Search NASA⌕ Search

SEARCH · Search NASA

Results for “BUFFER STORAGE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Air Brayton Solar Receiver, phase 1

A six month analysis and conceptual design study of an open cycle Air Brayton Solar Receiver (ABSR) for use on a tracking, parabolic solar concentrator are discussed. The ABSR, which includes a buffer storage system, is designed to provide inlet air to a power conversion unit. Parametric analyses, conceptual design, interface requirements, and production cost estimates are described. The design features were optimized to yield a zero maintenance, low cost, high efficiency concept that will provide a 30 year operational life.

Zimmerman, D. K.↗

Development, solar test, and evaluation of a high-temperature air receiver for point-focusing parabolic dish applications

A high temperature solar receiver was fabricated and tested in excess of 1370 C on an 11-meter-diameter test bed concentrator at the Jet Propulsion Laboratory Parabolic Dish Test Site, Edwards, California. The 60-kilowatt thermal receiver design utilizes state-of-the-art silicon carbide honeycomb matrix panels to receive and transfer the solar energy and mullite elements for thermal buffer storage. Solar tests were conducted with indicated air exit temperatures ranging from 885 C (1625 F) to 1427 C (2600 F), mass flow rates of 75 to 105 g/sec (0.16 to 0.23 lbm/sec), and pressures up to 265 kPa absolute (38.4 psia). Estimates of efficiency are 59.7% at 1120 C (2048 F) to 80.6% at 885 C (1625 F) when aperture spillage losses are considered separately. Results are presented which demonstrate the feasibility of this innovative receiver concept for point-focusing parabolic dish applications over a wide temperature range.

Hanseth, E. J.↗

Shuttle-Car System for Continuous Mining

Buffer storage catches coal production between loadings. Telescoping reservoir filled continuously. With tailgate down, shuttle car slides into place along sides and bottom of reservoir. Reservoir retracts along inside of car and out through tailgate, leaving coal behind in car. System not restricted to coal mining and may prove economical for hauling other solid materials.

Collins, E. R., Jr.↗

MOSAIC

The Mosaicked Optical Self-scanned Array Imaging Camera (MOSAIC), is a 50 sq cm active area detector system encompassing 5.76 million picture elements. This camera is being developed for use in astronomical instrumentation requiring the use of large area imaging detectors with high resolution photon counting capability in the space ultraviolet. This paper gives a descriptive outline of the MOSAIC camera system including: the 100 mm diameter microchannel plate intensifier, the 3 x 3 array of 800 x 800 pixel charge coupled devices, the signal processing and buffer storage subsystem, the electronic support and control subsystem, and the data processing subsystem. Performance characteristics of the camera and its subsystems are presented, based on system analysis.

Williams, J. T.↗

Mathematical modeling of control subsystems for CELSS: Application to diet

The dynamic control of a Closed Ecological Life Support System (CELSS) in a closed space habitat is of critical importance. The development of a practical method of control is also a necessary step for the selection and design of realistic subsystems and processors for a CELSS. Diet is one of the dynamic factors that strongly influences, and is influenced, by the operational states of all major CELSS subsystems. The problems of design and maintenance of a stable diet must be obtained from well characterized expert subsystems. The general description of a mathematical model that forms the basis of an expert control program for a CELSS is described. The formulation is expressed in terms of a complete set of time dependent canonical variables. System representation is dynamic and includes time dependent storage buffers. The details of the algorithm are described. The steady state results of the application of the method for representative diets made from wheat, potato, and soybean are presented.

Waleh, Ahmad↗

Expert system technologies for Space Shuttle decision support: Two case studies

This paper addresses the issue of integrating the C Language Integrated Production System (CLIPS) into distributed data acquisition environments. In particular, it presents preliminary results of some ongoing software development projects aimed at exploiting CLIPS technology in the new mission control center (MCC) being built at NASA Johnson Space Center. One interesting aspect of the control center is its distributed architecture; it consists of networked workstations which acquire and share data through the NASA/JSC-developed information sharing protocol (ISP). This paper outlines some approaches taken to integrate CLIPS and ISP in order to permit the development of intelligent data analysis applications which can be used in the MCC. Three approaches to CLIPS/IPS integration are discussed. The initial approach involves clearly separating CLIPS from ISP using user-defined functions for gathering and sending data to and from a local storage buffer. Memory and performance drawbacks of this design are summarized. The second approach involves taking full advantage of CLIPS and the CLIPS Object-Oriented Language (COOL) by using objects to directly transmit data and state changes from ISP to COOL. Any changes within the object slots eliminate the need for both a data structure and external function call thus taking advantage of the object matching capabilities within CLIPS 6.0. The final approach is to treat CLIPS and ISP as peer toolkits. Neither is embedded in the other; rather the application interweaves calls to each directly in the application source code.

Ortiz, Christopher J.↗

Life Support with Failures and Variable Supply

The life support system for long duration missions will recycle oxygen and water to reduce the material resupply mass from Earth. The impact of life support failures was investigated by dynamic simulation of a lunar outpost habitat life support model. The model was modified to simulate resupply delays, power failures, recycling system failures, and storage failures. Many failures impact the lunar outpost water supply directly or indirectly, depending on the water balance and water storage. Failure effects on the water supply are reduced if Extra Vehicular Activity (EVA) water use is low and the water supply is ample. Additional oxygen can be supplied by scavenging unused propellant or by production from regolith, but the amounts obtained can vary significantly. The requirements for oxygen and water can also vary significantly, especially for EVA. Providing storage buffers can improve efficiency and reliability, and minimize the chance of supply failing to meet demand. Life support failures and supply variations can be survivable if effective solutions are provided by the system design

Jones, Harry↗

Time Synchronization and Distribution Mechanisms for Space Networks

This work discusses research on the problems of synchronizing and distributing time information between spacecraft based on the Network Time Protocol (NTP), where NTP is a standard time synchronization protocol widely used in the terrestrial network. The Proximity-1 Space Link Interleaved Time Synchronization (PITS) Protocol was designed and developed for synchronizing spacecraft that are in proximity where proximity is less than 100,000 km distant. A particular application is synchronization between a Mars orbiter and rover. Lunar scenarios as well as outer-planet deep space mother-ship-probe missions may also apply. Spacecraft with more accurate time information functions as a time-server, and the other spacecraft functions as a time-client. PITS can be easily integrated and adaptable to the CCSDS Proximity-1 Space Link Protocol with minor modifications. In particular, PITS can take advantage of the timestamping strategy that underlying link layer functionality provides for accurate time offset calculation. The PITS algorithm achieves time synchronization with eight consecutive space network time packet exchanges between two spacecraft. PITS can detect and avoid possible errors from receiving duplicate and out-of-order packets by comparing with the current state variables and timestamps. Further, PITS is able to detect error events and autonomously recover from unexpected events that can possibly occur during the time synchronization and distribution process. This capability achieves an additional level of protocol protection on top of CRC or Error Correction Codes. PITS is a lightweight and efficient protocol, eliminating the needs for explicit frame sequence number and long buffer storage. The PITS protocol is capable of providing time synchronization and distribution services for a more general domain where multiple entities need to achieve time synchronization using a single point-to-point link.

Woo, Simon S.↗

Waypoint Following Dynamics of a Quaternion Error Feedback Attitude Control System

Closed-loop attitude steering can be used to implement alternative attitude maneuvers by using a conventional attitude control system to track a non-standard attitude profile sampled as a series of sequential commands. The idea has been employed in practice to perform zero-propellant maneuvers on the International Space Station and minimum time maneuvers on NASA’s TRACE space telescope. A challenge for operational implementation of the idea is the finite capacity of a space vehicle’s command storage buffer. One approach to mitigate the problem is to downsample-and-hold the attitude commands so that the attitude control system to follows a set of waypoints. This paper explores the waypoint following dynamics of a quaternion error feedback control law for downsample-and-hold. It is shown that downsample-and-hold induces a ripple between downsamples that causes the satellite angular rate to significantly overshoot the desired limit. Analysis in the z-domain is carried out in order to understand the phenomenon. An interpolating Chebyshev-type filter is proposed that allows attitude commands to be encoded in terms of a small set of filter coefficients. Using the interpolating filter, commands can be issued at the ACS rate but with significantly reduced memory requirements. The attitude control system of NASA’s Lunar Reconnaissance Orbiter is used as an example to illustrate the behavior of a practical attitude control system.

Mark Karpenko↗

200 Gbps TBIRD CubeSat Downlink: Pre-Flight Test Results

The Terabyte Infrared Delivery (TBIRD) program will establish an optical communication link from a 6Unanosatellite in low-Earth orbit to a ground station at burst rates up to 200 Gbps. The system is capable of reliable data delivery from a 2 TB storage buffer on the payload to a ground terminal in the presence of atmospheric fading. An overview of the communication architecture for TBIRD is provided as well as results from communications performance testing of the 3U lasercom payload prior to spacecraft integration. Launch is scheduled for mid-year 2022.

space communications↗

TBIRD 200-Gbps CubeSat Downlink: System Architecture and Mission Plan

The Terabyte Infrared Delivery (TBIRD) program will establish an optical communication link from a 6U CubeSat in low-Earth orbit (LEO) to a ground station at burst rates up to 200 Gbps, resulting in data volumes that can exceed 1 Terabyte in a single pass. The space and ground terminals utilize commercially available 1550-nm coherent transceivers in conjunction with an automatic repeat request (ARQ) system to guarantee robust communication in the presence of an atmospheric fading channel. This allows the system to perform a reliable end-toend transfer of data from the payload’s 2-TB storage buffer to the ground terminal. In this paper, we describe the system architecture, link analysis, and concept of operations for the upcoming TBIRD flight demonstration in 2022. We also provide an update on the development of the 3U terminal payload and the ground terminal at JPL’s Optical Communications Telescope Laboratory (OCTL).

Piazzolla, Sabino↗

Enhanced methods for operating refueling station tube-trailers to reduce refueling cost

A method and apparatus are provided for operating a refueling station including source tube-trailers and at least one compressor to reduce refueling cost. The refueling station includes a gaseous fuel supply source including a plurality of tanks on a tube trailer coupled to a first control unit, and high pressure buffer storage having predefined capacity coupled to a second control unit and the first tanks by a pressure control valve and the first control unit, and at least one compressor. The refueling station is operated at different modes depending on a state of the refueling station at the beginning of each operational mode. The refueling system is assessed at the end of each operational mode to identify the state of the system and select a next mode of operation. The operational modes include consolidating hydrogen, or any gaseous fuel, within the tubes mounted on the trailer.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Big Sky Regional Carbon Sequestration Partnership (Phase III Final Scientific/Technical Report)

The Big Sky Carbon Sequestration Partnership (BSCSP) pursued a Phase III demonstration project at Kevin Dome in north central Montana. Kevin Dome covers approximately 700 square miles and is a naturally occurring CO 2 reservoir that is flanked by oil and gas fields. The carbon dioxide (CO 2 ) is in the upper Devonian Duperow (carbonate) formation and does not reach the spill point of the dome; therefore, the dome has potential as a CO 2 sequestration reservoir, a CO 2 supply, or as both if anthropogenic sources and enhanced oil recovery (EOR) operations are associated with the dome. Kevin Dome could potentially act as a buffer to continue accepting anthropogenic CO 2 when EOR flooding operations are interrupted or completed. The project objective was to produce one million tonnes of CO 2 from the gas cap of Kevin Dome, pipe it laterally, inject, and re-store it in the brine leg of the same formation to test the hub / buffer storage concept. This was to be accomplished by drilling up to five production wells, building a short pipeline and compression facilities, and drilling an injection well and several monitoring wells. BSCSP commenced outreach and site characterization activities including acquiring baseline data for near-surface insurance monitoring, acquiring 3-dimensional, 9-component surface seismic over the project area, drilling two test wells (one in the production area and one in the injection area), coring key intervals, and performing comprehensive logging. Well tests of those wells revealed two barriers to the project. The production (Danielson 33-17) well was perforated in multiple zones but failed to produce any significant CO 2 . This was despite being drilled in the near vicinity of a historic well that had produced 3700 MCF per day in a drill stem test. Modeling indicated that this was likely due to a phase change during production causing a temperature drop resulting in hydrate and/or water ice formation that clogged the formation. Tests of the injection zone (Wallewein 22-1) well indicated total dissolved solids (TDS) slightly below the EPA required 10,000 parts per million (ppm) for a Class VI underground injection control permit. While the project was initiated before Class VI rules were promulgated, and this was an experimental project (seemingly qualified for a Class V permit), the Environmental Protection Agency (EPA) indicated that injection would require a Class VI permit. The low salinity result was unexpected as contours plotted based on regional formation water quality data indicated an expected TDS above 20,000 ppm, and wells between the recharge zone and the Wallewein well tested above 10,000 ppm. Faced with the inability to obtain an injection permit, the demonstration project could not proceed. However, the project had generated valuable samples and data on a large natural analog including 32 sq. mi. of 3-D, 9-C seismic, 430 ft. of carbonate core covering seven different depositional environments taken from areas with, and without the presence of CO 2 , 30 ft. of core of two caprocks, a tight carbonate and an anhydrite, a full set of modern logs on both wells, and well tests. DOE decided to re-scope the project around completing studies utilizing this data. This report covers both the initial scope and the re-scope (Task / Section numbers preceded with an R). While the report covers a wide range of project activities, highlights of this work include: Development of a geostatic model using neural nets to match well logs to facies and using multi-waveform seismic to inform reservoir heterogeneity; Unique mechanical testing of permeability – stress relationship in two caprock materials; Development of full waveform inversion to generate a high resolution velocity model; Model development for dual permeability (fracture and matrix) systems to better account for matrix-matrix interactions; Joint seismic wave inversion (including the first quadr-joint inversion) exhibiting better imaging of a challenging reservoir zone in stiff rock; Core flow and core flood results on a reactive carbonate; and Innovative laboratory measurements of seismic response of fractured core as a function of fluid fill.

54 ENVIRONMENTAL SCIENCES↗

Planning large-scale excavation and construction activities within an aerially constrained site for construction of a repository for low and short-lived intermediate level radioactive waste at the Bulgarian national disposal facility - 15372

The Bulgarian State Enterprise for Radioactive Waste Management (SERAW) is planning the construction of a near-surface repository for low and short-lived intermediate level radioactive waste, the National Disposal Facility (NDF), at the Radiana Site adjacent to the Kozloduy Nuclear Power Plant (KNPP). The Site, a rectangular area approximately 1.2 km east-west by 0.4 north-south, is located on a slopping area between the second and sixth loess terraces above the River Danube with elevations ranging from approximately +40 m to elevation +95 m. Construction of the NDF will be divided into three phases separated by approximately 20 years each. The first phase will see the construction of the primary support facilities, referred to as the Auxiliary Buildings and including the Waste Reception and Buffer Storage (WRBS) Building, and the first set of 22 reinforced concrete disposal cells and supporting infrastructure, including a network of subsurface observation galleries, the Infiltration Network Control (ICN) Galleries. Each disposal cell will be 20.15 m long by 17.05 m wide by 9.45 m in height. The disposal cells will be arranged in two parallel rows. Disposal activities will be conducted using overhead cranes installed inside of track mounted mobile roofs. Each row of disposal cells will be serviced by one mobile roof. The mobile roofs will be supported by massive concrete foundations. Construction at the site will present several logistical challenges that will need to be overcome to fully realize the NDF. First in order to begin construction of these facilities nearly 1 million 3 of soil will require excavation and handling. Consistent with requirements to minimize potential environmental impacts identified in the site Environmental Safety Assessment (EIA) excavated soil will, to the extent possible, remain onsite. Approximately three quarters of the soil can be accommodated within the site boundaries. Another challenge results from requirements imposed by the ground conditions. The sub-grade at the site, which consists primarily of loess, will require considerable improvement. To this end a 5 m thick loess-cement cushion will be constructed across much of the site. Specifically, the cushion will be required beneath the disposal cells and the WRBS Building. Construction of the loess-cement cushion in the disposal area will require detailed planning and coordination, particularly as the cushion beneath the disposal cells also contains embedded structures, including the ICN Galleries as well as massive concrete foundation beams required for the two mobile roofs. Construction of these structures will require planned interruptions in the construction of the loess-cement cushion. Specific cement types and strict quality requirements will be required for completion of the loess-cement cushion as well as for completion of the ICN Galleries. The construction planning will need to account for the large volumes of soil to be excavated as well as ensuring sufficient material supplies in terms of both quality as well as quantity. Large quantities of materials including both dry cement for mixing with the loess, and wet concrete for pouring of the mobile roof foundations are accounted for by the plan. However, even after completion of these activities additional challenges are addressed by the plan related to the contemporaneous construction management of the auxiliary buildings and the disposal cells. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Update on Construction Planning for the Bulgarian Low and Short-Lived Intermediate Level Radioactive Waste Repository - 16159

The Bulgarian State Enterprise for Radioactive Waste Management (SERAW) is planning the construction of a near-surface repository for low and short-lived inter-mediate level radioactive waste, the National Disposal Facility (NDF), at the Radiana Site adjacent to the Kozloduy Nuclear Power Plant (KNPP). This paper presents an update on construction planning activities that were originally presented at the 2015 Waste Management Conference. The Site, a rectangular area approximately 1.2 km east-west by 0.4 north-south, is located on a slopping area between the second and sixth loess terraces above the River Danube with elevations ranging from approximately +40 m to elevation +95 m. Construction of the NDF will be divided into three phases separated by approximately 20 years each. The first phase will see the construction of the primary support facilities, referred to as the Auxiliary Buildings and including the Waste Reception and Buffer Storage (WRBS) Building, and the first set of 22 reinforced concrete disposal cells and supporting infrastructure, including a network of subsurface observation galleries, the Infiltration Network Control (ICN) Galleries. Each disposal cell will be 20.15 m long by 17.05 m wide by 9.45 m in height. The disposal cells will be arranged in two parallel rows. Disposal activities will be conducted using overhead cranes installed inside of track mounted mobile roofs. Each row of disposal cells will be serviced by one mobile roof. The mobile roofs will be supported by massive concrete foundations. Construction at the site will present several logistical challenges that will need to be overcome to fully realize the NDF. First in order to begin construction of these facilities nearly 1 million m{sup 3} of soil will require excavation and handling. Consistent with requirements to minimize potential environmental impacts identified in the site Environmental Safety Assessment (EIA) excavated soil will, to the extent possible, remain onsite. Approximately three quarters of the soil can be accommodated within the site boundaries. Another challenge results from requirements imposed by the ground conditions. The sub-grade at the site, which consists primarily of loess, will require considerable improvement. To this end a 5 m thick loess-cement cushion will be constructed across much of the site. Specifically, the cushion will be required beneath the disposal cells and the WRBS Building. The cushion beneath the disposal cells also contains embedded structures, including the ICN Galleries as well as the massive concrete foundation beams required for the two mobile roofs. Construction of these structures will require planned interruptions in the construction of the loess-cement cushion. Specific cement types and strict quality requirements will be required for completion of the loess-cement cushion as well as for the completion of the ICN Galleries. The construction planning will need to account for the large volumes of soil to be excavated as well as ensuring sufficient material supplies in terms of both quality as well as quantity. Large quantities of materials including both dry cement for mixing with the loess, and wet concrete for pouring of the mobile roof foundations are ac-counted for by the plan. However, even after completion of these activities additional challenges are addressed by the plan related to the contemporaneous construction management of the auxiliary buildings and the disposal cells. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Buffer thermal energy storage for a solar Brayton engine

A study has been completed on the application of latent-heat buffer thermal energy storage to a point-focusing solar receiver equipped with an air Brayton engine. To aid in the study, a computer program was written for complete transient/stead-state Brayton cycle performance. The results indicated that thermal storage can afford a significant decrease in the number of engine shutdowns as compared to operating without thermal storage. However, the number of shutdowns does not continuously decrease as the storage material weight increases. In fact, there appears to be an optimum weight for minimizing the number of shutdowns.

Strumpf, H. J.↗

A buffering heat exchanger/thermal energy storage system for desalination applications

A buffering heat exchanger/thermal energy storage (BHXTES) system was designed using a fast-response phase-change material/graphite foam (PCM/GF) medium for desalination and potentially other industrial applications. Unlike a store-now-and-use-later TES system, this study focused on developing a dynamically balanced, continuously used, system that optimized three functions. A lab-scale prototype was designed and fabricated with a PureTemp 151/GF storage medium. The experimental data showed excellent thermal performance repeatability indicating minimal effects of PCM expansion and contraction on the GF as well as negligible PCM redistribution effects. The experimental data also served as a validation of the numerical model of the BHXTES system, after which optimization of the BHXTES system was conducted through numerical simulations for both PureTemp 151/GF and solar salt/GF as the storage medium. The results show that, with a Therminol 55 heat transfer fluid, continuous operation of the system can be realized with a solar energy source through cycles of 8-h changing for desalination and energy storage with the supplied heat followed by 16-h discharging for desalination with the stored energy. As a result, the working fluid outlet temperatures are generally in the ranges of approximately 128–160 °C for a PureTemp 151/GF medium and 198–220 °C for a solar salt/GF medium.

Buffering↗