Mitigating Data Center Impact on Grid Stability: A Coordinated Control Strategy Using Verrus StabiliGrid Architecture

Large data centers, which now represent a significant and growing share of the total U.S. grid load, can inadvertently destabilize the electrical grid when they disconnect simultaneously during brief voltage disturbances. The July 10, 2024, Eastern Interconnection incident, in which a sub-100-millisecond transmission fault triggered the cascading loss of approximately 1,500 MW of data center load, illustrates this vulnerability. While commercial battery energy storage systems (BESS) deployed in data centers provide device-level fault ride-through per IEEE 1547, they lack coordination with facility protection logic and uninterruptible power supplies (UPS), limiting their effectiveness as grid-stabilizing assets. This report presents the Verrus StabiliGrid architecture, a coordinated control framework that integrates BESS, UPS, and point-of-interconnection (POI) protection settings to enable data centers to ride through both undervoltage and overvoltage grid contingencies without disconnecting. The four-step strategy encompasses: (1) high-resolution power quality monitoring to detect the grid state during events such as undervoltage, overvoltage, underfrequency, and overfrequency; (2) POI protection settings that allow for extended ride-through and grid-connected operation during grid contingencies; (3) grid state-driven autonomous dispatch of assets to improve grid resilience by reducing power draw during undervoltage or absorbing more power during overvoltage events; and (4) coordinated post-recovery dispatch of data center assets to restore firm load to pre-contingency levels. Validated through controller-hardware-in-the-loop (C-HIL) simulations at the National Laboratory of the Rockies, results show grid import restoration to pre-fault levels within 100 milliseconds of voltage recovery. This work advances the ability of data centers to transition from passive, disturbance-sensitive loads to active participants in grid stability, a capability increasingly required by emerging NERC and ERCOT regulatory frameworks.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Techno-Economic Analysis for the Addition of Thermal Energy Storage to a Campus With Existing Battery Storage

Rising global temperatures and increasing energy demands pose significant challenges for energy management, particularly in institutional and commercial settings. As cooling needs grow, campuses must balance operational efficiency, cost control, and grid stability. Energy storage solutions, such as thermal energy storage (TES) systems, offer a promising approach to shifting energy consumption from peak to off-peak periods, alleviating peak demand, reducing utility costs, and enhancing grid resilience. When integrated with existing battery energy storage systems (BESS), TES can further optimize load management and improve energy savings, especially in buildings with diverse energy needs. This article presents a techno-economic analysis of integrating a chilled water TES system into the central plant at California State University, Dominguez Hills, which already operates a BESS. We assess three TES sizing strategies—full storage, load leveling, and peak demand limiting—by modeling and simulations based on historical energy loads. Our findings show that we can control TES systems to complement BESS operation, with campus-level load leveling providing the greatest cost savings by reducing peak demands. Furthermore, the study also evaluates the long-term economic viability of TES, considering installation costs, energy savings, and payback periods under varying tariffs. This research offers practical guidance for institutions seeking to enhance energy resilience and reduce operational costs through energy storage solutions.

25 ENERGY STORAGE↗

Arbitrage and Capacity Firming in Coordination with Day-Ahead Bidding of a Hybrid PV Plant: Preprint

A hybrid PV plant (HPP) combines a photovoltaic (PV) plant with a battery energy storage system (BESS), which is considered a promising step towards the future of renewable power plants by the U.S. Department of Energy. When the renewable penetration reaches a significant level, a hybrid PV plant can bid in as a controllable thermal plant in the future electricity market. In this study, a bidding and BESS scheduling model is proposed for the HPP. The robust optimization (RO) technique has been utilized to identify the worst-case scenario of uncertainties during the bidding process. To address the overly conservative issue of the single-stage RO, we have decoupled the BESS schedule for arbitrage and PV capacity firming by a two-stage RO formulation. By comparing the output of single-stage RO and two-stage RO, the two-stage RO bids and schedules in a more aggressive manner, which increases the income of HPP. Also, the penalty of under-generation is considered in our model so that the day-ahead bidding decision and arbitrage schedules can be adjusted based on the potential UNDER-GENERATION penalty. Because the proposed model is non-convex and contains multi-stages, the Column-and-Constraint Generation (C&CG) algorithm is applied to the model as the solution. The proposed model has shown better economic performance compared to a state-of-art single-stage bidding method in case studies.

BESS scheduling↗

Enhanced Inertial Support: Modeling Fast Frequency Response Controls for Energy Storage System Inverters

Reduction of power system inertia is a growing concern for grid operators given the transition under way from conventional fossil generators to inverter-based resources. One key concern is the rapid and severe dip in power system frequency following a large disturbance which could trigger remedial actions including operation of under frequency load shedding (UFLS) relays. A potential solution is to utilize battery energy storage systems (BESS) to provide fast frequency response(FFR) to mitigate the system frequency impact of low system inertia. In this work, we investigate different control parameters to achieve modeled FFR response from BESS in the simulated US Western Interconnection. First, a very low inertia model is developed from an existing positive sequence model of the Western Interconnection. Afterwards, we tune the BESS dynamic response parameters to eliminate any risks of reaching UFLS relay thresholds following the loss of large generators. Finally, we investigate the relative impact of having large BESS units in comparison of multiple smaller units in the same area. The results of the analyses indicate that 1 GW of transmission-connected BESS can help mitigate the frequency drop caused by large generators outages in the Western Interconnection, and significantly reduce the risk of under frequency load shedding.

power system dynamic performance, Low Inertia, Fas↗

Frequency Control and Dynamics (Part 2) [Slides]

This presentation provides an introductory overview of system dynamics and frequency control in electric power systems, with a focus on concepts relevant to small and interconnected grids such as those in Malawi. It explains foundational principles of AC system frequency, the relationship between generation-demand balance and frequency deviations, and the operational limits of generators and end-use equipment. The deck discusses frequency stability within broader system stability classifications and illustrates how inertia and turbine-governor dynamics shape system response to disturbances. It then outlines the tiered approach to frequency control - primary, secondary, and tertiary - detailing the roles, characteristics, timescales, and response mechanisms of each. Special emphasis is placed on hydro and thermal unit behavior, area control error (ACE), automatic generation control (AGC), and the operational implications of interconnecting small systems with larger grids. The material was developed to support Malawi's electricity sector and the establishment of the Southern Africa Battery Energy Storage Center of Excellence (SABESS CoE).

24 POWER TRANSMISSION AND DISTRIBUTION↗

IEEE PES GM Poster - Cyber-Informed Engineering Approach to Mitigating BESS Supply Chain Concerns

Battery energy storage systems (BESS) are increasingly important to meet the needs of grid resilience and reliability. BESS provide critical grid services, maintaining stability of the grid with increased variable conditions. However, there are significant geopolitical and security concerns regarding their operation in critical infrastructure, due to lack of a domestic supply chain and prevalence of foreign entity of concern (FEOC) components in BESS and associated inverter-based resources. The supply chain challenge is dually exacerbated by a lack of alternative suppliers who can meet the economic targets for energy delivery and a potentially adversarial supply chain. Solutions are needed to secure components, addressing mixed layers of risk and engineering controls. This paper presents a specific application of Cyber-Informed Engineering (CIE) principles for BESS and recommends an alternative strategy to blocking the supply chain, ensuring that grid modernization targets can be met despite lack of a validated or secure supply chain. This study focuses on the United State (U.S.) use case, but the process can be applied globally to address supply chain security challenges. CIE practices represent the next step in functional assurance and risk mitigation, ensuring optimal resource allocation and enhancing security measures to safeguard the future of energy in the U.S. and beyond.

25 - ENERGY STORAGE↗

Improving the Power Outage Resilience of Buildings with Solar PV through the Use of Battery Systems and EV Energy Storage

Buildings with solar photovoltaic (PV) generation and a stationary battery energy storage system (BESS) may self-sustain an uninterrupted full-level electricity supply during power outages. The duration of off-grid operation is dependent on the time of the power fault and the capabilities of the home energy management system (HEMS). In this paper, building resilience is quantified by analyzing the self-sustainment duration for all possible power outages throughout an entire year. An evaluation method is proposed and exercised on a reference house in California climate zone 9 for which the detailed electricity usage is simulated using the EnergyPlus software. The influence of factors such as energy use behavioral patterns, energy storage capacity from the BESS, and an electric vehicle (EV) battery on the building resilience is evaluated. Varying combinations of energy storage and controllable loads are studied for optimally improved resilience based on user preferences. It is shown that for the target home and region with a solar PV system of 7.2 kW, a BESS with a capacity of 11 kWh, and an EV with a battery of 80 kWh permanently connected to the home, off-grid self-sustained full operation is guaranteed for at least 72 h.

14 SOLAR ENERGY↗

Grid-Forming PV Inverter: Technology Development and Microgrid Applications

Presently, excluding residential backup power applications, grid-forming (GFM) inverters are commercially available for battery energy storage system (BESS) and some PV plus battery systems but not yet for stand-alone PV. This tech update investigates the control design for GFM PV inverter, especially the control required to provide active power reserve and to stabilize the dc link voltage. Subsequently, the use cases of GFM PV plants in utility-level microgrids are discussed considering fully inverter-based microgrids (i.e., with PV and BESS) as well as mixed-source microgrids (i.e., with PV and diesel generator). Scenarios where active power up-reserve from GFM PV plants is beneficial are illustrated. Moreover, requirements and specifications for GFM PV plant, especially for its active power reserve function are developed. In addition, stability of an example utility-level microgrid with two GFM PV plants and a diesel generator is analyzed to shed light on the potential unstable interaction between multiple GFM resources and the countermeasures. This research aims to advance GFM PV technology to offer more flexibility in microgrid design. With GFM PV available, depending on the level of reliability required, cost-benefit analysis, etc., the GFM BESS or diesel generator may be sized smaller while leveraging the full potential of PV generation inside the microgrid.

14 SOLAR ENERGY↗

SIW21-95: Hybridizing Synchronous Condensers with Grid-Forming Battery Energy Storage Systems

One of the main challenges associated with deployment of high shares of inverter-based resources (IBRs) in power grid is not only reduced system inertia but also degrading system strength that may cause severe stability impacts. A minimum level of system strength is needed for the power system to remain stable under normal conditions and to return to a steady state condition following a system disturbance. Significant system strength reduction is expected in almost all planned areas for solar and wind generation deployment. Synchronous condensers (SC) have been considered as one main technology to address the system strength issues for the areas with high levels of IBRs. SCs can help improving reliability and resiliency of power system but they do not provide the full range of services needed by power systems for reliable and economic integration of high shares of inverter-coupled variable generation such as PV generation. Services related to active power controls cannot be provided by SCs due to lack of prime mover. Even for provision of reactive power SCs have certain constraints based on their thermal and stability limits. NREL has been conducting research on a hybridized concept that combines SCs with grid forming (GFM) battery energy storage systems (BESS). This super flexible AC transmission system (SuperFACTS) that combines these two technologies in a single plant under the same controller offers a unique scalable set of services to the power system at all levels (transmission, sub-transmission, distribution, islands and isolated microgrids). Depending on use cases, SuperFACTS can be controlled to provide fully dispatchable and flexible operation using energy storage component, provide a full range of existing and future ancillary and reliability services to the grid (similar or better than conventional sources), maintain adequate levels of grid strength and inertia, and provide fault current for proper operation of protection systems. Therefore, this economic and easy to commercialize solution has potential for significant impacts on certain segments of global energy sector. All types of gird services (market based, reliability and resiliency) can be provided by SuperFACTS plants. GFM BESS can act as a self-black start source for each SuperFACTS module, which in turn can act a black start resource for co-located PV and wind power plants, segments of transmission and distribution networks, for conventional power plants, etc. The issue of in-rush currents during black start is addressed by overcurrent capability of SCs. In this paper we describe the results of modeling for SuperFACTS concept.

grid forming↗

Cybersecurity for Grid Connected eXtreme Fast Charging (XFC) Station (CyberX) (Final Scientific/Technical Report)

This report summarizes the activities conducted under the DOE VTO funded project DE- EE0008451, where ABB Inc. (ABB), in collaboration with Idaho National Laboratory (INL), APS Global (APS), and XOS Trucks (XOS) pursued the development of a cyber-resilient extreme fast charging (XFC) management system. This project entitled Cybersecurity for Grid Connected eXtreme Fast Charging (XFC) Station (CyberX) focuses on a resilient architecture for smart charging EV Supply Equipment (EVSE) device control and Coordinated Anomaly Detection System (CADS) features that can be added at the charging site depot level to increase cybersecurity. The project was split into two budget periods focused first on developing the threat model and resilient control concepts and second on testing, improving, and validating those developed resilient control algorithms and features with a focus on key vulnerabilities identified during the threat assessment portion of the project. During the first budget period of the CyberX project, the ABB led team focused on activities to identify, model, and quantitatively prioritize high-impact attack scenarios with potential cyber-physical effects while also modeling and developing concepts for a resilient control system that could securely address integration of DERs and other resources with EV charging. Development of the security focused XFC management system (XMS) was accomplished first by offline simulation using a developed XFC station or depot with 480V input level and simulating measurement inputs to monitoring and control systems in concept development. A representative distribution grid model was developed supporting an EV charging site model with BESS and 6 general EV charging models. These EV charging models allowed multiple configurations of charging level, multiple connected protection and measurement devices, and simulation function to show general compromise of EV, BESS, and protection features based on parallel threat analysis. During the second budget period, the EV site and supporting systems model was developed in more detail and converted from offline model to real-time to real-time with EV charging hardware in the loop (HIL). The resilient control architecture developed as concept in the first part of the project was further tested and validated for integration of local energy resources and XFC charging station site equipment while maintaining cybersecure operating principles. The proposed resilient architecture for smart charging and cybersecurity features consists of two main concepts developed and tested within the project. The first concept is an XFC management system (XMS) consisting of a hardware gateway, software platform, and Supervisory Control and Data Acquisition (SCADA) or Distribution Management System integration components. The second concept is a Coordinated Anomaly Detection System (CADS) which forms a primarily software-related subsystem of the total CyberX solution focused on monitoring system measurements, estimation of measurement states, and predicting current at the utility point of interaction based on machine learning for anomaly detection.

33 ADVANCED PROPULSION SYSTEMS↗

Photovoltaic Plant and Battery Energy Storage System Integration at NREL's Flatirons Campus

Although utility-scale solar photovoltaic (PV) power plants are becoming a cost-effective energy resource, there is belief within the energy industry that the increasing penetrations of PV technologies could potentially impact grid reliability. This is due to the variability across timescales, the forecast uncertainty of the solar energy resource, and the impacts on both distribution and transmission systems. This can cause utilities to severely limit PV installations or to assign PV integration costs when considering a least-cost portfolio of resources. As California and other regions in the United States are marching toward fulfilling - and probably exceeding - their renewables portfolio standards goals, grid operators are beginning to face operational challenges that could have implications for existing renewable and nonrenewable generators and that will shape opportunities for future projects. In this work, we focused on developing controls and conducting demonstrations for AC-coupled PV-battery energy storage systems (BESS) in which PV and BESS are collocated and share a point of common coupling (PCC).

14 SOLAR ENERGY↗

Evaluating the Risk of Enabling Energy Storage Systems to Provide Multiple Services

Battery energy storage systems (BESS) are emerging as a promising, versatile technology for modern power grids due to their inherent distributed nature, their ability to inject bidirectional power flows and to provide multiple grid services. With the proliferation of intermittent renewable energy resources, the BESS procurement is also expected to increase, thereby creating systematic and strategic opportunities for BESS to various revenue streams for providing multiple grid services. Utilizing a co-simulation architecture, this work presents evaluation framework for enabling Utility-scale BESS with simultaneous provision of multiple services. The proposed framework is implemented on a real-life feeder modeled in GridLAB-D, leveraging multi-service grid support. A Risk-Aware control strategy is also implemented in this work that that takes into account the uncertain nature of some of the stochastic services and ensures the BESS to deliver their service commitments. This promotes overall grid reliability and encourages BESS implementation through the revenue streams from providing multiple grid services.

Theisen, John↗

Optimal Coordination of Distributed Energy Resources Using Deep Deterministic Policy Gradient

Recent studies showed that reinforcement learning (RL) is a promising approach for coordination and control of distributed energy resources (DER) under uncertainties. Many existing RL approaches, including Q-learning and approximate dynamic programming, are based on lookup table methods, which become inefficient when the problem size is large and infeasible when continuous states and actions are involved. In addition, when modeling battery energy storage system (BESS), the loss of life is not reasonably considered into the decision-making process. This paper proposes an innovative deep RL method for DER coordination considering BESS degradation. The proposed deep RL is designed based on an adaptive actor-critic architecture and employs an off-policy deterministic policy gradient method for determining the dispatch operation that minimizes the operation cost and BESS life loss. Case studies were performed to validate the proposed method and demonstrate the effects of incorporating degradation models into control design.

Das, Avijit↗

Battery energy storage control systems and methods for a grid tie inverter coupled to a photovoltaic system

A distributed control system uses a central controller in Internet communication with a local controller to manage grid tie attachment with a battery to form an integrated battery energy storage system (BESS). The BESS is capable of charging or discharging the battery, as well as correcting grid phase with volt amp reactive (VAR) leading or lagging operation modes. Examples shown include simple BESS charging and discharging, BESS integrated with renewable energy sources (here photovoltaic), and direct current fast charge (DCFC) connections with an electric vehicle.

Gadh, Rajit↗

Sizing Considerations for EV Dynamic Wireless Charging Systems with Integrated Energy Storage

Roadways with dynamic wireless charging systems (DWCS) enable charge-sustaining in-motion EV charging, which can reduce charging idle time while increasing range capabilities. Spatially distributed transmitter coils are controlled in response to traffic load that varies significantly minute to minute with high power levels, very short charging time, and low system utilization like wind turbine power. Traffic load estimation and localized analysis may guide effective sizing and topology adoption for feasible and scalable DWCS deployment. DWCS traffic load approximation is reviewed with measured Automated Traffic Recorder (ATR) data and statistical distributions being used to create a synthetic load analyzed using proposed metrics quantifying system utilization over time. Lumped coil section segmentation is compared between second-based distance and spatial density analysis methods, offering 17-27% greater system utilization. A peak load shifting method is proposed for traffic redirection across two tracks with optional BESS integration increasing system utilization by 50-60% depending on time-based and power reserve-based sizing and control.

Lewis, Donovin D.↗