Search NASA⌕ Search

SEARCH · Search NASA

Results for “facility development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

DUNE Phase II: scientific opportunities, detector concepts, technological solutions

The international collaboration designing and constructing the Deep Underground Neutrino Experiment (DUNE) at the Long-Baseline Neutrino Facility (LBNF) has developed a two-phase strategy toward the implementation of this leading-edge, large-scale science project. The 2023 report of the US Particle Physics Project Prioritization Panel (P5) reaffirmed this vision and strongly endorsed DUNE Phase I and Phase II, as did the European Strategy for Particle Physics. While the construction of the DUNE Phase I is well underway, this White Paper focuses on DUNE Phase II planning. DUNE Phase-II consists of a third and fourth far detector (FD) module, an upgraded near detector complex, and an enhanced 2.1 MW beam. The fourth FD module is conceived as a “Module of Opportunity”, aimed at expanding the physics opportunities, in addition to supporting the core DUNE science program, with more advanced technologies. This document highlights the increased science opportunities offered by the DUNE Phase II near and far detectors, including long-baseline neutrino oscillation physics, neutrino astrophysics, and physics beyond the standard model. It describes the DUNE Phase II near and far detector technologies and detector design concepts that are currently under consideration. A summary of key R&D goals and prototyping phases needed to realize the Phase II detector technical designs is also provided. DUNE's Phase II detectors, along with the increased beam power, will complete the full scope of DUNE, enabling a multi-decadal program of groundbreaking science with neutrinos.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Magnetic and Mechanical Analysis of a Large Aperture 15 T Cable Test Facility Dipole Magnet

The US Department of Energy (DOE) Office of Science (SC), is funding a large bore “Cable Test Facility Magnet” for testing advanced cables and inserts in high transverse field. This is a joint effort between the Office of High Energy Physics (HEP) and the Office of Fusion Energy Sciences (FES). The background field magnet for this facility is being developed at Lawrence Berkeley National Laboratory (LBNL) while the cryostat and test facility will be located and operated by Fermi National Accelerator Laboratory (FNAL). The Nb 3 Sn dipole magnet, which will provide the transverse background field, is designed to generate a field of 15 T in a 100 × 150 mm bore at 1.9 K. The conceptual design of a block-type dipole with flared ends and a structure based on key-and-bladder technology will be introduced. The results of the magnetic and mechanical analysis will be presented.

43 PARTICLE ACCELERATORS↗

Offshore Testing Facility – Small Scale Turbine Testing and Development Final Technical Report

In July 2010 funding for an award was made available under contract DE-EE0004200 which is the focus of this report. Under this funding, The U.S. Department of Energy’s (USDOE) designated Florida Atlantic University’s (FAU) state of Florida marine renewable energy focused Center of Excellence for Ocean Energy Technology as the Southeast National Marine Renewable Energy Center (SNMREC). The award was advertised in 2008, when the USDOE Wind and Water Program issued a funding opportunity announcement (DE-PS36-08GO98030) to establish university-led National Marine Renewable Energy Centers (NMRECs). Although FAU was selected for this opportunity, funding did not become available until 2010 at which time three of the original five years of performance remained and scope was adjusted accordingly. This award was divided into two phases. The first phase focused on marine energy turbine system enhancement and research while the second phase aimed to advance offshore capabilities and testing opportunities for small-scale demonstration turbines. The project’s objective was to increase the nation’s capabilities, knowledge, and competitiveness with respect to ocean current energy technology. This project successfully achieved these goals by advancing marine energy technology testing opportunities and capabilities. This report details these accomplishments by phase and task. Descriptions include any relevant results, challenges, achievements, and outcomes. Additional intellectual products and publications are listed in the Appendix where detailed technical explanations can be found. Further, because this award designated SNMREC as a USDOE center, it challenges FAU to continue providing value for the marine energy sector in the long term. The direct accomplishments of this project, though noteworthy, are also the seeds for a greater partnership between the USDOE and FAU. SNMREC, leveraging its designation as an NMREC under this award, will expand these contributions for decades to come as a coordinated sustainable program that can serve the marine energy sector’s needs as they arise.

16 TIDAL AND WAVE POWER↗

Design, Development and Operational Experience of Demonstration Facility for Cs-137 Source Pencil Production at Trombay - 13283

Radioactive waste management is a vital aspect of any nuclear program. The commercial feasibility of the nuclear program largely depends on the efficiency of the waste management techniques. One of such techniques is the separation of high yield radio-nuclides from the waste and making it suitable for medical and industrial applications. This will give societal benefit in addition to revenue generation. Co-60, the isotope presently being used for medical applications, needs frequent replacement because of its short half life. Cs-137, the major constituent of the nuclear waste, is a suitable substitute for Co-60 as a radioactive source because of its longer half life (28 years). Indian nuclear waste management program has given special emphasis on utilization of Cs-137 for such applications. In view of this a demonstration facility has been designed for vitrification of Cs-137 in borosilicate glass, cast in stainless steel pencils, to be used as source pencils of 300 Ci strength for blood irradiation. An induction heated metallic melter of suitable capacity has been custom designed for the application and employed for the Cs-137 pencil fabrication facility. This article describes various systems, design features, experiments and resulting modifications, observations and remote handling features necessary for the actual operation of such facility. The layout of the facility has been planned in such a way that the same can be adopted in a hot cell for commercial production of source pencils. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

Dynamical System Scaling of a Thermocline Thermal Storage System in the Thermal Energy Distribution System (TEDS) Facility

The purpose of this study was to develop a process to convert input signals from one facility into another by reflecting geometric and environmental settings. The Dynamic Energy Transport and Integration Laboratory (DETAIL) is one facility in development that aims to emulate the daily interactions among power production industry systems and be capable of receiving real-time data from those systems as inputs. To convert signals and ensure that the temporal sequences and magnitudes reflect the laboratory settings, the ability to scale and project data is essential. To demonstrate this ability, Dynamical System Scaling (a methodology that enables systems to scale and project or extrapolate datasets to desired environments while conserving the observed transient behavior based on first principles) was applied to DETAIL’s thermocline thermal storage system in the Thermal Energy Distribution System. The thermocline system was successfully scaled and a test case was conducted to generate a doubly accelerated energy charge and discharge in reference to past experimental data from the facility. The accelerated data were determined as able to conserve the amount of energy stored and the associated test boundary conditions were charge line maximum temperature, charge line velocity, and thermocline maximum temperature at 354 °C, 0.458 m/s, and 418 °C, respectively. The research results represented a case that required signals to be accelerated without altering the stored energy.

Yoshiura, Ramon (ORCID:0000000319781313)↗

Deuteron injector for Peking University Neutron Imaging Facility project

The deuteron injector developed for the PKUNIFTY (Peking University Neutron Imaging Facility) has been installed and commissioned at Peking University (PKU). The injector system must transfer 50 keV 50 mA of D{sup +} ion beam to the entrance of the 2 MeV radio frequency quadrupole (RFQ) with 10% duty factor (1 ms, 100 Hz). A compact 2.45 GHz permanent magnet electron cyclotron resonance (PMECR) ion source and a 1.36 m long low energy beam transport (LEBT) line using two solenoids was developed as the deuteron injector. A {phi}5 mm four-quadrant diaphragm was used to simulate the entrance of RFQ electrodes. The beam parameters are measured after this core with an emittance measurement unit (EMU) and a bending magnet for ion fraction analysis at the end of injector. During the commissioning, 77 mA of total deuteron beam was extracted from PMECR and 56 mA of pure D{sup +} beam that passed through the {phi}5 mm four-quadrant diaphragm was obtained at the position of RFQ entrance with the measured normalized rms emittance 0.12-0.16{pi} mm mrad. Ion species analysis results show that the deuteron fraction is as high as 99.5%. All of the parameters satisfy PKUNIFTY's requirements. In this paper, we will describe the deuteron injector design and report the commissioning results as well as the initial operation.

43 PARTICLE ACCELERATORS↗

DUNE Software and Computing Research and Development

The international collaboration designing and constructing the Deep Underground Neutrino Experiment (DUNE) at the Long-Baseline Neutrino Facility (LBNF) has developed a two-phase strategy toward the implementation of this leading-edge, large-scale science project. The ambitious physics program of Phase I and Phase II of DUNE is dependent upon deployment and utilization of significant computing resources, and successful research and development of software (both infrastructure and algorithmic) in order to achieve these scientific goals. This submission discusses the computing resources projections, infrastructure support, and software development needed for DUNE during the coming decades as an input to the European Strategy for Particle Physics Update for 2026. The DUNE collaboration is submitting four main contributions to the 2026 Update of the European Strategy for Particle Physics process. This submission to the 'Computing' stream focuses on DUNE software and computing. Additional inputs related to the DUNE science program, DUNE detector technologies and R&D, and European contributions to Fermilab accelerator upgrades and facilities for the DUNE experiment, are also being submitted to other streams.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Solar Photovoltaic (PV) Manufacturing Expansions in the United States, 2017-2019: Motives, Challenges, Opportunities, and Policy Context

This report analyzes U.S. PV manufacturing announcements from 2017 through July-2019 and explores the potential impact of tariffs on the competitiveness of U.S. PV module manufacturing. First, the fraction of announcements that resulted in established facilities in the time frame specified is analyzed, as well as firm nationality and the existence of any other U.S. facilities for the firm. The prevalence of different PV product types among the announcements was also analyzed, as well as the type of facilities selected for development (greenfield, existing PV factories, or repurposed buildings). The cost to build these facilities was also analyzed in the context of their capacity, the value of incentives received by state and local governments, and the number of jobs created. Case studies of Auxin Solar, First Solar, Hanwha Q Cells, JinkoSolar, LG, Silfab, Solaria, and SunPower were conducted and highlight five factors influencing firms’ decisions to expand their U.S. PV production capacity. These included: 1) proximity to demand, including supply contracts and demand for domestic content 2) tariffs and other incentives. The Section 201 tariffs on PV module imports were often described helpful but tariffs on cell imports (Section 201) or materials (Section 301, Section 232) were often described as counterproductive since U.S. supply chains do not exist for many necessary goods. The corporate tax decrease and local incentives were often mentioned as helpful. 3) the ability to move quickly in order to maximize the benefit of the Section 201 tariffs. This affected decisions to select localities with faster permitting or moving into existing buildings. 4) competition with scale, where competing with Asian PV imports or avoiding imports of material from China was challenging due to the larger scale of Asian manufacturers. Additionally, smaller firms expressed concerns that larger firms may not need their U.S. facilities to profitable. 5) access to capital, which was a particular challenge for smaller firms. Several U.S. tariffs affect the economics of PV cells, modules, and balance-of-module (BOM) materials, some of which are applicable to a long list of countries and others applicable only to China or Taiwan. We analyze how the tariffs interact to affect the prices of c-Si modules sourced under various assumptions about domestic and imported components and assembly. We estimate module prices under a range of baseline scenarios featuring U.S.-assembled modules with Southeast Asian cells (not from China or Taiwan). When all BOM components are sourced from the United States, baseline module prices are $0.37/W (below the 2.5-GW Section 201 cell cap) to $0.42/W (above the 2.5-GW cell cap). If all BOM components are sourced from China, the module price in this baseline U.S.-assembly scenario can reach up to $0.60/W. Imported module prices are lower than or within the range of the U.S.-assembled baseline prices under some conditions. Importing bifacial modules from Southeast Asia is the lowest-priced alternative, at $0.35/W, because bifacial modules are excluded from the Section 201 tariffs. Importing Southeast Asia modules that contain U.S. cells results in a price of $0.38/W, also owing to a Section 201 exclusion. Importing Southeast Asian modules that have Southeast Asian cells yields a price of $0.44/W, and importing Chinese modules that have U.S. cells yields a price of $0.58/W. These results suggest that U.S. tariff policy in 2019 may encourage U.S. assembly of mono-facial c-Si modules if the 2.5-GW cell import cap is not reached and Chinese BOM imports are negligible. However, some imported module options may offer the lowest prices if the 2.5-GW cell import cap is reached and/or U.S. module manufacturers must rely on significant Chinese BOM content. The analysis shows the 2.5-GW cell cap may be exceeded in 2019 and following years. It is also likely that U.S. module manufacturers will need to use at least some Chinese BOM content, since U.S. module manufacturers have stated that U.S. supply chains do not exist (or do not exist at a sufficient scale) for most BOM components, which makes them at least partially reliant on Chinese BOM and thus subject to Section 301 tariffs.

14 SOLAR ENERGY↗

Modeling Techniques Used to Analyze Safety of Payloads for Generic Missile Type Weapons Systems During an Indirect Lightning Strike

During lightning strikes buildings and other structures can act as imperfect Faraday Cages, enabling electromagnetic fields to be developed inside the facilities. Some equipment stored inside these facilities may unfortunately act as antenna systems. It is important to have techniques developed to analyze how much voltage, current, or energy dissipation may be developed over valuable components. In this discussion we will demonstrate the modeling techniques used to accurately analyze a generic missile type weapons system as it goes through different stages of assembly. As work is performed on weapons systems detonator cables can become exposed. These cables will form different monopole and loop type antenna systems that must be analyzed to determine the voltages developed over the detonator regions. Due to the low frequencies of lightning pulses, a lumped element circuit model can be developed to help analyze the different antenna configurations. We will show an example of how numerical modeling can be used to develop the lumped element circuit models used to calculate voltage, current, or energy dissipated over the detonator region of a generic missile type weapons system.

42 ENGINEERING↗

U.S. Fusion D-Li Neutron Irradiation Facility: Fusion Prototypic Neutron Source (FPNS) Technology Study

A primary engineering challenge for the realization of fusion energy involves the development of high-performance structural and plasma-facing materials with dimensional stability and resistance to neutron degradation of mechanical properties. The harsh fusion environment, including high levels of helium production and other transmutation products along with high operating temperatures, poses an extreme challenge for materials. Identifying materials that can withstand these conditions is a high priority for fusion energy research. Critical to resolving this gap in scientific understanding is developing a neutron source facility with the ability to mimic the extreme conditions in a fusion reactor. Working with the Department of Energy (DOE) Office of Fusion Energy Sciences (FES), Oak Ridge National Laboratory (ORNL) and the Virtual Laboratory for Technology (VLT) organized a workshop to discuss the need for a Fusion Prototypic Neutron Source (FPNS). [1] While there are a variety of uses for FPNS neutrons, the main driver of US interest is expanding the scientific understanding of materials degradation in the deuterium-tritium (D-T) fusion environment. FPNS will help build the scientific foundation required to enable design of a next step fusion device. Using specifications from previous projects as a guide, key parameters were agreed upon for a near term, moderate cost US facility that would be complementary to the more extensive plans of the International Fusion Materials Irradiation Facility (IFMIF). Types of facilities that could potentially meet those criteria were identified. A scoping study for three technologies was initiated to answer three critical questions: 1) Can the concept meet the key parameters, 2) What is the estimated cost, and 3) What is the estimated schedule. One approach selected for the scoping study is a D-Li stripping source similar to the design of the IFMIF but at a lower beam power and atomic displacement rate for cost and schedule reasons. The purpose of this report is to document the results of the D-Li stripping source option study, providing answers to the three questions. The approach to generating a fusion prototypic neutron source using a deuteron beam incident on a flowing lithium target has been studied for more than 40 years. As a result of the research and development recently executed primarily in Europe and Japan, the ability of this approach to meet key parameters (damage parameters, irradiation volume) outlined in the US workshop for a near-term, moderate cost fusion prototypic neutron source facility is not in doubt. The main question that must be answered is the cost of such a facility. As a result, a strong focus was placed on understanding alternatives for developing the facility and their relative costs. The project was broken into four components for the cost estimate: the ion source, accelerator, lithium target system, and conventional facilities. The cost of the accelerator is an important cost driver for the D-Li stripping concept. To fully understand the range of the accelerator cost, multiple alternatives were considered including normal conducting and superconducting linacs and the frequency of the radiofrequency quadrupole. Multiple previous design studies dating from 1989 through 2017 were examined (costs were escalated to 2019 dollars) and compared. After analysis, two options were selected for costing, one superconducting and one room temperature. We found similar project costs for the two accelerator options, on the order of $100M including design and project management but excluding contingency. Including everything except the conventional facilities, the estimate for the neutron source facility is estimated to be $220M without contingency. Additional significant costs for the facility are the conventional costs arising from the need to construct buildings for the accelerator and target facilities, bringing electrical power to the site including a new substation, and removing the heat from the facility using heat exchangers. While ORNL would oversee this work, much of the effort would be executed by contractors. Estimates for this effort was based on similar projects that are currently being executed at ORNL or were executed at ORNL in the recent past. The estimate for conventional facilities for the neutron facility is $173M without contingency, bringing the total project cost to $393M without contingency. With a 50% contingency, the estimated cost is $589M. The estimate range was established using guidance from the Association for the Advancement of Cost Engineering (AACE). Specifically, guidance from recommended practice 17R-97 provides insight on the expected accuracy range of estimates based on the degree of project definition and the position of the project in the stage-gate process or maturity timeline. An AACE Class 5 type estimate is appropriate for concept screening. The expected accuracy range includes a low end of -50% to -20% and a high end of +30% to +100% around the estimated cost. For the D-Li stripping neutron source, a -20% to +100% cost range was applied for a recommended cost range of $471M to $1,179M. Less emphasis was placed on determining the project schedule due to the fact that the project costs were large and may eliminate this option from consideration. The development of the accelerator facility may require on the order of five years without contingency. A more realistic schedule with contingency may be seven years. However, this estimate should be scrutinized in a preconceptual design activity if a more realistic estimate is needed. Finally, one lesson learned in this process is that the requirements for a near-term, moderate cost facility drives the alternative selection toward existing facilities and infrastructure. The D-Li stripping neutron source option requires a green field site due to the lack of existing buildings and infrastructure that can be reused for this effort. As a result, the conventional facilities costs are a significant fraction of the total facility cost. Other neutron source options where buildings, electrical power, and cooling infrastructure already exist may be able to meet the requirements for a near term, moderate cost facility.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

A negative ion source test facility

Progress is being made in the development of an Ion Source Test Facility (ISTF) by D-Pace Inc. in collaboration with Buckley Systems Ltd. in Auckland, NZ. The first phase of the ISTF is to be commissioned in October 2015 with the second phase being commissioned in March 2016. The facility will primarily be used for the development and the commercialization of ion sources. It will also be used to characterize and further develop various D-Pace Inc. beam diagnostic devices.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

RESEARCH AND DEVELOPMENT ACTIVITIES AT SAVANNAH RIVER SITE'S H CANYON FACILITY

The Savannah River Site's (SRS) H Canyon Facility is the only large scale, heavily shielded, nuclear chemical separations plant still in operation in the U.S. The facility's operations historically recovered uranium-235 (U-235) and neptunium-237 (Np-237) from aluminum-clad, enriched-uranium fuel tubes from Site nuclear reactors and other domestic and foreign research reactors. Today the facility, in conjunction with HB Line, is working to provide the initial feed material to the Mixed Oxide Facility also located on SRS. Many additional campaigns are also in the planning process. Furthermore, the facility has started to integrate collaborative research and development (R&D) projects into its schedule. H Canyon can serve as the appropriate testing location for many technologies focused on monitoring the back end of the fuel cycle, due to the nature of the facility and continued operation. H Canyon, in collaboration with the Savannah River National Laboratory (SRNL), has been working with several groups in the DOE complex to conduct testing demonstrations of novel technologies at the facility. The purpose of conducting these demonstrations at H Canyon will be to demonstrate the capabilities of the emerging technologies in an operational environment. This paper will summarize R&D testing activities currently taking place in H Canyon and discuss the possibilities for future collaborations.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Anticipating Change - A Means to Save Time and Rethink the Implementation of the 10 Code of Federal Regulations 770 Real Property Transfer Process - 15662

The Department of Energy (DOE) issued 10 Code of Federal Regulations (CFR) 770 in 2000 for the 'Transfer of Real Property at Defense Nuclear Facilities for Economic Development'. The rule was issued in order to 'offset negative impacts on communities caused by unemployment from related DOE down-sizing, facility close-outs and workforce restructuring'. There is a sense of urgency implied in efforts designed to address economic conditions, especially in communities that have hosted DOE facilities and are experiencing negative impacts of mission changes. Despite the urgency, the transfer of real property from DOE or any federal agency is a lengthy, complex, iterative, but necessarily diligent effort. After all, the aim of the process is to be able to demonstrate that the property proposed for transfer is protective of human health and the environment for the intended use. Notwithstanding the efforts of the economic development organization to market, recruit, and prepare a robust proposal to request property, and the efforts of DOE to perform the many due diligence activities in response to that request, the actual results of the evaluations are an unknown until a major portion of the process is completed. Will the property be determined to be suitable for transfer? Will there be deed restrictions? Is indemnification available? Has a mission need for the property arisen while working through the reviews? There are many points along the way that can sidetrack or delay progress and, in the interim, the economic viability of the proposal can collapse. Even without the unforeseen events, the process in and of itself is lengthy. It is often heard (loudly) that it takes far too long to obtain a piece of property once a request is made; that observation/criticism is worthy of serious attention. Rather than revisit old debates, why not learn from them? Why not look at the transfer process from a different point of view and ameliorate it so it can be more responsive to community needs? Why not anticipate change, anticipate requests, and make property available before a request as well as responding to requests to make property available? There are several ways to rethink and modify the way the transfer process is implemented to reduce the time following a request. The modifications would arise from both internal information sharing, integrated and timely up-front planning and, in particular, by varying how and when certain elements of the process to enable transfer are performed. This paper will address: 1. How a unified overall vision can be created from the cleanup input of Site-Specific Advisory Boards with the Community Reuse Organizations' planning for economic development and can help inform site cleanup to end state to future use; 2. Why DOE is in the best position to know its site conditions and could determine ahead of a transfer request what property is indeed available and notify of that determination; 3. How a range of disposition paths for real property are available to DOE; and 4. Why broadening the understanding of 'best interest of the government' to one that is clearly able to recognize non-monetary benefits is in the best interest of the government. Anticipating change helps prepare DOE and their host communities for the future. It creates opportunities for flexibility and time savings. The sooner DOE's unneeded and under-utilized real property can be made available to the communities that need it most, the sooner those communities can work to moderate the adverse effects of DOE mission changes. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Review of TEAMER Awards for WEC-Sim Support: Preprint

Testing Expertise and Access for Marine Energy Research (TEAMER) is a U.S. Department of Energy Water Power Technologies Office sponsored program, overseen by the Pacific Ocean Energy Trust, which aims to advance the state of marine energy technologies. The program connects technology developers with experts at U.S. facilities, including numerical modeling and analysis facilities, like WEC-Sim. The WEC-Sim facility is supported by the WEC-Sim development team at Sandia National Laboratories and the National Renewable Energy Laboratory. WEC-Sim (Wave Energy Converter SIMulator) is an open-source software for simulating wave energy converters. WEC-Sim can model the multi-body dynamics of devices comprised of bodies, joints, power take-off systems, and mooring systems. Since TEAMER's first round of support in 2020, there have been eighteen TEAMER awards focused on numerical model development in WEC-Sim. TEAMER awards for WEC-Sim support have modeled a wide range of wave energy converter archetypes, including point absorbers, attenuators, oscillating water columns, and many other novel architectures. A wide variety of studies have been conducted, leading to important insights for TEAMER partners and software improvements for WECSim. This article highlights several successful WEC-Sim TEAMER awards. The awards described herein include TEAMER recipients Ocean Motion Technologies, AquaHarmonics, iProTech, East Carolina University, Virginia Tech, Maiden Wave Energy, and the University of Massachusetts Dartmouth. The awards of these seven partners contain a wide range of investigations and cover the creation of baseline hydrodynamic models, PTO modeling, geometry optimization in both boundary element methods and WECSim, and model tuning and validation.

industry support↗

Summary Report of the FY24 DOE Contributions to the GIF VHTR CMVB

The Generation-IV Forum (GIF) Very-High-Temperature Reactor-Computational Methods Validation and Benchmark (VHTR-CMVB) initiative, involving organizations from Korea Atomic Energy Research Institute (KAERI) (South Korea), Institute of Nuclear and New Energy Technology of Tsinghua University (INET) (China), U.S. Department of Energy (DOE) (U.S.), Joint Research Centre (JRC) (Europe), and Japan Atomic Energy Agency (JAEA) (Japan), is dedicated to the verification and validation of tools for High-Temperature Gas-Cooled Reactors (HTGRs) analysis, using data shared by Computational Methods Validation and Benchmark (CMVB) signatories. For FY24, the US DOE CMVB has committed to several critical activities. Under WP1, led by the US, the integration of the High Temperature Gas Cooled Reactor - Pebble-Bed Module (HTR-PM) Phenomena Identification and Ranking Table (PIRT) into the comparative PIRT is progressing, with a new draft of the comparison tables issued earlier this year and currently being utilized by INET for their contribution. Neutronic validation efforts under WP3 include the preparation of the burnup analysis benchmark, preliminary calculations, and the development of reference models and results. In WP2, a validation exercise for hot gas mixing in the lower plenum of HTR-PM is in progress, using experimental data from INET (China) to validate modeling approaches. A model of the experimental facility has been developed using StarCCM+, with initial calculations slated for presentation at the GIF CMVB meeting this fall. Another WP2 activity focuses on validating numerical models for air-cooled Reactor Cavity Cooling System (RCCS) with experimental data from the Wisconsin Madison RCCS facility. A high-fidelity model, developed using NEK-RS, is currently being validated with available data from a low power forced convection test. These efforts are aimed at enhancing and confirming the accuracy of HTGR analysis tools, ensuring their alignment with experimental data and regulatory requirements.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗