Search NASA⌕ Search

SEARCH · Search NASA

Results for “Automated Resilience Management System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

50 records · Page 3

Resilient U.S. Land Ports of Entry

The continued operation of Land Ports of Entry (LPOE), managed by the Customs and Border Protection (CBP) and General Services Administration% is vital to the U.S. economy and security. Border faculties are included in the Department of Homeland Security (DHS) Government Facilities Sector2, one of the 16 critical infrastructures "whose assets, systems, and networks, whether physical or virtual, are considered so vital to the United States that their incapacitation or destruction would have a debilitating effect on security, national economic security, national public health or safety, or any combination thereof.'" Specifically, disruptions to the flow of border crossing traffic, in the form of closures or increased border crossing wait times, impact the economy and security of all countries involved. This paper describes a process for analyzing and improving the resilience of U.S. Land Ports of Entry. For LPOE, the team believes that energy resilience is the primary objective due to the complete reliance on the e-manifest system and the increasing use of Multi-Energy Portals (MEPs). Emanifests are part of CPB's Automated Commercial Environment (ACE). They document several key pieces of information about cargo vehicles wishing to cross the border into the United States and are submitted before arriving at the port. Vehicles can be flagged for more invasive inspection based on the content of the e-manifest. MEPs are a non-intrusive inspection (NII) technology used to scan the contents of the cargo. Together MEPs and ACE serve an important role in aiding CBP with their mission to protect "the public from dangerous people and materials", and "enabling legitimate trade and travel.'" To analyze resilience of a port, the team would need to understand the port's current energy usage, which systems depend on energy and what backup systems exist, and any emergency operation plans that dictate how systems are operated in the event of a power outage. The team would also need to determine the design basis threats (DBTs) for the LPOE which could include natural disasters, manmade events, and accidents. The magnitudes of the DBTs are calculated and are then translated to expected impacts on the infrastructure and systems at the port. With this information gathered, existing LPOE models developed here at Sandia National Laboratories could be extended to support decisions about resilience. Current models are implemented in FlexSim, a 3rd party discrete event simulator. FlexSim provides 3-D visuals of physical layout that can reveal valuable insights, allows input to be variable (e.g. time it takes to interact with the CBP officer at primary inspection can vary) so that a whole range of possibilities can be captured in the results, and can be used to collect user-defined output metrics. Current LPOE models focus on cargo vehicle traffic, and process changes caused by the installation of new drive-through MEPs. Extending them to address resilience questions would require the addition of key pieces of information learned during the resilience analysis including critical systems, failure rates, and process changes for when failures occur. The primary output metric for current models is border crossing wait time. Additional metrics would also be added to the model to gain a more complete understanding of impacts related to resilience, for example, MEP scan rate. Once complete, the model could be used to analyze the effectiveness of mitigation strategies representing some future state.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

ARCADE Analysis Methods & Validation Pathway

The Advanced Reactor Cyber Analysis and Development Environment (ARCADE) provides an automated analysis system which supports risk-informed performance based (RIPB) evaluations of nuclear control systems. Every possible cyber threat which could lead to consequence is identified by simulating the unsafe control action sequences which transform digital harm into physical harm. Eliminating the simulation of complex digital cyber attack chains cuts out unnecessary computational overhead and focuses directly on the physics of cyber-physical attacks. This focus enables designers to make informed decisions which can entirely eliminate categories of cyber threats against advanced reactors through the physical nature of the plant design. This narrowing of cyber threat against nuclear power plants through the physics of the system is intended to make any remaining threat management and cost efficient. This is the goal of the Tiered Cyber Analysis (TCA) outlined in NRC Draft Regulation Guide (RG) 5.96, which provides a RIPB cybersecurity approach for new reactors. ARCADE has been custom developed to meet the demands of the rigorous analysis required in Tier 1 of the TCA, which forms the foundation of the TCA process. Currently, ARCADE is still under development, but has made significant leaps in capability. A pilot analysis on the opensource Asherah simulator was performed which demonstrated key functionality goals. The next stage of ARCADE development involves improvements to the applications which support the analysis system, and enabling the analysis system to utilize the full suite of unsafe control action simulations. Since the analysis method’s core functions are complete, validation of the analysis method will be started concurrent to the next development stages. The automated analysis ARCADE will provide can radically change the cybersecurity design process for advanced reactors, reducing the cost of security implementation while enhancing cyber resilience. The pathway for ARCADE’s development to this goal has become much clearer. The majority of technical hurdles have been cleared, and the remaining development needs have been solidified. ARCADE is now capable of assisting the advanced reactor design process and directly support advanced reactor industry RIPB practices.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

BrickQA: Bridging the Semantic Gap in Building Operations with Dynamic Graph Exploration

While standardized ontologies like the Brick schema address data heterogeneity in Building Automation Systems (BAS), accessing this semantic data remains a challenge as domain experts often lack the expertise to formulate complex SPARQL queries. To bridge this gap, we present BrickQA, a Large Language Model (LLM)-based framework that translates natural language into executable SPARQL queries through structured query decomposition, dynamic schema exploration, and inline validation. BrickQA utilizes an iterative reasoning agent to actively navigate graph topology through dynamic exploration actions without requiring exhaustive context injection or model fine-tuning. This approach effectively mitigates hallucinations, particularly in large-scale building knowledge graphs. Empirical evaluation on BuildingQA, a standardized benchmark, demonstrates that BrickQA significantly outperforms ReAct baselines, delivering a 0.291–0.355 absolute F1 improvement while achieving 3 × –12.7 × higher token cost-efficiency. Beyond these metrics, the framework maintains structural fidelity across heterogeneous buildings and remains resilient to ambiguous queries without requiring site-specific fine-tuning. Furthermore, a case study on operational analytics validates the framework’s capability to handle temporal and aggregation constraints, effectively transforming abstract semantic models into actionable facility management insights.1

Ko, Yun-Dam↗

Robotics for Energy Infrastructure Construction on Earth and Beyond: Pilot Study Exploring Level 3-4 Semi-Autonomous Installation of a Reduced-Scale Photovoltaic Power Plant Prototype: Preprint

There is a growing need to build energy infrastructure at massive scale on both Earth and in space. On Earth, increasing electricity demand from applications such as AI data centers is driving rapid expansion of power systems, while in space, long-duration missions such as lunar operations require reliable and resilient energy infrastructure that can be deployed quickly. These needs outpace the capabilities of conventional construction methods. Robotic construction offers a path to faster, lower-cost, and more consistent deployment, yet most existing approaches focus on automating individual tasks rather than end-to-end assembly. The Industrialized Construction Innovation (ICI) team at the National Laboratory of the Rockies (NLR), in collaboration with the Colorado School of Mines, has been investigating robotics and automation strategies for rapid end-to-end energy infrastructure construction. This paper presents a pilot study demonstrating level 3-4 semi-autonomous, end-to-end robotic assembly of a reduced-scale photovoltaic power plant prototype under terrestrial conditions. The approach combines hardware redesign of photovoltaic components for robotic compatibility, discrete-event and physics-based robotic simulations in synthetic environments, and sim-to-real deployment to execute end-to-end robotic assembly of[NM1.1][NM1.2] tracking components, structural members, photovoltaic modules, and embedded electrical connections. The pilot identifies key limitations like tolerance management, perception and localization, end effector capability, fastening methods, and multi-physics simulation fidelity, that must be addressed to enable end-to-end robotic assembly of full-scale energy infrastructure. The study highlights how these insights inform scaling strategies for terrestrial energy infrastructure and adaptation to unstructured and extreme environments, including off-world scenarios such as robotic assembly of vertical tall lunar towers.

14 SOLAR ENERGY↗

Risk of Performance Decrements and Adverse Health Outcomes Resulting from Sleep Loss, Circadian Desynchronization, and Work Overload

Sleep loss, circadian desynchronization, and work overload occur to some extent for ground and flight crews, prior to and during spaceflight missions. Ground evidence indicates that such risk factors may lead to performance decrements and adverse health outcomes, which could potentially compromise mission objectives. Efforts are needed to identify the environmental and mission conditions that interfere with sleep and circadian alignment, as well as individual differences in vulnerability and resiliency to sleep loss and circadian desynchronization. Specifically, this report highlights a collection of new evidence to better characterize the risk and reveals new gaps in this risk as follows: Sleep loss is apparent during spaceflight. Astronauts consistently average less sleep during spaceflight relative to on the ground. The causes of this sleep loss remain unknown, however ground-based evidence suggests that the sleep duration of astronauts is likely to lead to performance impairment and short and long-term health consequences. Further research is needed in this area in order to develop screening tools to assess individual astronaut sleep need in order to quantify the magnitude of sleep loss during spaceflight; current and planned efforts in BHP's research portfolio address this need. In addition, it is still unclear whether the conditions of spaceflight environment lead to sleep loss or whether other factors, such as work overload lead to the reduced sleep duration. Future data mining efforts and continued data collection on the ISS will help to further characterize factors contributing to sleep loss. Sleep inertia has not been evaluated during spaceflight. Ground-based studies confirm that it takes two to four hours to achieve optimal performance after waking from a sleep episode. Sleep inertia has been associated with increased accidents and reduced performance in operational environments. Sleep inertia poses considerable risk during spaceflight when emergency situations necessitate that crewmembers wake from sleep and make quick decisions. A recently completed BHP investigation assesses the effects of sleep inertia upon abrupt awakening, with and without hypnotics currently used in spaceflight; results from this investigation will help to inform strategies relative to sleep inertia effects on performance. Circadian desynchrony has been observed during spaceflight. Circadian desynchrony during spaceflight develops due to schedule constraints requiring non-24 operations or 'slam-shifts' and due to insufficient or mis-timed light exposure. In addition, circadian misalignment has been associated with reduced sleep duration and increased medication use. In ground-based studies, circadian desynchrony has been associated with significant performance impairment and increased risk of accidents when operations coincide with the circadian nadir. There is a great deal of information available on how to manage circadian misalignment, however, there are currently no easily collected biomarkers that can be used during spaceflight to determine circadian phase. Current research efforts are addressing this gap. Work overload has been documented during current spaceflight operations. NASA has established work hour guidelines that limit shift duration, however, schedule creep, where duty requirements necessitate working beyond scheduled work hours, has been reported. This observation warrants the documentation of actual work hours in order to improve planning and in order to ensure that astronauts receive adequate down time. In addition to concerns about work overload, ground based evidence suggests that work underload may be a concern during deep space missions, where torpor may develop and physically demanding workload will be exchanged for monitoring of autonomous systems. Given that increased automation is anticipated for exploration vehicles, fatigue effects in the context of such systems needs to be further understood. Performance metrics are needed to evaluate fitness-for-duty during spaceflight. Although ground-based evidence supports the notion that sleep loss, circadian desynchronization and work overload lead to performance impairment, inconsistency in the measures used to evaluate performance during spaceflight make it difficult to evaluate the magnitude of performance impairment during spaceflight. Work is underway to standardize measures of performance evaluation during spaceflight. Once established, such performance indicators need to be correlated with operational performance. Individual differences in sleep need and circadian preference, phase shifting ability and period have been documented in ground-based studies. Individual differences in response to sleep loss and circadian misalignment have also been documented and are presumed to be associated with genetic polymorphisms. No studies have systematically reported individual differences in sleep or circadian-related outcomes during spaceflight. More work is needed in this area in order to identify genetic or phenotypic biomarkers that predict resilience or vulnerability to sleep loss in order to personalize countermeasure strategies and mitigate performance impairment during spaceflight. Two laboratory and field investigations specific to this topic are currently ongoing; additional efforts, including an effort to mine existing biological data from spaceflight relative to sleep and circadian outcomes, are planned. Sex differences in sleep need and circadian period and phase have been reported in ground-based studies. The impact of these sex differences on performance is unclear. Sex differences in sleep need and circadian rhythms have not been systematically studied during spaceflight, presumably due to the small number of women that have flown in space. More research is needed in this area to evaluate whether any of the observed sex differences in physiology lead to altered performance in spaceflight and on the ground.

Flynn-Evans, Erin↗

Aggregate attack surface management for network discovery of operational technology

Interconnectivity has become a substratum of technology as the benefits of data-driven functionality are being realized in nearly all industries. Increased connectivity of Operational Technology (OT) exacerbates cyber risks because Industrial Control Systems (ICS) are becoming exposed to the Internet. These exposures are often done inadvertently through misconfigurations as additional network devices come online. Attack surface management (ASM) platforms can be used to identify vulnerabilities by performing external network discovery over the Internet using web spiders. These web spiders enable big data analytics of Internet of Things (IoT) devices as identifiable information of Internet-exposed equipment are archived in searchable databases that are made publicly available. There are a multitude of ASM service providers on the market. Here, this study was conducted to evaluate several commonly known tools to determine the aggregate attack surface of control systems. Queries were crafted by targeting commonly known manufacturers and communication protocols found in OT networks. Identified devices were that categorized based on technology types. Each query was replicated between several tools to target identical ICS equipment. Findings in this paper suggested a significant variance in the exposures discovered by each tool, but unique contributions were identified for each tool when a merged attack surface was derived. Therefore, all tools should be used in aggregate.

97 MATHEMATICS AND COMPUTING↗

Looking to the Future: A Call to Action for Advanced GNC Algorithm Verification and Validation

Future space systems will rely on autonomous Guidance, Navigation, and Control (GNC) functions to efficiently manage safe and precise self-directed operations in uncertain complex environments. Fundamentally, the GNC system plays a key role in mission performance and safety because it computes the ideal trajectory (Guidance), determines the actual trajectory (Navigation), and executes the ideal trajectory (Control) of a vehicle’s position and attitude. Our current GNC systems are highly automated and already have a high degree of complexity. As missions become more ambitious, GNC systems for launch vehicles and space platforms (e.g., spacecraft, probes, and landers) will require higher levels of performance and autonomous operation than previously encountered, for example, this includes GNC for optimizing aerodynamic and/or propulsion performance during planetary entry. This GNC Verification and Validation (V&V) paper highlights concerns with what undoubtedly will be a trend towards increased complexity as fully autonomous GNC systems are developed for future space missions. Clearly, complex GNC systems pose challenges in the prelaunch V&V phase, which is a relatively expensive part of a mission’s life cycle. Essentially the V&V phase is focused on checking that the system effectively meets all the design and operational requirements for the mission. The authors of this paper (i.e., the Inter-Agency Working Group of GNC subject matter experts) focused on this fundamental question over the past few years: Will the GNC engineering community of practice be sufficiently prepared to perform the necessary V&V on evolving GNC architectures that are driven by very demanding requirements for autonomy, resiliency, reconfigurability, adaptability, and mission cost-benefit balance? It is the viewpoint of our Inter-Agency team that the GNC V&V approaches and processes needed to address the next generation of complex GNC systems, which likely will employ various forms of modern GNC technology, are not currently established to the level the community will need in the future. While researchers and practitioners have made some progress in developing new GNC V&V methods for modern GNC systems, a good deal of work remains to be done to codify such methods in a comprehensive and systematic manner. Thus, the Inter-Agency team’s partner organizations [the National Aeronautics and Space Administration (NASA), the European Space Agency (ESA), the National Centre for Space Studies (CNES), the German Aerospace Center (DLR), the French Aerospace Lab (ONERA), and ISAE-SUPAERO] have conducted preliminary investigations into advancing GNC V&V techniques, which resulted in the identification of the need for education, new V&V tools, and benchmark problems for the GNC community. The necessary proactive steps to be taken to meet the challenges and fill the gaps in GNC V&V are summarized in this paper. The first steps include identifying advanced analysis tools, developing a GNC V&V roadmap, and expanding education and training programs for GNC practitioners. This paper is a call to action and proposes a comprehensive set of recommended actions for all our stakeholders: space agencies, researchers, and industry.

Samir Bennani↗

Optimizing Information Automation Using a New Method Based on System-Theoretic Process Analysis: Tool Development and Method Evaluation

This report is an update to a prior report that describes progress and findings for a program of research supporting the design and optimization of information automation systems for nuclear power plants. Much of the domestic nuclear fleet is currently focused on modernizing technologies and processes, including transitioning toward digitalization in the control room and throughout the plant, along with a greater interest in the use of automation, artificial intelligence, robotics, and other emerging technologies. While there are significant opportunities to apply these technologies toward greater plant safety, efficiency, and overall cost-effectiveness, optimizing their design and avoiding potential safety and performance risks depends on ensuring that human performance-related organizational and technical design issues are identified and addressed early in the design process. This report describes modeling tools and techniques, based on sociotechnical systems theory, to support these design goals and their application in the current research effort. The report is primarily intended for senior nuclear energy stakeholders, including regulators, corporate management, and senior plant management. We have developed and employed a method to design an optimized information automation ecosystem (IAE) based on the systems-theoretic constructs underlying sociotechnical systems theory in general and the Systems-Theoretic Accident Modeling and Processes (STAMP) approach in particular. We argue that an IAE can be modeled as an interactive information control system whose behavior can be understood in terms of dynamic control, feedback, and communication relationships amongst the system’s technical and organizational components. We have employed two STAMP-based tools in this effort. The first is Causal Analysis based on STAMP (CAST), an accident and incident analysis technique that was used to examine a performance- and safety-related incident at an industry partner’s plant involving the unintentional activation of an emergency diesel generator. This analysis provided insight into the behavior of the plant’s current information control structure within the context of a specific, significant event. The second tool is Systems Theoretic Process Analysis (STPA) which is a proactive risk analysis tool used to examine existing and potential, planned sociotechnical systems. STPA was used to identify risk factors in the current design of a generic nuclear power plant (NPP) preventive maintenance system. Our analyses focused on identifying near-term system improvements and longer-term design requirements for an optimized IAE system. CAST analysis findings indicate an important underlying contributor to the incident under investigation, and a significant risk to information automation system performance, was perceived time and schedule pressure, which exposed weaknesses in interdepartmental coordination between and within responsible plant organizations and challenged the resilience of established plant processes, until a human caused the eventual event. These findings are discussed in terms of their risk to overall system performance and their implications for information automation system resilience and brittleness. STPA findings exposed several areas of concern in the design of current preventive maintenance systems. We also present two preliminary information automation models. The proactive issue resolution (PIR) model is a test case of an information automation concept with significant near-term potential for application and subsequent reduction in significant plant events. The IAE model is a more general representation of a broader, plantwide information automation system and represents an end-state vision for our work. From our results, we have generated an initial set of preliminary system-level requirements and safety constraints for these models. We have also focused on early development of easy to learn, easy to use “transportable” tools for sociotechnical systems analysis. We intend these to be used by NPP personnel as a means of gaining reliable and relatively quick insight into (1) sociotechnical systems factors impacting incidents and accidents, (2) potential sociotechnical risk factors in existing or planned system designs, and (3) potential weaknesses in a system’s safety and/or information control structure. We conclude the report with a set of summary recommendations, a discussion of planned and potential follow-on research and development, and a draft list of system-level requirements and safety constraints for optimized information automation systems.

99 GENERAL AND MISCELLANEOUS↗

Light Water Sustainability Program: Optimizing Information Automation Using a New Method Based on System-Theoretic Process Analysis

This report describes the interim progress for research supporting the design and optimization of information automation systems for nuclear power plants. Much of the domestic nuclear fleet is currently focused on modernizing technologies and processes, including transitioning toward digitalization in the control room and elsewhere throughout the plant, along with a greater use of automation, artificial intelligence, robotics, and other emerging technologies. While there are significant opportunities to apply these technologies toward greater plant safety, efficiency, and overall cost-effectiveness, optimizing their design and avoiding potential safety and performance risks depends on ensuring that human-performance-related organizational and technical design issues are identified and addressed. This report describes modeling tools and techniques, based on sociotechnical system theory, to support these design goals and their application in the current research effort. The report is intended for senior nuclear energy stakeholders, including regulators, corporate management, and senior plant management. We have developed and employed a method to design an optimized information automation ecosystem (IAE) based on the systems-theoretic constructs underlying sociotechnical systems theory in general and the Systems-Theoretic Accident Modeling and Processes (STAMP) approach in particular. We argue that an IAE can be modeled as an interactive information control system whose behavior can be understood in terms of dynamic control and feedback relationships amongst the system’s technical and organizational components. Up to this point, we have employed a Causal Analysis based on STAMP (CAST) technique to examine a performance- and safety-related incident at an industry partner’s plant that involved the unintentional activation of an emergency diesel generator. This analysis provided insight into the behavior of the plant’s current information control structure within the context of a specific, significant event. Our ongoing analysis is focused on identifying near-term process improvements and longer-term design requirements for an optimized IAE system. The latter analyses will employ a second STAMP-derived technique, System-Theoretic Process Analysis (STPA). STPA is a useful modeling tool for generating and analyzing actual or potential information control structures. Finally, we have begun modeling plantwide organizational relationships and processes. Organizational system modeling will supplement our CAST and STPA findings and provide a basis for mapping out a plantwide information control architecture. CAST analysis findings indicate an important underlying contributor to the incident under investigation, and a significant risk to information automation system performance, was perceived schedule pressure, which exposed weaknesses in interdepartmental coordination between and within responsible plant organizations and challenged the resilience of established plant processes, until a human caused the initiating event. These findings are discussed in terms of their risk to overall system performance and their implications for information automation system resilience and brittleness. We present two preliminary information automation models. The proactive issue resolution model is a test case of an information automation concept with significant near-term potential for application and subsequent reduction in significant plant events. The IAE model is a more general representation of a broader, plantwide information automation system. From our results, we have generated a set of preliminary system-level requirements and safety constraints. These requirements will be further developed over the remainder of our project in collaboration with nuclear industry subject matter experts and specialists in the technical systems under consideration. Additionally, we will continue to pursue the system analyses initiated in the first part of our effort, with a particular emphasis on STPA as the main tool to identify weak or weakening control structures that affect the resilience of organizations and programs. Our intent is to broaden the scope of the analysis from an individual use case to a related set of use cases (e.g., maintenance tasks, compliance tasks) with similar human-system performance challenges. This will enable more generalized findings to refine the Proactive Issue Resolution and IAE models, as well as their system-level requirements and safety constraints. We will use organizational system modeling analyses to supplement STPA findings and model development. We conclude the report with a set of summary recommendations and an initial draft list of system-level requirements and safety constraints for optimized information automation systems.

99 GENERAL AND MISCELLANEOUS↗

Human Performance Contributions to Safety in Commercial Aviation

Every day in aviation, pilots, air traffic controllers, and other front-line personnel perform countless correct judgments and actions in a variety of operational environments. These judgments and actions are often the difference between an accident and a non-event. Ironically, data on these behaviors are rarely collected or analyzed. Data-driven decisions about safety management and design of safety-critical systems are limited by the available data, which influence how decision makers characterize problems and identify solutions. Large volumes of data are collected on the failures and errors that result in infrequent incidents and accidents, but in the absence of data on behaviors that result in routine successful outcomes, safety management and system design decisions are based on a small sample of nonrepresentative safety data. This assessment aimed to find and document “safety successes” made possible by human operators. With many Aeronautics Research Mission Directorate (ARMD) Programs and Projects focusing on increased automation and autonomy and decreased human involvement, failure to fully consider the human contributions to successful system performance in civil aviation represents a significant risk — a risk that has not been recognized to date. Without understanding how humans contribute to safety, any estimate of predicted safety of autonomous capabilities is incomplete and inherently suspect. Furthermore, understanding the ways in which humans contribute to safety can promote strategic interactions among safety technologies, functions, procedures and the people using them. Without this understanding, the full benefits of an integrated, optimized human/technology or autonomous system will not be realized. Historically, safety has been consistently defined in terms of the occurrence of accidents or recognized risks (i.e., in terms of things that go wrong). These adverse outcomes are explained by identifying their causes, and safety is restored by eliminating or mitigating these causes. An alternative to this approach is to focus on what goes right and identify how to replicate that process. Focusing on the rare cases of failures attributed to “human error” provides little information about why human performance routinely prevents adverse events. Hollnagel has proposed that things go right because people continuously adjust their work to match their operating conditions. These adjustments become increasingly important as systems continue to grow in complexity. Thus, the definition of safety should reflect not only “avoiding things that go wrong” but “ensuring that things go right.” The basis for safety management requires developing an understanding of everyday activities. However, few mechanisms to monitor everyday work exist in the aviation domain, which limits opportunities to learn how designs function in reality. This concept of safety thinking and safety management is reflected in the emerging field of resilience engineering. According to Hollnagel, a system is resilient if it can sustain required operations under expected and unexpected conditions by adjusting its functioning prior to, during, or following changes, disturbances, and opportunities. To explore “positive” behaviors that contribute to resilient performance in commercial aviation, the assessment team examined a range of existing sources of data about pilot and air traffic control (ATC) tower controller performance, including subjective interviews with domain experts and objective aircraft flight data records. These data were used to identify strategies that support resilient performance, methods for exploring and refining those strategies in existing data, and proposed methods for capturing and analyzing new data.

Null, Cynthia H.↗

Deriving Severe Hail Likelihood from Satellite Observations and Model Reanalysis Parameters using a Deep Neural Network

Geostationary satellite imagers, such as those of the Geostationary Operational Environmental Satellite (GOES) series, have been observing severe convection at 15–60-minute intervals for over 40 years. When properly assessed, such a data record can be valuable in efforts of estimating severe storm risk throughout the diurnal cycle based on automated detection of patterns consistently found atop severe storms. Furthermore, environmental conditions favorable for severe weather are well-known and are thought to be represented well by modern reanalysis products. Promoting resilience against such hazards on local and global scales is a chief goal the NASA Disasters program, which seeks to encourage use of satellite observations to mitigate risk. For instance, hail is the costliest severe weather hazard across the globe in terms of insured loss, but reporting inconsistencies for hail events globally make it difficult to develop models that can quantify the risk. Satellite observation and model reanalysis taken together have the potential to, with reasonable skill and specificity, characterize environmental conditions that are favorable for hazardous weather, and thereby enable creation of hazard climatologie. Such climatologies are particularly useful over regions without extensive radar networks or storm reporting. By mapping the multivariate combination of observed cloud features and reanalysis environmental parameters/indices to United States Next Generation Weather Radar (NEXRAD) radar-estimated Maximum Expected Size of Hail (MESH) by way of a deep neural network (DNN), estimates of likelihood for potentially severe hail can be produced. Such estimates are of greater complexity and efficiency than could be performed with previous multivariate or logistic regression analyses for observed points within convective systems. Statistical distributions of convective parameters from satellite and reanalysis are shown to highlight non-severe/severe class separation for well-known hailstorm predictors, e.g., overshooting cloud top characteristics, deep-layer wind shear, mid-level stability, helicity, and convective inhibition. These complex, multivariate predictor relationships are exploited within a DNN, which can efficiently produce a quantitative hail risk metric with better than 70% detection rate and under 30% false alarms. These hail classifications can then be aggregated across the satellite record to yield a hazard climatology for hail frequency and severity – knowledge of which is of particular interest to those who manage risk (e.g., insurers) and are seeking opportunities to identify hail-prone regions, particularly in developing nations. This NASA study uses satellite observations and model parameters in a DNN to perform climatological hailstorm analysis in support of catastrophe model development, with the hope of promoting risk resilience particularly in regions without adequate weather radar coverage.

Passive Remote Sensing↗

SuperLab 2.0 Showcase: Connecting Five Labs to Tackle Grid Complexity and Unlock Unique Grid Asset Potential

SuperLab 2.0 (5-Lab Demo) is a collaborative, national-scale experiment showcasing the coordination of geographically distributed energy assets in real time. The demonstration integrates 25 physical and digital assets, spanning wind, PV, batteries, electrolyzers, DC fast chargers, microgrid controllers, building automation systems, small modular reactor (SMR), control centers, and gas turbines, across five DOE national laboratories-NLR, INL, NETL, LBNL, and SNL. These assets are unified using Energy Sciences Network (ESnet), a low-latency, high-performance U.S. Department of Energy's (DOE) network, and controlled via a centralized energy controller hosted at NLR's ARIES facility. The demonstration validates the ability to stress-test hybrid energy systems under dynamic scenarios to de-risk advanced control strategies for greater resilience and flexibility. SuperLab 2.0 (5-Lab Demo) showcased a major advancement in federated national laboratory collaboration, enabling real-time, cross-laboratory experimentation to coordinate geographically dispersed distributed energy resources (DERs) using various communication protocols and networks. SuperLab 2.0 (5-Lab Demo) built on previous demonstrations conducted between NLR-PNNL and NLR-INL connecting diverse assets including distant protection devices, a SMR simulator, and a high temperature electrolyzer (HTE). Previous demos were based on a single connection between two labs with minimal coordination challenges. The 5-Lab demo with a centralized controller, distributed testbeds across different geographical locations, and use of protocols-based communication represents a scenario closer to real-world grid operations that coordinate resources across a region to meet system needs. This experiment studied how local DER controllers interact with a centralized energy controller during normal and abnormal events to maintain reliability. The SuperLab team across the five labs implemented a notional power system model equivalent of transmission and distribution lines, represented by the data networks interconnecting the labs. Each lab continuously exchanged local parameters (such as P and Q) from its Hardware-In-Loop (CHIL) and Power Hardware-In-Loop (PHIL) assets through centralized energy controller at NLR, enabling real-time interaction and coordination across sites. By leveraging ESnet as the communication backbone, the team successfully operated the distributed assets as a unified power system, with each bus represented by a different laboratory. This setup mirrors how assets interact in real-world power systems across dispersed locations with various protocols and latencies. At each lab site, assets were operated using their own local controllers which were coordinated through an overarching operation and control layer of centralized energy controller, equivalent to how an energy management system (EMS) orchestrates assets across a regional or national grid. SuperLab's federated connectivity utilized a Digital Real-Time Simulators (DRTS)-type gateway to connect Controller Hardware-In-Loop (CHIL) and PHIL assets between labs. To enable this federated connection through ESnet, a deterministic network was established where latency variations were consistent. This consistency allowed the development of digital filters for the power system assets across CHIL and PHIL interfaces to avoid unstable and unreliable grid conditions. This report provides an overview of the cross-laboratory configuration and offers insights into interconnecting geographically distributed research assets to test them as if they were co-located. This experiment represents a step toward linking nine DOE national laboratories, enabling nation-wide simulations that can address utility-driven challenges with grid resilience, flexibility, and modernization.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Designing for Advanced Aerial Mobility: Human-Autonomy Teaming and In-Time System-Wide Safety Assurance

The continued growth of aviation shall require new innovative technologies and operational concepts to meet the ever-increasing demands on air transportation. The NASA Advanced Air Mobility (AAM) project focuses on emerging aviation markets, such as Urban Air Mobility (UAM). UAM is defined as “...a safe and efficient system for air passenger and cargo transportation within an urban area. It is inclusive of small package delivery and other urban unmanned aerial system services and supports a mix of onboard/ground-piloted and increasingly autonomous operations” ([1]). The AAM project emphasizes technology development and validating system-level concepts and solutions in coordination with other NASA Aeronautics Research Mission Directorate (ARMD) projects to enable UAM metro- and micro-plex vertiport and airspace concepts of operations. The NASA AAM research portfolio includes the concepts of Remote Supervisor-in-Command (RSC) and Fleet and Airspace Manager (FAM) as possible human roles for consumer fleet providers. NASA research in RSC is focused on development of guidelines and standards for remote pilots/operators passively and actively controlling a large fleet of autonomous aircraft. For FAM, flight and ground system concepts and technologies to enable high density homogeneous operations at increased scale from vertiport(s), and coordination with other humans in the systems (e.g., UAM urban airspace manager, Air Traffic Control) are key research areas. The envisioned UAM operations are posited to require autonomous systems to enable functions ranging from fleet and resource management to vehicle control. Although automation has become increasingly sophisticated and ubiquitous in civil aviation, autonomy represents a significant evolution in automation, which has generally been limited in functional scope and capability. As autonomy takes on increasing responsibilities, humans and machines will be required to work together in new and different ways [2], rather than traditional design approaches focused on how machines (i.e., autonomy) can do the work of people. The emerging field of human-autonomy teaming (HAT) represents a comprehensive and prioritized research-driven approach to enable the success of future emerging aviation market applications through capabilities and principles that facilitate humans and machine working and thinking better together. The NASA Transformational Tools and Technologies (TTT) Autonomous System (AS) Sub-project was created to assist with the transition into higher levels of autonomy to enable new modes of air transportation, such as UAM. TTT-AS has identified HAT as a key research need to enable UAM while maintaining today’s ultra-safe aviation system safety levels. The latter challenge has been taken up by the NASA System-Wide Safety (SWS) Project, which recognizes that aviation safety, as it evolves, shall require new ways of thinking about safety to include integration of a wide-range of existing and new safety systems and practices, enhanced tools and technologies, increased access to data and data fusion, improved data analysis capabilities, enhanced in-time risk monitoring and detection, hazard prioritization and mitigation, safety assurance decision-support, and in-time integrated system analytics [3].The operational concept of UAM represents a variety of work that has been termed, “work-as-imagined” to characterize the idea that how people think that work is done and how work is actually done are often not the same [4]. To ensure design success and system safety, looking at “work-as-done” provides a comparative approach toward UAM concept and technology design through examination of corresponding analogs found today in aviation (e.g., on-demand operations) and other transportation domains (e.g., port operations). The paper shall discuss various alternative applications with specific focus on airline operation center (AOC) operations, and unmanned aerial system (UAS) command-and-control to inform scaled-versions of FAM and RSC, respectively, and with consideration of the national airspace system contextual environment. The tenets and principles of the HAT field and current NASA research efforts under the TTT-AS sub-project shall also be described. Finally, the SWS sub-project efforts to develop In-Time System-Wide Safety Assurance (ISSA) and In-Time Safety Management Systems (IASMS) are discussed in terms of how “in-time” safety assurance may be conceptualized for the on-demand mobility air taxi “work-as-imagined” operational concept [5]. As part of this effort, concepts from the emerging field of resilience engineering, are being studied. Traditional approaches to aviation safety have focused on what can go wrong and how to prevent it. Another approach to thinking about system safety should reflect not only “avoiding things that go wrong” (protective safety) but also “ensuring that things go right” (productive safety), that enables a system to exhibit the resilient performance [6] necessary for the success of the future aviation system emerging concepts of operations. The paper shall describe efforts focused on how productive safety and resilience may enable a more complete approach to system safety thinking and design of ISSA and IASMS for UAM. Future directions and research needs shall also be discussed.

resilience↗

Grid Resiliency with a 100% Renewable Microgrid

San Diego Gas & Electric Company (SDG&E) installed America’s first and largest utility-scale microgrid in Borrego Springs in 2013. The first generation Borrego Springs Microgrid utilized diesel generators to form and stabilize the microgrid island, with support from grid-scale batteries and local solar photovoltaic (PV) generation. In this project, SDG&E in partnership with National Renewable Energy Laboratory (NREL) demonstrated through modeling, simulation and utility field testing that blackstart and islanding of the microgrid can be led with 100% renewable, inverter based resources (IBRs), to help reduce community reliance on conventional generation resources. Through equipment upgrades, grid-forming island leader capability was transitioned to a battery IBR instead of the Borrego Springs Microgrid diesel generators. A new microgrid controller was integrated to the microgrid and programmed to control and manage multiple energy storage systems. Synchrophasor and other power quality data verified autonomous, high-speed response of the IBRs through blackstart, islanding, and load step testing. Results of project field evaluations provide distribution systems operators (DSO) with increased confidence that renewable, IBR can replace traditional generators to blackstart and island microgrids and rapidly establish stable island frequency with rapid changes in peak power demand. Importantly, the project validated the integration feasibility of a distributed energy resource management system (DERMS) controller that manages multiple grid-forming and grid-following IBRs, establishing a standard design interface to reduce the complexity of integrating new DERs in the future and supporting replication by the industry. As a result of learnings in this project, SDG&E has implemented the microgrid controller strategy at multiple other microgrid sites, thereby validating the replicability of the solution. Hardware-in-the-loop (HIL) simulations including power and controller HIL hardware — along with electromagnetic transient (EMT) simulations of Borrego Springs Microgrid —informed adjustments to inverter parameters and were important to characterize the performance of the IBRs in relevant operating conditions before deployment. The EMT and HIL simulations of islanding the entire community are important contributions in providing confidence in IBR performance prior to future islanding of the community in the field. High-fidelity EMT and/or HIL simulation of IBRs can de-risk field operations, and its relevance and importance as a tool is increasing as distribution grids and microgrids become more complex and dynamic with an increasing proportion of renewable generation, distributed energy storage, and two-way power and energy flows.

24 POWER TRANSMISSION AND DISTRIBUTION↗