Search NASA⌕ Search

SEARCH · Search NASA

Results for “2011”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Title V Semi-Annual Emissions Report for Permit P100R1, July 1, 2011 - December 31, 2011

Reports of actual emissions from permitted sources in Section 2.0 shall be submitted on a 6 month basis. Reports shall not include emissions from insignificant activities. Emission estimates of criteria pollutants NOx, CO, SO2, PM and VOCs shall not include fugitive emissions. Emission estimates of HAPs shall include fugitive emissions. The reports shall include a comparison of actual emissions that occurred during the reporting period with the facility-wide allowable emission limits specified in Section 2.11 of this permit. The report required by Condition 4.1 shall be submitted within 90 days from the end of the reporting period. The semiannual report required by Condition 4.2 shall be submitted within 45 days from the end of the reporting period. The reporting periods are January 1 st to June 30 th and July 1 st to December 31 st . This condition is pursuant to 20.2.70.302.E.1 NMAC.

54 ENVIRONMENTAL SCIENCES↗

Seismic Loading for FAST: May 2011 — August 2011

As more wind farms are constructed in seismically active regions, earthquake loading increases in prominence for design and analysis of wind turbines. Early investigation of seismic load tended to simplify the rotor and nacelle as a lumped mass on top of the turbine tower. This simplification allowed the use of techniques developed for conventional civil structures, such as buildings, to beeasily applied to wind turbines. However, interest is shifting to more detailed models that consider loads for turbine components other than the tower. These improved models offer three key capabilities in consideration of base shaking for turbines: 1) The inclusion of aerodynamics and turbine control; 2) The ability to consider component loads other than just tower loads; and 3) An improvedrepresentation of turbine response in higher modes by reducing modeling simplifications. Both experimental and numerical investigations have shown that, especially for large modern turbines, it is important to consider interaction between earthquake input, aerodynamics, and operational loads. These investigations further show that consideration of higher mode activity may be necessary in theanalysis of the seismic response of turbines. Since the FAST code is already capable of considering these factors, modifications were developed that allow simulation of base shaking. This approach allows consideration of this additional load source within a framework, the FAST code that is already familiar to many researchers and practitioners.

17 WIND ENERGY↗

Advanced Redox Flow Batteries for Stationary Electrical Energy Storage: Milestone Report for the DOE Energy Storage Systems Program (FY12 Quarter 1: October 2011 through December 2011)

This report describes the status of the advanced redox flow battery research being performed at Pacific Northwest National Laboratories for the U.S. Department of Energy’s Energy Storage Systems Program. The Quarter 1 of FY2012 Milestone was completed on time. The milestone entails completion of evaluation and optimization of single cell components for the two advanced redox flow battery electrolyte chemistries recently developed at the lab, the all vanadium (V) mixed acid and V-Fe mixed acid solutions. All the single cell components to be used in future kW-scale stacks have been identified and optimized in this quarter, which include solution electrolyte, membrane or separator; carbon felt electrode and bi-polar plate. Varied electrochemical, chemical and physical evaluations were carried out to assist the component screening and optimization. The mechanisms of the battery capacity fading behavior for the all vanadium redox flow and the Fe/V battery were discovered, which allowed us to optimize the related cell operation parameters and continuously operate the system for more than three months without any capacity decay.

25 ENERGY STORAGE↗

LLNL NESHAPs Radionuclide Air Emission Report for 2011 (2011 Annual Report)

Lawrence Livermore National Security, LLC operates facilities at Lawrence Livermore National Laboratory (LLNL) where radionuclides are handled and stored. These facilities are subject to the U.S. Environmental Protection Agency (EPA) National Emission Standards for Hazardous Air Pollutants (NESHAPs) in Code of Federal Regulations (CFR) Title 40, Part 61, Subpart H, which regulates radionuclide emissions to air from Department of Energy (DOE) facilities. Specifically, NESHAPs limits the emission of radionuclides to the ambient air to levels resulting in an annual effective dose equivalent of 10 mrem (100 µSv) to any member of the public. Using measured and calculated emissions, and building-specific and common parameters, LLNL personnel applied the EPA-approved computer code, CAP88-PC, Version 1.0, to calculate the dose to the maximally exposed individual member of the public for the Livermore site and Site 300.

54 ENVIRONMENTAL SCIENCES↗

Fusion Energy Science Joint Facilities and Theory Research Target 2011: Final Report for the Period October 1, 2010 through September 30, 2011

Briefly stated, the goal of this combined experiment/theory milestone was to improve our knowledge of the physics processes that control the H-mode pedestal by applying models of these mechanisms to experimental data. A concerted and coordinated effort of experimental, theory and modeling activities has examined several physics mechanisms of interest, and has met the goals of the milestone. A few noteworthy results will be noted here. The activity has applied peeling-ballooning theory to all three machines, and increased confidence that the theory predicts the ultimate limits to pedestal height in an ELMing plasma. The activity has expanded the range of conditions for testing of the EPED model, and increased confidence in the ability of the model to compute the pedestal pressure height in medium aspect ratio tokamaks. Kinetic neoclassical models have been used to verify that an important analytic model for the pedestal bootstrap current has good accuracy in many regimes of interest but needs correction at high collisionality. A benchmarking effort between electromagnetic gyrokinetic codes has provided increased understanding of how to use these codes in the pedestal, and has laid the groundwork for using these codes to study linear stability of gyrokinetic modes in and on top of the pedestal. Comparisons of data and models have led to successful simulations of a quasi-coherent mode in C-Mod and to the tentative identification of a high frequency mode in DIII-D. A kinetic neoclassical model qualitatively agrees with some features of pedestal density profiles. A paleoclassical transport model quantitatively predicts some features of the electron temperature profiles in NSTX and DIII-D. The milestone activity also laid the groundwork for future advancements in understanding and predicting the pedestal. All three machines obtained a wealth of pedestal data under a wide variety of operating conditions. Some of these data have been analyzed already, and the analysis and comparison with models will provide important results over the next year or two. Many codes were improved in significant ways in order to model data under the challenging conditions of the pedestal. In addition, new and strengthened collaborations were established between experiment, modeling and theory, and these efforts include providing mechanisms for sharing experimental data. All of these efforts will continue to provide major benefits to future pedestal studies. Much of the experimental and modeling work performed to support this milestone is reported in detail in the research contributions to this report. Here, a summary of results from the various contributions, as they pertain to several proposed pedestal physics processes, is discussed here. Emphasis is placed on mechanisms for which there are results from one or more machines or one or more models. Work from preceding quarterly reports is used for some of this summary. At the end of this summary, a brief summary of implications for ITER and implications for future work will be presented.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

2011 Laser Diagnostics in Combustion Gordon Research Conference, (August 14-19, 2011, Waterville Valley Resort, Waterville Valley, NH)

The vast majority of the world's energy needs are met by combustion of fossil fuels. Optimum utilization of limited resources and control of emissions of pollutants and greenhouse gases demand sustained improvement of combustion technology. This task can be satisfied only by detailed knowledge of the underlying physical and chemical processes. Non-intrusive laser diagnostics continuously contribute to our growing understanding of these complex and coupled multi-scale processes. The GRC on Laser Diagnostics in Combustion focuses on the most recent scientific advances and brings together scientists and engineers working at the leading edge of combustion research. Major tasks of the community are developing and applying methods for precise and accurate measurements of fluid motion and temperatures; chemical compositions; multi-phase phenomena appearing near walls, in spray and sooting combustion; improving sensitivities, precision, spatial resolution and tracking transients in their spatio-temporal development. The properties and behaviour of novel laser sources, detectors, optical systems that lead to new diagnostic capabilities are also part of the conference program.

42 ENGINEERING↗

2011 Quantum Control of Light & Matter Gordon Research Conference (July 31-August 5, 2011, Mount Holyoke College, South Hadley, MA)

Quantum control of light and matter is the quest to steer a physical process to a desirable outcome, employing constructive and destructive interference. Three basic questions address feasibility of quantum control: (1) The problem of controllability, does a control field exist for a preset initial and target state; (2) Synthesis, constructively finding the field that leads to the target; and (3) Optimal Control Theory - optimizing the field that carries out this task. These continue to be the fundamental theoretical questions to be addressed in the conference. How to realize control fields in the laboratory is an ongoing challenge. This task is very diverse viewing the emergence of control scenarios ranging from attoseconds to microseconds. How do the experimental observations reflect on the theoretical framework? The typical arena of quantum control is an open environment where much of the control is indirect. How are control scenarios realized in dissipative open systems? Can new control opportunities emerge? Can one null decoherence effects? An ideal setting for control is ultracold matter. The initial and final state can be defined more precisely. Coherent control unifies many fields of physical science. A lesson learned in one field can reflect on another. Currently quantum information processing has emerged as a primary target of control where the key issue is controlling quantum gate operation. Modern nonlinear spectroscopy has emerged as another primary field. The challenge is to unravel the dynamics of molecular systems undergoing strong interactions with the environment. Quantum optics where non-classical fields are to be generated and employed. Finally, coherent control is the basis for quantum engineering. These issues will be under the limelight of the Gordon conference on Quantum Control of Light and Matter.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

"Impact of Thin Film Coatings on the Performance of Highly Energy-Efficient Windows", 2011 Technical Conference Proceedings, Symposium on Coating Advances and Impact on the Future of Vacuum Coating Industry (November 16, 2011)

Low-emissivity coatings are a well-established approach to improve the energy efficiency of modern windows. Prior to the emergence of low-e coatings, calculated window performance was dominated by "Center of Glass" performance (low-e coating, cavity design). The impact of the window edge (spacer, frame) increases with current simulation procedures, particularly for smaller windows in residential applications. Weighted averaging incorporating frames, edge of glass and center of glass alters the performance contribution of low-e coatings in the system. Thermal modeling allows effective simulation of the thermal performance of these increasingly complex window systems. This paper examines the contribution of modern low-e coatings to the overall thermal performance of a window designed for cold-climate use in the context of upcoming energy efficiency regulation and cost efficiency. Such windows will require multi-cavity glazing systems with low-e coatings at each cavity. Edge-of-glass and window frame zones cause higher thermal losses than the glazing unit, and thus the best-performing design options must be integrated. Glazing units that maintain neutral color are desirable but can not be achieved with current low-e coatings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The Origin and Evolution of Saturn's 2011-2012 Stratospheric Vortex

The planet-encircling springtime storm in Saturn's troposphere (December 2010-July 2011, Fletcher, L.N. et al. [2011]. Science 332, 1413-1414; Sánchez-Lavega, A. et al. [2011]. Nature 475, 71-74; Fischer, G. et al. [2011]. Nature 475, 75-77) produced dramatic perturbations to stratospheric temperatures, winds and composition at mbar pressures that persisted long after the tropospheric disturbance had abated. Thermal infrared (IR) spectroscopy from the Cassini Composite Infrared Spectrometer (CIRS), supported by ground-based IR imaging from the VISIR instrument on the Very Large Telescope and the MIRSI instrument on NASA's IRTF, is used to track the evolution of a large, hot stratospheric anticyclone between January 2011 and March 2012. The evolutionary sequence can be divided into three phases: (I) the formation and intensification of two distinct warm airmasses near 0.5 mbar between 25 and 35degN (B1 and B2) between January-April 2011, moving westward with different zonal velocities, B1 residing directly above the convective tropospheric storm head; (II) the merging of the warm airmasses to form the large single 'stratospheric beacon' near 40degN (B0) between April and June 2011, disassociated from the storm head and at a higher pressure (2 mbar) than the original beacons, a downward shift of 1.4 scale heights (approximately 85 km) post-merger; and (III) the mature phase characterised by slow cooling (0.11 +/- 0.01 K/day) and longitudinal shrinkage of the anticyclone since July 2011. Peak temperatures of 221.6 +/- 1.4 K at 2 mbar were measured on May 5th 2011 immediately after the merger, some 80 K warmer than the quiescent surroundings. From July 2011 to the time of writing, B0 remained as a long-lived stable stratospheric phenomenon at 2 mbar, moving west with a near-constant velocity of 2.70 +/- 0.04 deg/day (24.5 +/- 0.4 m/s at 40degN relative to System III longitudes). No perturbations to visible clouds and hazes were detected during this period. With no direct tracers of motion in the stratosphere, we use thermal windshear calculations to estimate clockwise peripheral velocities of 200-400 m/s at 2 mbar around B0. The peripheral velocities of the two original airmasses were smaller (70-140 m/s). In August 2011, the size of the vortex as defined by the peripheral collar was 65deg longitude (50,000 km in diameter) and 25deg latitude. Stratospheric acetylene (C2H2) was uniformly enhanced by a factor of three within the vortex, whereas ethane (C2H6) remained unaffected. The passage of B0 generated a new band of warm stratospheric emission at 0.5 mbar at its northern edge, and there are hints of warm stratospheric structures associated with the beacons at higher altitudes (p < 0.1 mbar) than can be reliably observed by CIRS nadir spectroscopy. Analysis of the zonal windshear suggests that Rossby wave perturbations from the convective storm could have propagated vertically into the stratosphere at this point in Saturn's seasonal cycle, one possible source of energy for the formation of these stratospheric anticyclones.

evolution↗

Annual Radioactive Waste Tank Inspection Program - 2011

Aqueous radioactive wastes from Savannah River Site (SRS) separations and vitrification processes are contained in large underground carbon steel tanks. Inspections made during 2011 to evaluate these vessels and other waste handling facilities along with evaluations based on data from previous inspections are the subject of this report. The 2011 inspection program revealed that the structural integrity and waste confinement capability of the Savannah River Site waste tanks were maintained. All inspections scheduled per SRR-LWE-2011-00026, HLW Tank Farm Inspection Plan for 2011, were completed. Ultrasonic measurements (UT) performed in 2011 met the requirements of C-ESR-G-00006, In-Service Inspection Program for High Level Waste Tanks, Rev. 3, and WSRC-TR-2002-00061, Rev.6. UT inspections were performed on Tanks 25, 26 and 34 and the findings are documented in SRNL-STI-2011-00495, Tank Inspection NDE Results for Fiscal Year 2011, Waste Tanks 25, 26, 34 and 41. A total of 5813 photographs were made and 835 visual and video inspections were performed during 2011. A potential leaksite was discovered at Tank 4 during routine annual inspections performed in 2011. The new crack, which is above the allowable fill level, resulted in no release to the environment or tank annulus. The location of the crack is documented in C-ESR-G-00003, SRS High Level Waste Tank Leaksite Information, Rev.6.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nevada National Security Site 2011 Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site

This report is a compilation of the groundwater sampling results from the Area 5 Radioactive Waste Management Site (RWMS). The data have been collected since 1993 and include calendar year 2011 results. During 2011, groundwater samples were collected and static water levels were measured at the three pilot wells surrounding the Area 5 RWMS. Samples were collected at UE5PW-1 on March 8, August 2, August 24, and October 19, 2011; at UE5PW-2 on March 8, August 2, August 23, and October 19, 2011; and at UE5PW-3 on March 8, August 2, August 23, and October 19, 2011. Static water levels were measured at each of the three pilot wells on March 1, June 7, August 1, and October 17, 2011. Groundwater samples were analyzed for the following indicators of contamination: pH, specific conductance, total organic carbon, total organic halides, and tritium. Indicators of general water chemistry (cations and anions) were also measured. Initial total organic carbon and total organic halides results for samples collected in August 2011 were above previous measurements and, in some cases, above the established investigation limits. However, after field sample pumps and tubing were disinfected with Clorox solution, the results returned to normal levels. Final results from samples collected in 2011 were within the limits established by agreement with the Nevada Division of Environmental Protection for each analyte. These data indicate that there has been no measurable impact to the uppermost aquifer from the Area 5 RWMS. There were no significant changes in measured groundwater parameters compared to previous years. The report contains an updated cumulative chronology for the Area 5 RWMS Groundwater Monitoring Program and a brief description of the site hydrogeology.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

High Performance Computing Facility Operational Assessment, FY 2011 Oak Ridge Leadership Computing Facility

Oak Ridge National Laboratory's Leadership Computing Facility (OLCF) continues to deliver the most powerful resources in the U.S. for open science. At 2.33 petaflops peak performance, the Cray XT Jaguar delivered more than 1.5 billion core hours in calendar year (CY) 2010 to researchers around the world for computational simulations relevant to national and energy security; advancing the frontiers of knowledge in physical sciences and areas of biological, medical, environmental, and computer sciences; and providing world-class research facilities for the nation's science enterprise. Scientific achievements by OLCF users range from collaboration with university experimentalists to produce a working supercapacitor that uses atom-thick sheets of carbon materials to finely determining the resolution requirements for simulations of coal gasifiers and their components, thus laying the foundation for development of commercial-scale gasifiers. OLCF users are pushing the boundaries with software applications sustaining more than one petaflop of performance in the quest to illuminate the fundamental nature of electronic devices. Other teams of researchers are working to resolve predictive capabilities of climate models, to refine and validate genome sequencing, and to explore the most fundamental materials in nature - quarks and gluons - and their unique properties. Details of these scientific endeavors - not possible without access to leadership-class computing resources - are detailed in Section 4 of this report and in the INCITE in Review. Effective operations of the OLCF play a key role in the scientific missions and accomplishments of its users. This Operational Assessment Report (OAR) will delineate the policies, procedures, and innovations implemented by the OLCF to continue delivering a petaflop-scale resource for cutting-edge research. The 2010 operational assessment of the OLCF yielded recommendations that have been addressed (Reference Section 1) and where appropriate, changes in Center metrics were introduced. This report covers CY 2010 and CY 2011 Year to Date (YTD) that unless otherwise specified, denotes January 1, 2011 through June 30, 2011. User Support remains an important element of the OLCF operations, with the philosophy 'whatever it takes' to enable successful research. Impact of this center-wide activity is reflected by the user survey results that show users are 'very satisfied.' The OLCF continues to aggressively pursue outreach and training activities to promote awareness - and effective use - of U.S. leadership-class resources (Reference Section 2). The OLCF continues to meet and in many cases exceed DOE metrics for capability usage (35% target in CY 2010, delivered 39%; 40% target in CY 2011, 54% January 1, 2011 through June 30, 2011). The Schedule Availability (SA) and Overall Availability (OA) for Jaguar were exceeded in CY2010. Given the solution to the VRM problem the SA and OA for Jaguar in CY 2011 are expected to exceed the target metrics of 95% and 90%, respectively (Reference Section 3). Numerous and wide-ranging research accomplishments, scientific support, and technological innovations are more fully described in Sections 4 and 6 and reflect OLCF leadership in enabling high-impact science solutions and vision in creating an exascale-ready center. Financial Management (Section 5) and Risk Management (Section 7) are carried out using best practices approved of by DOE. The OLCF has a valid cyber security plan and Authority to Operate (Section 8). The proposed metrics for 2012 are reflected in Section 9.

99 GENERAL AND MISCELLANEOUS↗

Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2011

This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2011 and includes inspection and repair activities completed at the following CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 407: Roller Coaster RadSafe Area (TTR); (3) CAU 424: Area 3 Landfill Complexes (TTR); (4) CAU 453: Area 9 UXO Landfill (TTR); and (5) CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Appendix B. The inspection checklists are included in Appendix C, field notes are included in Appendix D, and photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted May 3 and 4, 2011. Maintenance was performed at CAU 424, CAU 453, and CAU 487. At CAU 424, two surface grade monuments at Landfill Cell A3-3 could not be located during the inspection. The two monuments were located and marked with lava rock on July 13, 2011. At CAU 453, there was evidence of animal burrowing. Animal burrows were backfilled on July 13, 2011. At CAU 487, one use restriction warning sign was missing, and wording was faded on the remaining signs. A large animal burrow was also present. The signs were replaced, and the animal burrow was backfilled on July 12, 2011. As a best management practice, the use restriction warning signs at CAU 407 were replaced with standard Federal Facility Agreement and Consent Order signs on July 13, 2011. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2011, and the vegetation monitoring report is included in Appendix F.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hydroacoustic Evaluation of Overwintering Summer Steelhead Fallback and Kelt Passage at The Dalles Dam Turbines, Early Spring 2011

This report presents the results of an evaluation of overwintering summer steelhead (Oncorhynchus mykiss) fallback and early out-migrating steelhead kelts downstream passage at The Dalles Dam turbines during early spring 2011. The study was conducted by Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers, Portland District (USACE) to investigate whether adult steelhead are passing through turbines during early spring before annual sluiceway operations typically begin. The sluiceway surface flow outlet is the optimal non-turbine route for adult steelhead, although operating the sluiceway reduces hydropower production. This is a follow-up study to similar studies of adult steelhead passage at the sluiceway and turbines we conducted in the fall/winter 2008, early spring 2009, fall/winter 2009, and early spring 2010. The goal of the 2011 study was to characterize adult steelhead passage rates at the turbines while the sluiceway was closed so fisheries managers would have additional information to use in decision-making relative to sluiceway operations. Sluiceway operations were not scheduled to begin until April 10, 2011. However, based on a management decision in late February, sluiceway operations commenced on March 1, 2011. Therefore, this study provided estimates of fish passage rates through the turbines, and not the sluiceway, while the sluiceway was open. The study period was March 1 through April 10, 2011 (41 days total). The study objective was to estimate the number and distribution of adult steelhead and kelt-sized targets passing into turbine units. We obtained fish passage data using fixed-location hydroacoustics with transducers deployed at all 22 main turbine units at The Dalles Dam. Adult steelhead passage through the turbines occurred on 9 days during the study (March 9, 12, 30, and 31 and April 2, 3, 5, 7, and 9). We estimated a total of 215 ± 98 (95% confidence interval) adult steelhead targets passed through the turbines between March 1 and April 10, 2011. Horizontal distribution data indicated Main Unit 18 passed the majority of fish. Fish passage occurred throughout the day. We conclude that adult steelhead passed through turbines during early spring 2011 at The Dalles Dam.

13 HYDRO ENERGY↗

Annual Report of Monitoring at Morrill, Kansas, in 2011

Carbon tetrachloride contamination in groundwater at Morrill, Kansas, was initially identified in 1985 during statewide testing of public water supply wells for volatile organic compounds (VOCs). High levels of nitrate were also present in the wells. The city of Morrill is located in Brown County in the northeastern corner of the state, about 7 mi east of Sabetha (Figure 1.1). The population of Morrill as of the 2010 Census was approximately 230 (down from 277 in 2000). All residents of Morrill now obtain their drinking water from the Sabetha municipal water system via a pipeline constructed in 1991. The findings of the April 2011 and October 2011 monitoring events at Morrill support the following conclusions: (1) Groundwater flow during the 2011 review period (as in prior years) was predominantly to the south, from the vicinity of the former CCC/USDA facility toward Terrapin Creek. Automatic water level monitoring data suggest that spring precipitation and recharge represent the predominant factors affecting the local groundwater level patterns. (2) No significant changes were observed in the concentration or distribution of carbon tetrachloride in groundwater during the spring and fall 2011 monitoring events versus the spring and fall 2010 monitoring events. In October 2011, a maximum carbon tetrachloride concentration of 49 μg/L was identified in groundwater at well MW3S on the former CCC/USDA facility, with concentrations decreasing downgradient toward Terrapin Creek. (3) Since 2004, the accumulated results of 15 sampling events have demonstrated a significant decline in the maximum detected concentration of carbon tetrachloride in groundwater. In 1995, the contaminant was detected at the former CCC/USDA facility at 390 μg/L, while the current maximum levels are < 50 μg/L. The residual contaminant plume extending from the former CCC/USDA facility southward toward Terrapin Creek is well-defined and slowly declining in concentration naturally. (4) No carbon tetrachloride contamination was detected in 2011 in surface waters or shallow streambed sediments sampled at five locations along Terrapin Creek, downgradient from the former CCC/USDA facility. These results indicate that Terrapin Creek remains unaffected by the carbon tetrachloride plume. (5) Since 2007, the accumulated results of 10 monitoring events for surface water and sediment in Terrapin Creek have demonstrated no impact to the sediment and surface waters of the creek by carbon tetrachloride and no imminent risk for further degradation of the creek. (6) Terrapin Creek (tributary segment 308 to Walnut Creek) receives discharge from the Morrill wastewater treatment plant and several confined animal feeding operations regulated by the KDHE. The Walnut Creek watershed is designated by the KDHE as impaired by fecal coliform bacteria. Terrapin Creek is classified by the KDHE as not open to or accessible by the public for contact recreation and does not support the food procurement designated use (KDHE 2010b). (7) In July 2011, trace concentrations of carbon tetrachloride were detected in vegetation samples collected from trees at 2 of the 42 sampled locations south (downgradient) of the former CCC/USDA facility. (8) Sampling of indoor air in August 2010 to evaluate the potential for vapor intrusion into homes overlying and within 100 ft laterally of the identified carbon tetrachloride plume resulted in no detections of carbon tetrachloride. Low concentrations of chloroform, indicative of indoor air sources, were detected. Low radon levels were also detected. The results indicate no evidence of upward migration of vapors from the low-level carbon tetrachloride contamination in groundwater to indoor air.

54 ENVIRONMENTAL SCIENCES↗

Nevada National Security Site 2011 Waste Management Monitoring Report, Area 3 and Area 5 Radioactive Waste Management Site

Environmental monitoring data are collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada National Security Site (NNSS). These data are associated with radiation exposure, air, groundwater, meteorology, and vadose zone. This report summarizes the 2011 environmental data to provide an overall evaluation of RWMS performance and to support environmental compliance and performance assessment (PA) activities. Some of these data (e.g., radiation exposure, air, and groundwater) are presented in other reports. Direct radiation monitoring data indicate exposure levels at the RWMSs are within the range of background levels measured at the NNSS. Slightly elevated exposure levels outside the Area 3 RWMS are attributed to nearby historical aboveground nuclear weapons tests. Air monitoring data show tritium concentrations in water vapor and americium and plutonium concentrations in air particles are only slightly above detection limits and background levels. The measured levels of radionuclides in air particulates and moisture are below derived concentration guides for these radionuclides. During the last 2 weeks of March 2011, gamma spectroscopy results for air particles showed measurable activities of iodine-131 ( 131 I), cesium-134 ( 134 Cs), and cesium-137 ( 137 Cs). These results are attributed to the release of fission products from the damaged Fukushima Daiichi power plant in Japan. The remaining gamma spectroscopy results for air particulates collected at the Area 3 and Area 5 RWMS were below minimum detectable concentrations. Groundwater monitoring data indicate the groundwater in the uppermost aquifer beneath the Area 5 RWMS is not impacted by RWMS operations. Results of groundwater analysis from wells around the Area 5 RWMS were all below established investigation levels. The 86.3 millimeters (mm) (3.40 inches [in.]) of precipitation at the Area 3 RWMS during 2011 is 44% below the average of 154.1 mm (6.07 in.), and the 64.8 mm (2.55 in.) of precipitation at the Area 5 RWMS during 2011 is 47% below the average of 122.4 mm (4.82 in.). Water balance measurements indicate that evapotranspiration from the vegetated weighing lysimeter dries the soil and prevents downward percolation of precipitation more effectively than evaporation from the bare-soil weighing lysimeter. Automated vadose zone monitoring on Area 5 RWMS operational waste covers was not done during 2011 due to construction of the final evapotranspiration cover at these monitoring locations. Moisture from precipitation did not percolate below 122 centimeters (4 feet) in the vegetated final mono-layer cover on the U-3ax/bl disposal unit at the Area 3 RWMS before being removed by evapotranspiration. During 2011, there was no drainage through 2.4 meters (8 feet) of soil from the Area 3 drainage lysimeters that received only natural precipitation. Ten percent of the applied precipitation and irrigation drained from the bare-soil drainage lysimeter that received 3 times natural precipitation. All 2011 monitoring data indicate that the Area 3 and Area 5 RWMSs are performing within expectations of the model and parameter assumptions for the facility PAs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗