Search NASA⌕ Search

SEARCH · Search NASA

Results for “future accelerators”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Simulation of large acceptance LINAC for muons

There has been a recent need for muon accelerators not only for future Neutrino Factories and Muon Colliders but also for other applications in industry and medical use. We carried out simulations on a large-acceptance muon linac with a new concept 'mixed buncher/acceleration'. The linac can accept pions/muons from a production target with large acceptance and accelerate muon without any beam cooling which makes the initial section of muon-linac system very compact. The linac has a high impact on Neutrino Factory and Muon Collider (NF/MC) scenario since the 300-m injector section can be replaced by the muon linac of only 10-m length. The current design of the linac consists of the following components: independent 805-MHz cavity structure with 6- or 8-cm-radius aperture window; injection of a broad range of pion/muon energies, 10-100 MeV, and acceleration to 150 - 200 MeV. Further acceleration of the muon beam are relatively easy since the beam is already bunched.

43 PARTICLE ACCELERATORS↗

Acceleration of electrons in the plasma wakefield of a proton bunch

High-energy particle accelerators have been crucial in providing a deeper understanding of fundamental particles and the forces that govern their interactions. To increase the energy of the particles or to reduce the size of the accelerator, new acceleration schemes need to be developed. Plasma wakefield acceleration, in which the electrons in a plasma are excited, leading to strong electric fields (so called ‘wakefields’), is one such promising acceleration technique. Experiments have shown that an intense laser pulse or electron bunch traversing a plasma can drive electric fields of tens of gigavolts per metre and above—well beyond those achieved in conventional radio-frequency accelerators (about 0.1 gigavolt per metre). However, the low stored energy of laser pulses and electron bunches means that multiple acceleration stages are needed to reach very high particle energies. The use of proton bunches is compelling because they have the potential to drive wakefields and to accelerate electrons to high energy in a single acceleration stage. Long, thin proton bunches can be used because they undergo a process called self-modulation, a particle–plasma interaction that splits the bunch longitudinally into a series of high-density microbunches, which then act resonantly to create large wakefields. The Advanced Wakefield (AWAKE) experiment at CERN uses high-intensity proton bunches—in which each proton has an energy of 400 gigaelectronvolts, resulting in a total bunch energy of 19 kilojoules—to drive a wakefield in a ten-metre-long plasma. Electron bunches are then injected into this wakefield. Here we present measurements of electrons accelerated up to two gigaelectronvolts at the AWAKE experiment, in a demonstration of proton-driven plasma wakefield acceleration. Measurements were conducted under various plasma conditions and the acceleration was found to be consistent and reliable. The potential for this scheme to produce very high-energy electron bunches in a single accelerating stage means that our results are an important step towards the development of future high-energy particle accelerators.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Essay: Bob Siemann-SLC Days at SLAC

Bob Siemann was a great experimentalist and an excellent teacher.We will greatly miss him. Bob came to SLAC in early 1991 to work on the Stanford Linear Collider (SLC). The SLC was a challenging accelerator which began operating in the late 1980's but still had numerous obstacles to be overcome years into operation. One of the compounding difficulties was making reproducible measurements, since the stability of the collider was poor and the diagnostics were insufficient. Bob dove into this challenge and helped design experiments and diagnostics that provided further clarity. I first got to know Bob while I was still a graduate student, trying to finish my thesis and performing some experimental studies on the SLC, which, at the time, was proving to be very difficult. Most of my expertise had been in beam theory and simulation. Dealing with the real issues of the accelerator was challenging. Bob helped me understand the difference between systematic and statistical errors, and separate operational issues from the fundamental physics. His way of teaching was not to provide an explanation but to ask enough questions so that I could find the answer on my own - this was the best way to learn. I later asked Bob to be a reader on my thesis. As in all things, he took this role extremely seriously. He read through the draft and marked every page to the point where I was regretting my decision. However, his questions again helped me understand my own work better and greatly improved my thesis. Bob was also the de facto leader of an effort focused on the damping rings and the bunch compressors. He was great to work with. He made people think for themselves and refused to simply provide answers. He also worked hard himself, expressing real interest and curiosity. After the studies of the SLC damping rings identified a sawtooth instability due to the vacuum chamber impedance as a source of many downstream fluctuations, Bob took charge of upgrading the rings. As part of this program, I suggested an extensive upgrade that also replaced the dipoles with combined function magnets which might have reduced the horizontal emittance another factor of 3. Although he was extremely busy, Bob helped me develop the proposal and understand the magnetic limitations as well as the potential impacts on the beam dynamics. He helped me consider issues well beyond my initial scope. While the proposal never went anywhere and I think Bob had been aware that there was no funding to pursue the option, he saw that it would be a great learning experience for me and it was. In the early 1990's I had simulated a new regime for the beam-ion instability and, with Frank Zimmermann, I developed a model for the effect which was predicted to occur within the high current, low emittance bunch trains in future storage rings or linear colliders. I thought this was pretty good work but Bob convinced me that the next step had to be confirming the theory with measurements. Because the growth rate was inversely dependent on beam sizes and proportional to the vacuum pressure, measurements required significantly increasing the vacuum pressure in existing facilities. Most people discounted trying such an experiment, but with Bob's urging and suggestions and John Byrd's excitement, we managed to make the measurements at the Advanced Light Source (ALS) at Berkeley. By the mid-1990's Bob was completely focused on advanced acceleration concepts and I was not interacting with him as often. At the time, SLAC was putting together a large effort in designing and documenting a design for the Next Linear Collider (NLC) while constructing the NLC Test Accelerator. Bob was worried that a straightforward extrapolation of the microwave technology would be difficult to bring to fruition because of the cost. He wanted to focus on more cost-effective approaches that could enable future accelerators for high energy physics. As usual, he was correct. The experimental programs that he started in direct laser acceleration and plasma-wakefield acceleration have made great progress. He accomplished this with lots of hard work and by engaging the people around him, especially students and postdocs. In the process, he created a group of extremely talented people which has enabled these technologies to be developed to the point where it seems likely that they are viable and will offer two cost-effective approaches to high-gradient acceleration.

43 PARTICLE ACCELERATORS↗

Coherent control of plasma dynamics by feedback-optimized wavefront manipulation

Plasmas generated by an intense laser pulse can support coherent structures such as large amplitude wakefield that can affect the outcome of an experiment. We investigate the coherent control of plasma dynamics by feedback-optimized wavefront manipulation using a deformable mirror. The experimental outcome is directly used as feedback in an evolutionary algorithm for optimization of the phase front of the driving laser pulse. In this paper, we applied this method to two different experiments: (i) acceleration of electrons in laser driven plasma waves and (ii) self-compression of optical pulses induced by ionization nonlinearity. The manipulation of the laser wavefront leads to orders of magnitude improvement to electron beam properties such as the peak charge, beam divergence, and transverse emittance. The demonstration of coherent control for plasmas opens new possibilities for future laser-based accelerators and their applications.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Environmental Management Waste Management Facility Proxy Waste Lot Profile 6.999 for Building K-25 West Wing, East Tennessee Technology Park, Oak Ridge, Tennessee

In 1989, the Oak Ridge Reservation (ORR), which includes the East Tennessee Technology Park (ETTP), was placed on the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) National Priorities List. The Federal Facility Agreement (FFA) (DOE 1992), effective January 1, 1992, now governs environmental restoration activities conducted under CERCLA at the ORR. Following signing of the FFA, U.S. Department of Energy (DOE), U.S. Environmental Protection Agency (EPA), and the state of Tennessee signed the Oak Ridge Accelerated Cleanup Plan Agreement on June 18, 2002. The purpose of this agreement is to define a streamlined decision-making process to facilitate the accelerated implementation of cleanup, resolve ORR milestone issues, and establish future actions necessary to complete the accelerated cleanup plan by the end of fiscal year 2008. While the FFA continues to serve as the overall regulatory framework for remediation, the Accelerated Cleanup Plan Agreement supplements existing requirements to streamline the decision-making process. Decontamination and decommissioning (D&D) activities of Bldg. K-25, the original gaseous diffusion facility, is being conducted by Bechtel Jacobs Company LLC (BJC) on behalf of the DOE. The planned CERCLA action covering disposal of building structure and remaining components from the K-25 building is scheduled as a non-time-critical CERCLA action as part of DOE's continuous risk reduction strategy for ETTP. The K-25 building is proposed for D&D because of its poor physical condition and the expense of surveillance and maintenance activities. The K-25/K-27 D&D Project proposes to dispose of the commingled waste listed below from the K-25 west side building structure and remaining components and process gas equipment and piping at the Environmental Management Waste Management Facility (EMWMF) under waste disposal proxy lot (WPXL) 6.999: (1) Building structure (e.g. concrete floors [excluding basement slab], roofing, structural steel supports, interior walls, and exterior walls) and support system components including the recirculation cooling water (RCW); electrical; communication; fire protection; ventilation; process coolant; process lube oil; utilities such as steam, water and drain lines; (2) Process Piping; (3) Seal Exhaust Headers; (4) Seal Exhaust Traps; (5) Process Valves; (6) Differential Blind Multipliers (DBM)/Partial Blind Multipliers (PBM); and (7) Aftercoolers (also known as Intercell coolers). Converters and compressors while components of the process gas system, are not included in this commingled waste lot. On January 6, 2009, a meeting was held with EPA, TDEC, DOE and the team for the sole purpose of finalizing the objectives, format, and content of WPXL 6.999. The objective of WPXL 6.999 was to provide a crosswalk to the building structure and the PGE components profiles. This was accomplished by providing tables with references to the specific section of the individual profiles for each of the WLs. There are two building profiles and eight PGE profiles. All of the waste identified in the individual profiles will be commingled, shipped, and disposed exclusively under WPXL 6.999. The individual profiles were provided to the EPA and Tennessee Department of Environment and Conservation (TDEC) for information purposes only. This summary WPXL 6.999 will be submitted to EPA, TDEC, and DOE for review and approval. The format agreed upon by the regulators and DOE form the basis for WPXL 6.999. The agreed format is found on pages v and vi of the CONTENTS section of this profile. The disposal of this waste will be executed in accordance with the Action Memorandum for the Decontamination and Decommissioning of the K-25 and K-27 Buildings, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2002), Removal Action Work Plan for the K-25 and K-27 Buildings, Process Equipment Removal and Demolition, K-25/K-27 Project, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2008a); Waste Handling Plan for Demolition of the K-25 and K-27 Building Structures and Remaining Components Located at the East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2005); and Waste Handling Plan for Building K-25 West Wing Process Equipment and Piping at the East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2008b).

54 ENVIRONMENTAL SCIENCES↗

Towards Agentic AI on Particle Accelerators

As particle accelerators grow in complexity, traditional control methods face increasing challenges in achieving optimal performance. This paper envisions a paradigm shift: a decentralized multi-agent framework for accelerator control, powered by Large Language Models (LLMs) and distributed among autonomous agents. We present a proposition of a self-improving decentralized system where intelligent agents handle high-level tasks and communication and each agent is specialized control individual accelerator components. This approach raises some questions: What are the future applications of AI in particle accelerators? How can we implement an autonomous complex system such as a particle accelerator where agents gradually improve through experience and human feedback? What are the implications of integrating a human-in-the-loop component for labeling operational data and providing expert guidance? We show two examples, where we demonstrate viability of such architecture.

43 PARTICLE ACCELERATORS↗

An experiment for electron-hadron scattering at the LHC

Abstract Novel considerations are presented on the physics, apparatus and accelerator designs for a future, luminous, energy frontier electron-hadron ( eh ) scattering experiment at the LHC in the thirties for which key physics topics and their relation to the hadron-hadron HL-LHC physics programme are discussed. Demands are derived set by these physics topics on the design of the LHeC detector, a corresponding update of which is described. Optimisations on the accelerator design, especially the interaction region (IR), are presented. Initial accelerator considerations indicate that a common IR is possible to be built which alternately could serve eh and hh collisions while other experiments would stay on hh in either condition. A forward-backward symmetrised option of the LHeC detector is sketched which would permit extending the LHeC physics programme to also include aspects of hadron-hadron physics. The vision of a joint eh and hh physics experiment is shown to open new prospects for solving fundamental problems of high energy heavy-ion physics including the partonic structure of nuclei and the emergence of hydrodynamics in quantum field theory while the genuine TeV scale DIS physics is of unprecedented rank.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Novel Materials and Concepts for Next-Generation High Power Target Applications

Novel beam-intercepting materials and targetry concepts are essential to improve the performance, reliability and operation lifetimes of next generation multi-megawatt (multi-MW) accelerator target facilities. The beam-intercepting materials and components must sustain an order-of-magnitude increase in particle beam intensities and are beyond the current state-of-the-art. With conventional materials already limiting the scope of experiments, it is crucial to investigate novel target materials, technologies and concepts that will satisfy the requirements and maximize the physics benefits of future energy and intensity frontier experiments. This paper provides an overview of the related targetry R&D required over the next 10 years to support and enable future high-power accelerator target facilities.

43 PARTICLE ACCELERATORS↗

Accuracy of the time-averaged ponderomotive approximation for laser-plasma accelerator modeling

Reliable modeling of laser-plasma accelerators, where a short and intense laser pulse propagates in an underdense plasma over long distances, is a computationally challenging task. This is due to the great disparity among the scales involved in the modeling, ranging from the micrometer scale of the laser wavelength to, for instance, the meter scale of the laser-plasma interaction length for a multi-GeV-class laser-plasma accelerator. To reduce such imbalance, the time-averaged ponderomotive approximation may be used, where the plasma particle dynamics is analytically averaged over the laser frequency, and only spatiotemporal scales associated with the laser envelope are retained in the calculations, resulting in significant computational savings. Here, we characterize the accuracy and robustness of the time-averaged ponderomotive approximation for a range of laser parameters of interest for present and future laser-plasma accelerators, and we show that the error introduced by the averaging process is small in all relevant cases.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Irradiation Facilities and Irradiation Methods for High Power Target

High Power Target systems are key elements in future neutrino and other rare particle production in accelerators. These systems transform an intense source of protons into secondary particles of interest to enable new scientific discoveries. As beam intensity and energies increase, target systems face significant challenges. Radiation damages and thermal shocks in target materials were identified as the leading cross-cutting challenges of high-power target facilities. Target material R&D to address these challenges are essential to enable and ensure reliable operation of future-generation accelerators. Irradiation facilities and alternative methods are critical to provide a full support of material R&D and better address these critical challenges.

43 PARTICLE ACCELERATORS↗

PIP-II Particle Accelerator Project

The PIP-II project is an essential upgrade of Fermilab’s particle accelerator complex. Groundbreaking occurred in March 2019. The upgrade will enable Fermilab’s accelerators to generate an unprecedented stream of neutrinos—subtle, subatomic particles that could hold the key to understanding the universe’s evolution—by creating the world’s most intense high-energy neutrino beams. This capability positions Fermilab to be the world leader in accelerator-based neutrino research. It enables the scientific program for the international, Fermilab-hosted Deep Underground Neutrino Experiment (DUNE) and Long-Baseline Neutrino Facility (LBNF). The key to PIP-II is power. When the PIP-II project is complete, Fermilab will be able to generate proton beams greater than 1 megawatt—60 percent higher than current capabilities. These powerful beams of protons will in turn create intense beams of neutrinos. Future PIP-II upgrades will triple the lab’s current beam power. PIP-II’s high-intensity proton beams will provide a flexible platform for the long-term future of the Fermilab accelerator complex and the U.S. accelerator-based particle physics program.

Fermilab, Fermilab↗

Development of Combined and Sequential Accelerated Stress Testing for Derisking Photovoltaic Modules

This talk reviews sequential and combined accelerated stress tests of the past decade that have been shown to better replicate degradation mechanisms seen in the field, that single-factor steady-state tests have failed to reproduce. When designing stress tests for PV modules, it is shown, with examples, how it is beneficial to consider representation of the shipping module, the stress factors applied, and how the stress factors are sequenced or combined in the natural environment. Finally, current and future efforts to realize accelerated stress tests based on these concepts are discussed.

14 SOLAR ENERGY↗

Meter-scale plasma waveguides for multi-GeV laser wakefield acceleration

Here, we present results from two new techniques for the generation of meter-scale, low density (~10 17 cm -3 on axis) plasma waveguides, the “two-Bessel” technique, and the “self-waveguiding” technique. Plasma waveguides of this density and length range are needed for demonstration of a ~10 GeV laser wakefield accelerator module, key for future staging for a ~TeV lepton collider. Both techniques require the use of high quality ultrashort pulse Bessel beams to efficiently and uniformly ionize hydrogen gas in meter-scale supersonic gas jets via optical field ionization. We review these two techniques, describe our meter-scale gas jets, and present a new method for correction of optical aberrations in Bessel beams. Finally, we briefly present results from recent experiments employing one of our techniques, demonstrating quasi-monoenergetic acceleration of ~5 GeV electron bunches in 20 cm long, low density plasma waveguides.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Status of the laser manipulations of H- beam at J-PARC

The laser manipulations of H- ion beam by single or double neutralization is a very promising technique and highly essential to utilized in accelerator processes such as stripping, pulse chopping, collimation, extraction, and beam diagnostics for the present and future high-intensity proton accelerators. At J-PARC, we are preparing for a POP (Proof-of-Principle) demonstration 400 MeV H- stripping by using only lasers. A prototype YAG laser system and a laser cavity system to reduce the laser power are being developed through 3 MeV H- neutralization studies. Fermilab utilizes H- neutralization at 0.75 MeV by establishing a laser Notcher system for a gap in the H- pulse needed for a clean beam extraction from the ring. To minimize the laser power and maximize the interaction efficiency are common issue at both laboratories. Under the US-Japan collaboration for high-intensity neutrino beam, we are closely working to establish recycling/reusing of seed laser pulses to reduce a size of the laser system. In parallel, we have also developed non-destructive beam diagnostic systems at lower H- energy of 3 MeV, which will be implemented to the 400 MeV as well as easily applicable to the Fermilab linac including PIP-II linac. Installation of the laser system at J-PARC linac for 400 MeV H- stripping is ongoing to start the POP experimental study in 2023.

43 PARTICLE ACCELERATORS↗

DOE Asset Revitalization: Sustainability and Waste Management Aspects - 12120

In February 2011 Secretary of Energy Steven Chu established a Task Force on Asset Revitalization to facilitate a discussion among the Department of Energy (DOE), communities around DOE sites, non-profits, tribal governments, the private sector, and other stakeholders to identify reuse approaches as environmental cleanup efforts at DOE sites reach completion. The Task Force was charged with exploring opportunities to reuse DOE site assets for beneficial purposes and making recommendations to the Under Secretaries of Energy, Science, and Nuclear Security on the formation of an Asset Revitalization Initiative (ARI). The ARI is a Department-wide effort to advance the beneficial reuse of the DOE's unique and diverse mix of assets including land, facilities, infrastructure, equipment, technologies, natural resources, and a highly skilled workforce. The ARI will encourage collaboration between the public and private sectors in order to achieve energy and environmental goals as well as to stimulate and diversify regional economies. The recommendations of the ARI Task Force are summarized below, focusing on the sustainability and waste management aspects. DOE's ongoing completion of cleanup efforts and modernization efforts is creating opportunities to transition under-used or excess assets to future beneficial use. The FY 2011 DOE ARI Task Force determined that DOE's assets could be reused for beneficial purposes such as clean energy production, industrial manufacturing, recreational and conversation use, and other economic development initiatives. Asset revitalization has the potential to both help achieve DOE's energy and environmental goals and diversify regional economies where the sites are located, including providing the support needed to implement large-scale projects that achieve green sustainability goals. Asset revitalization efforts could be accelerated by effectively incorporating future use plans into environmental management and remediation efforts. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE)

NASA has partnered with Advanced Space to develop and build the Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) mission which will serve as a pathfinder for Near Rectilinear Halo Orbit (NHRO) operations around the Moon. The NHRO, (Perilune = 3,200 km; Apolune = 70,000 km) will be the intended orbit for the NASA’s Artemis Gateway lunar orbital platform. The CAPSTONE mission will validate simulations and confirm operational planning for Gateway while also validating performance of navigation and station-keeping requirements for the Power and Propulsion Element. Thus, this mission will provide operational experience to NASA, commercial, and international missions for operations in a demanding orbital regime. The baseline for CAPSTONE is to fly a 12U cubesat developed, integrated, and tested by Tyvak Nanosatellite Systems carrying a payload communications system capable of cross-link ranging with the Lunar Reconnaissance Orbiter (LRO), a dedicated payload flight computer for software demonstration, and a camera. The launch, coordinated by NASA Launch Services Program, will be provided by a Rocket Lab launch vehicle utilizing their new Proton upper stage to deploy the CAPSTONE spacecraft into the lunar orbit. The CAPSTONE mission is targeting a launch no earlier than September 23, 2021. Upon launch, the spacecraft will traverse a highly efficient transfer taking approximately three months to enter a primary demonstration phase in an NRHO for six months followed by a twelve month technology enhancement operations phase. The CAPSTONE Project is lead by Advanced Space, LLC of Boulder Colorado. Spacecraft development and mission operations will be conducted by Tyvak Nanosatellite Systems of Irvine, California. Noted objectives for the CAPSTONE mission will be to demonstrate the accessibility of NHROs, validate key operational concepts in the NHRO environment, lay a foundation for commercial support of future lunar operations and accelerate the availability of peer-to-peer navigation capabilities provided by the Cislunar Autonomous Positioning System (CAPS). The CAPSTONE mission is funded through NASA's Small Spacecraft Technology Program (SSTP), which is one of several programs in NASA’s Space Technology Mission Directorate. SSTP is chartered to develop and demonstrate technologies to enhance and expand the capabilities of small spacecraft with a particular focus on enabling new mission architectures through the use of small spacecraft, expanding the reach of small spacecraft to new destinations, and augmenting future missions with supporting small spacecraft. The launch for the CAPSTONE Mission is provided by Human Exploration & Operations Missions Directorate Advanced Exploration Systems Division. Coordination and Acquisition of the Launch is managed by NASA’s Launch Services Program. The CAPSTONE Mission and project status will be presented.

CAPSTONE↗

Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) Mission

NASA has partnered with Advanced Space to develop and build the Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) mission which will serve as a pathfinder for Near Rectilinear Halo Orbit (NHRO) operations around the Moon. The NHRO, (Perilune = 3,200 km; Apolune = 70,000 km) will be the intended orbit for the NASA’s Artemis Gateway lunar orbital platform. The CAPSTONE mission will validate simulations and confirm operational planning for Gateway while also validating performance of navigation and station-keeping requirements for the Power and Propulsion Element. Thus, this mission will provide operational experience to NASA, commercial, and international missions for operations in a demanding orbital regime. The baseline for CAPSTONE is to fly a 12U cubesat developed, integrated, and tested by Tyvak Nanosatellite Systems carrying a payload communications system capable of cross-link ranging with the Lunar Reconnaissance Orbiter (LRO), a dedicated payload flight computer for software demonstration, and a camera. The launch, coordinated by NASA Launch Services Program, will be provided by a Rocket Lab launch vehicle utilizing their new Proton upper stage to deploy the CAPSTONE spacecraft into the lunar orbit. The CAPSTONE mission is targeting a launch no earlier than September 23, 2021. Upon launch, the spacecraft will traverse a highly efficient transfer taking approximately three months to enter a primary demonstration phase in an NRHO for six months followed by a twelve month technology enhancement operations phase. The CAPSTONE Project is lead by Advanced Space, LLC of Boulder Colorado. Spacecraft development and mission operations will be conducted by Tyvak Nanosatellite Systems of Irvine, California. Noted objectives for the CAPSTONE mission will be to demonstrate the accessibility of NHROs, validate key operational concepts in the NHRO environment, lay a foundation for commercial support of future lunar operations and accelerate the availability of peer-to-peer navigation capabilities provided by the Cislunar Autonomous Positioning System (CAPS). The CAPSTONE mission is funded through NASA's Small Spacecraft Technology Program (SSTP), which is one of several programs in NASA’s Space Technology Mission Directorate. SSTP is chartered to develop and demonstrate technologies to enhance and expand the capabilities of small spacecraft with a particular focus on enabling new mission architectures through the use of small spacecraft, expanding the reach of small spacecraft to new destinations, and augmenting future missions with supporting small spacecraft. The launch for the CAPSTONE Mission is provided by Human Exploration & Operations Missions Directorate Advanced Exploration Systems Division. Coordination and Acquisition of the Launch is managed by NASA’s Launch Services Program. The CAPSTONE Mission and project status will be presented.

CAPSTONE↗

Capturing Structural Dynamics in Crystalline Silicon Using Chirped Electrons from a Laser Wakefield Accelerator

Recent progress in laser wakefield acceleration has led to the emergence of a new generation of electron and X-ray sources that may have enormous benefits for ultrafast science. These novel sources promise to become indispensable tools for the investigation of structural dynamics on the femtosecond time scale, with spatial resolution on the atomic scale. Here in this paper, we demonstrate the use of laser-wakefield-accelerated electron bunches for time-resolved electron diffraction measurements of the structural dynamics of single-crystal silicon nano-membranes pumped by an ultrafast laser pulse. In our proof-of-concept study, we resolve the silicon lattice dynamics on a picosecond time scale by deflecting the momentum-time correlated electrons in the diffraction peaks with a static magnetic field to obtain the time-dependent diffraction efficiency. Further improvements may lead to femtosecond temporal resolution, with negligible pump-probe jitter being possible with future laser-wakefield-accelerator ultrafast-electron-diffraction schemes.

36 MATERIALS SCIENCE↗