Search NASA⌕ Search

SEARCH · Search NASA

Results for “full scale testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Qualifying the Instrument Thimble 11 Test Position in the Advanced Test Reactor Critical

The Advanced Test Reactor (ATR) is a versatile nuclear research reactor located at the Idaho National Laboratory (INL) in Eastern Idaho, United States of America. It is one of the most powerful and flexible research reactors in the world and is primarily used for materials testing, isotope production and basic nuclear science research. The ATR is a light-water-cooled, beryllium-moderated reactor with a nominal thermal power capacity of 250 MW utilizing specially designed fuel, arranged in a serpentine pattern to create 9 flux traps. The special design of ATR allows for the neutron flux within each of the flux traps providing flexibility for experiments, programs and allowing experiments with different dose requirements to be irradiated simultaneously. The Advance Test Reactor Critical (ATRC) is a full-scale replica of the ATR core but is housed in a pool instead of a pressure vessel. ATRC is usually operated at less than 600 watts [1]. There are 12 dry instrument thimbles located around the outside of the core tank where a variety of measurement equipment is housed to facilitate reactor operations. Currently Instrument Thimble 11 (IT-11) is not utilized in ATR or ATRC. A range of measurements is ongoing to qualify IT-11 as a test platform for nuclear instrumentation research, development and further experimentation.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Initial Findings in Qualifying the Instrument Thimble 11 Position in the Advanced Test Reactor Critical

The Advanced Test Reactor (ATR) is a versatile nuclear research reactor located at the Idaho National Laboratory (INL) in Eastern Idaho, United States of America. It is one of the most powerful and flexible research reactors in the world and is primarily used for materials testing, isotope production and basic nuclear science research. The ATR is a light-water-cooled, beryllium-moderated reactor with a nominal thermal power capacity of 250 MW utilizing specially designed fuel, arranged in a serpentine pattern to create 9 flux traps. The special design of ATR allows for the neutron flux within each of the flux traps providing flexibility for experiments, programs and allowing experiments with different dose requirements to be irradiated simultaneously. The Advance Test Reactor Critical (ATRC) is a full-scale replica of the ATR core but is housed in a pool instead of a pressure vessel. ATRC is usually operated at less than 600 watts [1]. There are 12 dry instrument thimbles located around the outside of the core tank where a variety of measurement equipment is housed to facilitate reactor operations. Currently Instrument Thimble 11 (IT-11) is not utilized in ATR or ATRC. A range of measurements is ongoing to qualify IT-11 as a test platform for nuclear instrumentation research, development and further experimentation.

46 - INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AN↗

Demonstration and Feasibility Analyses of using the Dual-Purpose Canister Drain Pipe to Support the Filling Process

This report documents experiments that are being used to determine the feasibility of filling dual-purpose canisters (DPCs) using the existing drain pipe. Mercury was identified as a surrogate filler for the initial experiments. Oak Ridge National Laboratory’s Target Test Facility (TTF), which is a full-scale Spallation Neutron Source (SNS) prototypical mercury loop, is being used for the planned pipe experiments using mercury. The pipe experiments were divided into two phases to provide a separate effects approach to the problem and to allow for development of system scalability. The first phase included taking strain measurements in a short length pipe, as well as measurements of flow-induced vibration. The second phase consists of the design and construction of a separated mercury flow loop capable of hosting exchangeable test sections and more localized instrumentation. Data acquisition of Phase I was performed during this reporting time period, and subsequent data reduction and data analysis will be performed in the future.

36 MATERIALS SCIENCE↗

Demonstration and Feasibility Analyses of Using the Dual-Purpose Canister Drain Pipe to Support the Filling Process

This work documents experiments that are being used to determine the feasibility of filling dual-purpose canisters (DPCs) using the existing drain pipe. Mercury was identified as a surrogate filler for the initial experiments. Oak Ridge National Laboratory’s Target Test Facility (TTF), which is a full-scale Spallation Neutron Source (SNS) prototypical mercury loop, is being used for the planned pipe experiments using mercury. The pipe experiments were divided into two phases to provide a separate effects approach to the problem and to allow for development of system scalability. The first phase included taking strain measurements in a short length pipe, as well as measurements of flow-induced vibration. The second phase consists of the design and construction of a separated mercury flow loop capable of hosting exchangeable test sections and more localized instrumentation. Data acquisition of Phase I was performed during this work and is presented in the form of strain measurements and vibration frequency.

Dominguez-Ontiveros, Elvis↗

The Disruption of Vessel-Spanning Bubbles with Sloped Fins in Flat-Bottom and 2:1 Elliptical-Bottom Vessels

Radioactive sludge was generated in the K-East Basin and K-West Basin fuel storage pools at the Hanford Site while irradiated uranium metal fuel elements from the N Reactor were being stored and packaged. The fuel has been removed from the K Basins, and currently, the sludge resides in the KW Basin in large underwater Engineered Containers. The first phase to the Sludge Treatment Project being led by CH2MHILL Plateau Remediation Company (CHPRC) is to retrieve and load the sludge into sludge transport and storage containers (STSCs) and transport the sludge to T Plant for interim storage. The STSCs will be stored inside T Plant cells that are equipped with secondary containment and leak-detection systems. The sludge is composed of a variety of particulate materials and water, including a fraction of reactive uranium metal particles that are a source of hydrogen gas. If a situation occurs where the reactive uranium metal particles settle out at the bottom of a container, previous studies have shown that a vessel-spanning gas layer above the uranium metal particles can develop and can push the overlying layer of sludge upward. The major concern, in addition to the general concern associated with the retention and release of a flammable gas such as hydrogen, is that if a vessel-spanning bubble (VSB) forms in an STSC, it may drive the overlying sludge material to the vents at the top of the container. Then it may be released from the container into the cell’s secondary containment system at T Plant. A previous study demonstrated that sloped walls on vessels, both cylindrical coned-shaped vessels and rectangular vessels with rounded ends, provided an effective approach for disrupting a VSB by creating a release path for gas as a VSB began to rise. Based on the success of sloped-wall vessels, a similar concept is investigated here where a sloped fin is placed inside the vessel to create a release path for gas. A key potential advantage of using a sloped fin compared to a vessel with a sloped wall is that a small fin decreases the volume of a vessel available for sludge storage by a very small fraction compared to a cone-shaped vessel. The purpose of this study is to quantify the capability of sloped fins to disrupt VSBs and to conduct sufficient tests to estimate the performance of fins in full-scale STSCs. Experiments were conducted with a range of fin shapes to determine what slope and width were sufficient to disrupt VSBs. Additional tests were conducted to demonstrate how the fin performance scales with the sludge layer thickness and the sludge strength, density, and vessel diameter based on the gravity yield parameter, which is a dimensionless ratio of the force necessary to yield the sludge to its weight.( ) Further experiments evaluated the difference between vessels with flat and 2:1 elliptical bottoms and a number of different simulants, including the KW container sludge simulant (complete), which was developed to match actual K-Basin sludge. Testing was conducted in 5-in., 10-in., and 23-in.-diameter vessels to quantify how fin performance is impacted by the size of the test vessel. The most significant results for these scale-up tests are the trend in how behavior changes with vessel size and the results from the 23-in. vessel. The key objective in evaluating fin performance is to determine the conditions that minimize the volume of a VSB when disruption occurs because this reduces the potential for material inside the STSC from being released through vents.

08 HYDROGEN↗

On the stability of capacitance-diaphragm gauges with ceramic membranes

Capacitance-diaphragm gauges with ceramic membranes or diaphragms have been on the market for about 15 years. The long-term stability of these devices with full scales from 13 Pa to 133 kPa has been tested in the past decade by the calibration of gauges used by the manufacturer as reference gauges on the production line. These reference gauges were calibrated annually on a primary standard. It was found that the reproducibility of these devices depends on their full scale. For 13 Pa, the annual reproducibility near full scale varied between 0.02% and 0.04%, and for full scales of 133 Pa and higher, it varied between 0.005% and 0.03% of full scale. The reproducibility of the ceramic capacitance-diaphragm gauges for full scales of 133 Pa and 1.3 kPa was significantly lower than the uncertainty of a primary standard applying the static-expansion method.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Rejection of low-molecular weight neutral organics is highly sensitive to reverse osmosis system design and operation

A computational model was developed to investigate the significance of system design and operating conditions on the rejection of neutral, low-MW organics by reverse osmosis for potable reuse. Here, the model demonstrated that the decrease in local rejection as net driving pressure decreases is substantially greater for moderately rejected compounds than for highly rejected compounds. At recovery values less than 70%, the local permeate concentration can exceed the pressure vessel feed concentration for moderately rejected compounds. System-level rejection of moderately rejected compounds is likewise substantially more sensitive to operating conditions than highly rejected compounds. The findings highlight a drawback of relying on rejection results from bench-scale testing that operates at low recovery, which invariably has higher rejection than full-scale systems operating at similar pressure. The analysis demonstrates a trade-off in which the low-pressure, high-recovery operation desired for potable reuse systems can be detrimental to the removal of low-MW neutral organics. The removal of low-MW neutral organics can be improved if organics rejection is explicitly evaluated during the design process.

42 ENGINEERING↗

Gamma Ray Detection In Liquid Argon Time Projection Chambers

Gamma rays are photons in excess of 100 keV of energy and can be produced by a variety of mechanisms like radioactive decay and inelastic neutrino-argon interactions. A reconstruc- tion of Compton scattering gamma rays was developed for use in liquid argon time projection chambers. This reconstruction was tested with detectors developed to demonstrate the ca- pabilities of Deep Underground Neutrino Experiment (DUNE) Near Detector Liquid Argon target (ND LAr). In October 2024, a radioactive fluorine-18 source was placed next to the Full Scale Demonstrator. The data obtained was used to test this reconstruction algorithm. It was able to determine the direction of the photons with an error of less than 10 percent. In addition to this work, there has been significant work on designing a liquid argon based Positron Emission Tomography (PET) scanner. PET scanners detect gamma rays emitted by a tracer chemical to help screen for diseases like cancer. In addition to the applications to medical imaging, this thesis briefly explores the applications of this reconstruction to de-excitation photons produced in interactions between neutrinos and argon nuclei. These applications could improve studies focusing on neutrinos originating from accelerators and supernovae.

Murphy, Thomas [Syracuse U.]↗

Modeling UV Radiation Feedback from Massive Stars. I. Implementation of Adaptive Ray-tracing Method and Tests [Modeling UV Radiation Feedback from Massive Stars: I. Implementation of Adaptive Ray Tracing Algorithm]

Here, we present an implementation of an adaptive ray-tracing (ART) module in the Athena hydrodynamics code that accurately and efficiently handles the radiative transfer involving multiple point sources on a three-dimensional Cartesian grid. We adopt a recently proposed parallel algorithm that uses nonblocking, asynchronous MPI communications to accelerate transport of rays across the computational domain. We validate our implementation through several standard test problems, including the propagation of radiation in vacuum and the expansions of various types of H II regions. Additionally, scaling tests show that the cost of a full ray trace per source remains comparable to that of the hydrodynamics update on up to $\sim {10}^{3}$ processors. To demonstrate application of our ART implementation, we perform a simulation of star cluster formation in a marginally bound, turbulent cloud, finding that its star formation efficiency is 12% when both radiation pressure forces and photoionization by UV radiation are treated. We directly compare the radiation forces computed from the ART scheme with those from the M 1 closure relation. Although the ART and M 1 schemes yield similar results on large scales, the latter is unable to resolve the radiation field accurately near individual point sources.

79 ASTRONOMY AND ASTROPHYSICS↗

Experimental study of the downstream effect of LOCA-generated debris on the pressure drop of full scale fuel assembly

The emergency core cooling system (ECCS) works to cool the reactor core in the event of a postulated loss-of-coolant accident (LOCA). The long-term reactor cooling water of ECCS comes from containment sump. Usually, the containment sump contains one or more screens to prevent the components of the ECCS from debris which could be washed into the sump. Large debris is blocked by the sump screens. However, some of the debris, such as fibrous, chemical precipitates and small particles may be ingested into the ECCS and subsequently into the reactor coolant systems (RCS), which would challenge the long-term core cooling (LTCC) and threaten the reactor core safety. NRC address this concern Generic Letter 2004-02. Westinghouse has evaluated the AP1000 1/4 height fuel assembly head-loss test in response to the issue. AVERA also perform the scaled 1/3 height mock-up fuel assembly test. The debris effect on the pressure drop of half-length mock-up PLUS7 fuel assembly of APR1400 were performed in KHNP. Numerical simulation by RELAP5-3D were performed for the debris-generated core blockage and full core as well as core bypass blockage condition were considered. However, the test in the works mentioned above use the scaled down FA (1/4, 1/3 or 1/2 length of a full FA), and didn't give the relationship between pressure drop and debris batches. The purpose of this study was to extend the debris effect to the full scale PWR fuel assembly, and identified batch by batch effect of debris to head loss of FA. The specific experimental procedure is concluded. The pressure drop test without adding debris is performed at the beginning and then three kinds of debris are added to the test loop step by step to test their effect on the pressure drop of fuel assembly. Two kinds of tests have been carried out, and the quantitative pressure data are obtained and analysis is provided. This work provides reliable and quantitative data for nuclear power plant (NPP) downstream effect analysis and safety analysis program, which is important to for licensing of NPP and further benchmark exercise. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

DECOVALEX-2023: Task D Final Report

Task D of DECOVALEX-2023 is focused on the simulation of the coupled thermal hydraulic-mechanical (THM) behaviour in the full-scale engineered barrier system (EBS). The Horonobe EBS experiment is the demonstration of the full-scale EBS in the underground research laboratory (URL) (performed by JAEA in the Horonobe URL in Japan). Task D consisted of the three steps, a preliminary step (Step 0), simulation of the laboratory tests (Step 1) and simulation of the in-situ full-scale EBS experiment (Step 2). Since the Horonobe EBS experiment demonstrates the vertical emplacement option of the EBS, the experiment gallery is also backfilled with the backfill material. Therefore, interaction between the EBS and the backfill material can also be demonstrated, such as deformation (change of density) of the buffer material. The underground water in the Horonobe URL is saline. This fact adds chemical processes to THM behaviour. For example, mechanical properties (such as swelling pressure of the buffer material and backfill material) and hydraulic properties (such as permeability of the buffer material and backfill material) change depending on the water chemistry. Task D was therefore a challenging Task focused on not only the relatively simple THM behaviour but also complex THM behaviour including chemical processes. Six research teams (BGR, CAS, JAEA, KAERI, SNL and Taipower) participated the Task D. BGR, CAS, JAEA, KAERI and Taipower research teams selected a THM approach, while the SNL research team selected a TH approach. Step 1 involved the simulation of laboratory test results and was important to check the numerical codes developed by the research teams. Step 1 was divided into four sub steps. The simulation results through the Step 1 identified the parameters for simulation of the Step 2. Basic parameters of the materials (buffer material, backfill material, rock mass, concrete, sand) were provided by JAEA. Special parameters which research team needed were identified by back analysis of Step 1. Most notably the mechanical behaviour of swelling and displacement depended on the applied model (elastic model or elastoplastic model). Parameters such as Young’s modulus were found to need smaller values than characterised in the fundamental laboratory test results (Step 1-1, 1-2) for the elastic model. Although laboratory experiments are usually simple, test results contained some error. For example, if the saturation level is 100 % or higher, it should be considered an error. This situation was presented in the Step 1-3. A possible reason is that the buffer material is a mixture of bentonite and silica sand. When a specimen is cut to measure volume or weight, sand grains will affect the measurement data. In Step 2, boundary conditions such as temperature on the surface of the simulated overpack, heater power of the electrical heaters installed in the simulated overpack, injection pressure and inflow rate of the test water, were applied. The outer boundary conditions can be selected using measured data (injection pressure and inflow rate of the test water that is controlled by the injection systems installed in the sand layer around the buffer material and in the boundary between backfill material and concrete support). Since such measured data has some noise, research teams developed their own simplified boundary conditions. Inner boundary conditions can be selected using measured data as heater power and temperature on the surface of the simulated overpack. These data also contain some noise, so research teams developed their own simplified developed boundary conditions. Task D validated various approaches thorough the simulation of the in-situ full scale EBS system including backfill of the gallery: variations in the coupling processes (THM or THC), analysis codes, and boundary conditions. Temperature distribution in the buffer material was simulated well by all research teams. This means thermal behaviour is not sensitive to the simulation approaches. Although the water content distribution on the outside of the buffer material was well simulated by all research teams, the simulation results differ from the measured values inside the buffer material (at the centre and inside, near the simulated overpack). The buffer material is made from tap water, but in the in-situ experiment, saline groundwater infiltrates the buffer material. Therefore, the selection of the hydraulic parameters of the buffer material greatly affects the simulation results of the re saturation behaviour of the buffer material. In the Horonobe EBS experiment, measured values suitable for validating the simulation results were not obtained near the simulated overpack. When simulating the pressure and deformation of the buffer material, the measurement data is easily affected by the installation conditions of the measurement sensors, so verifying the measurement data itself remains an issue. Mechanical simulation results differ depending on whether they are considered as elastic or elastoplastic phenomena. The accuracy of measured in-situ data can be assessed by detailed analysis comparing sampling specimen analysis and measured data. The Horonobe EBS experiment is scheduled to be dismantled in the future (FY2026 and 2027). This detailed dismantling investigation will finally confirm the measured data.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sintering of Iron Ores in a Millipot in Comparison with Tablet Testing and Industrial Process

To explore the feasibility of small-scale sintering pot testing, a ‘millipot’ facility (diameter of 53 mm and height of 400 mm) was established and used to examine the sintering performance of iron ores and other non-traditional ferrous materials. The sintering performance of a millipot was examined across a range of different operational conditions (coke rate and suction pressure) and compared with an industrial sinter strand operation. Tablet tests were also performed to assist in the design of the millipot experiments and identify conditions for achieving mineral composition similar to the industrial sinter. For the millipot experiments, the materials used need to be compacted to increase the bulk density, and a higher coke rate is required to compensate the high heat loss caused by wall effects. A higher suction pressure is also necessary to maintain an oxidizing atmosphere in the sinter bed. As expected, it was not possible to eliminate the wall effect, which resulted in more primary hematite at edges of the sintered column. However, the sintered material from the center of column simulates industrial sinter reasonably well. As such, millipot provides a practical way to evaluate the sintering process and material performance at laboratory scale, helping to bridge the gap between tablet sintering and large scale pot sintering, or full scale plant trial. The results of millipot testing can be used for designing larger scale experiments or commercial sintering trials.

36 MATERIALS SCIENCE↗

Subtask 2.6 – Optimization of Aerosol Mitigation Technology for Postcombustion CO 2 Capture

Growing concerns over the impact of CO 2 emissions from combustion sources on global climate change have prompted numerous research and development projects aimed at developing cost-effective technologies for CO 2 capture. One family of technologies being demonstrated at pilot and full scale globally is postcombustion CO 2 capture (PCCC) systems that employ amine-based solvents. The captured CO 2 can be compressed and permanently stored underground or used for enhanced oil recovery (EOR). The proximity of North Dakota’s lignite-fired fleet of power plants to potential CO 2 storage options creates a unique atmosphere for PCCC within the state. However, the aerosols present in lignite flue gas present a challenge for large-scale PCCC at North Dakota power plants. Aerosols can negatively impact the long-term performance of amine-based solvents for CO 2 capture. Amine-based solvents are volatile, and aerosols provide nucleation sites where amine vapors can condense. Because aerosols cannot be easily captured at the column outlet using conventional technologies, the amine-laden aerosols escape the system and lead to accelerated solvent losses. Moreover, aerosol components can chemically react with amines to form degradation products that can permanently deactivate the amine, cause fouling, and lead to hazardous emissions. Many of the elements that have been shown to catalyze solvent degradation are present in lignite coals and can exacerbate solvent replacement economics. Understanding this issue is critical to the implementation of solvent-based CO 2 capture systems as applied to lignite-fired generation systems. The Energy & Environmental Research Center (EERC) designed and carried out this project to optimize aerosol mitigation technology for PCCC at a lignite-fired power plant. To meet the goal of this project, the following objectives were identified: Determine the effectiveness of a wet electrostatic precipitator (WESP) on collection of aerosols at a low-rank coal-fired power station. Determine the impact of aerosols on the efficiency and degradation products of amine-based carbon capture systems fired with low-rank fuels. Work was conducted at Minnkota Power Cooperative’s (MPC’s) Milton R. Young (MRY) Station Unit 2 using a slipstream of flue gas from the outlet of the plant’s flue gas desulfurization (FGD) unit. To gather initial data for sizing and specifying a WESP for this system, a temporary pilot-scale WESP was rented and installed on-site. Several different conditions were tested to examine the impact of flow rate, voltage, and current on WESP performance. The WESP was effective at removing large particulate (>200 nm) but caused an increase in fine particulate (<75 nm). Fine particulate material at the inlet and outlet of the WESP was collected, analyzed, and showed that crystalline sulfates carried over from the plant’s FGD unit were being converted to fine aerosols and SO 2 was being converted to SO 3 through the WESP. Additionally, the high moisture content of the flue gas stream at this sample location also contributed to an overall increase in aerosol mass under some of the test conditions. Using the results from the rented WESP, the project team installed a smaller-scale WESP upstream of the EERC’s slipstream CO 2 capture system. Flue gas was routed through a pilot-scale FGD unit to remove SO 2 to very low levels (~1 ppm) and then through a direct contact cooler (DCC) to further cool the gas and to remove moisture. The gas exiting the DCC was then routed through the new WESP before passing to the CO 2 absorber columns. Fluor’s amine-based solvent was used to scrub CO 2 from the slipstream through a set of two absorber columns. The rich solvent was regenerated in a stripper column by heating to drive off captured CO 2 . The system operated using a catch-and-release method where the CO 2 was separated to provide data on the process, but the captured CO 2 was released back into the host site stack. Aerosols and sulfur species were measured at multiple locations throughout the pilot-scale system. The inlet FGD and DCC removed much of the particulate matter and gaseous sulfur upstream of the WESP. With this configuration, the WESP achieved >95% particulate capture. The new WESP did not show any of the increases in SO 3 or other aerosol species that had been consistently observed with the larger-scale WESP installed immediately downstream of the plant’s full-scale FGD unit. Particulate samples captured and analyzed from the WESP inlet did not show any presence of crystalline sulfate materials, indicating that the pilot-scale FGD and DCC were efficient at reducing carryover from the plant’s full-scale FGD unit. A set of parametric tests were conducted on the new WESP to assess the impacts of flow rate, voltage, number of online WESP fields, and gas-phase sulfur content on aerosol and sulfur transformations. The results showed that the WESP performed similarly well at all sets of conditions. Sulfur and particulate matter exiting the WESP were further reduced through the absorber column as the amine-based solvent captured some of the residual contaminants. Solvent analysis showed that these species were slowly concentrating in the solvent over the duration of the test. When the WESP was taken offline and the sulfur slip through the FGD allowed to rise, the sulfate content in the solvent rose sharply, showing that the extra FGD and WESP were effective at reducing sulfate and cation uptake. This would be expected to extend amine-based solvent life by slowing the formation of heat-stable salts and other degradation products. This subtask was cofunded through the EERC–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission and MPC.

01 COAL, LIGNITE, AND PEAT↗

Effect of Thermal Processes on Copper‐Tin Alloys for Zinc Gettering

A contamination mitigation plan was initiated to address the discovery of radioactive zinc-65 in a glovebox. A near term solution was developed, installation of heated filters in the glovebox piping. This solution is effective at retaining the zinc in the currently contaminated area, but the gamma emitting contaminant is still present in a system designed for tritium beta. A project was initiated to develop a solution to contain the 65 Zn in the furnace module. Copper and bronze (a Cu/Sn alloy) were found to be candidate materials to combine with zinc-65 vapor, using thermodynamic calculations. A series of binary Cu/Sn alloys were developed (after determining that commercial alloys were unacceptable), that were found to be effective traps of zinc vapor. The task described in this report was undertaken to determine if the bronze substrates would retain their zinc gettering capability after being exposed to simulated extraction conditions with oxidizing and reducing gases. Pure copper and three bronze alloys were prepared, exposed to varying oxidation conditions from 250 to 450°C, then exposed to varying reduction conditions in He-H 2 from 250-450°C, and finally exposed to zinc vapor at 350°C for four hours. The samples were characterized using scanning electron microscopy, X-ray diffraction, differential thermal analysis, mass change, and visual observation. It was observed that the as fabricated samples and the reduced samples all retained their zinc gettering capacity while samples in the "as-oxidized" condition exhibited losses in zinc gettering capacity. Over the range of conditions tested, i.e., composition, oxidation temperature, and reduction temperature, no particular sample composition appeared better. Samples reduced at 350°C exhibited the greatest zinc capacity, although there were some testing anomalies associated with these samples. This work clearly demonstrated that the zinc gettering was not adversely affected by exposure to simulated process conditions and a full scale lithium and zinc trap should be fabricated for testing in the Tritium Extraction Facility.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Scaling solid resuspension and sorption for the small column ion exchange processing tank

The Small Column Ion Exchange (SCIX) process is being developed to remove cesium, strontium, and actinides from Savannah River Site (SRS) Liquid Waste using an existing 1.3 million gallon waste tank (i.e., Tank 41H) to house the process. Savannah River National Laboratory (SRNL) is conducting pilot-scale mixing tests to determine the pump requirements for suspending and resuspending Monosodium Titanate (MST), Crystalline Silicotitanate (CST), and simulated sludge. In addition, SRNL will also be conducting pilot-scale tests to determine the mixing requirements for the strontium and actinide sorption. As part of this task, the results from the pilot-scale tests must be scaled up to a full-scale waste tank. This document describes the scaling approach. The pilot-scale tank is a 1/10.85 linear scale model of Tank 41H. The tank diameter, tank liquid level, pump nozzle diameter, pump elevation, and cooling coil diameter are all 1/10.85 of their dimensions in Tank 41H. The pump locations correspond to the proposed locations in Tank 41H by the SCIX Program (Risers B5 and B2 for two pump configurations and Risers B5, B3, and B1 for three pump configurations). MST additions are through Riser E1, the proposed MST addition riser in Tank 41H. To determine the approach to scaling the results from the pilot-scale tank to Tank 41H, the authors took the following approach. They reviewed the technical literature for methods to scale mixing with jets and suspension of solid particles with jets, and the technical literature on mass transfer from a liquid to a solid particle to develop approaches to scaling the test data. SRNL assembled a team of internal experts to review the scaling approach and to identify alternative approaches that should be considered.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a Semi-autonomous Miniature Rover for Inspection of Double Shell Tank Floors - 19575

Leaks in the primary liner of double-shell tank (DST) 241-AY-102 at Hanford have prompted the need for the development of inspection tools that are able to access confined spaces around and underneath the tanks. Last year, Florida International University (FIU) has continued to improve inspection tools that were developed in the previous years, to ensure that the resultant tools are able to overcome the challenges posed by the DSTs. Experimental testing conducted last year at the full-scale sectional mock-up of the DST's refractory slots revealed some shortcomings of the miniature rover, particularly in traversing over weld seams of different heights. The weld seams are the results of welded steel plate-joints for the DST. It was advised by the site engineers that the weld seams height could range from 6.35 mm - 9.525 mm (1/4 to 3/8 inches), and with 12.7 mm (1/2 inches) width. As the rover traverses over a weld seam, the gap between the rover's magnets and tank surface increases, causing the adhesive force to drop. The rover loses its surface contact if this adhesive force drops below its weight, jeopardizing the inspection tasks. In this paper, we present the numerical studies to calculate the minimum magnetic force required for the miniature rover to traverse over weld seams with different heights and the corresponding modifications to the rover design. Initial bench scale tests were conducted using a steel bar with 5 welds of varying heights. The testing validated the results from the simulation studies and established the rover's capability in traversing weld seams. Another challenge for the miniature rover is the use of a joystick or keypad for manual control. Utilizing these controls will likely be difficult for the operators due to the tight channels underneath the tank. Having a semi-autonomous navigational capability would alleviate the complexity of the inspection tasks and allow the operator to focus on the channel inspection. The goal is to implement lane-keeping capability, akin to that of a driverless car, for the inspection tool, so that it will maintain its relative position with respect to the wall of the channels. Am image processing pipeline has been developed using both the Robot Operating System (ROS) and OpenCV to process the image stream coming from the onboard camera, for the purpose of lane identification. Additionally, a PID controller has been implemented to navigate the miniature rover along the central location of the detected lane, while allowing the operator to control the tool's forward and backward motion. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Syracuse Univesity Test Report On Uptake Factor Resulting From A Dropped Storage Container - Phase II

Under certain circumstances, powder from an accidently dropped container can become airborne and inhaled by people nearby such as those who are moving the containers. The inhaled fine particles can deposit on respiratory tracts and lungs, causing asthma, lung cancer, and other acute respiratory illnesses and chronic symptoms. The objective of this study was to develop a standard procedure to measure the airborne concentrations of different size particles within the vicinity of a dropped container where a significant portion of the contained powder is ejected. Tungsten oxide (WO 3 ) was selected in this study to represent relatively heavy powders (7.16 g/cm 3 specific gravity for WO 3 ). A typical can with the outer dimensions of 4.25” diameter and 4.875” tall was used as the container. The powder was dropped in two different configurations: 1) contained within a can covered by a lid that has a 0.25” diameter hole, and 2) contained within a can without a lid. The packing volume of the powder was 51.4 in 3 (842.7 cm 3 ) and the target mass was 1936 g. The tests were carried out in a full-scale stainless steel environmental chamber with an interior volume of 852 ft 3 (24.1 m3). The chamber system includes an internal recirculation loop with a rectangular air diffuser and 10 variable frequency drive fans to provide a typical room air recirculation flow pattern. Two air filters were installed in the chamber air supply duct and return duct to achieve the required low background particle concentration. The initial chamber air conditions were set at 70°F (± 5°F) and 50% (± 10%) RH. A supporting frame and releasing device were designed and built to trigger consistently the dropping of the can. The particle sampling inlet was placed 5 ft above the floor and 6 inches laterally away from the can’s falling path. Concentrations of particles between 0.5 μm and 20 μm were recorded in units of mass and number of particles per unit volume. The data acquisition rate was once every 2 seconds during the first 2 hours. A test procedure was developed and verified. A total of thirty two drop tests were performed, eight in Phase I and twenty four in Phase II, covering variations in dropping height (8 ft or 4 ft from the floor), room air movement (0.25-0.30 m/s or 0.10-0.15 m/s near the ceiling), landing scenario (on a flat plate or a block), and lid condition (¼” lid hole or no lid). There were ten tests with flat plate and ¼” lid hole, ten tests with flat plate no lid and twelve tests with block no lid.

42 ENGINEERING↗

Simulation of DWPF Chemical Process Cell Using a Reaction Calorimeter

The Defense Waste Processing Facility (DWPF) converts liquid radioactive waste into glass using a Sludge Receipt Adjustment Tank (SRAT) and Slurry Mix Evaporator (SME) in addition to other processes. The SRAT and SME processes can be simulated on a small-scale using the Mettler-Toledo Reaction Calorimeter (RC1). This equipment is able to automate the execution and monitoring of experiments involving nonradioactive chemical simulants. During the chemical processing of sludge in the SRAT process, foam begins to form and can foam over the reaction vessel. The current antifoam used at DWPF creates a risk of increased flammability and has a limited pH range. Usually, mercury is circulated back into the reaction vessel during the SRAT process, making it difficult to remove. To combat foam over, novel antifoams will be tested during the boil-up process using the RC1. To improve mercury extraction, 3D-printed coalescer columns will be tested within the Mercury Water Wash Tank (MWWT) of the RC1. Testing of Simulant Sludge Batch 6 (SB6) was performed to ensure: the sludge would form a stable foam at boiling during full SRAT/SME runs; the antifoam would reduce the amount of foam within the vessel The sludge and a Precipitate Reactor Feed Tank (PRFT) simulant with monosodium titanate (MST) were mixed separately, combined, and then heated to boiling. As shown below, the antifoam used was able to eliminate the foam within the vessel, as expected. The FormLabs Form2 3D Printer can be used to create roughly 3-inch tall and 1-inch diameter columns from clear and ceramic resins. The columns will utilize chemical and physical forces to draw the mercury out of a condensed offgas stream leaving the RC1 reaction vessel. These columns will be tested during full SRAT/SME runs on the basis of how well they are able to collect elemental mercury. In preparation for full-scale runs, the RC1 equipment was assembled onto a custom table and tested with water runs. The software used to control automation, iControl, has a user-friendly interface that allows the experiment to be altered as needed. An example of the data recorded during an experimental run is represented in Figure 1 below. Water runs were utilized as a way to prove if the RC1 system was functioning in the following areas: Boil-up rates, Chemical additions using pumps, Temperature readings, Balance readings, Probe readings, Offgas system, Agitation. Future Plans: Five novel antifoams will be tested during full SRAT/SME runs. The most effective antifoam will be utilized in DWPF's Chemical Process Cell. The design of the Mercury Extraction Coalescer can be further manipulated to increase the extraction of not only elemental mercury, but other heavy metals in environmental remediation processes as well.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗