Inspection and Mapping of Savannah River Site (SRS) Waste Tanks via Unmanned Aircraft System (UAS) – 25351
The CSTF at SRS contain 51 waste tanks with 8 closed waste tanks between FTF and HTF. SRMC is the LW contractor. The LW mission includes removing legacy nuclear waste from these tanks and treating it for final disposition. Once the bulk of the waste has been removed from a tank, it will undergo inspection and sampling to characterize the remaining waste in the tank prior to it being operationally closed. There are multiple points in the tank closure process where an inspection is performed, and there are multiple parts of a tank that get inspected. Waste tanks have a primary containment vessel (referred to as the “Primary”) and a secondary containment vessel (referred to as the “Annulus”) that surrounds the primary. Both of these sections of a tank receive multiple inspections throughout the closure process.