Search NASA⌕ Search

SEARCH · Search NASA

Results for “performance monitoring”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Development of Real-Time System Identification to Detect Abnormal Operations in a Gas Turbine Cycle

Here, we present a novel online system identification methodology for monitoring the performance of power systems. This methodology was demonstrated in a gas turbine recuperated power plant designed for a hybrid configuration. A 120-kW Garrett microturbine modified to test dynamic control strategies for hybrid power systems designed at the National Energy Technology Laboratory (NETL) was used to implement and validate this online system identification methodology. The main component of this methodology consists of an empirical transfer function model implemented in parallel to the turbine speed operation and the fuel control valve, which can monitor the process response of the gas turbine system while it is operating. During fully closed-loop operations or automated control, the output of the controller, fuel valve position, and the turbine speed measurements were fed for a given period of time to a recursive algorithm that determined the transfer function parameters during the nominal condition. After the new parameters were calculated, they were fed into the transfer function model for online prediction. The turbine speed measurement was compared against the transfer function prediction, and a control logic was implemented to capture when the system operated at nominal or abnormal conditions. To validate the ability to detect abnormal conditions during dynamic operations, drifting in the performance of the gas turbine system was evaluated. A leak in the turbomachinery working fluid was emulated by bleeding 10% of the airflow from the compressor discharge to the atmosphere, and electrical load steps were performed before and after the leak. This tool could detect the leak 7 s after it had occurred, which accounted for a fuel flow increase of approximately 15.8% to maintain the same load and constant turbine speed operations.

algorithms↗

Kepler Instrument Performance: An In-Flight Update

The Kepler Mission is designed to detect the 80 parts per million (ppm) signal from an Earth-Sun equivalent transit. Such precision requires superb instrument stability on time scales up to 2 days and systematic error removal to better than 20 ppm. The sole scientic instrument is the Photometer, a 0.95 m aperture Schmidt telescope that feeds the 94.6 million pixel CCD detector array, which contains both Science and Fine Guidance Sensor (FGS) CCDs. Since Kepler's launch in March 2009, we have been using the commissioning and science operations data to characterize the instrument and monitor its performance. We find that the in-flight detector properties of the focal plane, including bias levels, read noise, gain, linearity, saturation, FGS to Science crosstalk,and video crosstalk between Science CCDs, are essentially unchanged from their pre-launch values. Kepler'sunprecedented sensitivity and stability in space have allowed us to measure both short- and long- term effects from cosmic rays, see interactions of previously known image artifacts with starlight, and uncover several unexpected systematics that affect photometric precision. Based on these results, we expect to attain Kepler's planned photometric precision over 90% of the field of view.

CCD↗

Risk-informed Graded Approach for Reliability and Performance Assessment for Advanced Condition Monitoring Techniques

With the shift away from time-based maintenance and toward condition-based maintenance, and to reduce overall maintenance costs, there has been an upsurge in the usage and development of advanced condition monitoring (ACM) techniques for real-time monitoring of nuclear power plant (NPP) components. ACM is particularly useful in the development of digital twins, which are designed to predict the failure or degradation of plant components. Successful implementation of ACM requires an assessment to inform the development of a risk-informed approach to evaluate the use of ACM to meet Nuclear Regulatory Committee (NRC) regulations for in-service testing (IST) programs. This includes the monitoring and diagnostics of reactor components and systems in current, new, and advanced reactors. A key component in ACM is the usage of machine learning (ML) and artificial intelligence (AI) algorithms that can employ real-time data from instrumentation and sensors to detect and predict reactor component degradations. Such predictive capabilities enable early detection of component degradation so as to help plant personnel plan and execute necessary maintenance. For successful implementation of ML/AI in ACM such that regulatory requirements are met, a risk-informed graded approach is needed to assess the reliability and performance of ML/AI for ACM. The American Society for Mechanical Engineers (ASME) developed their Operations and Maintenance (O&M) Code to provide guidance on safe, reliable O&M of NPPs. The IST section of the O&M Code specifically establishes requirements for IST and examination to gauge operational readiness of components in water-cooled NPPs. This paper presents a state-of-the-art review of how reliability and risk assessment can be integrated with ACM to assess component performance by non-nuclear industries. This is followed by different methodologies and approaches for conducting performance and reliability assessments so as to meet IST requirements for NPP components.

99 - GENERAL AND MISCELLANEOUS↗

Strip sensor performance in prototype modules built for ATLAS ITk

ATLAS experiment is preparing an upgrade of its detector for High-Luminosity LHC (HL-LHC) operation. The upgrade involves installation of the new all-silicon Inner Tracker (ITk). In the context of the ITk preparations, more than 80 strip modules were built with prototype barrel sensors. They were tested with electrical readout on a per-channel basis. In general, an excellent performance was observed, consistent with previous ASIC-level and sensor-level tests. However, the lessons learned included two phenomena important for the future phases of the project. First was the need to store and test the modules in a dry environment due to humidity sensitivity of the sensors. The second was an observation of high noise regions for 2 modules. The high noise regions were tested further in several ways, including monitoring the performance as a function of time and bias voltage. Additionally, direct sensor-level tests were performed on the affected channels. The inter-strip resistance and bias resistance tests showed low values, indicating a temporary loss of the inter-strip isolation. A subsequent recovery of the noise performance was observed. Here we present the test details, an analysis of how the inter-strip isolation affects the module noise, and the relationship with sensor-level quality control tests.

47 OTHER INSTRUMENTATION↗

Evolution of the Hubble Space Telescope Safing Systems

The Hubble Space Telescope (HST) was launched on April 24 1990, with an expected lifespan of 15 years. Central to the spacecraft design was the concept of a series of on-orbit shuttle servicing missions permitting astronauts to replace failed equipment, update the scientific instruments and keep the HST at the forefront of astronomical discoveries. One key to the success of the Hubble mission has been the robust Safing systems designed to monitor the performance of the observatory and to react to keep the spacecraft safe in the event of equipment anomaly. The spacecraft Safing System consists of a range of software tests in the primary flight computer that evaluate the performance of mission critical hardware, safe modes that are activated when the primary control mode is deemed inadequate for protecting the vehicle, and special actions that the computer can take to autonomously reconfigure critical hardware. The HST Safing System was structured to autonomously detect electrical power system, data management system, and pointing control system malfunctions and to configure the vehicle to ensure safe operation without ground intervention for up to 72 hours. There is also a dedicated safe mode computer that constantly monitors a keep-alive signal from the primary computer. If this signal stops, the safe mode computer shuts down the primary computer and takes over control of the vehicle, putting it into a safe, low-power configuration. The HST Safing system has continued to evolve as equipment has aged, as new hardware has been installed on the vehicle, and as the operation modes have matured during the mission. Along with the continual refinement of the limits used in the safing tests, several new tests have been added to the monitoring system, and new safe modes have been added to the flight software. This paper will focus on the evolution of the HST Safing System and Safing tests, and the importance of this evolution to prolonging the science operations of the telescope.

Pepe, Joyce↗

Model 9975 O-Ring Fixture Long-Term Leak Performance (FY2020 Status Report)

Leak testing experiments to monitor the aging performance of Viton GLT and GLT-S O-rings used in the model 9975 shipping package has been ongoing since 2004 at Savannah River National Laboratory. Seventy tests using mock-up 9975 primary containment vessels (PCVs) with GLT O-rings were assembled and heated to temperatures ranging from 200 to 450 °F. In addition, fourteen tests with GLT-S O-rings were initiated in 2008 and heated to temperatures ranging from 200 to 400 °F. The conditioning temperatures are elevated compared to the calculated maximum O-ring temperature in a 9975 package in storage, 158 °F, to accelerate aging and enable observations of O-ring failures in a reasonable time frame. The fixtures are leak tested periodically and all GLT O-ring fixtures aging at 350 °F or above have failed to maintain a leak-tight seal. Eight GLT O-ring fixtures aging at 300 °F have failed after 2.8 to 5.7 years at temperature while the remaining fixtures at 300 °F were retired from testing following more than five years without failure. No failures have yet been observed in GLT O-ring fixtures aging at 200 °F for 12 to 14 years or aging at 270 °F for 8.5 years. All GLT-S O-ring fixtures aging at 300 °F or above have failed their leak test. No failures have yet been observed in GLT-S O-ring fixtures aging at 200 and 250 °F for 10 to 10.5 years. Data from the O-ring fixtures are generally consistent with results from compression stress-relaxation testing, and provide confidence in the predictive models based on those results. However, uncertainty exists in extrapolating these elevated temperature results to the lower temperatures of interest for normal storage in K-Area Complex (KAC). Oxygen consumption testing, which includes results from temperatures near KAC normal storage temperatures, is ongoing to provide further confidence and corroborate these extrapolations. The collective data from these test efforts suggest the minimum O-ring service life at KAC normal storage conditions should be at least 34 years for GLT and GLT-S O-rings. Measurement of compression set in O-rings removed from failed fixtures, compared to that from KAC surveillance O-rings, indicates margin remains for O-rings still in service. Aging and periodic leak testing will continue for the remaining PCV fixtures.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Model 9975 O Ring Fixture LongTerm Leak Performance (FY2021 Status Report)

Leak testing experiments to monitor the aging performance of Viton® GLT and GLT-S O-rings used in the model 9975 shipping package has been ongoing since 2004 at Savannah River National Laboratory. Seventy tests using mock-up 9975 primary containment vessels (PCVs) with GLT O-rings were assembled and heated to temperatures ranging from 200 to 450 °F. Due to material substitution, fourteen tests with GLT-S O-rings were initiated in 2008 and heated to temperatures ranging from 200 to 400 °F. The conditioning temperatures are elevated compared to the calculated maximum O-ring temperature in a 9975 package in storage, 158 °F, to accelerate aging and enable observations of O-ring failures in a reasonable time frame. The fixtures are leak tested periodically and all GLT O-ring fixtures aging at 350 °F or above have failed to maintain a leak-tight seal. Eight GLT O-ring fixtures aging at 300 °F have failed after 2.8 to 5.7 years at temperature while the remaining fixtures at 300 °F were retired from testing following more than five years without failure. There has been one GLT O-ring fixture which failed after 13.4 years aging at 200 °F. However, 19 other GLT O-rings aging at 200 °F have remained leak-tight for over 14 years and remain in test. No failures have yet been observed in GLT O-ring fixtures aging at 270 °F for 9.5 years. All GLT-S O-ring fixtures aging at 300 °F or above have failed their leak test. No failures have yet been observed in GLT-S O-ring fixtures aging at 200 and 250 °F for 11.5 years. Data from the O-ring fixtures are generally consistent with results from compression stress-relaxation testing, and provide confidence in the predictive models based on those results. However, uncertainty exists in extrapolating these elevated temperature results to the lower temperatures of interest for normal storage in K-Area Complex (KAC). Oxygen consumption testing, which includes results from temperatures near KAC normal storage temperatures, is ongoing to provide further confidence and corroborate these extrapolations. The collective data from these test efforts suggest the minimum O-ring service life at KAC normal storage conditions should be at least 34 years for GLT and GLT-S O-rings. Measurement of compression set in O-rings removed from failed fixtures, compared to that from KAC surveillance O-rings, indicate significant margin remains for O-rings still in service in 9975 packages in KAC. Aging and periodic leak testing will continue for the remaining 26 mock-up PCV fixtures.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Model 9975 O-Ring Fixture Long-Term Leak Performance (FY2022 Status Report)

Leak testing experiments to monitor the aging performance of Viton® GLT and GLT-S O-rings used in the model 9975 shipping package has been ongoing since 2004 at Savannah River National Laboratory. Seventy tests using mock-up 9975 primary containment vessels (PCVs) with GLT O-rings were assembled and heated to temperatures ranging from 200 to 450 °F. Due to material substitution, fourteen tests with GLT-S O-rings were initiated in 2008 and heated to temperatures ranging from 200 to 400 °F. The conditioning temperatures are elevated compared to the calculated maximum O-ring temperature in a 9975 package in storage, 158 °F, to accelerate aging and enable observations of O-ring failures in a reasonable time frame. The fixtures are leak tested periodically and all GLT O-ring fixtures aging at 350 °F or above have failed to maintain a leak-tight seal. Eight GLT O-ring fixtures aging at 300 °F have failed after 2.8 to 5.7 years at temperature while the remaining fixtures at 300 °F were retired from testing following more than five years without failure. There has been one GLT O-ring fixture which failed after 13.4 years aging at 200 °F. However, 20 other GLT O-rings aging at 200 °F have remained leak-tight for over 14 years and remain in test. No failures have yet been observed in GLT O-ring fixtures aging at 270 °F for 10.4 years. All GLT-S O-ring fixtures aging at 300 °F or above have failed their leak test. No failures have yet been observed in GLT-S O-ring fixtures aging at 250 °F for 12.5 years. This year, one GLT-S O-ring fixture failed after 12.4 years aging at 200 °F. Data from the O-ring fixtures are generally consistent with results from compression stress-relaxation testing, and provide confidence in the predictive models based on those results. However, uncertainty exists in extrapolating these elevated temperature results to the lower temperatures of interest for normal storage in K-Area Complex (KAC). Oxygen consumption testing, which includes results from temperatures near KAC normal storage temperatures, is ongoing to provide further confidence and corroborate these extrapolations. The collective data from these test efforts suggest the minimum O-ring service life at KAC normal storage conditions should be at least 34 years for GLT and GLT-S O-rings. Measurement of compression set in O-rings removed from failed fixtures, compared to that from KAC surveillance O-rings, indicate significant margin remains for O-rings still in service in 9975 packages in KAC. Aging and periodic leak testing will continue for the remaining 25 mock-up PCV fixtures.

36 MATERIALS SCIENCE↗

Model 9975 O Ring Fixture Long-Term Leak Performance (FY2024 Status Report)

Leak testing experiments to monitor the aging performance of Viton ® GLT and GLT-S O-rings used in the model 9975 shipping package have been ongoing since 2004 at Savannah River National Laboratory. Seventy tests using mock-up 9975 primary containment vessels (PCVs) with GLT O-rings were assembled and heated to temperatures ranging from 200 to 450 °F. Due to material substitution, fourteen tests with GLT-S O-rings were initiated in 2008 and heated to temperatures ranging from 200 to 400 °F. The conditioning temperatures are elevated compared to the calculated maximum O-ring temperature in a 9975 package in storage, 158 °F, to accelerate aging and enable observations of O-ring failures in a reasonable time frame. The mock-up PCV fixtures are leak tested periodically, and all GLT O-ring fixtures aging at 350 °F or above have failed to maintain a leak-tight seal. Eight GLT O-ring fixtures aging at 300 °F have failed after 2.8 to 5.7 years at temperature while the remaining fixtures at 300 °F were retired from testing following more than five years of aging without failure. Two of these retired fixtures were returned to testing and heated to 350 °F to evaluate the impact of additional heating at higher temperature for aged O-rings. Fixture #20 failed after 3 months of testing while fixture #18 remained leak tight. These O-rings demonstrated that aged and in-service O-rings can continue to be used, even at higher temperatures, after being in storage, and their leak performance are consistent with other samples at 350 °F.

42 ENGINEERING↗

Psyche Hardware Abstraction Simulation Environment (PHASE): Development of High-Fidelity Downlink Model for Flight Software Performance Testing

NASA’s Katherine Johnson Independent Verification and Validation (IV&V) Independent Test Capability (ITC) Team develops high fidelity software-only simulations (or “digital-twins”) of NASA’s most critical missions that are then used for software verification and validation (V&V). One such digital-twin simulator nearing maturity is the Psyche Hardware Abstraction Simulation Environment (PHASE). PHASE utilizes an instruction set simulator along with ITC-developed avionics models. PHASE includes a newly-developed model of the telecom hardware with a high-fidelity downlink interface, capable of supporting reconfigurable downlink data rates and transmission modes. The different downlink transmission modes allow more processing to be ceded from software onto the telecom hardware. Thus, we are able to monitor the performance of the downlink software module in the time-partitioned OS and perform more realistic dynamic testing based on software’s resource utilization. This presentation will cover PHASE, avionics modeling, the downlink model, and its usage for flight software performance testing.

modeling↗

Industrial Energy Management During a Pandemic: Lessons Learned from DOE Better Plants Program Partners

The COVID-19 pandemic is causing many challenges for manufacturers, especially those that depend on workers whose jobs cannot be performed remotely. This has detrimentally impacted the energy management workforce, energy support system performance, as well as operations and supply chains.This article discusses four primary challenges for industrial energy management caused by the pandemic, strained budget for energy projects, increased energy intensity caused by low production rates and other safety practices, limited access to energy systems, and the lost knowledge and experience of senior staff. This article also proposes some potential solutions for these challenges that include implementing no- and low-cost energy conservation measures, adopting alternative financing options, improving shutdown procedures, reducing baseloads, creating an effective online energy-monitoring system, performing virtual energy assessments, building a robust EnMS, and attending online and in-person training events.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Overview of GSICS visible calibration methods.

Global Space-based Inter-Calibration System (GSICS) is an international collaborative effort initiated in 2005 by the World Meteorological Organization (WMO) and the Coordination Group for Meteorological Satellites (CGMS) to 1-monitor, 2-improve and 3-harmonize the quality of observations from operational weather and environmental satellites of the Global Observing System (GOS). GSICS aims at ensuring consistent accuracy among space-based observations worldwide for climate monitoring, weather forecasting, and environmental applications by 1-monitoring instrument performance, 2-operational inter-calibration of satellite instruments, 3-radiometrically scaling observations to absolute reference standards, 4-recalibration of archived datasets. Although many of the GSIC visible inter-calibration methods are based on medium pixel-level imagers such as MODIS, VIIRS, AVHRR, and geostationary sensors, the methods are applicable to high spatial resolution imagery such as Landsat. For sensor inter-calibration efforts, coincident ray-matched reflectance pairs are used to transfer the calibration from the reference to the target instrument. Spectral band adjustment factors (SBAF) are applied to account for any spectral band differences. For sensor stability monitoring, PICS, deep convective cloud (DCC) and polar ice Earth viewed targets are utilized. GSICS uses the moon for stability monitoring by using the GSICS Implementation of the USGS Robotic Lunar Observatory (ROLO) model (GIRO). GSICS is looking forward to the launch of CLARREO on the international space station (ISS) in 2023. The CLARREO hyperspectral reflective solar band (RSB) sensor will establish an absolute calibration reference in space, which will characterize invariant targets and will inter-calibrate concurrent sensors. Examples of these calibration methods will be presented at the workshop.

Visible calibration methods↗

Iodine Capture Studies of Copper- and Bismuth-Based Sorbents

The release of radioiodine, one of several radionuclides of concern when recycling used nuclear fuel (UNF), is an important consideration in the fuel cycle. In this study, two sorbent materials, Cu 0 -polyacrylonitrile (PAN) and Bi 0 -PAN, were tested as solid sorbent candidates for iodine capture. Experiments using a thin bed of sorbent material were exposed to vaporized iodine for over 300 hours (~2 weeks) under varied conditions in a dynamic flow environment. The overall performance was monitored in real-time using thermogravimetric analysis, and the materials were subsequently characterized for surface and bulk analysis using scanning electron microscopy – energy-dispersive spectroscopy (SEM-EDS) and powder x-ray diffraction (pXRD), respectively. Iodine (in the form of I 2 ) is expected to be released primarily in the dissolver off-gas (DOG) stream; therefore, this study demonstrates the effects of elemental iodine (I 2 ), water vapor (H 2 O), and nitrogen dioxide (NO 2 ). When exposed to ‘ideal’ conditions (in which I 2 is carried by dry air), Cu 0 -PAN and Bi 0 -PAN behave differently, with TGA analysis indicating that Cu 0 sorption performance is higher than that of Bi 0 , as evidenced by a larger mass change. Under ‘harsh’ conditions—such as a gaseous feed containing I 2 , H 2 O, and NO 2 vapors carried by air,—iodine capture performance for both Cu 0 - and Bi 0 -PAN are affected. SEM-EDS and pXRD analysis of these materials is discussed herein.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

PNNL ARENA Cable Motor Test Bed Update

A major focus of the Light Water Reactor Sustainability (LWRS) Cable Nondestructive Examination (NDE) 2021 research is to acquire new equipment and integrate it with existing NDE instruments for a cable motor test bed which has been dubbed the Accelerated and Real Time Experimental Nodal Analysis or “ARENA”. All the primary components have been received and are being staged in the 2410 Stevens building on PNNL’s Richland campus. Building modifications to support a plug-in 480VAC receptacle have been completed and details of the system operating procedure (SOP) are in review. The approved SOP is required before the system is energized but is expected before July 2021. The ARENA system will support planned cable tests for 2021 and beyond that cannot conveniently be performed with on-site installations of cable test equipment including: (1) NDE Tests including Frequency Domain Reflectometry (FDR), Time Domain Reflectometry (TDR), Tan Delta (TD) Impedance measurements, Low Frequency Dielectric Spectroscopy (DS) measurements, standard multi-meter resistance checks, withstand tests and other bulk and distributed tests from the instrument panel with and without motors connected. (2) Online energized live wire tests using partial discharge instruments and LIVE-WIRE spread-spectrum TDR instruments. (3) Cable tests with partially submerged cable segments (including ability to submerge live cable segments). (4) Cable tests with partially or completely thermally aged segments (including ability to expose energized cable segments to thermal aging and use online monitoring instruments to monitor cable performance. (5) Ability to introduce low resistance simulations of connector or splice faults to off-line and on-line instrument setups.

42 ENGINEERING↗

Remote diagnosis server

A network-based diagnosis server for monitoring and diagnosing a system, the server being remote from the system it is observing, comprises a sensor for generating signals indicative of a characteristic of a component of the system, a network-interfaced sensor agent coupled to the sensor for receiving signals therefrom, a broker module coupled to the network for sending signals to and receiving signals from the sensor agent, a handler application connected to the broker module for transmitting signals to and receiving signals therefrom, a reasoner application in communication with the handler application for processing, and responding to signals received from the handler application, wherein the sensor agent, broker module, handler application, and reasoner applications operate simultaneously relative to each other, such that the present invention diagnosis server performs continuous monitoring and diagnosing of said components of the system in real time. The diagnosis server is readily adaptable to various different systems.

Deb, Somnath↗

CCSDS Spacecraft Monitor and Control Mission Operations Interoperability Prototype

We are entering a new era in space exploration. Reduced operating budgets require innovative solutions to leverage existing systems to implement the capabilities of future missions. Custom solutions to fulfill mission objectives are no longer viable. Can NASA adopt international standards to reduce costs and increase interoperability with other space agencies? Can legacy systems be leveraged in a service oriented architecture (SOA) to further reduce operations costs? The Operations Technology Facility (OTF) at the Johnson Space Center (JSC) is collaborating with Deutsches Zentrum fur Luft- und Raumfahrt (DLR) to answer these very questions. The Mission Operations and Information Management Services Area (MOIMS) Spacecraft Monitor and Control (SM&C) Working Group within the Consultative Committee for Space Data Systems (CCSDS) is developing the Mission Operations standards to address this problem space. The set of proposed standards presents a service oriented architecture to increase the level of interoperability among space agencies. The OTF and DLR are developing independent implementations of the standards as part of an interoperability prototype. This prototype will address three key components: validation of the SM&C Mission Operations protocol, exploration of the Object Management Group (OMG) Data Distribution Service (DDS), and the incorporation of legacy systems in a SOA. The OTF will implement the service providers described in the SM&C Mission Operation standards to create a portal for interaction with a spacecraft simulator. DLR will implement the service consumers to perform the monitor and control of the spacecraft. The specifications insulate the applications from the underlying transport layer. We will gain experience with a DDS transport layer as we delegate responsibility to the middleware and explore transport bridges to connect disparate middleware products. A SOA facilitates the reuse of software components. The prototype will leverage the capabilities of existing legacy systems. Various custom applications and middleware solutions will be combined into one system providing the illusion of a set of homogenous services. This paper will document our journey as we implement the interoperability prototype. The team consists of software engineers with experience on the current command, telemetry and messaging systems that support the International Space Station (ISS) and Space Shuttle programs. Emphasis will be on the objectives, results and potential cost saving benefits.

Lucord, Steve↗

In-Service Monitoring of Steam Pipe Systems at High Temperatures

An effective, in-service health monitoring system is needed to track water condensation in real time through the walls of steam pipes. The system is required to measure the height of the condensed water from outside the pipe, while operating at temperatures that are as high as 250 C. The system needs to account for the effects of water flow and cavitation. In addition, it is desired that the system does not require perforating the pipes and thereby reducing the structural integrity. Generally, steam pipes are used as part of the district heating system carrying steam from central power stations under the streets to heat, cool, or supply power to high-rise buildings and businesses. This system uses ultrasonic waves in pulse-echo and acquires reflected signal data. Via autocorrelation, it determines the water height while eliminating the effect of noise and multiple reflections from the wall of the pipe. The system performs nondestructive monitoring through the walls of steam pipes, and automatically measures the height of condensed water while operating at the high-temperature conditions of 250 C. For this purpose, the ultrasonic pulse-echo method is used where the time-of-flight of the wave reflections inside the water are measured, and it is multiplied by the wave velocity to determine the height. The pulse-echo test consists of emitting ultrasonic wave pulses from a piezoelectric transducer and receiving the reflections from the top and bottom of the condensed water. A single transducer is used as a transmitter as well as the receiver of the ultrasonic waves. To obtain high resolution, a broadband transducer is used and the frequency can be in the range of 2.25 to 10 MHz, providing sharp pulses in the time domain allowing for higher resolution in identifying the individual reflections.

Bar-Cohen, Yoseph↗

Functional fiber-optic sensors embedded in stainless steel components using ultrasonic additive manufacturing for distributed temperature and strain measurements

The nuclear industry is progressing toward microreactors that can be factory assembled and deployed to remote regions for reliable, scalable power generation. However, the reduced power output requires enhanced monitoring capabilities to reduce staffing and eventually move toward autonomous control to improve the economics of microreactors. The ability to embed sensors such as fiber-optics, which can provide spatially distributed temperature and strain measurements, within microreactor components for real-time health monitoring would be particularly advantageous. Recent advances in ultrasonic additive manufacturing (UAM) have demonstrated the successful embedding of fiber-optics in soft materials such as Al and Cu by placing the sensors in machined cavities and ultrasonically welding over the top with thin foils. This article reports the first successful embedment of fiber-optic sensors and thermocouples within a common nuclear reactor material, SS304, via UAM. UAM parameters were first explored with simple plate geometries before moving to more complex geometries, such as pipes and other test articles for heat pipe–based microreactors. Select samples were sectioned for microscopy to evaluate the sensor/foil and foil/foil interfaces from samples fabricated by using 100% SS304 foils vs. foils plated with a Ni coating to improve UAM bonding. Furthermore, embedding metal-coated, low-bend loss fibers resulted in greatly reduced signal attenuation and adequate compressive residual strain in the embedded region to ensure successful strain coupling. Pipe specimen functional testing was performed by monitoring temperature and strain during transient and steady-state thermal testing.

36 MATERIALS SCIENCE↗