Search NASA⌕ Search

SEARCH · Search NASA

Results for “2026”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

PRELIMINARY JPSS-3 VIIRS POLARIZATION SENSITIVITY AND COMPARISON WITH S-NPP, JPSS-1 AND -2

The Visible-Infrared Imaging Radiometer Suite (VIIRS) was first launched on-board the Suomi National Polar-orbiting Partnership (S-NPP) spacecraft in October of 2011. There have been three subsequent builds of the VIIRS sensor for the Joint Polar Satellite System (JPSS) program with JPSS-1, -2 and -3 having launch dates of November 2017, March 2022 and 2026 respectively. There is also a JPSS-4 VIIRS, that is in hardware integration during 2020, with a launch date of 2031. VIIRS has 22 bands: 7 thermal emissive bands (TEBs), 14 reflective solar bands (RSBs) and a Day Night Band (DNB). Ocean Color/Chlorophyll (OCC) products use calibrated Science Data Records (SDRs) for bands M1-M7(0.412-0.865μm) to compute their ocean chemistry products. These bands require accurate polarization sensitivity characterization to compensate for polarized upwelling Rayleigh scatter and produce accurate OCC Environment Data Products (EDRs). VIIRS polarization sensitivity requirement failures have driven hardware modifications to the bandpass filters and dichroic beam splitter over the program. This paper will discuss the preliminary JPSS-3 polarization results and how these hardware modifications, as the JPSS program progresses, have affected the sensor performance. Comparisons of the polarization sensitivities between sensor builds will be discussed along with the hardware modifications that contributed to their differences.

VIIRS↗

Technology Development for a Potential Hybrid Mars Ascent Vehicle

With Mars Sample Return mission concepts being considered for launch as early as 2026, technology development to enable this potential campaign is currently underway. One of the critical items in the campaign would be a Mars Ascent Vehicle, which would be responsible for getting the samples from the surface of Mars to orbit around Mars. This would be the first rocket launch from another planet. Therefore, several challenges arise due to the Martian atmosphere and remote location. A technology development program to determine the feasibility of a hybrid rocket for a Mars Ascent Vehicle is entering its fourth year. Highlights and successes of this program will be discussed.

Oglesby, Britt↗

Hybrid propulsion technology development for a potential near-term Mars Ascent Vehicle

A technology development program for a potential hybrid Mars Ascent Vehicle (MAV) is currently underway to enable its infusion into a potential Mars Sample Return (MSR) campaign as early as 2026. A NASA team from the Jet Propulsion Laboratory (JPL), Marshall Space Flight Center (MSFC) and Ames Research Center (ARC) is leading and coordinating this program. A new propellant combination: the wax-based fuel, SP7, and MON-30 were proposed for a hybrid option for the MAV propulsion system several years ago. Since that time, hotfire testing with a similar propellant combination (SP7/MON-3) has been completed and a pathway to achieving high performance with the flight propellant combination is currently being pursued. Highlights of the progress to date and plans for risk reduction and the next steps in hybrid technology will be presented.

Zilliac, Greg↗

Preliminary JPSS-3 VIIRS Polarization Sensitivity and Comparison with S-NPP, JPSS-1 and -2

The Visible-Infrared Imaging Radiometer Suite (VIIRS) was first launched on-board the Suomi National Polar-orbiting Partnership (S-NPP) spacecraft in October of 2011. There have been three subsequent builds of the VIIRS sensor for the Joint Polar Satellite System (JPSS) program with JPSS-1, -2 and -3 having launch dates of November 2017, March 2022 and 2026 respectively. There is also a JPSS-4 VIIRS, that is in hardware integration during 2020, with a launch date of 2031. VIIRS has 22 bands: 7 thermal emissive bands (TEBs), 14 reflective solar bands (RSBs) and a Day Night Band (DNB). Ocean Color/Chlorophyll (OCC) products use calibrated Science Data Records (SDRs) for bands M1-M7 (0.412-0.865μm) to compute their ocean chemistry products. These bands require accurate polarization sensitivity characterization to compensate for polarized upwelling Rayleigh scatter and produce accurate OCC Environment Data Products (EDRs). VIIRS polarization sensitivity requirement failures have driven hardware modifications to the bandpass filters and dichroic beam splitter over the program. This paper will discuss the preliminary JPSS-3 polarization results and how these hardware modifications, as the JPSS program progresses, have affected the sensor performance. Comparisons of the polarization sensitivities between sensor builds will be discussed along with the hardware modifications that contributed to their differences.

VIIRS↗

HyTEC Hybrid Thermally Efficient Core

As part of the NASA Advanced Air Vehicles Program (AAVP), a new project is being formulated called Hybrid Thermally Efficient Core (HyTEC) in which NASA intends to accelerate the development of small turbofan engine core technologies, culminating in an advanced core demonstration in the 2026 timeframe. NASA Glenn Research Center plans to issue a NASA Research Announcement (NRA) for HyTEC Small Core Technology Demonstration, in preparation the HyTEC Project is holding an industry day February 24, 2021. The HyTEC goal is to demonstrate increased thermal efficiency with integrated high power-density core engine technologies achieving a 5- to 10-percent fuel burn benefit, versus 2020 best in class, for early 2030s entry into service (EIS) single-aisle aircraft. In order to accomplish this, NASA intends to collaborate with industry in a cost sharing arrangement on key technologies that NASA can accelerate to strengthen the US industry position on highly efficient, power dense small cores for a future single aisle aircraft.

Anthony Nerone↗

Robotic Mars Sample Return and Earth entry vehicle concept development

NASA has studied potential Mars Sample Return over many decades, and the most recent Planetary Science Decadal Survey recommended making significant progress on this topic one of its highest priority goals. Recent inter-agency discussions and scientific support are lending credence to current Mars Sample Return planning activities, which notionally target launch of Sample Retrieval Lander and Earth Return Orbiter flight elements in 2026, and return of Martian samples to Earth in 2031. As part of the Mars Sample Return architecture under consideration, an Earth Entry Vehicle would perform the final phase by protecting the samples through severe entry environments using a 60-deg. sphere-cone flying on a passive/ballistic trajectory. The Earth Entry Vehicle design activities in particular are considering a variety of potential challenges, including: minimizing vehicle mass due to the need to travel to Mars and back to Earth, vehicle robustness to Micrometeroid and Orbital Debris impacts, capability to withstand severe entry environments while minimizing landing ellipse size, and providing impact load attenuation during a high-speed landing to meet Martian sample tube load limits and ensure sample containment in off-nominal scenarios. The present work provides a snapshot of current study work in progress, and highlights paths being taken to address these various design challenges for the conceptual Earth Entry Vehicle.

Corliss, James↗

Run Time Improvement Efforts for the Roman Space Telescope Thermal Analysis

"Observatory thermal models for large, complex missions, such as the Wide Field InfraRed Survey Telescope (WFIRST) mission, produce an immense amount of data to be processed. Configuration management of the model throughout the project life cycle has mainly focused on which versions of the subsystem models form the current observatory level configuration. However, the results produced by the model are not nearly as well The Roman Space Telescope (RST), formerly known as the Wide Field InfraRed Survey Telescope, is the next great astrophysics observatory mission to follow the James Webb Space Telescope with a planned launch in 2026. As a large scale, flagship mission for NASA with challenging wave front error stability requirements, a single model approach for both thermal discipline analysis and thermo-optical distortion analysis has been used since the early days of the project. In alleviating the need to maintain two separate models for different analysis types, it imposes run time penalties on the thermal analysis with a large model with significant radiation heat exchange. Throughout the lifecycle of the project, the component models have steadily grown in size, resulting in a continuous growth of the overall observatory model with each update and consequently a considerable increase in the model run time. While ongoing efforts to reduce run time are continuously investigated, previous efforts had primarily focused on timestep size and total simulation time to reach quasi-equilibrium. More recently, studies were performed on the total number of radiation couplings (radks) included in the model, which has a nearly linear impact on run time, but increases exponentially with node count. As standard practice for spacecraft analysis, small radks were excluded from the temperature solution based on the assumption that their interchange/view factors have a negligible impact on heat flow. Four approaches were investigated to reduce the model run time while minimizing the impact on accuracy: (1) the Equivalent Radiation Network node, (2) Progressive Radk Inclusion as solution proceeds, (3) Targeted Radk Filtering for critical/non critical areas, and lastly (4) Representation of culled radks with Backloads. Furthermore, the investigation of model run time also revealed that cold cases took noticeably longer to run than hot cases; the root computational inefficiencies were explored along with the computation penalty of linearization of the external radks and recalculation of temperature dependent linear couplings at each timestep. This paper outlines the details of each of the above approaches and their impact on run time and model accuracy.

Thermal Analysis↗

Run Time Improvement Efforts for the Roman Space Telescope Thermal Analysis

Observatory thermal models for large, complex missions, such as the Wide Field InfraRed Survey Telescope (WFIRST) mission, produce an immense amount of data to be processed. Configuration management of the model throughout the project life cycle has mainly focused on which versions of the subsystem models form the current observatory level configuration. However, the results produced by the model are not nearly as well The Roman Space Telescope (RST), formerly known as the Wide Field InfraRed Survey Telescope, is the next great astrophysics observatory mission to follow the James Webb Space Telescope with a planned launch in 2026. As a large scale, flagship mission for NASA with challenging wave front error stability requirements, a single model approach for both thermal discipline analysis and thermo-optical distortion analysis has been used since the early days of the project. In alleviating the need to maintain two separate models for different analysis types, it imposes run time penalties on the thermal analysis with a large model with significant radiation heat exchange. Throughout the lifecycle of the project, the component models have steadily grown in size, resulting in a continuous growth of the overall observatory model with each update and consequently a considerable increase in the model run time. While ongoing efforts to reduce run time are continuously investigated, previous efforts had primarily focused on timestep size and total simulation time to reach quasi-equilibrium. More recently, studies were performed on the total number of radiation couplings (radks) included in the model, which has a nearly linear impact on run time, but increases exponentially with node count. As standard practice for spacecraft analysis, small radks were excluded from the temperature solution based on the assumption that their interchange/view factors have a negligible impact on heat flow. Four approaches were investigated to reduce the model run time while minimizing the impact on accuracy: (1) the Equivalent Radiation Network node, (2) Progressive Radk Inclusion as solution proceeds, (3) Targeted Radk Filtering for critical/non critical areas, and lastly (4) Representation of culled radks with Backloads. Furthermore, the investigation of model run time also revealed that cold cases took noticeably longer to run than hot cases; the root computational inefficiencies were explored along with the computation penalty of linearization of the external radks and recalculation of temperature dependent linear couplings at each timestep. This paper outlines the details of each of the above approaches and their impact on run time and model accuracy.

Thermal Analysis↗

Nancy Grace Roman Space Telescope Observatory Implementation and Challenges

NASA’s Nancy Grace Roman Space Telescope (Roman), previously referred to as Wide Field Infrared Survey Telescope (WFIRST), was named after Dr. Nancy Grace Roman, an astronomer and NASA pioneer of modern space-based astronomy who is known as the “mother of the Hubble Space Telescope”. Roman is a deep space infrared observatory with a Hubble-sized telescope and wide field of view instrument (greater than 100 times that of Hubble’s) that will conduct a high latitude time-domain survey, a high latitude imaging and spectroscopic survey, and a galactic bulge time-domain survey to characterize dark energy and expand the census of exoplanets in our galaxy while allowing a broad range of astrophysics research. Roman will also demonstrate exoplanet coronagraphy with active wave front control technology and provide general investigator programs for the science community. Roman is finishing the critical design phase and is planning for launch in 2026. It will operate in a quasi-halo orbit about Sun-Earth L2, 1.5 million kilometers from Earth, for a five-year primary mission life. The Observatory features an Optical Telescope Assembly with an existing, repurposed 2.4m primary mirror, a Wide Field Instrument with a focal plane array comprised of 18 HgCdTe near-infrared detectors and a grism, prism and filter elements for imaging and spectroscopy in support of the primary surveys, as well as a Coronagraph instrument technology demonstration with starlight suppression technology for direct imaging and spectroscopy of exoplanets. The telescope is mounted to the Instrument Carrier composite truss structure which also optically meters each instrument, includes a Launch Load and Vibration Isolation System to provide passive isolation of spacecraft jitter sources while also supporting the payload during launch and is attached to the Spacecraft Bus. The Spacecraft also includes a Solar Array Sunshield ,Deployable Aperture Cover, Lower Instrument Sunshade, High Gain Antenna System, and Outer Barrel Assembly. Figure 1 shows an overview of the Roman Observatory. When fully integrated, Roman will be the largest Observatory assembled and tested at NASA’s Goddard Space Flight Center. Figure 1. Roman Observatory Overview Development of scientific satellites is challenging by nature, as the pursuit to broaden scientific knowledge always pushes the boundary of what has come before. The implementation of the Roman mission is a prime example and expected challenges have been augmented by the foundational decision to use the existing telescope components, developed in the early 2000s by another Government agency for a different application. Other unique aspects of the Roman mission, such as its survey nature, the vast amount of data required to meet science objectives, and packaging of the Observatory elements around the existing telescope components, create constrained design spaces that drive competing requirements across Observatory subsystems. Given these challenges, systems engineering has been a critical discipline in balancing implementation decisions for the Roman mission and will continue to play a key role going forward. This paper will discuss details of the Roman Observatory configuration, as well as some of the systems engineering challenges and the decision-making process used to mature the Roman Space Telescope preliminary design to implementation.

Lisa Ml Bartusek↗

Nancy Grace Roman Space Telescope Observatory Implementation and Challenges

NASA’s Nancy Grace Roman Space Telescope (Roman) is a deep space infrared observatory with a Hubble-sized telescope and wide field of regard with a boresight view greater than 200 times that of the Hubble Wide Field Camera 3infrared field of view, that will conduct a suite of science surveys to characterize dark energy and expand the census of exoplanets in our galaxy. Roman will also demonstrate exoplanet coronagraphy with active wavefront control technology and provide general investigator opportunities for the science community. Roman is finishing the critical design phase and is planning for launch in 2026. It will operate at the second Sun-Earth-Moon Lagrange for a five-year primary mission life. The Observatory features a telescope with an existing, repurposed 2.4m primary mirror, a Wide Field Instrument with a near-infrared detector focal plane array and optical elements for imaging and spectroscopy, as well as a Coronagraph instrument technology demonstration for direct imaging and spectroscopy of exoplanets. The telescope and instruments are mounted to an Instrument Carrier for optical metering and isolation from Spacecraft-induced disturbances. The Spacecraft includes a Bus, Solar Array Sunshield, Deployable Aperture Cover, Outer Barrel Assembly, and Star Tracker/Inertial Reference Unit Bench. When fully integrated, Roman will be the largest Observatory assembled and tested at NASA’s Goddard Space Flight Center. The development of scientific satellites is challenging and pushes engineering boundaries to broaden scientific knowledge. The Roman mission implementation is a prime example and expected challenges have been amplified by the foundational decision to use existing, repurposed telescope components. Other unique aspects of the Roman mission, including its survey nature, large data volume, and Observatory packaging, create constrained design spaces that drive competing requirements across Observatory subsystems. Given these challenges, systems engineering has been a critical discipline in balancing implementation decisions and will continue to play a key role in the development of the Roman mission. This paper will discuss details of the Roman Observatory configuration, systems engineering challenges and the decision-making process used to mature the Roman Space Telescope from preliminary design to implementation.

Lisa M L Bartusek↗

NASA-ESA Mars Sample Return Program

NASA's Perseverance mission arrived at Jezero Crater on Mars in February 2021 and began scientific studies and acquisition of Martian samples for return to Earth by future missions, consistent with the recommendations of the U.S. science community in the previous Planetary Science Decadal Survey. NASA and ESA have established a joint Mars Sample Return (MSR) program to safely deliver these samples back to Earth, allowing researchers to use advanced scientific instrumentation that cannot be transported on robotic spacecraft and enable future studies of carefully curated samples using capabilities that have not yet been developed. The MSR architecture consists of two flight elements to follow Perseverance, the NASA-led Sample Retrieval Lander (SRL) and the ESA-led Earth Return Orbiter (ERO). The ERO is designed to orbit Mars and provide relay services for the SRL, including its ESA Sample Fetch Rover (SFR) and the NASA Mars Ascent Vehicle (MAV). The SRL deploys the SFR to retrieve Martian samples cached by the Perseverance rover and then returns the samples to the Orbiting Sample container (OS) on board the MAV using the ESA Sample Transfer Arm (STA). Independently, Perseverance could also deliver samples retained onboard to the OS. The MAV would launch and release the OS into low Mars orbit for rendezvous with the ERO. Upon successful capture of the OS in the ERO’s primary payload, the NASA Capture/Containment Return System (CCRS), the OS would be safely contained and loaded into the Earth Entry System (EES). The ERO will leave Mars orbit and release the EES on Earth approach on a ballistic reentry trajectory through the Earth's atmosphere for landing in the United States. Following return of the samples to Earth, the samples would be protected, preserved, assessed, curated, and made available to the international science community for scientific research and analysis. The NASA SRL and ESA ERO missions are expected to launch as early as 2026, with the return of Martian samples to Earth as early as 2031. MSR’s primary objective is the return of scientifically selected Mars samples for detailed investigation in terrestrial laboratories. The mission would also further inform the design of future human missions. The Mars Sample Return campaign is underway with the successful collection of several scientifically selected samples in Jezero Crater. The MSR Program is working towards a confirmation review in 2023 for the remaining flight elements.

Mars↗

Qualification of Domestic Lyocell Based Phenolic Impregnated Carbon Ablator (PICA-D) for NASA Missions

Phenolic Impregnated Carbon Ablator (PICA) is a low-density ablator that has been used as the planetary entry heatshield for several NASA missions since the late 90’s. Its low density and efficient performance characteristics have proven effective for use from Discovery to Flag-ship class missions, from Sample Return missions such as Stardust, OSIRIS-REx to large Mars Lander missions such as Mars Science Lab (MSL) and Mars 2020. The rayon-based carbon precursor raw material used in PICA preform manufacturing has experienced multiple supply chain issues. The challenge involved in finding a replacement fiber source is in processing as well as in the final performance of the ablator. Each replacement necessitates the requalification of the PICA. This has happened at least twice in the past 25 years, and a third substitution is now needed. Due to the obsolescence of the input foreign rayon fiber source, a new variant of PICA has been developed using a domestic rayon-like fiber source, Lyocell. Due to its flight heritage and proven capability, PICA is baselined as the Thermal Protection System (TPS) for Dragonfly and Mars Sample Return Sample Retrieval Lander mission and is being considered for the backshell of the Mars Sample Return Earth Entry System. All three missions are due to be launched between 2026 and 2028. The challenge this time is to ensure the PICA made with domestic material is a suitable replacement to the heritage PICA used in MSL and Mars 2020 so that the design of the heatshield can be matured without much risk. Results are presented from the recent efforts of 22 PICA-D billets that were Lot Acceptance Tested. Thermal, mechanical, and representative environment arc-jet tests have been conducted. Testing of PICA-Domestic (PICA-D) indicates very comparable performance with respect to “heritage” PICA materials and thus PICA-D is expected to be a sustainable and nearly a “drop-in” replacement solution for future NASA missions.

Matt Gasch↗

Qualification of Domestic Lyocell Based Phenolic Impregnated Carbon Ablator (PICA-D) for NASA Missions

Phenolic Impregnated Carbon Ablator (PICA) is a low-density ablator that has been used as the planetary entry heatshield for several NASA missions since the late 90’s. Its low density and efficient performance characteristics have proven effective for use from Discovery to Flag-ship class missions, from Sample Return missions such as Stardust, OSIRIS-REx to large Mars Lander missions such as Mars Science Lab (MSL) and Mars 2020. The rayon-based carbon precursor raw material used in PICA preform manufacturing has experienced multiple supply chain issues. The challenge involved in finding a replacement fiber source is in processing as well as in the final performance of the ablator. Each replacement necessitates the requalification of the PICA. This has happened at least twice in the past 25 years, and a third substitution is now needed. Due to the obsolescence of the input foreign rayon fiber source, a new variant of PICA has been developed using a domestic rayon-like fiber source, Lyocell. Due to its flight heritage and proven capability, PICA is baselined as the Thermal Protection System (TPS) for Dragonfly and Mars Sample Return Sample Retrieval Lander mission and is being considered for the backshell of the Mars Sample Return Earth Entry System. All three missions are due to be launched between 2026 and 2028. The challenge this time is to ensure the PICA made with domestic material is a suitable replacement to the heritage PICA used in MSL and Mars 2020 so that the design of the heatshield can be matured without much risk. Results are presented from the recent efforts of 22 PICA-D billets that were Lot Acceptance Tested. Thermal, mechanical, and representative environment arc-jet tests have been conducted. Testing of PICA-Domestic (PICA-D) indicates very comparable performance with respect to “heritage” PICA materials and thus PICA-D is expected to be a sustainable and nearly a “drop-in” replacement solution for future NASA missions.

PICA↗

Implementation of the Solar Exclusion Zone Burn Through Maneuvers for DSCOVR to Preserve Fuel for the Gyro-less Spacecraft in a Sun-Earth L1 Lissajous Orbit

DSCOVR (Deep Space Climate Observatory) is a National Oceanic and Atmos-pheric Administration (NOAA) space weather, space climate, and Earth obser-vation satellite operating in a Sun-Earth L1 Lissajous orbit. This report summa-rizes the two-burn maneuver campaign performed in Summer 2021 to transfer DSCOVR from the collapsing phase into the expansion phase of the Lissajous orbit to avoid the Solar Exclusion Zone (SEZ). The two-maneuver campaign performed in July and August 2021 was successful and resulted in saving the mission 31 kilograms of fuel and 100 m/s of delta-v reserved for SEZ maneu-vers which are no longer required until 2026 or 2027.

DSCOVR↗

Implementation of Field-Oriented Control in Joint Actuator Electronics for Satellite-Servicing Robotics

NASA’s OSAM-1 (On-orbit Servicing, Assembly, and Manufacturing 1) is a robotic spacecraft designed to extend the life of a satellite. Launching in 2026, the OSAM-1 servicer will use a robotic arm to grasp, refuel, and relocate Landsat 7. In order to accomplish the various servicing operations, including the critical auto-grapple capturing operation, the robot arm uses active compliance and visual servo control loops. These sophisticated control algorithms are enabled by the high performance Joint Control Boards (JCBs). At the core of the robot arm control architecture, the JCBs employ field-oriented control (FOC) to accurately commutate and efficiently control joint actuator torque. FOC offers numerous benefits over other current control methods, allowing the JCBs to achieve the high bandwidth and performance required by the outer control loops. As an added benefit, a torque feed-forward term allows the FOC loop to simulate microgravity actuator performance during ground testing. In this paper, a FOC implementation for space robotics applications and an end-to-end actuator calibration process are discussed.

Sam Zhao↗

Low Temperature Brazing: A Candidate Method for Preventing Interplanetary Contamination During the Mars Sample Return Mission

NASA and the European Space Agency are planning a joint Mars Sample Return campaign, scheduled to launch in 2026, with a very specific objective: return to Earth the rock and regolith samples that have been collected on Mars by NASA’s Perseverance rover. This is a very complex, multi-step process intended to culminate in the safe return of Mars samples to Earth. The term “safe return” implies use of a robust containment vessel designed to prevent any uncontained or unsterilized material from Mars from being returned to Earth. Hence, any technology chosen for sealing this vessel has to meet stringent contamination requirements, but also to withstand impact forces upon landing. This paper describes the development of a primary candidate for the sealing approach: brazing.

Schein, Mike↗

Feedback-Directed Random Sequence Generation for Verifying Spacecraft Flight Rule Violations

The Psyche: Journey to a Metal World mission will be launched in 2022 to study the largest metal asteroid in the main asteroid belt, (16) Psyche. The spacecraft will perform a Mars Flyby in 2023 and enter (16) Psyche’s orbit in 2026. Throughout the mission, safely operating the spacecraft will require abiding by a set of flight rules that can be defined at any point in the mission lifecycle. These flight rules ensure that the spacecraft is operating within allowed regimes and a discrete event simulation tool, SEQGEN, will be used to model all command sequences prior to uplink. One of SEQGEN’s responsibilities is to determine if a command sequence violates any flight rules. For each flight rule, the necessary logic to determine if a violation has occurred is implemented in the SEQGEN adaptation, which is maintained by the mission. This adaptation must be tested thoroughly to ensure that the flight rule logic was interpreted and implemented correctly. This work describes a tool, RandSEQ, that autogenerates a suite of flight rule violating test sequences for each flight rule implemented in SEQGEN, and can be used by any mission using SEQGEN. The Psyche SEQGEN adaptation is still being developed, but so far, RandSEQ has been used to generate 532 test cases, that can be reviewed by various stakeholders, for 40 flight rules. The ability to autogenerate these test cases has significantly reduced the amount of time required to implement and test each flight rule.

Su, Laura↗

The Roman Space Telescope Optical System: Status, Test, and Verification

The Nancy Grace Roman Space Telescope (“Roman”) was prioritized by the 2010 Decadal Survey in Astronomy & Astrophysics and is NASA’s next flagship observatory. Launching no earlier than 2026, Roman will explore the nature of dark energy, as well as expand the census of exoplanets in our galaxy via microlensing. Roman will also demonstrate key technology needed to image and spectrally characterize extra-solar planets. Roman’s large field of view, agile survey capabilities, and excellent stability enable these scientific objectives, yet present unique challenges for the design, test, and verification of its optical system. The Roman optical system comprises an optical telescope assembly (OTA) and two instruments: the primary science wide-field instrument (WFI) and a technology demonstration coronagraph instrument (CGI), and the instrument carrier (IC), which meters the OTA to each instrument. This paper presents a status of the optical system hardware as it begins integration and test (I&T), as well as describes key optical test, alignment, and verification activities as part of the I&T program.

space telescope↗