Space documentation - A boon to the contractor
Space research documentation and role of contractor in implementing NASA programs
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Space research documentation and role of contractor in implementing NASA programs
Program and introduction for Fifth NASA Intercenter and Contractors Conference on Plasma Physics
Program of proceedings and abstracts presented at Sixth NASA Intercenter and Contractors Conference on Plasma Physics
Research at NASA Lewis Research Center reported at Fifth NASA Intercenter and Contractors Conference on Plasma Physics
NASA NHB reliability engineering provisions for aeronautical and space system contractors, considering criteria for program management, system engineering, manufacturing and facilities.
A general guide is presented to aid contractors in the preparation of safety programs and plans for operations conducted at Cape Kennedy Space Center.
GSFC contractors with cost-plus contracts provide cost estimates for each of the next four quarters on a quarterly basis. Actual expenditures over a two-year period were compared to the estimates, and the data were sorted in different ways to answer several questions and give quantification to observations, such as how much does the accuracy of estimates degrade as they are made further into the future? Are estimates made for small dollar amounts more accurate than for large dollar estimates? Other government agencies and private companies with cost-plus contracts may be interested in this analysis as potential methods of contract management for their organizations. It provides them with the different methods one organization is beginning to use to control costs.
The development of the Administrative Contracting Officer represents an advance in the Government system of contract management because it provides an individual with knowledge, time, and a specialized function to insure performance of Government contracts. However, the development has created a dichotomy between the award and the post-award function which increases the adversary relationship with Government contractors. This paper advocates that this adversary relationship can be decreased if PCOs and ACOs are provided with opportunities to serve in the assignments of the other.
A model of plasma contractors is being developed, which can be used to describe electron collection in a laboratory test tank and in the space environment. To validate the model development, laboratory experiments are conducted in which the source plasma is separated from the background plasma by a double layer. Model calculations show that an increase in ionization rate with potential produces a steep rise in collected current with increasing potential.
Viewgraphs on technology transfer from the viewpoint of a NASA prime contractor are provided. Technology Transfer Program for Manned Space Systems and the Technology Transfer Program status are addressed.
The assigned topic, "Contractor and Government: Teamwork and Commitment," is a subject about vitally interested. The successes of the U.S. space program were built on such teamwork and commitment. It seems only a short time ago that man's role in space was an unknown quantity. In rapid succession, however, the flights of Shepard, Glenn, and Armstrong demonstrated man's capability to live and travel in space. Consequently, we no longer live with the same awe of space. The success of these joint industry-NASA efforts in achieving our Nation's space goals testifies to the validity of our team's past commitment, management expertise, communications techniques, and teamwork over a period of 25 years. Today, however, We are at the beginning of a new era in space.
This slide presentation reviews the opportunities for contractor partnerships to develop secure environment cloud computing, from the perspective of a small business.
This Corrective Measures Implementation (CMI) Progress Report, Revision 1, for Contractor's Road Heavy Equipment (CRHE) Area Solid Waste Management Unit (SWMU) Number 055 was prepared by Geosyntec Consultants (Geosyntec) for the National Aeronautics and Space Administration (NASA) under contract number NNK09CA02B, Delivery Order NNK09CA62D and Project Number PCN ENV-2324. This CMI Progress Report documents: (i) activities conducted as part of supplemental assessment activities completed from June 2009 through November 2014; (ii) Engineering Evaluation (EE) Advanced Data Packages (ADPs); and (iii) recommendations for future activities related to corrective measures at the Site.
Presentation on the impact of high-resolution site characterization during baseline groundwater sampling prior to groundwater interim measures at Contractors Road Heavy Equipment Area.
The National Aeronautics and Space Administration (NASA), Kennedy Space Center (KSC), has adopted high-resolution site characterization (HRSC) sampling techniques during baseline sampling prior to implementation of remedies to confirm and refine the conceptual site model (CSM). HRSC sampling was performed at Contractors Road Heavy Equipment Area (CRHE) prior to bioremediation implementation to verify the extent of the trichloroethene (TCE) dense non-aqueous phase liquid (DNAPL) source area (defined as the area with TCE concentrations above 1% solubility) and its daughter product dissolved plume that had been identified during previous HRSC events. The results of HRSC pre-bioremediation implementation sampling suggested that the TCE source area was larger than originally identified during initial site characterization activities, leading to a design refinement to improve electron donor distribution and increase the likelihood of achieving remedial objectives. Approach/Activities: HRSC was conducted from 2009 through 2014 to delineate the vertical and horizontal extent of chlorinated volatile organic compounds (CVOCs) in the groundwater. Approximately 2,340 samples were collected from 363 locations using direct push technology (DPT) groundwater sampling techniques. Samples were collected from up to 14 depth intervals at each location using a 4-foot sampling screen. This HRSC approach identified a narrow (approx. 5 to 30 feet wide), approximately 3,000 square foot TCE DNAPL source area (maximum detected TCE concentration of 160,000 micrograms per liter [micro-g/L] at DPT sampling location DPT0225). Prior to implementation of a bioremediation interim measure, HRSC baseline sampling was conducted using DPT groundwater sampling techniques. Concentrations of TCE were an order of magnitude lower than previous reported (12,000 micro-g/L maximum at DPT sampling location DPT0225) at locations sampled adjacent to previous sampling locations. To further evaluate the variability in concentrations observed additional sampling was conducted in 2016. The results identified higher concentrations than originally detected within the previously defined source area and the presence of source zone concentrations upgradient of the previously defined source area (maximum concentration observed 570,000 micro-g/L). The HRSC baseline sampling data allowed for a revision of the bioremediation design prior to implementation. Bioremediation was implemented within the eastern portion of the source area in November and December 2016 and quarterly performance monitoring was completed in March and June 2017. Reductions in CVOC concentrations from baseline were observed at all performance monitoring wells in the treatment area, and by June 2017, an approximate 95% CVOC mass reduction was observed based on monitoring well sampling results. Results/Lessons Learned: The results of this project suggest that, due to the complexity of DNAPL source zones, HRSC during pre-implementation baseline sampling in the TCE source zone was an essential strategy for verifying the treatment area and depth prior to remedy implementation. If the upgradient source zone mass was not identified prior to bioremediation implementation, the mass would have served as a long-term source for the dissolved plume.
This document presents a summary of activities completed from January through December 2019 at the Contractors Road Heavy Equipment (CRHE) area, located at John F. Kennedy Space Center (KSC), Florida. The activities summarized include: 1) Annual Hot Spot 1 (HS1) eastern bioremediation interim measure (IM) performance monitoring (December 2019); 2) Annual HS1 western bioremediation IM performance monitoring (December 2019); 3) Annual Interim Groundwater Monitoring (IGM) activities (December 2019); 4) Sub-slab soil gas (SSSG) sampling to investigate potential vapor intrusion (VI) (June 2019). Bioremediation IM activities were implemented in two phases at the CRHE. The first event was implemented in November and December 2016 in the eastern portion of HS1. In April and May 2018, bioremediation IM was implemented in the western portion of HS1. The bioremediation IM targeted chlorinated volatile organic compound (CVOC) concentrations greater than 10 times their Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Criteria (NADC). Bioremediation IM activities included the injection of a diluted solution of SRS®-SD (electron donor) and microbial culture (KB-1®) into the subsurface via direct push technology (DPT) injection down to 50 feet below land surface (ft bls).
This Work Plan documents the proposed field sampling activities for a per- and polyfluoroalkyl substances (PFAS) Site Assessment at the Contractor Support Building (CSB) #7 at Kennedy Space Center (KSC). The Work Plan provides a background of the historical activities that occurred at CSB #7, and the limited environmental investigations performed at CSB #7. The proposed Site Assessment activities at CSB #7 include the advancement of a soil lithologic boring to 60 feet below ground surface, the installation of a staff gauge in site surface water, perform direct push groundwater sampling at eight locations, and collect four surface water samples. Sampling details, depths, and locations are presented in the Work Plan. The Work Plan was presented to the KSC Remediation Team in the form of an Advance Data Package in February 2023. Following STRIVES approval, the CSB #7 PFAS Site Assessment Work Plan will be formally submitted to the Florida Department of Environmental Protection.
This document presents a summary of activities completed at the Contractors Road Heavy Equipment (CRHE) Area, located at Kennedy Space Center (KSC), Florida, from June through December 2022. The activities conducted at the CRHE Area include: - Annual groundwater sampling activities associated with sitewide plume monitoring and Underground Injection Control (UIC) monitoring in the former bioremediation Interim Measures (IM) Hot Spot 1 (HS1) area; - Direct push technology (DPT) groundwater investigation; - Semiannual vapor intrusion (VI) evaluation activities. This facility is designated Solid Waste Management Unit (SWMU) Number 055 (SWMU 055) under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action program. HydroGeoLogic, Inc. (HGL) prepared this report for the National Aeronautics and Space NASA) under contract number 80KSC019F0096/80KSC019D0012, Technical Directive-03. An Advance Data Package (ADP) presentation of the elements of this report received Team (KSCRT) agreement at the April 5, 2023, KSCRT meeting. The chlorinated volatile organic compound plume appears to be stable vertically and horizontally. Additional DPT groundwater sampling will be completed to support a remedial alternatives evaluation for potential means to expedite groundwater cleanup. There are per- and polyfluorinated alkyl substances in site groundwater, and assessment is planned in the future. Sub-slab soil gas monitoring results do not indicate any concerns with indoor vapor intrusion. Based on the 2022 annual groundwater sampling results, it is recommended that annual sampling continue to alternate with the wet and dry season, with the next sampling event planned for December 2023.