education, university professors need to encourage them to consider pursuing graduate studies to ensure that a qualified future workforce can be developed for research and teaching. In this paper, we present our work on developing STEM materials for K-12 student engagement. Our K-12 materials target the grid integration of hydrogen assets that are suitable to engage students in the classroom. Our undergraduate materials target hands-on projects and collaboration with industry to connect classroom learning with real-world applications and needs in renewable energy. Our work leverages available open-source models and tools to create projects for undergraduate students and motivate their interest in pursuing research topics in graduate-level education.

ENERGY PLANNING, POLICY, AND ECONOMY↗