Search NASA⌕ Search

SEARCH · Search NASA

Results for “ATD-2 (Airspace Technology Demonstration 2)”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Field Evaluation of the Baseline Integrated Arrival, Departure, and Surface (IADS) Capabilities at Charlotte Douglas International Airport (CLT)

NASA is currently developing a suite of decision support capabilities for integrated arrival, departure, and surface (IADS) operations in a metroplex environment. The effort is being made in three phases, under NASA's Airspace Technology Demonstration 2 (ATD-2) sub-project, through a strong partnership with the Federal Aviation Administration (FAA), air carriers, airport, and general aviation community. The Phase 1 Baseline IADS capabilities provide enhanced operational efficiency and predictability of flight operations through data exchange and integration, tactical surface metering, and automated coordination of release time of controlled flights for overhead stream insertion. The users of the IADS system include the personnel at the Charlotte Douglas International Airport (CLT) air traffic control tower, American Airlines ramp tower, CLT terminal radar approach control (TRACON), and Washington Center. This paper describes the Phase 1 Baseline IADS capabilities and field evaluation conducted at CLT from September 2017 for a year. From the analysis of operations data, it is estimated that 538,915 kilograms of fuel savings, and 1,659 metric tons of CO2 emission reduction were achieved during the period with a total of 944 hours of engine run time reduction. The amount of CO2 savings is estimated as equivalent to planting 42,560 urban trees. The results have also shown that the surface metering had no negative impact on on-time arrival performance of both outbound and inbound flights. The technology transfer of Phase 1 Baseline IADS capabilities has been made to the FAA and aviation industry, and the development of additional capabilities for the subsequent phases is underway.

and Surface (IADS)↗

Assessment of Ramp Times (ART 2) Human-In-The-Loop (HITL) Simulation - Final Results

Airspace Technology Demonstration 2 (ATD-2) sub-project conducted a human-in-the-loop (HITL) simulation to assess various strategies for Ramp controllers to deliver aircraft to the spot at a specified time. Results show that the rate of compliance with the spot time improved when Ramp controllers first complied with a gate hold advisory for pushing aircraft off the gates. Results also show that Ramp controller workload was lower when they only had to focus on complying with the gate hold advisories.

Stevens, Lindsay K.↗

Future Surface Decision Support Overview

This presentation presents the capabilities of the Airspace Technology Demonstration 2 (ATD-2) Integrated Arrival, Departure, and Surface (IADS) system as a surface decision support tool for users, including Air Traffic Control (ATC) personnel working at the tower and Center facilities and airline Ramp personnel. The ATD-2 IADS capabilities include data exchange and integration, modeling and scheduling, surface metering, and departure scheduling for overhead stream insertion of constrained flights.

Surface Decision Support↗

Departure Approval Request Compliance Effects on Overhead Stream Insertion

Integrated Arrival-Departure-Surface (IADS) air traffic management relies on information sharing and integration between automation systems for efficiency, predictability, and throughput improvements throughout the National Airspace System (NAS). The NASA Airspace Technology Demonstration 2 (ATD-2) project supports this effort by integrating SWIM (System Wide Information Management) information and evaluating and refining potential TFDM (Terminal Flight Data Manager) functionality in a surface traffic management system fielded at Charlotte-Douglas International Airport (CLT). Among the IADS areas under study during ATD-2 is the use of electronically negotiated departure times for efficiently inserting flights into overhead traffic streams. Stream-insertion accuracy is important for reducing excessive vectoring that negatively impacts the NAS by increasing controller workload along with aircraft fuel burn and emissions. Departure-time approval requests (APREQs) provide center-approved departure times to allow for smooth stream insertion. In this presentation, TBFM (Time-Based Flow Management) and ATD-2 flight summary data are used to empirically show that APREQ compliance leads to improved stream insertion.

Overhead-Stream Insertion↗

Ramp Traffic Console (RTC) Lessons Learned

This presentation provides lessons learned for use of ramp traffic control (RTC) and ramp manager traffic console (RMTC) features of the ATD-2 (Airspace Technology Demonstration 2) Integrated Arrival, Departure, and Surface (IADS) system in an operational environment.

Jung, Yoon↗

Fast-Time Simulation for Evaluating the Impact of Estimated Flight Ready Time Uncertainty on Surface Metering

NASA has been developing and demonstrating new concepts and technologies for Integrated Arrival, Departure, and Surface (IADS) traffic management capabilities under the Airspace Technology Demonstration 2 (ATD-2) project. One of the IADS capabilities in the ATD-2 project is surface metering enabled by a tactical surface scheduler to provide controllers with the pushback advisories for departures at gates. The tactical surface scheduler uses the estimated flight ready times provided by airlines, called Earliest Off-Block Times (EOBTs), as input to calculate the target off-block times for pushback advisories. However, the EOBTs are often inaccurate and deviate from the actual flight ready times, which may reduce the benefits of surface metering. In this paper, a linear regression model is developed to model the EOBT uncertainty distribution over time based on actual EOBT data collected at Charlotte airport. This EOBT model is integrated with a tactical surface scheduler and a fast-time simulation tool. To evaluate the impact of the EOBT accuracy on airport surface operations, fast-time simulations are implemented for selected traffic scenarios under different levels of modelled EOBT accuracy. The simulation results show that the EOBT uncertainty affects several performance metrics related to the surface metering, such as gate hold, taxi time reduction, and target takeoff time predictability, which in turn influences ATD-2's scheduler performance.

tactical surface scheduler↗

Fast-Time Simulation for Evaluating the Impact of Estimated Flight Ready Time Uncertainty on Surface Metering

NASA has been developing and demonstrating new concepts and technologies for Integrated Arrival, Departure, and Surface (IADS) traffic management capabilities under the Airspace Technology Demonstration 2 (ATD-2) project. One of the IADS capabilities in the ATD-2 project is surface metering enabled by a tactical surface scheduler to provide controllers with the pushback advisories for departures at gates. The tactical surface scheduler uses the estimated flight ready times provided by airlines, called Earliest Off-Block Times (EOBTs), as input to calculate the target off-block times for pushback advisories. However, the EOBTs are often inaccurate and deviate from the actual flight ready times, which may reduce the benefits of surface metering. In this paper, a linear regression model is developed to model the EOBT uncertainty distribution over time based on actual EOBT data collected at Charlotte airport. This EOBT model is integrated with a tactical surface scheduler and a fast-time simulation tool. To evaluate the impact of the EOBT accuracy on airport surface operations, fast-time simulations are implemented for selected traffic scenarios under different levels of modelled EOBT accuracy. The simulation results show that the EOBT uncertainty affects several performance metrics related to the surface metering, such as gate hold, taxi time reduction, and target takeoff time predictability, which in turn influences ATD-2's scheduler performance.

tactical surface scheduler↗

Assessment of Ramp Times 4 (ART-4) Human-in-the-Loop (HITL) Simulation - Final Results

Airspace Technology Demonstration 2 (ATD-2) sub-project conducted a Human-in-the-Loop (HITL) simulation to assess Ramp Controllers ability to deliver aircraft to the spot within the compliance window (+/- 5 min) under various metering conditions. Compliance at the spot was similar between the different metering conditions ranging between 83% - 85% and increased to 92% - 99% when aircraft were initially compliant with gate advisories. Metering benefits that exist in the field did not appear in the simulation due to simulation artifacts such as gate holding departures in Baseline, which effectively metered the demand. The combined Target Off-Block Time (TOBT) +Target Movement Area entry Time (TMAT) condition resulted in higher workload on the Workload Assessment Keypad (WAK) than the Baseline and TOBT alone conditions, and lower situation awareness than the Baseline condition. Metering at Dallas/Fort Worth International Airport (DFW) with TOBT only or TMAT only could be equally effective, and either would be a better option than TOBT + TMAT due to increased workload and reduced situation awareness.

Jung, Yoon C.↗

STBO Client User Manual

This document serves as a user manual for the STBO Client utilized by ATC in the Tower. It describes the elements of the STBO Client and provides explanations for how to interact with the interface. STBO Client functionality includes the display of live flight information and management of traffic restrictions. The STBO Client is a component of the NASA Airspace Technology Demonstration 2 (ATD-2) sub-project.

Surface Decision Support Tool↗

Ramp Traffic Console (RTC) Ramp Manager Traffic Console (RMTC) User Manual

This document serves as a user manual for the Ramp Traffic Console (RTC) Version 4.6.0 in the Ramp Control Tower. It describes the elements of the RTC interface and provides explanations for how to utilize RTC to manage ramp traffic. RTC provides live data for all flights including Earliest Off-Block Times (EOBTs) and Traffic Management Initiatives (TMIs). RTC augments management of ramp traffic by providing notifications of runway configurations, and lists flight arrivals, near arrivals, and departures as additional sources of information. This document also provides instructions for use of the Ramp Manager Traffic Console (RMTC) for Ramp Manager functions, such as adjusting the priority flight list and setting the ramp status. The RTC/RMTC ramp tools are components of the NASA Airspace Technology Demonstration 2 (ATD-2) sub-project.

Airport surface decision support tool↗

Objective Measurement Assessment of Departure Advisories for Ramp Controllers from a Human-In-The-Loop Simulation

NASA has developed and demonstrated an integrated arrival, departure, and surface concept and technology for efficient air traffic management in busy terminal environments under the Airspace Technology Demonstration 2 (ATD-2) subproject. In April/May 2019, NASA conducted a human-in-the-loop (HITL) simulation with ramp and tower controllers having experience at Dallas/Fort Worth International Airport (DFW). The purpose of this HITL was to evaluate the impacts of various surface metering goals in ramp operations at DFW and test new features of the ATD-2 ramp controller decision support tools. This paper evaluates the quantitative metrics from the simulation results related to airport performance and surface metering given various departure scheduling advisories for ramp controllers. The objective measurements compared include the controller’s compliance with the target times for pushback and spot arrival, the number of metered flights, aircraft gate hold and taxi time, runway throughput, and the number of aircraft on the surface. The simulation results show that there were no statistically significant benefits from surface metering at DFW for airport performance due to several simulation artifacts notably different from real operations. Considering controller workload and situation awareness, following either gate pushback or spot arrival advisory could be a better metering option than utilizing both advisories when surface metering is applied at DFW.

airport ramp traffic control decision support↗

Investigating Effects of Controlled Flights through Fast-Time Simulation

Departure flights at major U.S. airports are often subject to Traffic Management Initiatives to mitigate congestion and delay due to demand-capacity imbalances. These controlled flights can lead to inefficiency and delay on the airport surface. The integrated arrival, departure, and surface traffic management capabilities developed by NASA’s Airspace Technology Demonstration 2 (ATD-2) sub-project provide enhanced operational efficiency and predictability of flight operations through data exchange and integration, surface metering, and automated coordination of release time of controlled flights for overhead stream insertion. This paper evaluates the impacts of controlled flights on airport performance and assesses the ATD-2 benefits of pushback hold advisories for both controlled and non-controlled flights using fast-time simulation for Charlotte Douglas International Airport.

controlled flight↗

Insights Gained from the Ongoing Integrated Arrival/Departure/Surface (IADS) Traffic Flow Operational Prototype

The Insights Gained from the Ongoing Integrated Arrival/Departure/Surface (IADS) Traffic Flow Operational Prototype presentation will include a definition of the learning objectives for the audience, an overview/explanation of the ATD-2 project, an overview of the ATC/Operator data exchange and integration that is foundational for advanced surface capability, and a description of the ATC/Operator data exchange and integration research questions and insights. It will also give an overview of the overhead stream around CLT and a preview of the operational integration benefits, research questions, and insights related to the overhead stream. It will continue with a surface metering process flow overview, a description of local surface demand/capacity imbalance, the benefits of collaborative surface metering, the associated research questions and insights, and wrap up with the next steps planned for ATD-2.

collaborative operational environment↗

Electronic Departure Approval Requests in ATD-2 Daily Operations

The NASA Airspace Technology Demonstration 2 project is investigating Integrated Arrival-Departure-Surface air traffic management through progressive refinement of a surface air traffic management system fielded at Charlotte-Douglas International Airport. Among the areas under study are departure release-time approval request (APREQ) traffic management initiatives. Scheduling departures at downstream points and complying with approved departure release times helps flights fit smoothly into busy traffic streams. This paper presents a review of APREQ operations and compliance data from daily electronic APREQ negotiations over fourteen months beginning in January 2018. It describes APREQ-compliance improvements observed as the electronic negotiation process has matured and discusses contributing factors, including renegotiation of departure release times.

Call for release↗

Charlotte - EDC Evaluation and Demonstration (CEED) Human-in-the-Loop Results Briefing to ATD-2 FAA Partners

The Charlotte EDC Evaluation and Demonstration (CEED) was the first Human-In-The-Loop experiment under the Air Traffic Management Technology Demonstration-2 (ATD-2) project. The purpose of the study was fourfold: 1) to establish a simulation environment (Charlotte) for airspace operations for ATD-2 technology, 2) to simulate current-day departures and arrival operations, 3) to assess the impact of current Traffic Management Initiatives (TMI) on Charlotte (CLT) departure flows and en route operations in Washington (ZDC) and Atlanta Centers (ZTL), and 4) to assess the impact of departure takeoff time compliance on airspace operations. The experimental design compared 3 TMIs and 2 compliance levels. Fourteen FAA retired controllers participated in the simulation. In addition, two Traffic Management Coordinators from ZTL and ZDC managed traffic flows. Surface and airborne delays, control efficiency, throughput, realism, workload, and acceptability were assessed and will be compared across the experimental conditions. Participants rated the simulation as very realistic. Results indicate that different TMIs have different impacts on surface and airspace delay. Departure compliance indicates partial benefits to sector complexity and controller workload. This simulation will provide an initial assessment of the tactical scheduling problems that the ATD-2 technology will address in the near term.

airspace technology demonstration 2↗

On-Time Performance ASPM Non-Parametric Statistical Analysis

The purpose of this analysis is to provide a data-driven examination of two selected flight metrics, i.e., (1) total taxi-out time and (2) actual off time minus scheduled off block time. More specifically, Aviation System Performance Metrics (ASPM) data were analyzed to determine any possible differences in CLT (Charlotte Douglas International Airport) departure flights on these two metrics when comparing pre-IADS (Integrated Arrival, Departure, and Surface Operations) against post-IADS metering operations. This was originally presented to the ATD-2 (Airspace Technology Demonstration-2) Analytics team in August 2018.

tech transfer↗

Scheduling Improvements Following the Phase 1 Field Evaluation of the ATD-2 Integrated Arrival, Departure, and Surface Concept

NASA is conducting the Airspace Technology Demonstration-2 (ATD-2) to evaluate an Integrated Arrival, Departure, and Surface (IADS) traffic management system that extends traffic sequencing for the entire life-cycle of a flight from departure gate to arrival gate within multi-airport, metroplex environments. After development and testing in human-in-the-loop simulations, the IADS system was deployed to Charlotte Douglas International Airport for a three-year field evaluation. From the initial IADS concept development through the end of the Phase 1 field evaluation many lessons were learned with regards to the IADS scheduler. In this paper we describe how data from the Phase 1 field evaluation helped identify scheduler improvements and guided the implementation of refinements. The improvements in the IADS scheduler described in this paper are incorporated into the IADS Phase 2 scheduler enabling strategic Surface Metering Programs and will be evaluated during the field evaluation.

Airspace Technology Demonstration-2↗