Search NASA⌕ Search

SEARCH · Search NASA

Results for “BEAM LOSS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Beam Losses for the PIP-III Linac to Recycler/Main Injector

The PIP-III linac produces 8 GeV H - beam for injection into the Recycler or Main Injector (MI). Beam losses throughout the system must remain low to ensure high intensity in the MI cycle and to manage radiation effects to acceptable levels, including enabling practical maintenance of the facility. Beam loss mechanisms in the system mageable maintStripping to H+ is needed, in a system that is vulnerable to magnetic stripping of H- in magnetic fields. The High power beam will heat stripping foils, perhaps unacceptably. The injection pulse is much longer than the MI circumference, so multiturn pulses with resulting heating and beam diffusion are required. We discuss beam loss related design considerations for the Linac-based scenario.

43 PARTICLE ACCELERATORS↗

Feasibility of using crystal channeling for the beam loss mitigation in Slow Extraction at 8GeV

The mitigation of the beam losses in slow extraction is becoming more and more demanding in accelerator applications for HEP as the beam power is gradually increasing. The successful demonstration of using the proton beam channeling at 450GeV to deflect the beam away from the extraction septa opens the new levels of improving the slow extraction efficiency. It is yet to be demonstrated that this method is still effective at low and medium proton beam energies. Here we present the promising results of the recent computer simulation studies of the septum shadowing at 8GeV for the Mu2e project slow extraction at Fermilab. Depending on the beam parameters the beam loss reduction is shown to be achievable in the range of 1/3 to factor of 3.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Semantic Regression for Disentangling Beam Losses in the Fermilab Main Injector and Recycler

Fermilab’s Main Injector enclosure houses two accelerators: the Main Injector (MI) and the Recycler (RR). In periods of joint operation, when both machines contain high intensity beam, radiative beam losses from MI and RR overlap on the enclosure’s beam loss monitoring (BLM) system, making it difficult to attribute those losses to a single machine. Incorrect diagnoses result in unnecessary downtime that incurs both financial and experimental cost. In this work, we introduce a novel neural approach for automatically disentangling each machine’s contributions to those measured losses. Using a continuous adaptation of the popular UNet architecture in conjunction with a novel data augmentation scheme, our model accurately infers the machine of origin on a per-BLM basis in periods of joint and independent operation. Crucially, by extracting beam loss information at varying receptive fields, the method is capable of learning both local and global machine signatures and producing high quality inferences using only raw BLM loss measurements.

43 PARTICLE ACCELERATORS↗

Finding beam loss locations in a linac with oscillating dipole correctors

The paper proposes a method of finding the beam loss locations in a linac. If the beam is scraped at an aperture limitation, moving its centroid with two dipole correctors located upstream and oscillating in sync produces a line at the corresponding frequency in spectra of current-sensitive devices downstream of the loss point. The phase of this signal contains information about the location of the beam loss. Similar lines appear also in the position signals of Beam Position Monitors (BPMs). The phases of the BPM position lines change monotonically (within each 2π) along the linac and can be used a reference system. The phase of the loss signal compared with this reference system pinpoints the beam loss location, assuming that longitudinal coordinates of the BPMs are known. If the correctors deflection amplitudes and the phase offset between their waveforms are chosen optimally and well calibrated, the same measurement provides values of the β-function and the betatron phase advance at the BPM locations. Optics measurements of this type can be made parasitically, with negligible effect on the emittance, if a long measurement time is acceptable.

43 PARTICLE ACCELERATORS↗

Measuring correlations between beam loss and residual radiation in the Fermilab Main Injector

In order to control beam loss for high intensity operation of the Fermilab Main Injector, electronics has been implemented to provide detailed loss measurements using gas-filled ionization monitors. Software to enhance routine operation and studies has been developed and losses are logged for each acceleration cycle. A systematic study of residual radiation at selected locations in the accelerator tunnel have been carried out by logging residual radiation at each of 142 bar-coded locations. We report on fits of the residual radiation measurements to half-life weighted sums of the beam loss data using a few characteristic lifetimes. The data are now available over a multi-year period including residual radiation measurements repeated multiple times during three extended facility shutdown periods. Measurement intervals of a few weeks combined with variable delays between beam off time and the residual measurement permits sensitivity to lifetimes from hours to years. The results allow planning for work in radiation areas to be based on calibrated analytic models.

43 PARTICLE ACCELERATORS↗

beam loss scenarios for MuCool Test Area

The MuCool Test Area (MTA) is an intense primary beam facility derived directly from the Fermilab Linac to test heat deposition and other technical concerns associated with the liquid hydrogen targets, gas-filled RF cavities, and other apparatus being developed to cool intense, large-emittance muon beams. In this study the results of Monte Carlo modeling of several beam loss scenarios are presented. The MTA facility was designed to test targets and other muon cooling apparatus using the intense Fermilab Linac beam. The requested intensity of the proton beam for the MTA is essentially full Linac capability, or 1.6 x 10{sup 13} protons per pulse and an energy of 400 MeV. Two modes of operation will be supported in the MuCOOL beamline: one mode for emittance measurements (and beamline studies) and a second mode for MTA experiments. Maximum beam intensity for these two modes is: 9.6 x 10{sup 15} protons/hr - 600 beam pulses/hour of full Linac beam pulse intensity (1.6 x 10{sup 13} protons/pulse) to the emittance beam absorber and 9.6 x 10{sup 14} protons/hour - 60 beam pulses/hour of full Linac beam pulse intensity to experiments in the MTA experimental hall. This extremely high intensity implies careful investigation into and application of proper shielding materials and configuration in order to satisfy the following two requirements: (i) to reduce the instantaneous dose rate outside of the experimental enclosure to prescribed levels appropriate for the area considered; (ii) to ensure the civil construction of the hall is capable of additional shielding and, further, that the weight of the shielding is commensurate with the loading specifications of the enclosure, notably the ceiling. A number of scenarios for beam loss at different locations were studied in order to determine the maximum beam intensity which is in compliance with the existing shielding. The modeling was performed with the MARS15 code.

43 PARTICLE ACCELERATORS↗

H- Beam Loss and Evidence for Intrabeam Stripping in the LANSCE Linac

The LANSCE accelerator complex is a multi-beam, multi-user facility that provides high-intensity H{sup +} and H{sup -} particle beams for a variety of user programs. At the heart of the facility is a room temperature linac that is comprised of 100-MeV drift tube and 800-MeV coupled cavity linac (CCL) structures. Although both beams are similar in intensity and emittance at 100 MeV, the beam-loss monitors along the CCL show a trend of increased loss for H{sup -} that is not present for H{sup +}. This difference is attributed to stripping mechanisms that affect H{sup -} and not H{sup +}. We present the results of an analysis of H{sup -} beam loss along the CCL that incorporates beam spill measurements, beam dynamics simulations, analytical models and radiation transport estimates using the MCNPX code. The results indicate a significant fraction of these additional losses result from intrabeam stripping.

43 PARTICLE ACCELERATORS↗

OPERATIONAL EXPERIENCE WITH FAST FIBER-OPTIC BEAM LOSS MONITORS FOR THE ADVANCED PHOTON SOURCE STORAGE RING SUPERCONDUCTING UNDULATORS

Fast fiber-optic (FFO) beam loss monitors (BLMs) installed with the first two superconducting undulators (SCUs) in the Advanced Photon Source storage ring have proven to be a useful diagnostic for measuring deposited charge (energy) during rapid beam loss events. The first set of FFOBLMs were installed outside the cryostat of the short SCU, a 0.33-m long device, above and below the beam centerline. The second set are mounted with the first 1.1-mlong SCU within the cryostat, on the outboard and inboard sides of the vacuum chamber. The next 1.1-m-long SCU is scheduled to replace the short SCU later in 2016 and will be fitted with FFOBLMs in a manner similar to original 1.1-m device. The FFOBLMs were employed to set timing and voltage for the abort kicker (AK) system. The AK helps to prevent quenching of the SCUs during beam dumps [1] by directing the beam away from the SC magnet windings. The AK is triggered by the Machine Protection System (MPS). In cases when the AK fails to prevent quenching, the FFOBLMs show that losses often begin before detection by the MPS.

Dooling, J.↗

New Beam Loss Monitor for 12 GeV Upgrade

This paper describes a new VME based machine protection Beam Loss Monitor (BLM) signal processing board designed at Jefferson Lab to replace the current CAMAC based BLM board. The new eight-channel BLM signal processor has linear, logarithmic, and integrating amplifiers that simultaneously provide the optimal signal processing for each application. Amplified signals are digitized and then further processed through a Field Programmable Gate Array (FPGA). Combining both the diagnostic and machine protection functions in each channel allows the operator to tune-up and monitor beam operations while the machine protection is integrating the same signal. Other features include extensive built-in-self-test, fast shutdown interface (FSD), and 16-Mbit buffers for beam loss transient play-back. The new VME BLM board features high sensitivity, high resolution, and low cost per channel.

43 PARTICLE ACCELERATORS↗

The LCLS Undulator Beam Loss Monitor Readout System

The LCLS Undulator Beam Loss Monitor System is required to detect any loss radiation seen by the FEL undulators. The undulator segments consist of permanent magnets which are very sensitive to radiation damage. The operational goal is to keep demagnetization below 0.01% over the life of the LCLS. The BLM system is designed to help achieve this goal by detecting any loss radiation and indicating a fault condition if the radiation level exceeds a certain threshold. Upon reception of this fault signal, the LCLS Machine Protection System takes appropriate action by either halting or rate limiting the beam. The BLM detector consists of a PMT coupled to a Cherenkov radiator located near the upstream end of each undulator segment. There are 33 BLMs in the system, one per segment. The detectors are read out by a dedicated system that is integrated directly into the LCLS MPS. The BLM readout system provides monitoring of radiation levels, computation of integrated doses, detection of radiation excursions beyond set thresholds, fault reporting and control of BLM system functions. This paper describes the design, construction and operational performance of the BLM readout system.

43 PARTICLE ACCELERATORS↗

Signal Processing for Beam Loss Monitor System at Jefferson Lab

Ion Chamber and Photomultiplier Tube (PMT) are both used for beam loss monitor in the Machine Protection System (MPS) at Jefferson Lab. The requirements of signal processing of these detectors are different, so two VME-based signal processing boards, Beam Loss Monitor (BLM) board and Ion-Chamber board, were developed. The BLM board has fast response (< 1us) and 5 decades dynamic range from 10nA to 1 mA, while the Ion-Chamber board has 8 decades dynamic range from 100 pA to 10 mA and slower response. Both of boards provide functions of machine protection and beam diagnostics, and features of fast shutdown (FSD) interface, beam sync interface, built-in-self-test, remotely controlled bias signals, and on-board memory buffer.

Yan, J.↗

Characterizing and Controlling Beam Losses at the LANSCE Facility

The Los Alamos Neutron Science Center (LANSCE) currently provides 100-MeV H{sup +} and 800-MeV H{sup -} beams to several user facilities that have distinct beam requirements, e.g. intensity, micropulse pattern, duty factor, etc. Minimizing beam loss is critical to achieving good performance and reliable operation, but can be challenging in the context of simultaneous multi-beam delivery. This presentation will discuss various aspects related to the observation, characterization and minimization of beam loss associated with normal production beam operations in the linac.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A novel digitization scheme with FPGA-base TDC for beam loss monitors operating at cryogenic temperature

Recycling integrators are common current-to-frequency converting circuits for measurements of low current such as that produced by Fermilab's cryogenic ionization chambers. In typical digitization/readout schemes, a counter is utilized to accumulate the number of pulses generated by the recycling integrator to adequately digitize the total charge. In order to calculate current with reasonable resolution (e.g., 7-8 bits), hundreds of pulses must be accumulated which corresponds to a long sampling period, i.e., a very low sampling rate. In our new scheme, an FPGA-based Time-to-Digital Convertor (TDC) is utilized to measure the time intervals between the pulses output from the recycling integrator. Using this method, a sample point of the current can be made with good resolution (>10 bits) for each pulse. This effectively increases the sampling rates by hundreds of times for the same recycling integrator front-end electronics. This scheme provides a fast response to the beams loss and is potentially suitable for accelerator protection applications. Moreover, the method is also self-zero-suppressed, i.e., it produces more data when the beam loss is high while it produces significantly less data when the beam loss is low.

43 PARTICLE ACCELERATORS↗

Finding Beam Loss Locations in a Linac with Oscillating Dipole Correctors

The paper proposes a method of finding the beam loss locations in a linac. If the beam is scraped at an aperture limitation, moving its centroid with two dipole correctors located upstream and oscillating in sync produces a line at the corresponding frequency in spectra of current-sensitive devices, loss monitors, and BPMs downstream of the loss point. The phase of this signal contains information about the location of the beam loss. Proof-of-principle measure-ments performed at the Fermilab Linac are presented.

43 PARTICLE ACCELERATORS↗

Feasibility of using crystal channeling for the beam loss mitigation in slow extraction at 8GeV

In the accelerator applications of slow extraction for High Energy Physics (HEP), one of the prime challenges is the mitigation of beam losses, which is becoming increasingly critical with the continuous rise in beam power. A significant breakthrough was achieved earlier at CERN through the successful deployment of proton beam channeling in a crystal at 400GeV, effectively diverting the beam away from extraction septa and offering new avenues for improving slow extraction efficiency. However, a crucial question remains whether this approach is still effective at lower and medium proton beam energies. In this paper, we present the promising results of the computer simulation studies of the septum shadowing at 8GeV for the Mu2e project slow extraction at Fermilab. In conclusion, across the wide range of beam parameters, the beam loss reduction is shown to range between 40% and factor of three.

43 PARTICLE ACCELERATORS↗

Beam Loss due to Foil Scattering in the SNS Accumulator Ring

In order to better understand the contribution of scattering from the primary stripper foil to losses in the SNS ring, we have carried out calculations using the ORBIT Code aimed at evaluating these losses. These calculations indicate that the probability of beam loss within one turn following a foil hit is ~1.8 10-8 , where is the foil thickness in g/cm2, assuming a carbon foil. Thus, for a typical SNS stripper foil of thickness = 390 g/cm2, the probability of loss within one turn of a foil hit is ~7.0 10-6. This note describes the calculations used to arrive at this result, presents the distribution of these losses around the SNS ring, and compares the calculated results with observed ring losses for a well-tuned production beam.

Holmes, Jeffrey A↗

Disentangling Beam Losses in The Fermilab Main Injector Enclosure Using Real-Time Edge AI

The Fermilab Main Injector enclosure houses two accelerators, the Main Injector and Recycler Ring. During normal operation, high intensity proton beams exist simultaneously in both. The two accelerators share the same beam loss monitors (BLM) and monitoring system. Deciphering the origin of any of the 260 BLM readings is often difficult. The (Accelerator) Real-time Edge AI for Distributed Systems project, or READS, has developed an AI/ML model, and implemented it on fast FPGA hardware, that disentangles mixed beam losses and attributes probabilities to each BLM as to which machine(s) the loss originated from in real-time. The model inferences are then streamed to the Fermilab accelerator controls network (ACNET) where they are available for operators and experts alike to aid in tuning the machines.

43 PARTICLE ACCELERATORS↗

Signal Processing Board for Beam Loss Monitors

This paper describes a new VME based machine protection Beam Loss Monitor (BLM) signal processing board designed at Jefferson Lab which features high sensitivity, high resolution, and low cost per channel. This double-wide VME board provides eight-channel signal processing with each channel having linear, logarithmic, and integrating amplifiers that simultaneously provide the optimal signal processing for both machine protection and beam diagnostics. Amplified signals are independently sampled by 16-bit, fast ADCs and then further processed through a Field Programmable Gate Array (FPGA). It also has features of fast shutdown interface (FSD), beam sync interface, built-in-self-test, remotely controlled bias signals, and on-board memory buffer. The initial experimental test shows that the BLM board has fast response (<< 1us) for integrating and wide dynamic range from 10 nA to 1 mA (>50 dB) for logarithmic signals. The board is suitable for signal processing from photomultiplier (PMT) and ion chamber detectors. Notice: Authored by Jefferson Science Associates, LLC under U.S. DOE Contract No. DE-AC05-06OR23177. The U.S. Government retains a non-exclusive, paid-up, irrevocable, world-wide license to publish or reproduce this manuscript for U.S. Government purposes.

Yan, Jianxun↗