Search NASA⌕ Search

SEARCH · Search NASA

Results for “COMPACT COMMISSIONS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Study of beam loading and its compensation in the Compact Ultrafast Terahertz Free-Electron Laser injector linac

The RF properties of an accelerating structure, and the pulse structure and charge per bunch in the electron beam propagating through it are important parameters that determine the impact of beam loading in the structure. The injector linac of the Compact Ultrafast Terahertz Free-Electron Laser (CUTE-FEL) has been operated with two different pulse structures during initial commissioning experiments and the effect of beam loading on the accelerated electron beam parameters has been studied analytically for these two pulse structures. This paper discusses the analytical study of beam loading in a Standing Wave, Plane Wave Transformer linac employed in the CUTE-FEL setup, and a possible technique for its compensation for the electron beam parameters of the CUTE-FEL. A parametric study has been performed to study beam loading for different beam currents and to optimize injection time of the electron beam to compensate beam loading. Results from the parametric study have also been used to explain previously observed results from acceleration experiments in the CUTE-FEL setup.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

National Synchrotron Light Source II storage ring vacuum systems

The National Synchrotron Light Source II, completed in 2014, is a 3-GeV synchrotron radiation (SR) facility at Brookhaven National Laboratory and has been in steady operation since. With a design electron current of 500 mA and subnanometer radians horizontal emittance, this 792-m circumference storage ring is providing the highest flux and brightness x-ray beam for SR users. The majority of the storage ring vacuum chambers are made of extruded aluminium. Chamber sections are interconnected using low-impedance radiofrequency shielded bellows. SR from the bending magnets is intercepted by water-cooled compact photon absorbers resided in the storage ring chambers. This paper presents the design of the storage ring vacuum system, the fabrication of vacuum chambers and other hardware, the installation, the commissioning, and the continuing beam conditioning of the vacuum systems.

43 PARTICLE ACCELERATORS↗

Design and construction of the X-2 two-stage free piston driven expansion tube

This report outlines the design and construction of the X-2 two-stage free piston driven expansion tube. The project has completed its construction phase and the facility has been installed in the new impulsive research laboratory where commissioning is about to take place. The X-2 uses a unique, two-stage driver design which allows a more compact and lower overall cost free piston compressor. The new facility has been constructed in order to examine the performance envelope of the two-stage driver and how well it couple to sub-orbital and super-orbital expansion tubes. Data obtained from these experiments will be used for the design of a much larger facility, X-3, utilizing the same free piston driver concept.

Doolan, Con↗

A new neutral particle analyzer diagnostic and its first commissioning on HL-2A

A new neutral particle analyzer diagnostic has been developed for HuanLiuqi-2A (commonly referred to as HL-2A), which can provide the neutral particle flux measurement along 11 separate sightlines, simultaneously, within a wider energy range (1-70 keV). It is an electrostatic type analyzer with a removable pinhole and special-shape condenser. The energy analysis can be flexibly achieved by controlling a preset stepwise high voltage on the condenser. It is compact and its field of view covers HL-2A cross section from -33 cm to 33 cm without 'cross-talk.' The energy spectra and ion temperature profile have been obtained during its commissioning.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Spectra of clinical CT scanners using a portable Compton spectrometer

Purpose: Spectral information of the output of x-ray tubes in (dual source) computer tomography (CT) scanners can be used to improve the conversion of CT numbers to proton stopping power and can be used to advantage in CT scanner quality assurance. The purpose of this study is to design, validate, and apply a compact portable Compton spectrometer that was constructed to accurately measure x-ray spectra of CT scanners. Methods: In the design of the Compton spectrometer, the shielding materials were carefully chosen and positioned to reduce background by x-ray fluorescence from the materials used. The spectrum of Compton scattered x-rays alters from the original source spectrum due to various physical processes. Reconstruction of the original x-ray spectrum from the Compton scattered spectrum is based on Monte Carlo simulations of the processes involved. This reconstruction is validated by comparing directly and indirectly measured spectra of a mobile x-ray tube. The Compton spectrometer is assessed in a clinical setting by measuring x-ray spectra at various tube voltages of three different medical CT scanner x-ray tubes. Results: The directly and indirectly measured spectra are in good agreement (their ratio being 0.99) thereby validating the reconstruction method. The measured spectra of the medical CT scanners are consistent with theoretical spectra and spectra obtained from the x-ray tube manufacturer. Conclusions: A Compton spectrometer has been successfully designed, constructed, validated, and applied in the measurement of x-ray spectra of CT scanners. These measurements show that our compact Compton spectrometer can be rapidly set-up using the alignment lasers of the CT scanner, thereby enabling its use in commissioning, troubleshooting, and, e.g., annual performance check-ups of CT scanners.

07 ISOTOPE AND RADIATION SOURCES↗

A low-voltage retarding-field Mott polarimeter for photocathode characterization

Nuclear physics experiments at Thomas Jefferson National Accelerator Facility's CEBAF rely on high polarization electron beams. We describe a recently commissioned system for prequalifying and studying photocathodes for CEBAF with a load-locked, low-voltage polarized electron source coupled to a compact retarding-field Mott polarimeter. The polarimeter uses simplified electrode structures and operates from 5 to 30 kV. The effective Sherman function for this device has been calibrated by comparison with the CEBAF 5 MeV Mott polarimeter. For elastic scattering from a thick gold target at 20 keV, the effective Sherman function is 0.201(5). Its maximum efficiency at 20 keV, defined as the detected count rate divided by the incident particle current, is 5.4(2)×10 -4 , yielding a figure-of-merit, or analyzing power squared times efficiency, of 1.0(1)×10 -5 . The operating parameters of this new polarimeter design are compared to previously published data for other compact Mott polarimeters of the retarding-field type.

43 PARTICLE ACCELERATORS↗

Accelerator Physics Lessons From CBETA, the First Multi-turn SRF ERL

The Cornell-BNL ERL Test Accelerator (CBETA) has been designed, constructed, and commissioned in a collaboration between Cornell and Brookhaven National Laboratory (BNL). It focuses on energy-saving measures in accelerators, including permanent magnets, energy recovery, and superconductors; it has thus been referred to as a green accelerator. CBETA has become the world's first Energy Recovery Linac (ERL) that accelerates through multiple turns and then recovers the energy in superconducting radiofrequency (SRF) cavities though multiple decelerating turns. The energy is then available to accelerate more beam. It has also become the first accelerator that operates 7 beams in the same large-energy aperture Fixed Field Alternating-gradient (FFA) lattice. The FFA is constructed of permanent combined function magnets and transports energies of 42, 78, 114, and 150 MeV simultaneously. Accelerator physics lessons from the commissioning period will be described and applications of such an accelerator from hadron cooling to EUV lithography and from nuclear physics to a compact Compton source will be discussed.

Deitrick, K. E.↗

Deuteron injector for Peking University Neutron Imaging Facility project

The deuteron injector developed for the PKUNIFTY (Peking University Neutron Imaging Facility) has been installed and commissioned at Peking University (PKU). The injector system must transfer 50 keV 50 mA of D{sup +} ion beam to the entrance of the 2 MeV radio frequency quadrupole (RFQ) with 10% duty factor (1 ms, 100 Hz). A compact 2.45 GHz permanent magnet electron cyclotron resonance (PMECR) ion source and a 1.36 m long low energy beam transport (LEBT) line using two solenoids was developed as the deuteron injector. A {phi}5 mm four-quadrant diaphragm was used to simulate the entrance of RFQ electrodes. The beam parameters are measured after this core with an emittance measurement unit (EMU) and a bending magnet for ion fraction analysis at the end of injector. During the commissioning, 77 mA of total deuteron beam was extracted from PMECR and 56 mA of pure D{sup +} beam that passed through the {phi}5 mm four-quadrant diaphragm was obtained at the position of RFQ entrance with the measured normalized rms emittance 0.12-0.16{pi} mm mrad. Ion species analysis results show that the deuteron fraction is as high as 99.5%. All of the parameters satisfy PKUNIFTY's requirements. In this paper, we will describe the deuteron injector design and report the commissioning results as well as the initial operation.

43 PARTICLE ACCELERATORS↗

First Beam Waist Measurements in the Final Focus Beam Line at the KEK Accelerator Test Facility

The ATF2 project is the final focus system prototype for the ILC and CLIC linear collider projects, with a purpose to reach a 37 nm vertical beam size at the interaction point using compact optics based on a novel scheme of local chromaticity correction. Construction of all components and installation were completed at the end of 2008. An initial commissioning phase followed in 2009, using larger than nominal {beta} functions at the interaction point, corresponding to reduced demagnification factors in comparison to the design, to limit effects from higher-order optical aberrations and hence simplify beam tuning procedures while key instrumentation was being tested and calibrated. In this paper, first measurements of dispersion and Twiss parameters are presented based on scanning the beam during this period with a set of tungsten wires located just behind the interaction point, using two complementary analysis methods.

43 PARTICLE ACCELERATORS↗

SU-F-T-146: Comparing Monte Carlo Simulations with Commissioning Beam Data for Mevion S250 Proton Therapy System

Purpose: To evaluate the Monte Carlo simulated beam data with the measured commissioning data for the Mevion S250 proton therapy system. Method: The Mevion S250 proton therapy system utilizes a passive double scattering technique with a unique gantry mounted superconducting accelerator and offers effective proton therapy in a compact design concept. The field shaping system (FSS) includes first scattering foil, range modulator wheel (RMW), second scattering foil and post absorber and offers two field sizes and a total of 24 treatment options from proton range of 5 cm to 32 cm. The treatment nozzle was modeled in detail using TOPAS (TOolkit for PArticle Simulation) Monte Carlo code. The timing feathers of the moving modulator wheels were also implemented to generate the Spread Out Bragg Peak (SOBP). The simulation results including pristine Bragg Peak, SOBP and dose profiles were compared with the data measured during beam commissioning. Results: The comparison between the measured data and the simulation data show excellent agreement. For pristine proton Bragg Peaks, the simulated proton range (depth of distal 90%) values agreed well with the measured range values within 1 mm accuracy. The differences of the distal falloffs (depth from distal 80% to 20%) were also found to be less than 1 mm between the simulations and measurements. For the SOBP, the widths of modulation (depth of proximal 95% to distal 90%) were also found to agree with the measurement within 1 mm. The flatness of the simulated and measured lateral profiles was found to be 0.6 % and 1.1 %, respectively. Conclusion: The agreement between simulations and measurements demonstrate that TOPAS could be used as a viable platform to proton therapy applications. The matched simulation results offer a great tool and open opportunity for variety of applications.

60 APPLIED LIFE SCIENCES↗

The CUORE and CUORE-0 experiments at LNGS

The Cryogenic Underground Observatory for Rare Events (CUORE) is the first bolometric experiment searching for neutrinoless double beta decay that has been able to reach the 1-ton scale. The detector consists of an array of 988 TeO2 crystals arranged in a cylindrical compact structure of 19 towers. The construction of the experiment and, in particular, the installation of all towers in the cryostat was completed in August 2016 and commissioning started in fall 2016. The experiment has completed the pre-operation phase and is currently in data taking. We present here the achievements of CUORE during the commissioning phase and the limit on the 130Te half-life for the neutrinoless double beta decay that has been released after the first 3 weeks of collected data. Physics results from CUORE-0 will also be updated.

Alduino, C↗

High Temperature Heat Exchanger Design and Fabrication for Systems with Large Pressure Differentials

The project’s main purpose was to design, build and test a compact heat exchanger for supercritical carbon dioxide (sCO 2 ) power cycle recuperators. The compact recuperator is required to operate at high temperature and high pressure differentials, 169 bar (~2,500 psi), between streams of sCO 2 . Additional project tasks included building a hot air-to-sCO 2 Heater heat exchanger (HX) and design, build and operate a test loop to characterize the recuperator and heater heat exchangers. A novel counter-current microtube recuperator was built to meet the high temperature high differential pressure criteria and tested. The compact HX design also incorporated a number of features that optimize material use, improved reliability and reduced cost. The air-to-sCO 2 Heater HX utilized a cross flow, counter-current, micro-tubular design. This compact HX design was incorporated into the test loop and exceeded design expectations. The test loop design to characterize the prototype Brayton power cycle HXs was assembled, commissioned and operated during the program. Both the prototype recuperator and Heater HXs were characterized. Measured results for the recuperator confirmed the predictions of the heat transfer models developed during the project. Heater HX data analysis is ongoing.

20 FOSSIL-FUELED POWER PLANTS↗

SCALE Analyses of Scenarios in the TRISO-based Heat Pipe Microreactor Fuel Cycle

This report documents the application of the SCALE code to the analysis of a TRistructural-ISOtropic (TRISO)-based heat pipe microreactor (HPMR) within the context of its nuclear fuel cycle stages. The evaluation was conducted in support of the US Nuclear Regulatory Commission’s ongoing efforts to assess modeling capabilities for advanced non–light-water reactor technologies. The generic HPMR selected as a representative microreactor concept features a compact core design that incorporates TRISO fuel compacts, passive heat removal via heat pipes, and a transportable configuration intended for deployment in remote environments.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Success in commissioning a key U.S. radioactive waste burial site through the technical support of Dufrane Nuclear Shielding Incorporated (DNSI) - 15476

With the -phase out- of the South Carolina based Barnwell Radioactive Waste Burial Site, and the stockpile and storage of radioactive waste and irradiated components throughout the U.S. Nuclear Industry for decades, the opening of the Texas Low-Level Radioactive Waste Disposal Compact Facility by Waste Control Specialists (WCS), is a game changer in solving this industry-wide issue. For the first time in decades, generators now have the opportunity to send their waste to a site specifically designed to permanently sequester the waste in a licensed facility that will protect public health and the environment, better than any built to date. As history has shown through the many decades of the U.S. Commercial and Federal Nuclear Industry, site operators and management have relied heavily on contractors and vendors with exceptional expertise and decades of experience to achieve success and meet their goals. The commissioning of WCS was no exception as DNSI was contracted to design, develop, build and deploy a major component required for the opening and successful operation of the WCS site. This component, being the Modular Concrete Canister (MCC), is the -work horse- of the site. With its enormous size, weight and strength, it provides many functions that meet and comply with the site performance assessment (PA) under 10 CFR Part 61, the site WAC, and Texas Low-Level Radioactive Waste Disposal Authority. Offsite contracting the production and delivery of this critical component was a major step toward success in meeting schedule and cost for the much needed opening of the Texas Compact and Federal site. In selecting a shielding vendor, WCS partnered with a U.S. Nuclear Service company with over 30 years of experience which spans the entire U.S. Commercial, Federal, and Nuclear Industry. The task given DNSI was not a simple one, it involved every aspect from start to finish of the design, production and delivery of rectangular, cylindrical and -irradiated hardware- (IH) MCCs, that could accept waste up to 100 Sv /Hr contact dose rates. The enormity of this project was quite clear and required extensive quality control, construction of batch plants, purchase of huge quantities of raw materials, setting up a production site in a neighboring city, relocation of personnel from company headquarters, and safely transporting 8,000 Tons of MCC components 75 miles one-way on West Texas highways daily. Most important of all, this was accomplished safely with no incidents, no component failures or rejects, and on schedule. The start of receipt, of -in-compact waste- and -out-of-compact waste- was conducted virtually in a 3 month period time span. To help guarantee success and quality of product, all forms had surfaces machined, heavy duty elastomer coatings were applied to concrete surfaces, only galvanized anchors were used, and the batch plant was run to strict ASME standards thus testing every 50 cubic yards of concrete poured. With significant teamwork and success from Vendors such as DNSI, WCS and the Texas Compact has evolved as one of the leading radioactive waste sites in the U.S. and the world, providing safe, secure and compliant permanent waste disposal services by using technical expertise and innovation of the highest standards. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Estimating Residual Gas Beam Loss in the BNL AGS Booster:Model, Numerical Tools, and Implications for a Polarimeter Chamber

Beamloss from residual gas scattering is calculated for a storage ring of circumference C = 200m, covering a linear magnetic rigidity ramp from B ρ inj = 1.25Tm to B ρ ext = 9.50Tm over tramp = 1.00s. Three loss mechanisms are considered: nuclear inelastic reactions, single Coulomb scattering beyond the acceptance angle of the machine, and charge-state exchange for heavy ions. Calculations are performed for protons and Au 32+ ions, the latter being the charge state delivered by the EBIS pre-injector into the BNL AGS Booster. At a baseline vacuum of P 0 = 5 × 10 −11 mbar the integrated fractional beam loss over the full ramp is negligible for protons (< 0.001%) and 33.1% for Au 32+ . The impact of a 1m polarimeter section at elevated pressure P s = 5 × 10 −9 mbar is evaluated: the proton loss remains negligible, while the Au 32+ loss rises to 45.1%, establishing the vacuum requirement for the polarimeter chamber. In the present compact approximate model, Au 32+ losses are dominated by charge exchange at injection, while proton losses are dominated by single Coulomb scattering. The design, outgassing budget, pumping strategy, and commissioning sequence for a UHV polarimeter chamber housing silicon detectors and ASICs are described in detail.

43 PARTICLE ACCELERATORS↗

Commissioning the 90 Degree Lattice for the PEP II High Energy Ring

In order to benefit from further reduction of the vertical IP beta function of the PEP-II high energy ring (HER) the bunch length should be reduced. This will be achieved by changing the phase advance from 60 degree to 90 degree in the four arcs not adjacent to the IR region, thus reducing momentum compaction by about 30% and reducing bunch length from a present 12 mm down to 8.5 mm at low beam current. In preparation to implement the 90 degree lattice the main HER quadrupole and sextupole strings and their power supplies have been reconfigured. The synchrotron tune initially will be lower but can be brought back by raising the rf voltage. Beam emittance is held at 48 nmr by introducing a significant dispersion beat in the arcs. The lattice was successfully commissioned at currents up to 800 mA in August 2007. In this paper we will compare the actual machine with the predicted behaviour, explain the correction strategies used and give an overall assessment of the operation and the benefit of the new lattice configuration.

43 PARTICLE ACCELERATORS↗

ADAPTATION OF CRACK GROWTH DETECTION TECHNIQUES TO US MATERIAL TEST REACTORS

A key component in evaluating the ability of Light Water Reactors to operate beyond 60 years is characterizing the degradation of materials exposed to radiation and various water chemistries. Of particular concern is the response of reactor materials to Irradiation Assisted Stress Corrosion Cracking (IASCC). Some test reactors outside the United States, such as the Halden Boiling Water Reactor (HBWR), have developed techniques to measure crack growth propagation during irradiation. The basic approach is to use a custom-designed compact loading mechanism to stress the specimen during irradiation, while the crack in the specimen is monitored in-situ using the Direct Current Potential Drop (DCPD) method. In 2012 the US Department of Energy commissioned the Idaho National Laboratory and the MIT Nuclear Reactor Laboratory (MIT NRL) to take the basic concepts developed at the HBWR and adapt them to a test rig capable of conducting in-pile IASCC tests in US Material Test Reactors. The first two and half years of the project consisted of designing and testing the loader mechanism, testing individual components of the in-pile rig and electronic support equipment, and autoclave testing of the rig design prior to insertion in the MIT Reactor. The load was applied to the specimen by means of a scissor like mechanism, actuated by a miniature metal bellows driven by pneumatic pressure and sized to fit within the small in-core irradiation volume. In addition to the loader design, technical challenges included developing robust connections to the specimen for the applied current and voltage measurements, appropriate ceramic insulating materials that can endure the LWR environment, dealing with the high electromagnetic noise environment of a reactor core at full power, and accommodating material property changes in the specimen, due primarily to fast neutron damage, which change the specimen resistance without additional crack growth. The project culminated with an in-pile demonstration at the MIT Reactor. The test rig and associated support equipment were used to apply loads to a representative Compact Tensile specimen during one MITR operating cycle, while measuring crack growth using the DCPD method. Although the test period was short (approximately 70 days), and the accumulated neutron dose relatively small, successful operation of the test rig was demonstrated. The specimen was cycled more than 8000 times (more than would be typical for a long term IASCC test), which was sufficient to propagate a crack of over 2 mm.

Crack Growth↗

Vacuum system of the compact Energy Recovery Linac

The compact Energy Recovery Linac (cERL), a test accelerator to establish important technologies demanded for future ERL-based light sources, was constructed in late 2013 at KEK. The accelerator was successfully commissioned in early 2014, and demonstrated beam circulation with energy recovery. In the cERL vacuum system, low-impedance vacuum components are required to circulate high-intensity, low-emittance and short-bunch electron beams. We therefore developed ultra-high-vacuum (UHV)-compatible flanges that can connect beam tubes seamlessly, and employed retractable beam monitors, namely, a movable Faraday cup and screen monitors. In most parts of the accelerator, pressures below 1×10{sup −7} Pa are required to mitigate beam-gas interactions. Particularly, near the photocathode electron gun and the superconducting (SC) cavities, pressures below 1×10{sup −8} Pa are required. The beam tubes in the sections adjoining the SC cavities were coated with non-evaporable getter (NEG) materials, to reduce gas condensation on the cryo-surfaces. During the accelerator commissioning, stray magnetic fields from the permanent magnets of some cold cathode gauges (CCGs) were identified as a source of the disturbance to the beam orbit. Magnetic shielding was specially designed as a remedy for this issue.

43 PARTICLE ACCELERATORS↗