Search NASA⌕ Search

SEARCH · Search NASA

Results for “testing facility”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Oak Ridge 25URC Tandem Accelerator 2007 SNEAP Lab Report

During FY 2008, the 25URC operated for slightly over 3,000 research hours. The radioactive species 80Ge and 17,18F accounted for 763 of these hours. This included an experiment using 17F which was only possible due to an improvement of a factor of 50 in beam intensity over our previous facility record. Twenty stable beam species were provided this year. Operation for the experimental program was at terminal potentials from 2.02 to 23.8 MV. Approximately 200 hours of conditioning were done to return the machine to operation after tank openings. There were six tank openings during the year: three scheduled for general maintenance and three unscheduled. Two of the unscheduled openings were required to correct shorting rod issues and the other was to reestablish communication with one of the major dead sections. On July 28, an event happened that caused all accelerators at the Holifield Radioactive Ion Beam Facility (HRIBF) to suspend operation. At approximately 8 AM on that Monday, during operations with approximately 12 {micro}A of 50-MeV protons on a uranium carbide target, delivering neutron-rich 81Zn beam to the new Low-energy Radioactive Ion Beam Spectroscopy Station (LeRIBSS), a radiological control technician (RCT) reported higher than normal radiation levels just outside the shield door to the IRIS1 vault (the room in which RIBs are produced at HRIBF). The measured dose rate equivalent was 4 mrem/hr. The presence of radiological contamination on the floor just outside the shield door was subsequently noted, as was the possible presence of airborne radioactivity. These observations were reported to facility management. Accelerators were put in standby immediately and the building evacuated. The event was declared a laboratory operational emergency. Parts of the building were cleared for reentry to collect belongings on Monday afternoon. The entire building was cleared for reoccupation on Tuesday morning after a detailed radiological survey found no contamination outside the shielded vaults. No decontamination was required. No individual received any detectable radiological dose as a result of this event. The 25URC tandem accelerator was given permission to resume operation with stable beams in early September, but radioactive ion production is still not allowed. Subsequent analysis indicated a release that consisted entirely of noble gasses (Xe and Kr isotopes). We believe we have identified two unrelated failures, one associated with the HVAC system and the other with the roughing system exhaust which accounts for both the escape of noble gasses into the IRIS1 vault and their migration outside the vault. An investigation team report is expected by October 24. At that time, corrective actions will be determined and the path to future radioactive ion beam production will be known. The break from operations allowed a few upgrades to be implemented. The most notable was the installation and commissioning of a SNICS ion source purchased from National Electrostatics Corporation (NEC). The SNICS replaced the old Alton/Aarhus source that we have used for many years. An ANU style gas cathode holder was purchased also but has not yet been implemented. The first beams have been produced by the source and the biggest problem encountered was reducing the beam for very low current experiments. A new power supply for the injection magnet was installed during this period also. Radioactive ion beam (RIB) development at the High Power Target Laboratory (HPTL) has been delayed this year while installing the platforms, conduits and equipment for the second Injector for Radioactive Ion Species (IRIS2) which is co-located with the HPTL facility. The majority of development activities have been performed at the two off-line ion source test facilities (ISTF1 and ISTF2) and the On-Line Test Facility (OLTF). Both test facilities have been developing systems which will eventually be used with IRIS2. Two new tunable Ti:Sapphire lasers have been ordered for continuing development of an ion source based on laser ionization using all solid-state lasers. When these are delivered, we will have a complete laser system. The other ion source test facility is continuing development of a negative-ion cooler for beam purification using photodetachment. This process has been demonstrated to work well in three systems so far (removing Co from Ni, removing S from Cl, and removing O from F). The original ion cooler has been modified to allow for use on the IRIS2 platform. Testing of this modified device is starting now. The OLTF has been used to test new types of uranium carbide targets for the electron beam plasma source (which are used for neutron-rich RIB campaigns) and to test a novel ion source which may result in purified beams of radioactive strontium isotopes. This ion source uses a quartz tube in the transfer line between the production target and the ion source to selectively slow down some elements such as rubidium and cesium.

43 PARTICLE ACCELERATORS↗

MCNP6 simulated performance of Micro-Pocket Fission Detectors (MPFDs) in the Transient REActor Test (TREAT) Facility

Micro-Pocket Fission Detectors (MPFDs) are under development for in-core neutron flux measurements at the Transient REActor Test facility (TREAT) and in other experiments at Idaho National Laboratory (INL). The sensitivity of MPFDs to the energy dependent neutron flux at TREAT has been determined for 0.0300-μm thick active material coatings of 242 Pu, 232 Th, natural uranium, and 93% enriched 235 U. Self-shielding effects in the active material of the MPFD was also confirmed to be negligible. Lastly, fission fragment energy deposition was found to be in conformance with previously reported results.

36 MATERIALS SCIENCE↗

Oak Ridge 25URC Tandem Accelerator 2008 SNEAP Lab Report

During FY 2008, the 25URC operated for slightly over 3,000 research hours. The radioactive species {sup 80}Ge and {sup 17,18}F accounted for 763 of these hours. This included an experiment using {sup 17}F which was only possible due to an improvement of a factor of 50 in beam intensity over our previous facility record. Twenty stable beam species were provided this year. Operation for the experimental program was at terminal potentials from 2.02 to 23.8 MV. Approximately 200 hours of conditioning were done to return the machine to operation after tank openings. There were six tank openings during the year: three scheduled for general maintenance and three unscheduled. Two of the unscheduled openings were required to correct shorting rod issues and the other was to reestablish communication with one of the major dead sections. On July 28, an event happened that caused all accelerators at the Holifield Radioactive Ion Beam Facility (HRIBF) to suspend operation. At approximately 8 AM on that Monday, during operations with approximately 12 {micro}A of 50-MeV protons on a uranium carbide target, delivering neutron-rich {sup 81}Zn beam to the new Low-energy Radioactive Ion Beam Spectroscopy Station (LeRIBSS), a radiological control technician (RCT) reported higher than normal radiation levels just outside the shield door to the IRIS1 vault (the room in which RIBs are produced at HRIBF). The measured dose rate equivalent was 4 mrem/hr. The presence of radiological contamination on the floor just outside the shield door was subsequently noted, as was the possible presence of airborne radioactivity. These observations were reported to facility management. Accelerators were put in standby immediately and the building evacuated. The event was subsequently declared a laboratory operational emergency. Parts of the building were cleared for reentry to collect belongings on Monday afternoon. The entire building was cleared for reoccupation on Tuesday morning after a detailed radiological survey found no contamination outside the shielded vaults. No decontamination was required. No individual received any detectable radiological dose as a result of this event. The 25URC tandem accelerator was given permission to resume operation with stable beams in early September, but radioactive ion production is still not allowed. Subsequent analysis indicated a release that consisted entirely of noble gasses (Xe and Kr isotopes). We believe we have identified two unrelated failures, one associated with the HVAC system and the other with the roughing system exhaust which accounts for both the escape of noble gasses into the IRIS1 vault and their migration outside the vault. An investigation team report is expected by October 24. At that time, corrective actions will be determined and the path to future radioactive ion beam production will be known. The break from operations allowed a few upgrades to be implemented. The most notable was the installation and commissioning of a SNICS ion source purchased from National Electrostatics Corporation (NEC). The SNICS replaced the old Alton/Aarhus source that we have used for many years. An ANU style gas cathode holder was purchased also but has not yet been implemented. The first beams have been produced by the source and the biggest problem encountered was reducing the beam for very low current experiments. A new power supply for the injection magnet was installed during this period also. Radioactive ion beam (RIB) development at the High Power Target Laboratory (HPTL) has been delayed this year while installing the platforms, conduits and equipment for the second Injector for Radioactive Ion Species (IRIS2) which is co-located with the HPTL facility. Therefore, the majority of development activities have been performed at the two off-line ion source test facilities (ISTF1 and ISTF2) and the On-Line Test Facility (OLTF). Both test facilities have been developing systems which will eventually be used with IRIS2. Two new tunable Ti:Sapphire lasers have been ordered for continuing development of an ion source based on laser ionization using all solid-state lasers. When these are delivered, we will have a complete laser system. The other ion source test facility is continuing development of a negative-ion cooler for beam purification using photodetachment. This process has been demonstrated to work well in three systems so far (removing Co from Ni, removing S from Cl, and removing O from F). The original ion cooler has been modified to allow for use on the IRIS2 platform. Testing of this modified device is starting now. The OLTF has been used to test new types of uranium carbide targets for the electron beam plasma source (which are used for neutron-rich RIB campaigns) and to test a novel ion source which may result in purified beams of radioactive strontium isotopes.

43 PARTICLE ACCELERATORS↗

A test cassette for x-ray-exposure experiments at the National Ignition Facility

We present the design and operation of a test cassette for exposure of samples to radiation environments at the National Ignition Facility. The cassette provides options for square and round samples and exposure areas; the cassette provides for multiple levels of filtration on a single sample, which allows dynamic range in experiments. The samples had normal lines of sight to the x-ray source in order to have uniform x-ray illumination. The incident x-radiation onto the samples was determined by the choice of filter thicknesses and materials. The samples were held at precise locations, accurate to within a few hundred microns, in the target chamber in order to have a known fluence incident. In the cassette, the samples were held in place in such a way that a minimal ''line contact'' allows them to have the maximal mechanical response to the x-ray load. We present postshot images of the debris found on films used for filters, and pre- and postexposure specimens.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Code validation of a scaled-down DRACS model in RELAP5/SCDAPSIM/MOD 4.0

Direct Reactor Auxiliary Cooling System (DRACS) is a passive safety system proposed for Fluoride-salt-cooled High-temperature Reactors (FHRs). Additionally, benchmark study of decay heat removal capability of DRACS by natural circulation is critical for FHR safety analysis. Two scaled-down test facilities, a low-temperature DRACS test facility (LTDF) and a high-temperature DRACS test facility (HTDF), were designed following a scaling analysis and constructed to investigate thermal performance and heat removal capability of the DRACS. The LTDF uses water as a surrogate coolant for both the primary and DRACS loops. Two transient scenarios were carried out in the LTDF, namely, DRACS startup and primary coolant pump trip. In both of the scenarios, the experimental results demonstrate sufficient heat removal capabilities of the DRACS with natural circulations established in the system. These two scenarios were simulated using RELAP5/SCDASIM/MOD4.0 code and the code simulation results show good agreement with the LTDF experimental data. For the HTDF, molten salts FLiNaK and KF-ZrF4 are used respectively as the primary coolant and DRACS coolant. Thermodynamic and transport properties of FLiNaK and KF-ZrF4 were implemented into RELAP5/SCDAPSIM/MOD 4.0. Lastly, simulations of transient scenarios in the HTDF were also performed and the code results will be compared with the HTDF experimental data once available

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Drop Tower Statement of Work

This document details the needs and requirements for a propulsion-assisted drop tower system (further referenced simply as Drop Tower) to perform hardware testing at Lawrence Livermore National Laboratory (LLNL). LLNL is managed and operated by Lawrence Livermore National Security, LLC (LLNS) for the Department of Energy (DOE). LLNL requires a robust testing platform that will allow for the characterization of interactions between objects of interest. The initial siting of the equipment will be located in an existing test facility (B191). When another test facility becomes online, the objective will be to move the test capability to the new facility as a final location (B132N). The Drop Tower will be a cornerstone capability for testing and model validation for LLNL interested programs.

42 ENGINEERING↗

CRADA Final Report For CRADA NO. CR-12-006 [Operation and Testing of an SO 2 -depolarized Electrolyzer (SDE) for the Purpose of Hydrogen and Sulfuric Acid Production]

Over the past several years, Savannah River National Laboratory (SRNL) has led a team of collaborators under the Department of Energy’s (DOE) nuclear hydrogen production program to develop the Hybrid Sulfur (HyS) Process. HyS is a 2-step water-splitting process consisting of high temperature decomposition of sulfuric acid to generate SO 2 , followed by the electrolysis of aqueous SO 2 to generate hydrogen and sulfuric acid. The latter is fed back into the high temperature reactor. SRNL designed and built an SO 2 -depolarized electrolyzer (SDE) and a test facility. Over 40 SDE’s were tested using different catalysts, membranes and other components. SRNL demonstrated that an SDE could be operated continuously for approximately 200 hours under certain conditions without buildup of sulfur at the SDE’s cathode, thus solving a key technical problem with SDE technology. Air Products and Chemicals, Inc. (APCI) is a major supplier of hydrogen production systems, and they have proprietary technology that could benefit from the SDE developed by SRNS, or some improved version thereof. However, to demonstrate that SRNL’s SDE is a truly viable approach to the electrolyzer design, continuous operation for far greater periods of time than 200 hours must be demonstrated, and the electrolyzer must be scaled up to greater hydrogen production capacities. SRNL and Air Products entered into a Cooperative Research and Development Agreement with the objective of demonstrating the effectiveness of the SDE for hydrogen and sulfuric acid production and to demonstrate long-term continuous operation so as to dramatically increase the confidence in the SDE design for commercial operation. SRNL prepared a detailed technical report documenting previous SDE development, including the current SDE design and operating conditions that led to the 200-hour sulfurfree testing. SRNL refurbished its single cell SDE test facility and qualified the equipment for continuous operation. A new membrane electrode assembly (MEA) was fabricated and installed in the single cell electrolyzer (60 cm 2 active cell area). Shakedown testing was conducted, and several modifications were made to the test facility equipment. Seven different MEAs were used during testing. Beginning on May 20, 2013, SRNL was able to test the SDE continuously for 1200 hours, including 1000 hours under power to generate hydrogen at an average rate of 10.8 liters per hour. The SDE was not removed or repaired during the 50-day test and was successfully restarted after each shutdown. The test was intentionally stopped after 1200 hours (1000 hours of hydrogen production) due to funding constraints. Post-test examination of the MEA using Scanning Electron Microscopy (SEM) and Energy Dispersive X-ray Microanalysis (EDAX) showed no elemental sulfur deposits or sulfur layer inside the cell, thus successfully achieving the test goals. The results demonstrated that the SDE could be operated for extended periods without major performance degradation or the buildup of sulfur inside the MEA. Air Products conducted an assessment of the economic viability of the SDE based on the “as tested” design. The results indicated that the SDE faces significant economic obstacles in its current state. Further development and scale-up are necessary before the SDE is ready for commercialization.

08 HYDROGEN↗

Effect of steam generator configuration in a loss of the RHR during mid-loop operation at PKL facility

The loss of the residual heat removal system in mid-loop conditions may occur with a non-negligible contribution to the plant risk, so the analysis of the accidental sequences and the actions to mitigate the accident are of great interest in shutdown conditions. In order to plan the appropriate measures to mitigate the accident is necessary to understand the thermal-hydraulic processes following the loss of the residual heat removal system during shutdown. Thus, transients of this kind have been simulated using best-estimate codes in different integral test facilities and compared with experimental data obtained in different facilities. In PKL (Primaerkreislauf-Versuchsanlage, primary coolant loop test facility) test facility different series of experiments have been undertaken to analyze the plant response in shutdown. In this context, the E3 and F2 series consist of analyzing the loss of the residual heat removal system with a reduced inventory in the primary system. In particular, the experiments were developed to investigate the influence of the steam generators secondary side configuration on the plant response, what involves the consideration of different number of steam generators filled with water and ready for activation, on the heat transfer mechanisms inside the steam generators U-tubes. This work presents the results of such experiments calculated using, RELAP5/Mod 3.3. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Development and Testing of Techniques for In-Ground Stabilization, Size Reduction and Safe Removal of Radioactive Wastes Stored in Large Containments in Burial Grounds - 13591

Radioactive waste materials, including Transuranic (TRU) wastes from laboratories have been stored below ground in large containments at a number of sites in the US DOE Complex, and at nuclear sites in Europe. These containments are generally referred to as caissons or shafts. The containments are in a range of sizes and depths below grade. The caissons at the DOE's Hanford site are cylindrical, of the order of 2,500 mm in diameter, 3,050 mm in height and are buried about 6,000 mm below grade. One type of caisson is made out of corrugated pipe, whereas others are made of concrete with standard re-bar. However, the larger shafts in the UK are of the order of 4,600 mm in diameter, 53,500 mm deep, and 12,000 below grade. This paper describes the R and D work and testing activities performed to date to evaluate the concept of in-ground size reduction and stabilization of the contents of large containments similar to those at Hanford. In practice, the height of the Test Facility provided for a test cell that was approximately 22' deep. That prevented a 'full scale mockup' test in the sense that the Hanford Caisson configuration would be an identical replication. Therefore, the project was conducted in two phases. The first phase tested a simulated Caisson with surrogate contents, and part of a Chute section, and the second phase tested a full chute section. These tests were performed at VJ Technologies Test Facility located in East Haven, CT, as part of the Proof of Design Concept program for studying the feasibility of an in-situ grout/grind/mix/stabilize technology for the remediation of four caissons at the 618-11 Burial Ground at US Department of Energy Hanford Site. The test site was constructed such that multiple testing areas were provided for the evaluation of various tools, equipment and procedures under conditions that simulated the Hanford site, with representative soils and layout dimensions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Measurements of transverse ion beam emittance generated by high current ion sources at the GSI test injector facility HOSTI

The first emittance measurements with a new test injector facility (HOSTI) at GSI, designed for optimization of high current beam injection scheme, are discussed. The emittance of the ion beam (88 kV, Ar{sup 1+} ions) was investigated as a function of various parameters related to the ion source, extraction, and postacceleration systems and the optimum parameters for future low energy beam transport line are concluded. The preliminary results of the emittance measurements with superconducting solenoid are presented. The influence of the focusing strength as well as the longitudinal field shape of the solenoid on the beam emittance is described.

43 PARTICLE ACCELERATORS↗

The IPP RF Source: A High Power, Low Pressure Negative Ion Source For The Neutral Beam Injection System Of ITER

IPP Garching has successfully developed a RF driven negative ion source for the ITER neutral beam injection system. The RF source was chosen recently as the reference source for ITER due to its in principle maintenance-free operation. Current densities of 330 A/m{sup 2} and 230 A/m{sup 2} have been achieved for hydrogen and deuterium, respectively, at a pressure of 0.3 Pa and an electron/ion ratio of less than 1 for a small extraction area (7.0x10{sup -3} m{sup 2}) and short pulses (<4 s). The development concentrates now on extending the pulse length and extending the size of the source on two dedicated test facilities. The pulse length can be extended up to one hour at the long pulse test facility having an extraction area of 0.02 m{sup 2}. The large source test facility is equipped a large RF source with the width and half the height of the ITER beam source in order to demonstrate the homogeneity of a large RF plasma. The paper will give a short overview on the results achieved at the three test facilities of IPP; the underlying physical mechanisms are discussed with an emphasis on electron suppression.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Ring Model Development and Validation for Prismatic HTGR Core Thermal-hydraulics and Safety Analysis

Because of the complex core geometry, prismatic high temperature gas-cooled reactors (prismatic HTGRs) often exhibit complex thermal fluid behaviors during both normal operating and transient conditions. Most HTGR designs rely on passive safety system for decay heat removal, such as the reactor cavity cooling system (RCCS). During postulated accidents like Pressurized Conduction Cooldown (PCC) event, the decay heat is first radially transferred from the core region to the reactor vessel outer surface, then to the RCCS cooling panels. The peak fuel temperature is controlled by heat transfer mechanisms with two distinctive characteristic length scales, i.e., the core-wise effective heat conduction and local heat conduction in the fuel pellet scale. As both length scales are essential to determine the fuel temperature, from the modeling perspective, computer codes must be able to capture heat transfer in both scales. This is challenging for both computational fluid dynamics (CFD) tools because of extremely large amount of computation resources required, and for system analysis codes because of the challenge to model the complex core geometry. Under the support of DOE-NE’s Nuclear Energy Advanced Modeling and Simulation (NEAMS) program, efforts have been pursued to support HTGR technology development and its modeling and simulation needs. There is a particular need for advanced modeling and simulation tools to predict thermal-fluid behavior during safety-related transients. In our previous studies, the ring model was adopted in SAM and further developed to simulate the normal operating condition and a PCC event using the MHTGR-350 design of General Atomics as the reference design. This current work represents a continuation of these previous efforts, and the focus is to critically review and examine simplifications and assumptions made to develop the ring model, and to perform code validation using experimental data from an integral-effect test facility, the High Temperature Test Facility (HTTF) at the Oregon State University. In this study, the test PG-27 from the HTTF test suite was selected for code validation purpose. The test PG-27 is a transient test designed to simulate the PCC event of the MHTGR design. Very good agreements between SAM prediction and experimental measurements were found in both coolant and solid structure temperatures during the transient.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Full-Scale Cask Testing and Public Acceptance of Spent Nuclear Fuel Shipments - 12254

Full-scale physical testing of spent fuel shipping casks has been proposed by the National Academy of Sciences (NAS) 2006 report on spent nuclear fuel transportation, and by the Presidential Blue Ribbon Commission (BRC) on America's Nuclear Future 2011 draft report. The U.S. Nuclear Regulatory Commission (NRC) in 2005 proposed full-scale testing of a rail cask, and considered 'regulatory limits' testing of both rail and truck casks (SRM SECY-05-0051). The recent U.S. Department of Energy (DOE) cancellation of the Yucca Mountain project, NRC evaluation of extended spent fuel storage (possibly beyond 60-120 years) before transportation, nuclear industry adoption of very large dual-purpose canisters for spent fuel storage and transport, and the deliberations of the BRC, will fundamentally change assumptions about the future spent fuel transportation system, and reopen the debate over shipping cask performance in severe accidents and acts of sabotage. This paper examines possible approaches to full-scale testing for enhancing public confidence in risk analyses, perception of risk, and acceptance of spent fuel shipments. The paper reviews the literature on public perception of spent nuclear fuel and nuclear waste transportation risks. We review and summarize opinion surveys sponsored by the State of Nevada over the past two decades, which show consistent patterns of concern among Nevada residents about health and safety impacts, and socioeconomic impacts such as reduced property values along likely transportation routes. We also review and summarize the large body of public opinion survey research on transportation concerns at regional and national levels. The paper reviews three past cask testing programs, the way in which these cask testing program results were portrayed in films and videos, and examines public and official responses to these three programs: the 1970's impact and fire testing of spent fuel truck casks at Sandia National Laboratories, the 1980's regulatory and demonstration testing of MAGNOX fuel flasks in the United Kingdom (the CEGB 'Operation Smash Hit' tests), and the 1980's regulatory drop and fire tests conducted on the TRUPACT II containers used for transuranic waste shipments to the Waste Isolation Pilot Plant in New Mexico. The primary focus of the paper is a detailed evaluation of the cask testing programs proposed by the NRC in its decision implementing staff recommendations based on the Package Performance Study, and by the State of Nevada recommendations based on previous work by Audin, Resnikoff, Dilger, Halstead, and Greiner. The NRC approach is based on demonstration impact testing (locomotive strike) of a large rail cask, either the TAD cask proposed by DOE for spent fuel shipments to Yucca Mountain, or a similar currently licensed dual-purpose cask. The NRC program might also be expanded to include fire testing of a legal-weight truck cask. The Nevada approach calls for a minimum of two tests: regulatory testing (impact, fire, puncture, immersion) of a rail cask, and extra-regulatory fire testing of a legal-weight truck cask, based on the cask performance modeling work by Greiner. The paper concludes with a discussion of key procedural elements - test costs and funding sources, development of testing protocols, selection of testing facilities, and test peer review - and various methods of communicating the test results to a broad range of stakeholder audiences. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development and tests of molybdenum armored copper components for MITICA ion source

In order to prevent detrimental material erosion of components impinged by back-streaming positive D or H ions in the megavolt ITER injector and concept advancement beam source, a solution based on explosion bonding technique has been identified for producing a 1 mm thick molybdenum armour layer on copper substrate, compatible with ITER requirements. Prototypes have been recently manufactured and tested in the high heat flux test facility Garching Large Divertor Sample Test Facility (GLADIS) to check the capability of the molybdenum-copper interface to withstand several thermal shock cycles at high power density. This paper presents both the numerical fluid-dynamic analyses of the prototypes simulating the test conditions in GLADIS as well as the experimental results.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Design of Ionization Profile Monitors at the Integrable Optics Test Accelerator Facility at Fermilab

The Integrable Optics Test Accelerator (IOTA) at Fermilab is transitioning from an electron beam facility to a proton beam facility for studies in nonlinear accelerator optics and space-charge dominated proton beams. This project involves the commissioning and fabrication of Ionization Profile Monitors (IPMs) to enable beam profile measurements at IOTA. In general, IPMs work on principle of residual gas ionization by the beam to generate beam profile. This work focuses on a mechanical design that leverages a controlled injection of noble gases, primarily Argon, as the ultra-high vacuum of the IOTA ring provides insufficient residual gas for ionization. Efforts to understand vacuum integration to ensure compatibility with the storage ring environment, the integration of real-time data acquisition systems and the commissioning of the IPMs will be discussed. This project provides a versatile diagnostic tool, supporting IOTA’s role as a testbed for larger-scale accelerator facilities and contributing to the broader understanding of beam physics in high-intensity, high-space-charge regimes.

Mwaniki, M. W. [IIT, Chicago] (ORCID:0000000169057↗

Support of the Massachusetts — NREL Wind Technology Testing Center (Cooperative Research and Development Final Report)

Under the shared-resources CRADA agreement, NREL will collaborate with the Massachusetts Technology Park Corporation, d/b/a Massachusetts Technology Collaborative (MTC), in its efforts to design, construct, and operate the Massachusetts-NREL Wind Technology Testing Center (WTTC), which is an advanced blade testing facility capable of testing blades up to at least 70 meters in length. The WTTC building will be owned and the facility operated by the MTC. In the CRADA, NREL agrees to provide certain capital equipment and certain NREL employees at the WTTC facility for training, commissioning, and continued technical assistance. In addition, NREL will provide one or more Laboratory staff to serve on any WTTC advisory committee, a no-cost license of the NREL blade-resonance fatigue testing technology (NREL Testing IP) and training to MA staff at the NREL blade test facilities in Colorado. MTC will provide all other resources necessary to design, construct, and operate the WTTC.

17 WIND ENERGY↗

Argonne Pixel Tracking Telescope at the Fermilab Test Beam Facility

The Argonne Pixel Tracking Telescope is installed at the Fermilab Test Beam Facility. The telescope consists of six planar n + -in-n silicon sensors with a pixel size of 250 × 50 μm 2 . The instrumentation of the telescope is described including the electrical and mechanical setups. A 120 GeV proton beam is used to evaluate the telescope performance using criteria such as cluster size, pixel tracking efficiency, and spatial resolution. The spatial resolution of the telescope is measured to be 72 μm × 13 μm and is consistent with the resolution determined from the simulation. In conclusion, this telescope will be used to test the performance of the various silicon pixel technology as well as to study the effects and the performance of the detectors after being irradiated.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗