Search NASA⌕ Search

SEARCH · Search NASA

Results for “CEBAF”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Performance of First C100 Cryomodules for the CEBAF 12 GeV Upgrade Project

The Thomas Jefferson National Accelerator Facility is currently engaged in the 12 GeV Upgrade Project. The goal of the project is a doubling of the available beam energy of CEBAF from 6 GeV to 12 GeV. This increase in beam energy will be due primarily to the construction and installation of ten "C100" cryomodules in the CEBAF linacs. The C100 cryomodules are designed to deliver an average 108 MV each from a string of eight seven-cell, electropolished superconducting RF cavities operating at an average accelerating gradient of 19.2 MV/m. The new cryomodules fit in the same available linac space as the original CEBAF 20 MV cryomodules. Cryomodule production started in September 2010. Initial acceptance testing started in June 2011. The first two C100 cryomodules were installed and tested from August 2011 through October 2011, and successfully operated during the last period of the CEBAF 6 GeV era, which ended in May 2012. This paper will present the results of acceptance testing and commissioning of the C100 style cryomodules to date.

43 PARTICLE ACCELERATORS↗

Optimal Thermal Gradient for Flux Expulsion in 600°C Heat-treated CEBAF 12 GeV Upgrade Cavities

We will present results on measurement of flux expulsion in CEBAF 12 GeV upgrade cavities and original CEBAF cavities and the search for optimal thermal gradient for reducing the trapped flux in cavities installed in CEBAF linacs. Preliminary measurements of one C100 cavities has shown that a nearly perfect flux expulsion can be achieved at an optimal thermal gradient - a surprising result contrary to the expectation of zero flux expulsion for 600°C heat treated niobium cavities. These results could lead to a cost-effective path for improving the quality factor of cavities installed in CEBAF and ultimately saving accelerator operation cost.

Geng, R.↗

Powering CEBAF's Extraction Cavities At 12 GeV

CEBAF (Continuous Electron Beam Accelerator Facility) at Jefferson Lab was initially designed to deliver up to a 4 GeV electron beam simultaneously to three experimental halls. The maximum deliverable energy was raised to 6 GeV and CEBAF ran there until May of 2012 after which CEBAF entered an upgrade shutdown. After the upgrade, scientists plan to use CEBAF to deliver 11 GeV beam to the three original experimental halls and 12 GeV to new hall ? Hall D. Delivering beams to multiple halls at the new energy requires increased RF power to drive the separation cavities and adding a 750 MHz beam repetition rate to deliver beam to all halls simultaneously. Doubling the beam energy means doubling field strength in the cavities by quadrupling delivered power. 750 MHz beam repetition rate requires new 750 MHz capable cavities and a frequency change to one of the existing IOT amplifiers powering these cavities, and new 499 MHz Solid State Amplifiers to power four downstream cavities. Topics covered will include: verifying the Cavity?s power capabilities, modifications to the 750 MHz system and new cavities, and the decision process in selecting an amplifier type to power four downstream cavities.

Wissmann, Mark↗

CEBAF and Advances in RF Superconductivity

The CEBAF accelerator at Jefferson Lab has completed 18 years of operation, supporting 172 major experiments, 419 PhDs in NP to date, 204 more in progress, and 289 Physics Letters and Physical Review Letters publications and 889 publications in other refereed journals at the end of FY 2010. CEBAF has far exceeded its original performance requirements and via its current 12 GeV Upgrade Project is poised for breakthrough research in the coming decades. Its cw operation and precision beam characteristics are made possible by exploitation of superconducting rf (SRF) accelerating structures. While commitment to 5 MV/m accelerating gradient was considered risky in 1986, the continued evolution of CEBAF has been made possible by sustained advances in SRF technology in the years since. The progression of CEBAF capability from initial construction into its 12 GeV era will be reviewed alongside the enabling SRF technical advances.

Reece, Charles↗

Modeling the CEBAF Injector at 200 kV: Investigating K-Long Beam Conditions with and without Wien Filter

The upcoming K-Long experiment [1] ain Hall D at Jefferson Lab presents unique beam requirements, featuring a significantly low bunch repetition rate and an unusually high bunch charge. This experiment, which utilizes the CEBAF accelerator in conjunction with the GlueX experimental setup, aims to study strange hadron spectroscopy by measuring the differential cross section and polarizations of produced hyperons such as Λ, Σ, Ξ, and Ω. By directing an intense K-Long beam towards the LD2/LH2 target, new and valuable data can be obtained. To optimize the CEBAF injector specifically for this experiment, we employed Multi-Objective Genetic Optimization (MGO) using General Particle Tracer (GPT) simulations. Through this approach, we determined the optimal magnetic elements and radiofrequency (RF) settings required to achieve a K-Long bunch charge of 0.64 pC at an energy of 200 kV. We conducted simulations with both the Wien Filter turned on and off to examine its impact on the beam. Furthermore, we investigated the transmission efficiency and beam characteristics of electron beams with varying charge per bunch through the injector, considering the simultaneous operation of all four CEBAF Halls. The results of our study offer valuable insights and guidance for optimizing the CEBAF injector not only for the Jefferson Lab K-Long experiment but also for other experiments that entail similar beam conditions.

Pokharel, Sunil↗

CEBAF accelerator achievements

In the past decade, nuclear physics users of Jefferson Lab's Continuous Electron Beam Accelerator Facility (CEBAF) have benefited from accelerator physics advances and machine improvements. As of early 2011, CEBAF operates routinely at 6 GeV, with a 12 GeV upgrade underway. This article reports highlights of CEBAF's scientific and technological evolution in the areas of cryomodule refurbishment, RF control, polarized source development, beam transport for parity experiments, magnets and hysteresis handling, beam breakup, and helium refrigerator operational optimization.

43 PARTICLE ACCELERATORS↗

Conceptual MEIC electron ring injection scheme using CEBAF as a full energy injector

The Medium-energy Electron-Ion Collider (MEIC) proposed by Jefferson Lab is planning to use the newly upgraded 12 GeV CEBAF 1497 MHz SRF CW recirculating linac as a full-energy injector for the electron collider ring. The electron collider ring is proposed to reuse the 476 MHz PEP-II RF system to achieve high installed voltage and high beam power. The MEIC electron injection requires 3-10 (or 12) GeV beam in 3-4µs long bunch trains with low duty factor and high peak current, resulting in strong transient beam loading for the CEBAF. In this paper, we propose an injection scheme that can match the two systems' frequencies with acceptable injection time, and also address the transient beam loading issue in CEBAF. The scheme is compatible with future upgrade to 952.6 MHz SRF system in the electron ring.

43 PARTICLE ACCELERATORS↗

The CEBAF Element Database and Related Operational Software

The newly commissioned 12GeV CEBAF accelerator relies on a flexible, scalable and comprehensive database to define the accelerator. This database delivers the configuration for CEBAF operational tools, including hardware checkout, the downloadable optics model, control screens, and much more. The presentation will describe the flexible design of the CEBAF Element Database (CED), its features and assorted use case examples.

43 PARTICLE ACCELERATORS↗

High-$Q_0$ treatment of CEBAF 1.5 GHz SRF cavities

The Continuous Electron Beam Accelerator Facility (CEBAF) was the first large-scale accelerator to employ superconducting radiofrequency (SRF) cavities for continuous-wave operation. Ongoing research and development efforts continue to focus on increasing the intrinsic quality factor (Q 0 ) of these cavities in order to reduce cryogenic losses while maintaining operational gradients. Here, in this work, we report on the application of high-Q 0 surface treatments to single-cell and multicell C100 and C75 style 1.5 GHz niobium cavities used in the CEBAF accelerator. Nitrogen infusion and oxygen alloying via medium-temperature baking were applied under heat-treatment constraints relevant to existing cavity hardware. Both processes yielded substantial improvements in Q 0 at moderate accelerating gradients, achieving values of approximately 2 × 10 10 at 2.07 K and 20 MV/m. The effectiveness of nitrogen infusion at reduced annealing temperatures and the successful extension of oxygen alloying to multicell cavities are demonstrated. These results establish viable pathways for implementing high-Q 0 treatments in CEBAF-compatible cavities and support future integration into cryomodules for reduced operational cryogenic load.

Dhakal, Pashupati [Thomas Jefferson National Accel↗

HIGH ORDER MODES SURVEY AND MITIGATION OF THE CEBAF C100 CRYOMODULES

Ten new C100 cryomodules have been fabricated and installed for the CEBAF 12 GeV upgrade in the past few years. The high order modes (HOM) of these modules need to be controlled to avoid beam breakup (BBU) instability. Over the last few years, we surveyed the HOM for all the 80 cavities of the C100 modules in the Vertical Test Area (VTA), as well as in the JLAB Cryomodule Test Facility (CMTF) and the CEBAF tunnel. Additional measures such as waveguide filters were applied to reduce the quality factor of the out of spec modes. In addition, we also measured the same passband modes of all the cavities. In this paper, we will present the HOM survey methodology and results from CMTF and CEBAF survey (not including the VTA survey), as well as the same passband modes. The mitigation measures and their effects will also be discussed.

Wang, Shaoheng↗

Root Causes of Field Emitters in SRF Cavities Placed in CEBAF Tunnel

It has been suspected that appearance of new field emitters can occur in SRF cavities after their placement in accelerator tunnel for long term beam operation. This apparently has been the case for CEBAF. However, no physical evidence has been shown in the past. In this contribution, we will report on the recent results concerning the root cause of field emitters in SRF cavities placed in CEBAF tunnel. We will discuss these results in the context of high-reliability and low-cryogenic-loss operation of CEBAF.

Geng, Rongli↗

UNDERSTANDING AND MITIGATION OF FIELD EMISSION IN CEBAF SRF LINACS

We present our current understanding of field emission (FE) in two 1.1 GeV continuous wave (CW) superconducting radio frequency (SRF) linacs at CEBAF and its mitigation for improved CEBAF energy reach and operation reliability. We focus on the root causes of FE in operational SRF cavities, including recently installed cavities for CEBAF 12 GeV energy upgrade. We evaluate the effect of initial mitigations implemented since 2016, aimed at reducing generation and transportation of new field emitting particulates. Effects of cavity thermal cycling aimed at abating activation of settled field emitting particulates will be evaluated as well. Remaining issues toward predictable control of field emission in operational SRF cavities will be discussed.

Geng, R.L.↗

CEBAF Injector Model for KL Beam Conditions

The Jefferson Lab KL experiment will run at the Continuous Electron Beam Accelerator Facility with a much lower bunch repetition rate (7.80 or 15.59 MHz) than nominally used (249.5 or 499 MHz). While the proposed average current of 2.5 - 5.0 muA is relatively low compared to the maximum CEBAF current of approximately 180 muA, the corresponding bunch charge is atypically high for CEBAF injector operation. In this work, we investigated the evolution and transmission of low-rep-rate, high-bunch-charge (0.32 to 0.64 pC) beams through the CEBAF injector. Using the commercial software General Particle Tracer, we have simulated and analyzed the beam characteristics for both values of bunch charge. We performed these simulations with the existing injector using a 130 kV gun voltage. We have calculated and measured the transmission as a function of the photocathode laser spot size and pulse length. We report on the findings of these simulations and optimum parameters for operating the experiment.

Pokharel, Sunil↗

Status of Error Correction Studies in Support of FFA@CEBAF

In pursuit of higher energy at the Continuous Electron Beam Accelerator Facility (CEBAF), the FFA@CEBAF energy upgrade study is considering the implementation of a novel technology to recirculate electron beam through the accelerating gradient of the machine more times. The technology in question is Fixed-Field Alternating-gradient (FFA) bending accelerator arcs: these arcs may replace the present highest energy electromagnetic (EM) arcs, and due to a much wider energy acceptance allow several more passes. The survey and beam error tolerance of the FFA arcs need to be well understood prior to commissioning, in addition to the limits of planned correction magnets and diagnostics. This work explores the current state of error tolerance and correction studies in FFA arcs at CEBAF.

Benesch, J.↗

CEBAF 22 GeV FFA energy upgrade

Extending the energy reach of CEBAF by increasing the number of recirculations, while using the existing linacs is explored. This energy upgrade is based on the multi-pass acceleration of electrons in a single non-scaling Fixed Field Alternating Gradient (FFA) beam line, using Halbach-style permanent magnets. Encouraged by the recent successful demonstration of CBETA, a proposal was formulated to nearly double the energy of CEBAF from 12 to 22~GeV by replacing the highest energy arcs with FFA transport. The new FFA arcs would support simultaneous transport of an additional 6 passes spanning roughly a factor of two in energy. One of the challenges of the multi-pass (11) linac optics is to assure uniform focusing over a wide range of energies. Here, we propose a triplet lattice that provides a stable periodic solution covering an energy ratio of 1:33. The current CEBAF injection at 123 MeV, makes optical matching in the first linac impossible due to the extremely high energy ratio (1:175). Replacement of the current injector with a 650 MeV recirculating injector will alleviate this issue. Orbital and optical matching from the FFA arcs to the linacs is implemented as a compact non-adiabatic insert. The design presented here is anticipated to deliver a 22 GeV beam with normalized emittance of 76 mm·mrad and a relative energy spread of 1×10\textsuperscript{-3}. Further recirculation beyond 22 GeV is limited by the large (974 MeV per electron) energy loss due to synchrotron radiation.

Benesch, J.↗

Modeling for the phased injector upgrade for 12 GeV CEBAF

The upcoming Jefferson Lab K-Long experiment at Hall D will require unique beam conditions with a much lower bunch repetition rate and atypically high bunch charge. To optimize the Continuous Electron Beam Accelerator Facility (CEBAF) injector for this experiment, we performed Multi-Objective Genetic Optimization (MGO) using General Particle Tracer (GPT) to determine the magnetic elements and RF settings necessary for the K-long bunch charge (0.64 pC) at 200 kV. We also investigated the transmission and beam characteristics of low to high charge per bunch electron beams through the injector for simultaneous operations of all four CEBAF Halls and characterized the transmission as a function of the photocathode laser spot size and pulse length. Our findings provide valuable insights into optimizing the CEBAF injector for the Jefferson Lab K-Long experiment, as well as for other experiments with similar beam conditions

Kazimi, R.↗

4 K SRF Operation of the 10 MeV CEBAF Photo-Injector

Superconducting radio-frequency (SRF) accelerating cavities are often operated in superfluid liquid helium with temperature near 2 K to enhance the cavity quality factor Q0 and to help manage heat loads, which are particularly important at large SRF accelerator facilities. This 2 K temperature paradigm, however, need not put SRF technology out of the reach of small institutions or even limit SRF operation at large facilities that need 10-100 MeV beam energy. At the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab there are regularly scheduled maintenance periods during which cryogenic plant often increases the liquid helium temperature from 2 K to 4 K, reducing power consumption by ~ 50 % and saving megawatts of wall-plug power. During recent maintenance periods, we accelerated a continuous-wave electron beam at the CEBAF photo-injector to a total energy of 6.3 MeV at currents up to 80 uA using two 5-cell niobium cavities in the quarter-cryomodule at 4 K. This contribution describes the SRF and cryogenic performance and uses measured beam quality and energy stability as key metrics. These measurements indicate that 4 K operation of niobium SRF cavities in CEBAF is a sensible and cost effective mode for high quality beam operation, provided the cryogenic load associated with lower Q0 is manageable for the number of cavities needed to operate. For Jefferson Lab, this enhances our scientific reach allowing additional low-energy ~ 10 MeV experiments each year.

Drury, Michael↗

Progress towards Nb3Sn CEBAF Injector Cryomodule

Operations at 4 K instead of 2 K have the potential to reduce the operational cost of an SRF linac by a factor of 3, if the cavity quality factor can be maintained. Cavities coated with Nb3Sn have been shown to achieve the accelerating gradients above 10 MV/m with a quality factor around 1010 at 4 K. Because such performance is already pertinent for CEBAF injector cryomodule, we are working to extend these results to CEBAF accelerator cavities envisioning coating of two CEBAF 5-cell cavities with Nb3Sn. They will be installed in an injector cryomodule and tested with beam. The progress on this path is reported in this contribution.

Eremeev, Grigory↗