Search NASA⌕ Search

SEARCH · Search NASA

Results for “CDR”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Tropospheric Emissions: Monitoring of Pollution Overview

TEMPO is now well into its implementation phase, having passed both its Key Decision Point C and the Critical Design Review (CDR) for the instrument. The CDR for the ground systems will occur in March 2016 and the CDR for the Mission component at a later date, after the host spacecraft has been selected. TEMPO is on schedule to measure atmospheric pollution for greater North America from space using ultraviolet and visible spectroscopy. TEMPO measures from Mexico City to the Canadian oil sands, and from the Atlantic to the Pacific, hourly and at high spatial resolution. TEMPO provides a tropospheric measurement suite that includes the key elements of tropospheric air pollution chemistry. Measurements are from geostationary (GEO) orbit, to capture the inherent high variability in the diurnal cycle of emissions and chemistry. The small product spatial footprint resolves pollution sources at sub-urban scale. Together, this temporal and spatial resolution improves emission inventories, monitors population exposure, and enables effective emission-control strategies. TEMPO takes advantage of a GEO host spacecraft to provide a modest cost mission that measures the spectra required to retrieve O3, NO2, SO2, H2CO, C2H2O2, H2O, aerosols, cloud parameters, and UVB radiation. TEMPO thus measures the major elements, directly or by proxy, in the tropospheric O3 chemistry cycle. Multi-spectral observations provide sensitivity to O3 in the lowermost troposphere, substantially reducing uncertainty in air quality predictions by 50 percent. TEMPO quantifies and tracks the evolution of aerosol loading. It provides near-real-time air quality products that will be made widely, publicly available. TEMPO provides much of the atmospheric measurement capability recommended for GEO-CAPE in the 2007 National Research Council Decadal Survey, Earth Science and Applications from Space: National Imperatives for the Next Decade and Beyond. Instruments from Europe (Sentinel 4) and Asia (GEMS) will form parts of a global GEO constellation for pollution monitoring later this decade, with a major focus on intercontinental pollution transport. TEMPO will launch at a prime time to be a component of this constellation.

Chance, Kelly↗

GPCP Version 3.2 Products and Results

The Global Precipitation Climatology Project (GPCP) products address the need for long-term precipitation products that emphasize homogeneity, following Climate Data Record (CDR) principles. The new-generation Version 3.2 provides key improvements over the operational Version 2.3 such as: finer spatial resolution of 0.5°x0.5°; wider geosynchronous infrared estimation (58°N-S) upgraded with the PERSIANN-CDR algorithm; upgraded retrievals from selected passive microwave sensors (GPROF algorithm) that calibrate the IR input; revised intercalibrations of TOVS and AIRS data (used at high latitudes); climatologies based on CloudSat, TRMM, and GPM to provide overall calibration by modern satellite estimates; the latest Global Precipitation Climatology Centre (GPCC) precipitation gauge analyses over land areas; regional modifications to the gauge undercatch correction; and IMERG half-hourly data input to the Daily V3.2 product. We will show sample analyses that demonstrate aspects of the Version 3.2 precipitation record, such as the global climatology, the time series for global land and ocean total precipitation and snowfall, and the time series of tropical land and ocean daily precipitation rate histograms. For selected analyses we will show improvements in both the Monthly and Daily products in Version 3.2 compared to the operational Version 2.3. In particular, the climatological zonal profile of precipitation in the Southern Ocean, extending south of 40°S, improves a suspected artifact in V2.3. Similarly, the Daily histograms over ocean in Version 3.2 lack the jump in the predecessor Version 1.3 Daily over ocean at the start of 2009, although a smaller jump is introduced in June 2014. The presentation will conclude with a prospectus for the future satellites/sensors and community datasets necessary to continue computation of a consistent CDR product on the one hand, while also potentially contributing to improvements in the historical record.

Global Precipitation Measurement↗

Insights into Long-Term Global Precipitation from IMERG and GPCP

Multiple satellite-based datasets provide estimates of the long-term record of global precipitation. Each necessarily includes both the real atmospheric behavior and a collection of artifacts driven by the input data sources and design choices in the retrievals and dataset construction. For this presentation, the Integrated Multi-satellitE Retrievals for GPM (IMERG) products from the Global Precipitation Measurement (GPM) mission’s U.S. Science Team are designed as a modern High-Resolution Precipitation Product (HRPP), while the Global Precipitation Climatology Project’s (GPCP) products are designed as a modern Climate Data Record (CDR). Although they share some common input data sources, the computational process for each is rather different. Comparing the precipitation estimates from each algorithm gives us insights into likely artifacts and the natural variations that are common to both. The goal of an HRPP is to give the best estimate of precipitation at each time step in the dataset, generally meaning that “all possible available” data are used. In contrast, the CDR is intended to provide a precipitation record that has relatively homogeneous statistics, necessary for climate analysis. Each analysis strives for both goals, of course, but this means that the HRPP uses the disparate collection of satellites whose statistics don’t quite match the ideal record, while the CDR is computed from fewer satellites that provide a relatively homogeneous set of precipitation statistics. This presentation employs the current versions of the IMERG and GPCP products, V07B and V3.2, respectively. A variety of analyses have demonstrated that IMERG has more artifacts, as expected, which tend to result from changes in the source of intercalibration for the various input satellites, namely the Combined Radar-Radiometer Algorithm using TMI and PR during the TRMM era and using GMI and DPR-Ku during the GPM era. As well, a shift occurs when the altitudes of the TRMM and GPM satellites change as a result of orbit boosts. For the most part the mean precipitation shows good continuity across these boundaries, but there are noticeable changes in the respective histograms. The latter has taken on more importance in recent years due to increased scrutiny on extremes which implicitly focus on the upper end of the precipitation histograms. The GPCP product is more homogeneous, with only one major change in calibrator, transitioning from the SSMI series of satellites to the SSMIS series of satellites in 2009. The GPCP analysis does a good job of minimizing artifacts in the means at this boundary, while the histograms show a smaller, but still noticeable shift in the histograms, a result that is similar to data boundaries in IMERG. The GPCP Daily, which is a month-by-month rescaling of the daily accumulated IMERG Final product, shows more consistency than the equivalent daily IMERG, but inherits the histogram shifts from IMERG. Given this overlay of artifacts, there is enough consistency between the products to illustrate some important long-term variations, including interannual variations, not all of which are easily attributable to ENSO events, and trends that are large regionally, but comparatively small when averaged across the globe.

precipitation↗

A generalized analysis of dual-polarization radar measurements of rain

In the study of meteorological phenomena by radar, it has been shown that dual-polarization radar measurements can yield useful data about precipitation structures within the radar beam. The techniques available for dual-polarized radar measurement are differential reflectivity, or Z(DR), linear depolarization ratio (LDR), and circular depolarization ratio (CDR). This paper presents a theoretical analysis of backscattering from a volume filled with raindrops using Rayleigh scattering theory. A generalized radar equation is given in matrix form, and the dependence of backscatter measurements in terms of a rainstorm model including raindrop shape, size, and canting angle is examined. Calculated results which show the dependence of Z(DR) on beam elevation angle and polarization angle are presented. Some results for LDR and CDR are presented, showing how these quantities depend on raindrop parameters.

Stapor, D. P.↗

Space Station Freedom - Approaching the critical design phase

The status and future developments of the Space Station Freedom are discussed. To date detailed design drawings are being produced to manufacture SSF hardware. A critical design review (CDR) for the man-tended capability configuration is planned to be performed in 1993 under the SSF program. The main objective of the CDR is to enable the program to make a full commitment to proceed to manufacture parts and assemblies. NASA recently signed a contract with the Russian space company, NPO Energia, to evaluate potential applications of various Russian space hardware for on-going NASA programs.

Kohrs, Richard H.↗

Space Station Freedom research capabilities

NASA's plan for enhancing space-based research capabilities begins with extended-duration Space Shuttle missions that will double the research capability currently provided by Spacelab and culminate in Space Station Freedom. The 14-day USML 1 mission flown on the Space Shuttle in June 1992 was a space station precursor mission, dedicated to microgravity and life science research. Freedom will be a permanent space-based research facility, providing a working environment nearly free of buoyancy-driven convection, sedimentation, and hydrostatic pressure and featuring access to the ultra-high vacuum of space (for external payloads). In its crew-tended phase, Space Station Freedom will provide 40 times Spacelab's capability, and in its permanently occupied phase, Freedom will provide 110 times Spacelab's capability. (The Russian space station, Mir, offers 26 times Spacelab's capabilities.) According to NASA's current schedule, the first launch of a space station element will take place in November 1995, with permanently occupied capability planned for September 1999. This year, NASA will conduct space station critical design reviews (CDR's). Work package design reviews will take place from February to April 1993, followed by a systems CDR.

Moorehead, Robert↗

SXI prototype mirror mount

The purpose of this contract was to provide optomechanical engineering and fabrication support to the Solar X-ray Imager (SXI) program in the areas of mirror, optical bench and camera assemblies of the telescope. The Center for Applied Optics (CAO) worked closely with the Optics and S&E technical staff of MSFC to develop and investigate the most viable and economical options for the design and fabrication of a number of parts for the various telescope assemblies. All the tasks under this delivery order have been successfully completed within budget and schedule. A number of development hardware parts have been designed and fabricated jointly by MSFC and UAH for the engineering model of SXI. The major parts include a nickel electroformed mirror and a mirror mount, plating and coating of the ceramic spacers, and gold plating of the contact rings and fingers for the camera assembly. An aluminum model of the high accuracy sun sensor (HASS) was also designed and fabricated. A number of fiber optic tapers for the camera assembly were also coated with indium tin oxide and phosphor for testing and evaluation by MSFC. A large number of the SXI optical bench parts were also redesigned and simplified for a prototype telescope. These parts include the forward and rear support flanges, front aperture plate, the graphite epoxy optical bench and a test fixture for the prototype telescope. More than fifty (50) drawings were generated for various components of the prototype telescope. Some of these parts were subsequently fabricated at UAH machine shop or at MSFC or by the outside contractors. UAH also provide technical support to MSFC staff for a number of preliminary and critical design reviews. These design reviews included PDR and CDR for the mirror assembly by United Technologies Optical Systems (UTOS), and the program quarterly reviews, and SXI PDR and CDR. UAH staff also regularly attended the monthly status reviews, and made a significant number of suggestions to improve the design, assembly and alignment of the telescope. Finally, a high level assembly and alignment plan for the entire telescope was prepared by UAH. This plan addresses the sequence of assembly, the required assembly and alignment tolerances, and the methods to verify the alignment at each step during the assembly process. This assembly and alignment plan will be used to assemble and integrate the engineering model (EM) of the telescope. Later on, based on this plan more detailed assembly and alignment procedures will be developed for the lower-level assemblies of SXI.

Source record↗

The use of high fidelity CAD models as the basis for training on complex systems

During the design phases of large and complex systems such as NASA's Space Station Freedom (SSF), there are few, if any physical prototypes built. This is often due to their expense and the realization that the design is likely to change. This poses a problem for training, maintainability, and operations groups who are tasked to lay the foundation of plans for using these systems. The Virtual Reality and Visualization Laboratory at the Boeing Advanced Computing Group's Huntsville facility is supporting the use of high fidelity, detailed design models that are generated during the initial design phases, for use in training, maintainability and operations exercises. This capability was used in its non-immersive form to great effect at the SSF Critical Design Review (CDR) during February, 1993. Allowing the user to move about within a CAD design supports many efforts, including training and scenario study. We will demonstrate via a video of the Maintainability SSF CDR how this type of approach can be used and why it is so effective in conveying large amounts of information quickly and concisely. We will also demonstrate why high fidelity models are so important for this type of training system and how it's immersive aspects may be exploited as well.

Miller, Kellie↗

Additive Runge-Kutta Schemes for Convection-Diffusion-Reaction Equations

Additive Runge-Kutta (ARK) methods are investigated for application to the spatially discretized one-dimensional convection-diffusion-reaction (CDR) equations. First, accuracy, stability, conservation, and dense output are considered for the general case when N different Runge-Kutta methods are grouped into a single composite method. Then, implicit-explicit, N = 2, additive Runge-Kutta ARK2 methods from third- to fifth-order are presented that allow for integration of stiff terms by an L-stable, stiffly-accurate explicit, singly diagonally implicit Runge-Kutta (ESDIRK) method while the nonstiff terms are integrated with a traditional explicit Runge-Kutta method (ERK). Coupling error terms are of equal order to those of the elemental methods. Derived ARK2 methods have vanishing stability functions for very large values of the stiff scaled eigenvalue, z(exp [I]) goes to infinity, and retain high stability efficiency in the absence of stiffness, z(exp [I]) goes to zero. Extrapolation-type stage-value predictors are provided based on dense-output formulae. Optimized methods minimize both leading order ARK2 error terms and Butcher coefficient magnitudes as well as maximize conservation properties. Numerical tests of the new schemes on a CDR problem show negligible stiffness leakage and near classical order convergence rates. However, tests on three simple singular-perturbation problems reveal generally predictable order reduction. Error control is best managed with a PID-controller. While results for the fifth-order method are disappointing, both the new third- and fourth-order methods are at least as efficient as existing ARK2 methods while offering error control and stage-value predictors.

Kennedy, Christopher A.↗

Additive Runge-Kutta Schemes for Convection-Diffusion-Reaction Equations

Additive Runge-Kutta (ARK) methods are investigated for application to the spatially discretized one- dimensional convection-diffusion-reaction (CDR) equations. Accuracy, stability, conservation, and dense-output are first considered for the general case when N different Runge-Kutta methods are grouped into a single composite method. Then, implicit-explicit, (N = 2), additive Runge-Kutta (ARK(sub 2)) methods from third- to fifth-order are presented that allow for integration of stiff terms by an L-stable, stiffly-accurate explicit, singly diagonally implicit Runge-Kutta (ESDIRK) method while the nonstiff terms are integrated with a traditional explicit Runge-Kutta method (ERK). Coupling error terms of the partitioned method are of equal order to those of the elemental methods. Derived ARK(sub 2) methods have vanishing stability functions for very large values of the stiff scaled eigenvalue, z['] yields -infinity, and retain high stability efficiency in the absence of stiffness, z['] yield 0. Extrapolation-type stage- value predictors are provided based on dense-output formulae. Optimized methods minimize both leading order ARK(sub 2) error terms and Butcher coefficient magnitudes as well as maximize conservation properties. Numerical tests of the new schemes on a CDR problem show negligible stiffness leakage and near classical order convergence rates. However, tests on three simple singular-perturbation problems reveal generally predictable order reduction. Error control is best managed with a PID-controller. While results for the fifth-order method are disappointing, both the new third- and fourth-order methods are at least as efficient as existing ARK(sub 2) methods.

Kennedy, Christopher A.↗

TRIO: Turbulent Response in Oxygen

This project was designed to build on the results from the successful launch of the Turbulent Oxygen Mixing Experiment (TOMEX) mother-daughter (instrumented and chemical-release) payload (21.126) that was launched in October 2000 from the White Sands Missile Range. The overall science objective was to investigate the evolution of the atmospheric response. at altitudes between 80 and 120 km, to the presence of unstable regions with vertical scales of the order of 1 to 10 km. TRIO was designed to use Na lidar measurements from the MAUUMALT observation on MAUI with a launch of a payload from Pacific Missile Range Facility (PMRF), located on Kauai. During this project, Aerospace participated in a Mission Initiation Conference. put together a science requirements document. performed a site visit to PMRF. prepared a CDR document. and developed a production and calibration procedure for one of the payload instruments. the 3-channel photometer. Unfortunately. NASA decided to terminate the program because of unforeseen (by NASA) range costs. This CDR document represents our view of this project at termination and provides a roadmap to perform this experiment should it be proposed again.

Hecht, J. H.↗

Spitzer Pre Launch Mission Operations System - The Road to Launch

Spitzer Space Telescope was launched on 25 August 2003 into an Earth-trailing solar orbit to acquire infrared observations from space. Development of the Mission Operations System (MOS) portion prior to launch was very different from planetary missions from the stand point that the MOS teams and Ground Data System had to be ready to support all aspects of the mission at launch (i.e., no cruise period for finalizing the implementation). For Spitzer, all mission-critical events post launch happen in hours or days rather than months or years, as is traditional with deep space missions. At the end of 2000 the Project was dealt a major blow when the Mission Operations System (MOS) had an unsuccessful Critical Design Review (CDR). The project made major changes at the beginning of 2001 in an effort to get the MOS (and Project) back on track. The result for the Spitzer Space Telescope was a successful launch of the observatory followed by an extremely successful In Orbit Checkout (IOC) and operations phase. This paper describes how the project was able to recover the MOS to a successful Delta (CDR) by mid 2001, and what changes in philosophies, experiences, and lessons learned followed. It describes how projects must invest early or else invest heavily later in the development phase to achieve a successful operations phase.

observatory↗

Ares I and Ares V First Stage - Powering Exploration

The National Aeronautics and Space Administration (NASA) Ares Projects Office (APO) is continuing to make progress toward the final design of the first stage propulsion system for the Ares I crew launch vehicle and the Ares V cargo launch vehicle. Ares I and Ares V will provide the space launch capabilities needed to fulfill NASA' s exploration strategy of sending human beings to the Moon, Mars, and beyond. As primary propulsion for the Ares launch vehicles, the Space Shuttle-derived Reusable Solid Rocket Motor (RSRM) is one of the first and most important components to be tested. The first flight of Ares I, called Ares I-X, will occur in April 2009, with booster integration to begin at Kennedy Space Center (KSC) by autumn 2008. The Ares I-X flight will use a combination of flight and simulation hardware to obtain data on controlling the long and narrow crew launch vehicle configuration. The test will use a four-segment RSRM from the Shuttle inventory and a fifth spacer segment to simulate the size and weight of the operational five-segment motor to be used on later flights. The upper stage, Orion crew exploration vehicle, and launch abort system will all be replaced with simulator hardware. Manufacturing work has begun on the spacer segment, as well as the new forward hardware for the booster. Atlas V avionics will be adapted to control Ares I-X' s first stage. That hardware is undergoing hardware-in-the-loop testing in a contractor-provided systems integration laboratory (SIL); a critical design review (CDR) was completed in December 2007. Drogue and main parachute drop tests have also been conducted successfully at Yuma Proving Grounds, allowing the First Stage team to begin fabricating parachutes for Ares I-X. The Ares I-X flight test will be the first flight test for the parachutes. A series of preliminary design technical interchange meetings is being conducted prior to the Ares I-X CDR in January 2007 to ensure readiness for the flight. Much of the First Stage activity in 2007 has focused on a series of preliminary design (PDR) activities associated with each booster subsystem. These events will culminate in a formal preliminary design review in 2008, where subsystems and component specifications will be developed and associated analyses and drawings will be evaluated for technical adequacy. The first stage also has been undergoing a series of trade studies to determine means for upgrading booster performance and reducing operational costs. Performance improvement studies have included changing from polybutadiene acrylonitrile (PBAN) propellant to hydroxyl-terminated polybutadiene (HTPB); replacing aluminum with composite motor casings; and optimizing or upgrading the propellant grain and nozzle structures. Some or all of these changes could result in a block upgrade to the Ares I first stage, after becoming the standard configuration for the Ares V. The cost reduction studies included a change from reusable or recoverable boosters to completely expendable boosters; changing from hydrazine-powered to more environmentally friendly electrohydrostatic actuators (EHAs) on the thrust vector control (TVC) system; and changing the location of the separation plane to reduce the likelihood of recontact upon booster separation. The expendability trade study resulted in a decision to keep the recoverable boosters, as the new hardware costs significantly outweighed the potential operational cost savings due to reduced ground operations. Likewise, due to cost considerations, the team continued using existing hydrazine-powered actuators for the TVC system. The separation plane location for Ares I is still being studied, with results to be announced in 2008. In short, the Ares launch vehicles' first stage is building upon NASA's close familiarity with this Shuttle-derived system, while continuing to seek out improvements for long-term exploration.

Priskos, Alex S.↗

Ares I-X Flight Test - On the Fast Track to the Future

In less than two years, the National Aeronautics and Space Administration (NASA) will launch the Ares I-X mission. This will be the first flight of the Ares I crew launch vehicle, which, together with the Ares V cargo launch vehicle, will send humans to the Moon and beyond. Personnel from the Ares I-X Mission Management Office (MMO) are finalizing designs and fabricating vehicle hardware for an April 2009 launch. Ares I-X will be a suborbital development flight test that will gather critical data about the flight dynamics of the integrated launch vehicle stack; understand how to control its roll during flight; better characterize the severe stage separation environments that the upper stage engine will experience during future flights; and demonstrate the first stage recovery system. NASA also will modify the launch infrastructure and ground and mission operations. The Ares I-X Flight Test Vehicle (FTV) will incorporate flight and mockup hardware similar in mass and weight to the operational vehicle. It will be powered by a four-segment Solid Rocket Booster (SRB), which is currently in Shuttle inventory, and will include a fifth spacer segment and new forward structures to make the booster approximately the same size and weight as the five-segment SRB. The Ares I-X flight profile will closely approximate the flight conditions that the Ares I will experience through Mach 4.5, up to approximately130,OOO feet and through maximum dynamic pressure ("Max Q") of approximately 800 pounds per square foot. Data from the Ares I-X flight will support the Ares I Critical Design Review (CDR), scheduled for 2010. Work continues on Ares I-X design and hardware fabrication. All of the individual elements are undergoing CDRs, followed by an integrated vehicle CDR in March 2008. The various hardware elements are on schedule to begin deliveries to Kennedy Space Center (KSC) in early September 2008.

Davis, Stephan R.↗

Ares I-X Flight Test--The Future Begins Here

In less than one year, the National Aeronautics and Space Administration (NASA) will launch the Ares I-X mission. This will be the first flight of the Ares I crew launch vehicle, which, together with the Ares V cargo launch vehicle, will send humans to the Moon and beyond. Personnel from the Ares I-X Mission Management Office (MMO) are finalizing designs and fabricating vehicle hardware for a 2009 launch. Ares I-X will be a suborbital development flight test that will gather critical data about the flight dynamics of the integrated launch vehicle stack; understand how to control its roll during flight; better characterize the severe stage separation environments that the upper stage engine will experience during future flights; and demonstrate the first stage recovery system. NASA also will modify the launch infrastructure and ground and mission operations. The Ares I-X Flight Test Vehicle (FTV) will incorporate flight and mockup hardware similar in mass and weight to the operational vehicle. It will be powered by a four-segment Solid Rocket Booster (SRB), which is currently in Shuttle inventory, and will include a fifth spacer segment and new forward structures to make the booster approximately the same size and weight as the five-segment SRB. The Ares I-X flight profile will closely approximate the flight conditions that the Ares I will experience through Mach 4.5, up to approximately 130,000 feet (39,600 meters (m)) and through maximum dynamic pressure ('Max Q') of approximately 800 pounds per square foot (38.3 kilopascals (kPa)). Data from the Ares I-X flight will support the Ares I Critical Design Review (CDR), scheduled for 2010. Work continues on Ares I-X design and hardware fabrication. All of the individual elements are undergoing CDRs, followed by a two-part integrated vehicle CDR in March and July 2008. The various hardware elements are on schedule to begin deliveries to Kennedy Space Center (KSC) in early September 2008. Ares I-X is the first step in the long journey to the Moon and farther destinations. This suborbital test will be NASA's first flight of a new human-rated launch vehicle in more than a generation. This promises to be an exciting time for NASA and the nation, as we reach for new goals in space exploration. A visual presentation is included.

Davis, Stephan R.↗

Testing to Transition the J-2X from Paper to Hardware

The J-2X Upper Stage Engine (USE) will be the first new human-rated upper stage engine since the Apollo program of the 1960s. It is designed to carry the Ares I and Ares V into orbit and send the Ares V to the Moon as part of NASA's Constellation Program. This paper will provide an overview of progress on the design, testing, and manufacturing of this new engine in 2009 and 2010. The J-2X embodies the program goals of basing the design on proven technology and experience and seeking commonality between the Ares vehicles as a way to minimize risk, shorten development times, and live within current budget constraints. It is based on the proven J-2 engine used on the Saturn IB and Saturn V launch vehicles. The prime contractor for the J-2X is Pratt & Whitney Rocketdyne (PWR), which is under a design, development, test, and engineering (DDT&E) contract covering the period from June 2006 through September 2014. For Ares I, the J-2X will provide engine start at approximately 190,000 feet, operate roughly 500 seconds, and shut down. For Ares V, the J-2X will start at roughly 190,000 feet to place the Earth departure stage (EDS) in orbit, shut down and loiter for up to five days, re-start on command and operate for roughly 300 seconds at its secondary power level to perform trans lunar injection (TLI), followed by final engine shutdown. The J-2X development effort focuses on four key areas: early risk mitigation, design risk mitigation, component and subassembly testing, and engine system testing. Following that plan, the J-2X successfully completed its critical design review (CDR) in 2008, and it has made significant progress in 2009 and 2010 in moving from the drawing board to the machine shop and test stand. Post-CDR manufacturing is well under way, including PWR in-house and vendor hardware. In addition, a wide range of component and sub-component tests have been completed, and more component tests are planned. Testing includes heritage powerpack, turbopump inducer water flow, turbine air flow, turbopump seal testing, main injector and gas generator, injector testing, augmented spark igniter testing, nozzle side loads cold flow testing, nozzle extension film cooling flow testing, control system testing with hardware in the loop, and nozzle extension emissivity coating tests. In parallel with hardware manufacturing, work is progressing on the new A-3 test stand to support full duration altitude testing. The Stennis A-2 test stand is scheduled to be turned over to the Constellation Program in September 2010 to be modified for J-2X testing also. As the structural steel was rising on the A-3 stand, work was under way in the nearby E complex on the chemical steam generator and subscale diffuser concepts to be used to evacuate the A-3 test cell and simulate altitude conditions.

Byrd, Tom↗

Independent Peer Review of Communications, Navigation, and Networking re-Configurable Testbed (CoNNeCT) Project Antenna Pointing Subsystem (APS) Integrated Gimbal Assembly (IGA) Structural Analysis

Glenn Research Center Chief Engineer's Office requested an independent review of the structural analysis and modeling of the Communications, Navigation, and Networking re-Configurable Testbed (CoNNeCT) Project Antenna Pointing Subsystem (APS) Integrated Gimbal Assembly (IGA) to be conducted by the NASA Engineering and Safety Center (NESC). At this time, the IGA had completed its critical design review (CDR). The assessment was to be a peer review of the NEi-NASTRAN1 model of the APS Antenna, and not a peer review of the design and the analysis that had been completed by the GRC team for CDR. Thus, only a limited amount of information was provided on the structural analysis. However, the NESC team had difficulty separating analysis concerns from modeling issues. The team studied the NASTRAN model, but did not fully investigate how the model was used by the CoNNeCT Project and how the Project was interpreting the results. The team's findings, observations, and NESC recommendations are contained in this report.

Raju, Ivatury S.↗

Reducing NPR 7120.5D to Practice: Transitioning from Design Reviews to the SIR Hardware Review

The Gravity Recovery And Interior Laboratory (GRAIL) mission was the first Jet Propulsion Laboratory (JPL) project initiated under NASA's revised rules for space flight project management, NPR 7120.5D, "NASA Space Flight Program and Project Management Requirements." NASA selected GRAIL through a competitive Announcement of Opportunity process and funded its Phase B Preliminary Design effort. The team's first major milestone was a JPL institutional milestone, the Project Mission System Review (PMSR), which proved an excellent tune-up for the end-of-Phase-B NASA life-cycle review, the Preliminary Design Review (PDR). Building on JPL experience on the Prometheus and Juno projects, the team successfully organized for and conducted these reviews on an aggressive schedule. For the Project Critical Design Review (CDR), lessons learned from the PDR and updated Standing Review Board (SRB) practices from the Agency were factored into the review preparation effort. Additionally, the review was held at the Principal Investigator's institution, the Massachusetts Institute of Technology, rather than at the project management center (JPL), which necessitated additional cross-country coordination steps. The PMSR, PDR, and CDR were design reviews and largely paper-oriented. For the System Integration Review (SIR), the project needed to transition to a hardware review and deal with paper in a very different manner. While many of the practices employed for the design reviews were modified and retained (e.g., review preparation team, gate products management, pre-reviews, SRB coordination), the review agenda, presentation style, and slide templates were significantly changed. A key success factor concerned the handling of project open paper, which was succinctly and effectively communicated to the SRB in presentations.This paper provides a brief overview of the GRAIL mission and its project management challenges, provides a detailed description of project SIR preparation and execution activities, including positive and negative lessons learned and identifies recommendations for future NASA (and non- NASA) project teams.

NPR 7120.5D↗