Search NASA⌕ Search

SEARCH · Search NASA

Results for “AC PV effect”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

40 records · Page 3

Soft-Switching Solid-State Transformer With Reduced Conduction Loss

Solid-state transformers (SSTs) are a promising solution photovoltaic (PV), wind, traction, data center, battery energy storage system (BESS), and fast charging electric vehicle (EV) applications. The traditional SSTs are typically three-stage, i.e., hard-switching cascaded multilevel rectifiers and inverters with dual active bridge (DAB) converters, which leads to bulky passives, low efficiency, and high electromagnetic interference (EMI). This article proposes a new soft-switching solid-state transformer (S4T). The S4T has full-range zero-voltage switching (ZVS), electrolytic capacitor-less dc link, and controlled dv/dt, which reduces EMI. The S4T comprises two reverse-blocking current-source inverter (CSI) bridges, auxiliary branches for ZVS, and transformer magnetizing inductor as a reduced dc link with 60% ripple. Compared with the prior S4T, an effective change on the leakage inductance diode is made to reduce the number of the devices on the main power path by 20% for significant conduction loss saving and retain the same functionality of damping the resonance between the leakage and resonant capacitors and recycling trapped leakage energy. The conduction loss saving is crucial, being the dominating loss mechanism in SSTs. Importantly, the proposed single-stage SST not only holds the potential for high power density and high efficiency but also has full functionality, e.g., multiport dc loads integration, voltage regulation, and reactive power compensation, unlike the traditional single-stage matrix SST. The S4T can achieve single-stage isolated bidirectional dc–dc, ac–dc, dc–ac, or ac–ac conversion. It can also be configured input-series output-parallel (ISOP) in a modular way for medium-voltage (MV) grids. Hence, the S4T is a promising candidate for the SST. The full functionality, e.g., voltage buck–boost, multiport, etc., and the universality of the S4T for the dc–dc, dc–ac, and ac–ac conversion are verified through the simulations and experiments of two-port and three-port MV prototypes based on 3.3 kV SiC MOSFETs in dc–dc, dc–ac, and ac–ac modes at 2 kV.

14 SOLAR ENERGY↗

Aging Effect Analysis of PV Inverter Semiconductors for Ancillary Services Support

PV inverters can provide reactive power while generating active power. An ongoing microgrid implementation at Duke Energy actively engages non-utility PVs to generate/absorb reactive power in support of ancillary services to increase microgrid resiliency during extreme events. PV systems are requested to provide reactive power support: 1) in response to grid voltage variation to better regulate the local voltage; or 2) in response to utility incentives, such as following Transactive Energy System (TES) incentives. However, providing ancillary services might shorten the lifetime expectation of PV inverter semiconductors. This paper summarizes the potential impacts on a PV inverter semiconductor's lifetime when providing ancillary services. The analysis presented in this research work shows that providing reactive power support will increase the mean junction temperature and the junction temperature variation of the inverter diodes. This increased junction temperature will eventually lead to shorter diode lifetime. The lifetime estimation of semiconductors is briefly reviewed. The power losses of PV inverter semiconductors are derived as a support analysis to the junction temperature calculation. In addition, the impact of the filtering inductor on the semiconductor current distribution is discussed. The theoretical analysis presented in this research work is supported by simulation results.

14 SOLAR ENERGY↗

Optimized V1G and V2G Electric Vehicle Fleet Management and Grid Transaction at Marine Corps Air Station Miramar in San Diego, CA

The overall technical goal of the project was to demonstrate an all-electric bi-directional non-tactical fleet at Marine Corps Air Station (MCAS) Miramar that was integrated and controlled with other distributed energy resources (DERs) (i.e., PV, stationary battery, and building loads) to provide resilience to critical electric loads in the event of grid outages, to minimize charging costs, and to provide economic energy resources to electricity markets. In this project, the specific, technical objectives were: 1. Demonstrate that bi-directional electric vehicles can provide critical complementary services to fixed storage batteries in microgrid applications while performing function as non-tactical vehicles. 2. Demonstrate participation of bi-directional (V2G) and unidirectional (V1G) PEVs for demand management and minimization of charging costs. 3. Demonstrate integration of multiple DERs for grid service participation. US Marine Corps Air Station (MCAS) Miramar in San Diego was the site of this electric vehicle-to-microgrid-utility grid test and demonstration project. Existing microgrid assets in this study included (1) a public works building; (2) a 30-kW rooftop photovoltaic (PV) system and (3) a separate 250 kW carport PV system. In this project, six bi-directional V2G vans were located at the MCAS Miramar’s showcase building-scale microgrid to develop and test technical capabilities that V2G can provide in microgrid applications (e.g., cost reduction and resiliency). These resources provided aggregated demand management and simulated participation in current retail DR programs. The vehicles used in this demonstration were selected because they provided functionality that MCAS Miramar needed, 15 passenger transport and facilities work cargo carrying capacity, and bi-directional charging capability that the research project required. All vehicles in this study were manufactured and distributed by VIA Motors, Inc. There were six vehicles total and each was VIA’s VTRUX eREV V2G model, a modified General Motors Chevrolet 2500 2WD van. Three of the vans were configured as passenger vans and the other three were configured as cargo vans. Each van had an on-board bi-direcrtional inverter/charger, Bel Power Solutions model 350INVCHGT150-120-240-8G nominally rated at +/-15 kW. The VIA van’s charging connector follows the J1772 charging protocol. The bi-directional EVSEs demonstrated in this study were manufactured by Coritech, Inc. Each VGI-80-AC charging station enabled enhanced V2G charging capability to a Clipper Creek CS-100 charging module. The enhanced capabilities included ethernet communication following the SEP2.0 protocol with a distributed energy resource function set and an operator screen displaying real-time SOC, voltage, and current. The VGI-80-AC charging stations are classified as level 2 with a maximum current output of 80 A or effectively 19 kW. The VIA van’s onboard charger limited the charging and discharging power to 15 kW in each direction. A control computer was installed in the EWOC and connected to an existing monitor. The V2G control communication network was a completely stand-alone closed system that did not have any connection to any other networks on the base. A cybersecure remote communication connection was created with a cellular modem, firewall hardware, and a virtual private network configuration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Utility-Scale Solar: Empirical Trends in Project Technology, Cost, Performance, and PPA Pricing in the United States – 2018 Edition

The utility-scale solar sector has led the overall U.S. solar market in terms of installed capacity since 2012. In 2017, the utility-scale sector accounted for nearly 60% of all new solar capacity, and is expected to maintain its market-leading position for at least another six years. Two-thirds of all states, representing all regions of the country, are now home to one or more utility-scale solar projects. This report—the sixth in an ongoing annual series—provides in-depth data-driven analysis of the utility-scale solar project fleet in the United States. Drawing on empirical project-level data from a wide range of sources, this report analyzes technology trends, installed project prices, operating costs, capacity factors, power purchase agreement ("PPA") prices, the levelized cost of solar energy (LCOE), and the market value of solar. Given its current preeminence in the market, utility-scale PV also dominates much of this report, though data from CPV and CSP projects are also presented where appropriate. Highlights from this year's edition include: -Installation and Technology Trends: The use of solar trackers dominated 2017 installations with nearly 80% of all new capacity. In a reflection of the ongoing geographic expansion of the market beyond California and the high-insolation Southwest, the median insolation level at newly built project sites declined again in 2017. While new fixed-tilt projects are now seen predominantly in less-sunny regions, tracking projects are increasingly pushing into these same regions. The median inverter loading ratio grew to 1.32 in 2017, allowing the inverters to operate closer to full capacity for a greater percentage of the day. -Installed Prices: Median installed PV project prices have steadily fallen by two-thirds since the 2007-2009 period, to $2.0/WAC (or $1.6/WDC) for projects completed in 2017. The lowest 20th percentile of projects within our 2017 sample were priced at or below $1.8/WAC, with the lowest-priced projects around $0.9/WAC. Overall price dispersion across the entire sample has decreased steadily every year since 2013; similarly, price variation across regions decreased in 2017. -Operation and Maintenance ("O&M") Costs: PV O&M costs were in the neighborhood of $16/kWAC-year, or $8/MWh, in 2017. These numbers include only those costs incurred to directly operate and maintain the generating plant. -Capacity Factors: The cumulative net AC capacity factors of individual projects vary widely, from 14.3% to 35.2%, with a sample median of 26.3%. This project-level variation is based on a number of factors, including the strength of the solar resource at the project site, whether the array is mounted at a fixed tilt or on a tracking mechanism, the inverter loading ratio, degradation, and curtailment. Changes in at least the first three of these factors drove mean capacity factors higher from 2010-vintage to 2013-vintage projects, where they've remained fairly steady among more-recent project vintages as an ongoing increase in the prevalence of tracking has been offset by a build-out of lower resource sites. -PPA Prices and LCOE: Driven by lower installed project prices and improving capacity factors, levelized PPA prices for utility-scale PV have fallen dramatically over time, by $20-$30/MWh per year on average from 2006 through 2012, with a smaller price decline of ~$10/MWh per year evident from 2013 through 2016. Most recent PPAs in our sample—including many outside of California and the Southwest—are priced at or below $40/MWh levelized (in real 2017 dollars), with a few priced as aggressively as ~$20/MWh. The median LCOE among operational PV projects in our sample has followed PPA prices lower, suggesting a relatively competitive market for PPAs. -Solar's Wholesale Energy Market Value: Falling PPA prices have been offset to some degree by a decline in the wholesale energy market value of solar within higher-penetration markets like California, where solar earned just 79% of the average price across all hours within CAISO's real-time wholesale energy market in 2017 (down from 125% back in 2012). In other markets with less solar penetration, however, solar's hourly generation profile still earns more than the average wholesale price (e.g., 127% in ERCOT, 112% in PJM). -Solar+Storage: Adding battery storage is one way to at least partially restore the value of solar, and three recent PV+storage PPAs in Nevada (each using 4-hour batteries sized at 25% of PV nameplate capacity) suggest that the incremental PPA price adder for storage has fallen to ~$5/MWh, down from ~$15/MWh just a year ago for a similarly configured project. As PV plus battery storage becomes more cost-effective, a number of developers are regularly offering it as a viable upgrade to standalone PV. At the end of 2017, there were at least 188.5 GW of utility-scale solar power capacity within the interconnection queues across the nation. The 2017 growth within these queues is widely distributed across all regions of the country, but is most pronounced in the up-and-coming Midwest region, which accounts for 27% of the 99.2 GW of new queue capacity. The widening geographic distribution is as clear of a sign as any that the utility-scale market is maturing and expanding outside of its traditional high-insolation comfort zones.

14 SOLAR ENERGY↗