Search NASA⌕ Search

SEARCH · Search NASA

Results for “CSSX”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

SCALE-UP OF CAUSTIC-SIDE SOLVENT EXTRACTION PROCESS FOR REMOVAL OF CESIUM AT SAVANNAH RIVER SITE

In 2004, the Department of Energy (DOE) directed Westinghouse Savannah River Company (WSRC) to develop a Caustic-Side Solvent Extraction (CSSX) process at the Savannah River Site (SRS) capable of removing cesium from 1 million gallons a year of dissolved salt solution. This facility would provide interim processing for cesium containing salt solution until the Salt Waste Processing Facility (SWPF) comes on-line. The DOE design inputs1 were to utilize contactors similar in design to those to be used in the SWPF, assume class C waste with less than 0.5 Ci/gal Cs-137, achieve a Decontamination Factor (DF) greater than 12, include the ability to clean the contactors in place, and assume an operating life of three years. WSRC embarked on a design, test, and build program to achieve these criteria as described in the following text. All DOE design criteria have been met or exceeded by WSRC.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Application of Molecular Recognition for the Efficient Removal of Cesium from Hanford Nuclear Waste by Modular Solvent Extraction

In this work, experimental results leading to flowsheet design are presented showing how a calixarene-crown ether based solvent-extraction process can meet the challenge of cesium removal from nuclear tank wastes stored at the US Department of Energy Hanford site. Cleanup of legacy Cold War nuclear waste stored in underground tanks represents one of the greatest environmental challenges facing the US Department of Energy in terms of risk, cost, and effectiveness of applicable science and technology. Planning for the cleanup at the Hanford Site calls for the removal of the radioactive fission product 137Cs from its alkaline salt waste, including the use of modular processes that can be deployed near the tank farms. To meet the resulting need for extremely high selectivity, the Next-Generation Caustic-Side Solvent Extraction (NG-CSSX) process employing a calix[4]arene-crown ether in modified kerosene has been adapted to remove sub-millimolar cesium in competition with molar sodium and potassium in a high-nitrate alkaline matrix. Potassium loading in the solvent was determined in extraction, scrubbing, and stripping, leading to an empirical model closely approximating cesium distribution ratios for a variety of Hanford waste types. Process chemistry has been developed based on this molecular-recognition approach, focusing on the competitive effect of potassium loading and the mitigating process modifications needed, including extending the scrub section. The result is a modular flowsheet design that can achieve cesium decontamination factors well in excess of 15,000 even for the worst-case Hanford waste.

Williams, Neil [ORNL] (ORCID:000000023159226X)↗

THE IMPACT OF THE MCU LIFE EXTENSION SOLVENT ON DWPF GLASS FORMULATION EFFORTS

As a part of the Actinide Removal Process (ARP)/Modular Caustic Side Solvent Extraction Unit (MCU) Life Extension Project, a next generation solvent (NG-CSSX), a new strip acid, and modified monosodium titanate (mMST) will be deployed. The strip acid will be changed from dilute nitric acid to dilute boric acid (0.01 M). Because of these changes, experimental testing with the next generation solvent and mMST is required to determine the impact of these changes in 512-S operations as well as Chemical Process Cell (CPC), Defense Waste Processing Facility (DWPF) glass formulation activities, and melter operations at DWPF. To support programmatic objectives, the downstream impacts of the boric acid strip effluent (SE) to the glass formulation activities and melter operations are considered in this study. More specifically, the impacts of boric acid additions to the projected SB7b operating windows, potential impacts to frit production temperatures, and the potential impact of boron volatility are evaluated. Although various boric acid molarities have been reported and discussed, the baseline flowsheet used to support this assessment was 0.01M boric acid. The results of the paper study assessment indicate that Frit 418 and Frit 418-7D are robust to the implementation of the 0.01M boric acid SE into the SB7b flowsheet (sludge-only or ARP-added). More specifically, the projected operating windows for the nominal SB7b projections remain essentially constant (i.e., 25-43 or 25-44% waste loading (WL)) regardless of the flowsheet options (sludge-only, ARP added, and/or the presence of the new SE). These results indicate that even if SE is not transferred to the Sludge Receipt and Adjustment Tank (SRAT), there would be no need to add boric acid (from a trim tank) to compositionally compensate for the absence of the boric acid SE in either a sludge-only or ARP-added SB7b flowsheet. With respect to boron volatility, the Measurement Acceptability Region (MAR) assessments also suggest that Slurry Mix Evaporator (SME) acceptability decisions would not be different assuming either 100% of the B{sub 2}O{sub 3} from the SE were retained or volatilized. More specifically, the 0.84 wt% B{sub 2}O{sub 3} in the SE is so minor that its presence in the SME analysis does not influence SME acceptability decisions. In fact, using the 100% retention and 100% volatilization composition projections, only minor differences in the predicted properties of the glass product occur with all of the glasses being acceptable over a WL interval of 32-42%. Based on the 0.01M boric acid flowsheet, there is very little difference between Frit 418 and Frit 418-7D (a frit that was compositionally altered to account for the 0.84 wt% B{sub 2}O{sub 3} in the SE) with respect to melt temperature. In fact, when one evaluates the composition of Frit 418-7D, it lies within the current Frit 418 vendor specifications and therefore could have been produced by the vendor targeting the nominal composition of Frit 418.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RESULTS FOR THE SECOND QUARTER 2011 TANK 50 WAC SLURRY SAMPLE: CHEMICAL AND RADIONUCLIDE CONTAMINANT RESULTS

The Saltstone Facility is designed and permitted to immobilize and dispose of low-level radioactive and hazardous liquid waste (salt solution) remaining from the processing of radioactive material at the Savannah River Site. Low-level waste (LLW) streams from the Effluent Treatment Project (ETP), H-Canyon, the DDA (Deliquification, Dissolution, and Adjustment) process, and the decontaminated salt solution product from the Actinide Removal Process/Modular Caustic Side Solvent Extraction (CSSX) Unit (ARP/MCU) process are stored in Tank 50 until the LLW can be transferred to the Saltstone Facility for treatment and disposal. The LLW must meet the specified waste acceptance criteria (WAC) before it is processed into saltstone. The specific chemical and radionuclide contaminants and their respective WAC limits are listed in the current Saltstone WAC. Waste Solidification Engineering (WSE) requested that Savannah River National Laboratory (SRNL) perform quarterly analysis on saltstone samples. The concentrations of chemical and radionuclide contaminants are measured to ensure the saltstone produced during each quarter is in compliance with the current WAC. This report documents the concentrations of chemical and radionuclide contaminants for the 2011 Second Quarter samples collected from Tank 50 on April 4, 2011 and discusses those results in further detail than the previously issued results report. The following conclusions are drawn from the analytical results provided in this report: (1) The concentrations of the reported chemical and radioactive contaminants were less than their respective WAC targets or limits unless noted in this section. (2) The reported detection limit for {sup 59}Ni is above the requested limit from Reference 2 but below the established limit in Reference 3. (3) The reported detection limit for {sup 94}Nb is above the requested limit from Reference 2; however, it is below the established limits in Reference 3. (4) The reported concentration of {sup 242m}Am is above the target in Listed in Attachment 8.4 of the Saltstone WAC. (5) {sup 247}Cm and {sup 249}Cf are above the requested limits from Reference 2. However, they are below the limits established in Reference 3. (6) The reported detection limit for Norpar 13{sup 5} is greater than the limit from Table 4 and Attachment 8.2 of the WAC. (7) The reported detection limit for Isopar L is greater than the limit from Table 3 of the WAC. (8) Isopar L and Norpar 13 have limited solubility in aqueous solutions making it difficult to obtain consistent and reliable sub-samples. The values reported in this memo are the concentrations in the sub-sample as detected by the instrument; however, the results may not accurately represent the concentrations of the analytes in Tank 50.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NEXT GENERATION SOLVENT MATERIALS COMPATIBILITY WITH POLYMER COMPONENTS WITHIN MODULAR CAUSTIC-SIDE SOLVENT EXTRACTION UNIT

The Office of Waste Processing, within the Office of Technology Innovation and Development, is funding the development of an enhanced solvent for deployment at the Savannah River Site for removal of cesium from High Level Waste. The technical effort is collaboration between Oak Ridge National Laboratory (ORNL), Savannah River National Laboratory (SRNL), and Argonne National Laboratory. The first deployment target for the technology is within the Modular Caustic-Side Solvent Extraction Unit (MCU). Deployment of a new chemical within an existing facility requires verification that the chemical components are compatible with the installed equipment. In the instance of a new organic solvent, the primary focus is on compatibility of the solvent with organic polymers used in the facility. This report provides the data from exposing these polymers to the Next Generation Solvent (NGS). The test was conducted over six months. An assessment of the dimensional stability of polymers present in MCU (i.e., PEEK, Grafoil{reg_sign}, Tefzel{reg_sign} and Isolast{reg_sign}) in the modified NGS (where the concentration of the guanidine suppressor and MaxCalix was varied systematically) showed that guanidine (LIX{reg_sign}79) selectively affected Tefzel{reg_sign} (by an increase in size and lowering its density). The copolymer structure of Tefzel{reg_sign} and possibly its porosity allows for the easier diffusion of guanidine. Tefzel{reg_sign} is used as the seat material in some of the valves at MCU. Long term exposure to guanidine, may make the valves hard to operate over time due to the seat material (Tefzel{reg_sign}) increasing in size. However, since the physical changes of Tefzel{reg_sign} in the improved solvent are comparable to the changes in the CSSX baseline solvent, no design changes are needed with respect to the Tefzel{reg_sign} seating material. PEEK, Grafoil{reg_sign} and Isolast{reg_sign} were not affected by guanidine and MaxCalix within six months of exposure. The initial rapid weight gain observed in every polymer is assigned to the finite and limited uptake of Isopar{reg_sign} L/Modifier by the polymers probably due to the polymers porosity and rough surfaces. Spectroscopic data on the organic liquid and the polymer surfaces showed no preferential adsorption of any component in the NGS to the polymers and no leachate was observed in the NGS from any of the polymers studied.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RESULTS FOR THE THIRD QUARTER 2011 TANK 50 WAC SLURRY SAMPLE: CHEMICAL AND RADIONUCLIDE CONTAMINANT RESULTS

The Saltstone Facility is designed and permitted to immobilize and dispose of low-level radioactive and hazardous liquid waste (salt solution) remaining from the processing of radioactive material at the Savannah River Site. Low-level waste (LLW) streams from the Effluent Treatment Project (ETP), H-Canyon, and the decontaminated salt solution product from the Actinide Removal Process/Modular Caustic Side Solvent Extraction (CSSX) Unit (ARP/MCU) process are stored in Tank 50 until the LLW can be transferred to the Saltstone Facility for treatment and disposal. The LLW must meet the specified waste acceptance criteria (WAC) before it is processed into saltstone. The specific chemical and radionuclide contaminants and their respective WAC limits are in the current Saltstone WAC. Waste Solidification Engineering (WSE) requested that Savannah River National Laboratory (SRNL) perform quarterly analysis on saltstone samples. The concentrations of chemical and radionuclide contaminants are measured to ensure the saltstone produced during each quarter is in compliance with the current WAC. This report documents the concentrations of chemical and radionuclide contaminants for the 2011 Third Quarter samples collected from Tank 50 on July 7, 2011 and discusses those results in further detail than the previously issued results report.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RESULTS FROM ANALYSIS OF THE FIRST AND SECOND STRIP EFFLUENT COALESCER ELEMENTS FROM RADIOACTIVE OPERATIONS OF THE MODULAR CAUSTIC-SIDE SOLVENT EXTRACTION UNIT

The coalescer elements for the Strip Effluent (SE) acid within the Modular Caustic-Side Solvent Extraction Unit (MCU) experienced elevated differential pressure drop during radioactive operations. Following the end of operations for the first Macrobatch campaign and soon after start of the second Macrobatch campaign, personnel removed the coalescer media and provided to Savannah River National Laboratory (SRNL) for diagnostic investigation of the causes of reduced flow. This report summarizes those studies. Two Strip Effluent (SE) coalescers were delivered to the Savannah River National Laboratory (SRNL). One was removed from the Modular Caustic-Side Solvent Extraction Unit (MCU) between processing of Macrobatch 1 and 2 (coalescer 'Alpha'), and the second was removed from MCU after processing of {approx}24,000 gallons of salt solution (coalescer 'Beta'). Both coalescers underwent the same general strip acid flush program to reduce the dose and were delivered to SRNL for analysis of potential occluding solids. Analysis of Coalescer Alpha indicates the presence of aluminum hydroxide solids and aluminosilicate solids, while analysis of Coalescer Beta indicates the presence of aluminum hydroxide solids, but no aluminosilicates. Leaching studies on sections of both coalescers were performed. The results indicate that the coalescers had different amounts of solids present on them at the time of removal. Finally, samples of free liquids retrieved from both coalescers indicate no excessive amounts of CSSX solvent present. Given the strip acid flushing that occurred in the SE coalescers, the solids we detected on the coalescers are probably indicative of a larger quantity of these solids present before the strip acid flushing. Under this scenario, the excessive pressure drops are due to the solids and not from organic fouling.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Results for the Fourth Quarter 2011 Tank 50 WAC Slurry Sample: Chemical and Radionuclide Contaminant Results

The Saltstone Facility is designed and permitted to immobilize and dispose of low-level radioactive and hazardous liquid waste (salt solution) remaining from the processing of radioactive material at the Savannah River Site. Low-level waste (LLW) streams from the Effluent Treatment Project (ETP), H-Canyon, and the decontaminated salt solution product from the Actinide Removal Process/Modular Caustic Side Solvent Extraction (CSSX) Unit (ARP/MCU) process are stored in Tank 50 until the LLW can be transferred to the Saltstone Facility for treatment and disposal. The LLW must meet the specified waste acceptance criteria (WAC) before it is processed into saltstone. The specific chemical and radionuclide contaminants and their respective WAC limits are in the current Saltstone WAC. Waste Solidification Engineering (WSE) requested that Savannah River National Laboratory (SRNL) perform quarterly analysis on saltstone samples. The concentrations of chemical and radionuclide contaminants are measured to ensure the saltstone produced during each quarter is in compliance with the current WAC. This report documents the concentrations of chemical and radionuclide contaminants for the 2011 Fourth Quarter samples collected from Tank 50 on October 12, 2011 and discusses those results in further detail than the previously issued results report.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of Analysis of NGS Concentrate Drum Samples (Next Generation Solvent)

Savannah River National Laboratory (SRNL) prepared two drums (50 gallons each in Drum#2 and Drum#4) of NGS-MCU (Next Generation Solvent-Modular CSSX Unit) concentrate for future use at MCU in downblending the BOBCalixC6 based solvent to produce NGS-MCU solvent. Samples of each drum were sent for analysis. The results of all the analyses indicate that the blend concentrate is of the correct composition and should produce a blended solvent at MCU of the desired formulation.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Sample Results from the Interim Salt Disposition Program Macrobatch 8 Tank 21H Qualification Samples

Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 8 for the Interim Salt Disposition Program (ISDP). An Actinide Removal Process (ARP) and several Extraction-Scrub- Strip (ESS) tests were also performed. This document reports characterization data on the samples of Tank 21H as well as simulated performance of ARP and the Modular Caustic Side Solvent Extraction (CSSX) Unit (MCU). No issues with the projected Salt Batch 8 strategy are identified. A demonstration of the monosodium titanate (MST) (0.2 g/L) removal of strontium and actinides provided acceptable average decontamination factors for plutonium of 2.62 (4 hour) and 2.90 (8 hour); and average strontium decontamination factors of 21.7 (4 hour) and 21.3 (8 hour). These values are consistent with results from previous salt batch ARP tests. The two ESS tests also showed acceptable performance with extraction distribution ratios (D(Cs)) values of 52.5 and 50.4 for the Next Generation Solvent (NGS) blend (from MCU) and NGS (lab prepared), respectively. These values are consistent with results from previous salt batch ESS tests. Even though the performance is acceptable, SRNL recommends that a model for predicting extraction behavior for cesium removal for the blended solvent and NGS be developed in order to improve our predictive capabilities for the ESS tests.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Sample results from the Interim Salt Disposition Program Macrobatch 8 Tank 21H qualification samples

Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 8 for the Interim Salt Disposition Program (ISDP). An Actinide Removal Process (ARP) and several Extraction-Scrub-Strip (ESS) tests were also performed. This document reports characterization data on the samples of Tank 21H as well as simulated performance of ARP and the Modular Caustic Side Solvent Extraction (CSSX) Unit (MCU). No issues with the projected Salt Batch 8 strategy are identified. A demonstration of the monosodium titanate (MST) (0.2 g/L) removal of strontium and actinides provided acceptable average decontamination factors for plutonium of 2.62 (4 hour) and 2.90 (8 hour); and average strontium decontamination factors of 21.7 (4 hour) and 21.3 (8 hour). These values are consistent with results from previous salt batch ARP tests. The two ESS tests also showed acceptable performance with extraction distribution ratios (D (Cs) ) values of 52.5 and 50.4 for the Next Generation Solvent (NGS) blend (from MCU) and NGS (lab prepared), respectively. These values are consistent with results from previous salt batch ESS tests. Even though the performance is acceptable, SRNL recommends that a model for predicting extraction behavior for cesium removal for the blended solvent and NGS be developed in order to improve our predictive capabilities for the ESS tests.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for Actinide Removal Process 512-S Guard Filter Analyses

The Actinide Removal Process (ARP) removes Sr and actinides by adsorption to monosodium titanate (MST) from radioactive salt solutions that have been stored at the Savannah River Site (SRS). The MST solids are then removed by filtration. Material from the 512-S Late Wash Precipitate Tank (LWPT) is cross-flow filtered and the filtrate sent through a secondary filter (guard filter) to the Late Wash Hold Tank (LWHT) for further processing in the Modular Caustic Side Solvent Extraction (CSSX) Unit (MCU).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of Solids Deposited on the Modular Caustic-Side Solvent Extraction Unit (MCU) Strip Effluent (SE) Coalescer Media Removed in April 2015

On June 2015, Savannah River National Laboratory (SRNL) received a Strip Effluent (SE) coalescer (FLT-304) from MCU. That coalescer was first installed at MCU in late October 2014 and removed in April 2015. While processing approximately 48,700 gallons of strip solution, the pressure drop steadily increased linearly from 1 psi to near 16 psi (the administrative limit is 17 psi) with the total filtrate volume (2.1E-4 psi/gal of filtrate). The linear behavior is due to the combined effect of a constant deposition of material that starts from the closed-end to the mid-section of the coalescer reducing the available surface area of the coalescer for fluid passage (linearly with filtrate volume) and the formation of a secondary emulsion (water in NG-CSSX) on the fibers of the coalescer media. Both effects reduced the coalescer porosity by at least 13% (after processing 48,700 gallons). Before the coalescer was removed, it was flushed with a 10 mM boric acid solution to reduce the dose level. To determine the nature of the deposited material, a physical and chemical analysis of the coalescer was conducted. Characterization of this coalescer revealed the adsorption of organic containing amines (secondary amides and primary amines), TiDG, degraded modifier (with no hydroxyl group), MaxCalix, and oxidized hydrocarbon (possibly from Isopar™L or from lubricant used at MCU) onto the coalescer media. The amide and amines are possibly from the decomposition of the suppressor (TiDG). The modifier and MaxCalix were the largest components of the deposited organic material, as determined from leaching the coalescer with dichloromethane. Both the Fourier-Transformed Infrared (FTIR) and Fourier-Transformed Hydrogen Nuclear Magnetic Resonance (FT-HNMR) results indicated that some of the modifier was degraded (missing their OH groups). The modifier was observed everywhere in the examined coalescer pieces (FTIR), while the TiDG and its decomposition products were observed at the entrance discs of the coalescer. A solvent trim (a cocktail of solvent components with a high concentration of modifier) was added to the solvent on 2/22/2015. It is believed that the trim did not mix completely with the solvent and that it was subsequently spread around the MCU components including the coalescers, where it may have deposited. Chronologically, the modifier, the TiDG’s decomposition products and silicates deposited on the entrance discs first and after the pressure drop increased significantly, parts of the coalescer media detached itself from the central porous steel mandrel and a significant amount of steel debris, mercury, titanium, and additional aluminum and silicates deposited on the coalescer.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Extraction, scrub, and strip test results for the salt waste processing facility caustic side solvent extraction solvent example

An Extraction, Scrub, and Strip (ESS) test was performed on a sample of Salt Waste Processing Facility (SWPF) Caustic-Side Solvent Extraction (CSSX) solvent and salt simulant to determine cesium distribution ratios (D(Cs)), and cesium concentration in the strip effluent (SE) and decontaminated salt solution (DSS) streams; this data will be used by Parsons to help determine if the solvent is qualified for use at the SWPF. The ESS test showed acceptable performance of the solvent for extraction, scrub, and strip operations. The extraction D(Cs) measured 12.9, exceeding the required value of 8. This value is consistent with results from previous ESS tests using similar solvent formulations. Similarly, scrub and strip cesium distribution ratios fell within acceptable ranges.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Extraction, scrub, and strip test results for the solvent transfer to salt waste processing facility

The Savannah River National Laboratory (SRNL) prepared approximately 240 gallons of Caustic-Side Solvent Extraction (CSSX) solvent for use at the Salt Waste Processing Facility (SWPF). An Extraction, Scrub, and Strip (ESS) test was performed on a sample of the prepared solvent using a salt solution prepared by Parsons to determine cesium distribution ratios (D(Cs)), and cesium concentration in the strip effluent (SE) and decontaminated salt solution (DSS) streams. This data will be used by Parsons to help qualify the solvent for use at the SWPF. The ESS test showed acceptable performance of the solvent for extraction, scrub, and strip operations. The extraction D(Cs) measured 15.5, exceeding the required value of 8. This value is consistent with results from previous ESS tests using similar solvent formulations. Similarly, scrub and strip cesium distribution ratios fell within acceptable ranges.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Extraction, Scrub, and Strip Test Results for the Salt Waste Processing Facility Caustic Side Solvent Extraction Solvent Sample

An Extraction, Scrub, and Strip (ESS) test was performed on a sample of Salt Waste Processing Facility (SWPF) Caustic-Side Solvent Extraction (CSSX) solvent and salt simulant to determine cesium distribution ratios (D( Cs )), and cesium concentration in the strip effluent (SE) and decontaminated salt solution (DSS) streams; this data will be used by Parsons to help determine if the solvent is qualified for use at the SWPF. The ESS test showed acceptable performance of the solvent for extraction, scrub, and strip operations. The extraction D( Cs ) measured 12.5, exceeding the required value of 8. This value is consistent with results from previous ESS tests using similar solvent formulations. Similarly, scrub and strip cesium distribution ratios fell within acceptable ranges. This revision was created to correct an error. The previous revision used an incorrect set of temperature correction coefficients which resulted in slight deviations from the correct D( Cs ) results.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Extraction, Scrub, and Strip Test Results for the Second Solvent Lot Qualification Sample for the Salt Waste Processing Facility

An Extraction, Scrub, and Strip (ESS) test was performed on the qualification sample from the second lot of Caustic-Side Solvent Extraction (CSSX) solvent for the Salt Waste Processing Facility (SWPF). Testing used simulated salt solution to determine cesium distribution ratios (D( Cs )), and cesium concentration in the strip effluent (SE) and decontaminated salt solution (DSS) streams. This data will be used by Parsons to help determine if the solvent is qualified for use at the SWPF. The ESS test showed acceptable performance of the solvent for extraction, scrub, and strip operations. The extraction D( Cs ) measured 14.4, exceeding the required value of 8. This value is consistent with results from previous ESS tests using similar solvent formulations. Similarly, scrub and strip cesium distribution ratios fell within acceptable ranges.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A GC-FID-Based Method for Quantifying the Breakdown of TiDG in NGS Solvent

A fast and reliable analytical technique for monitoring the levels of the Next Generation Solvent (NGS) solvent suppressor, N,N’,N”-tris(3,7-dimethyloctyl)guanidine (TiDG), is required due to the susceptibility of this guanidine to degradation arising from the thermal and chemical conditions encountered in the Next Generation Caustic-Side Solvent Extraction (NG-CSSX) process currently in use at the Savannah River Site. This report documents the development of a GC-FID-based (Gas Chromatography–Flame Ionization Detection) technique for analyzing and quantifying TiDG and its primary degradation product, di-isodecylurea (di-iDU), as a means of near real-time surveillance of the NGS solvent. Upon experimental certification, the technique was subsequently utilized to measure the degradation of this suppressor component of the NGS solvent following a storage period of 19 months at both 25 °C and 35 °C. As currently described, this simple technique can be used to monitor the amounts of both TiDG and di-iDU in NGS solvent in less than 15 minutes time, thus offering near real-time guidance as to the levels of suppressor and its primary degradation product. This analytical information is essential for calculating the quantity of TiDG that must be routinely added to the solvent under conditions of continual suppressor degradation, in order to maintain stripping performance.

36 MATERIALS SCIENCE↗