Search NASA⌕ Search

SEARCH · Search NASA

Results for “Canberra”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Interagency arraying

Activities performed to match ground aperture requirements for the Neptune encounter in August 1989 with the expected capabilities of the JPL Deep Space Network (DSN) are discussed. Ground aperture requirements, DSN capabilities, and the capabilities of other agencies are reviewed. The design and configurations of the receiver subsystem, combiner subsystem, monitor and control subsystem, recording subsystem, and supporting subsystems are described. The implementation of the Very Large Array-Goldstone Telemetry Array is discussed, and the differences involved with the Parkes-Canberra Telemetry Array implementation are highlighted. The operational concept is addressed.

Cox, Henry G.↗

Shock tunnel studies of scramjet phenomena

Commissioning of the new T4 shock tunnel at the University of Queensland implied that it was no longer necessary to focus the work of the research group about an annual test series conducted in the T3 shock tunnel in Canberra. Therefore, it has been possible to organize a group for work to proceed along lines such that particular personnel are associated with particular project areas. The format of this report consists of a series of reports on specific project areas, with a brief general introduction commenting on each report. The introduction is structured by project areas, with the title of the relevant report stated under the project area heading. The reports themselves follow in the order of the project area headings.

Morgan, R. G.↗

DSN radio science system design and testing for Voyager-Neptune encounter

The Deep Space Network (DSN) Radio Science System presently implemented within the Deep Space Network was designed to meet stringent requirements imposed by the demands of the Voyager-Neptune encounter and future missions. One of the initial parameters related to frequency stability is discussed. The requirement, specification, design, and methodology for measuring this parameter are described. A description of special instrumentation that was developed for the test measurements and initial test data resulting from the system tests performed at Canberra, Australia and Usuda, Japan are given.

Ham, N. C.↗

Doppler measurements of an interplanetary satellite with a VLBI antenna

In preparation for the Ulysses Gravitational Wave Experiment a Doppler detector has been constructed for the Bologna VLBI antenna and tested in a differential mode with the spacecraft Voyager 2 at 25 AU. In this mode the signal was sent from the Deep Space Network station in Canberra and received at Madrid and Bologna. The correlation between the received signals allows a discrimination between local and common noise sources. The successful test was performed in August, 1988 showed that special communication procedure will have to be implemented to allow a smooth and reliable operation during the real experiment.

Gomoretto, G.↗

Interagency telemetry arraying for Voyager-Neptune encounter

The reception capability of the Deep Space Network (DSN) has been improved over the years by increasing both the size and number of antennas at each complex to meet spacecraft-support requirements. However, even more aperture was required for the final planetary encounters of the Voyager 2 spacecraft. This need was met by arraying one radio astronomy observatory with the DSN complex in the United States and another with the complex in Australia. Following a review of augmentation for the Uranus encounter, both the preparation at the National Radio Astronomy (NRAO) Very Large Array (VLA) and the Neptune encounter results for the Parkes-Canberra and VLA-Goldstone arrays are presented.

Brown, D. W.↗

The Parkes front-end controller and noise-adding radiometer

A new front-end controller (FEC) was installed on the 64-m antenna in Parkes, Australia, to support the 1989 Voyager 2 Neptune encounter. The FEC was added to automate operation of the front-end microwave hardware as part of the Deep Space Network's Parkes-Canberra Telemetry Array. Much of the front-end hardware was refurbished and reimplemented from a front-end system installed in 1985 by the European Space Agency for the Uranus encounter; however, the FEC and its associated noise-adding radiometer (NAR) were new Jet Propulsion Laboratory (JPL) designs. Project requirements and other factors led to the development of capabilities not found in standard Deep Space Network (DSN) controllers and radiometers. The Parkes FEC/NAR performed satisfactorily throughout the Neptune encounter and was removed in October 1989.

Brunzie, T. J.↗

Engineering Test Satellite VI (ETS-VI)

The Engineering Test Satellite-VI (ETS-VI) is being developed as the third Japanese three-axis stabilized engineering test satellite to establish the 2-ton geostationary operational satellite bus system and to demonstrate the high performance satellite communication technology for future operational satellites. The satellite is expected to be stationed at 154 deg east latitude. It will be launched from the Tanegashima Space Center in Japan by a type H-II launch vehicle. The Deep Space Network (DSN) will support the prelaunch compatibility test, data interface verification testing, and launch rehersals. The DSN primary support period is from launch through the final AEF plus 1 hour. Contingency support is from final AEF plus 1 hour until launch plus 1 month. The coverage will consist of all the 26-m antennas as prime and the 34-m antennas at Madrid and Canberra as backup. Maximum support will consist of two 8-hour tracks per station for a 7-day period, plus the contingency support, if required. Information is given in tabular form for DSN support, telemetry, command, and tracking support responsibility.

Horii, M.↗

European Telecommunications Satellite II (EUTELSAT II)

EUTELSAT II is a regional public telecommunications system for Europe. The services which will be provided are telephone and television. The satellites will be placed at a geostationary orbit within the arcs of 6 degrees east to 19 degrees east or 26 degrees to 36 degrees east. The designed lifetime is 7 years. After separation of the satellites from the launch vehicles, telemetry, telecommand, and ranging will be performed within the S-band frequencies. After positioning of the satellite at its final geostationary orbit, the Ku-band telecommunication equipment will be activated. From this time on, all satellite control operations will be performed in Ku-band. The Deep Space Network (DSN) will support the transfer and drift orbit mission phases. The coverage will consist of the 26-m antennas at Goldstone and Canberra as prime support for the transfer and drift orbits. Maximum support will consist of a 7-day period, plus 14 days of contingency support. Information is given in tabular form for DSN support, frequency assignments, telemetry, command, and tracking support responsibility.

Laemmel, G.↗

French direct TV broadcast satellite (TDF-1 and -2)

The French Direct TV Broadcast Satellite (TDF-1 and -2) missions are to provide three channels of TV and sound broadcasting to France within the 12 to 18 GHz bands. The satellites will be placed in a geostationary orbit at 19 degrees west longitude. The satellites will be launched from the Centre Spatial Guyanis in French Guiana on an Ariane launch vehicle. The Deep Space Network (DSN) will support the transfer and drift orbit mission phases. The coverage will consist of the 26-m antennas at Goldstone and Canberra as prime support. Maximum support will consist of two 8-hour tracks per station for a 7-day period, plus 14 days contingency support. Information is given in tabular form for DSN coverage, frequency assignments, telemetry, command, and tracking support responsibility.

Vacheyroux, R.↗

Heat flux and shock shape measurements on an Aeroassist Flight Experiment model in a high enthalpy free piston shock tunnel

This paper describes measurements of heat flux and shock shapes made on a 2.08 percent scale model of the proposed Aeroassist Flight Experiment model in a high enthalpy free piston shock tunnel T3 at the Australian National University in Canberra, Australia. The enthalpy and Reynolds number range covered were 7.5 MJ/kg to 20 MJ/kg and 150,000 to 270,000 per meter respectively. The test Mach number varied between 7.5 and 8. Two test gases, air and nitrogen, were used and the model angle of attack varied from -10 deg to +10 deg to the free stream. The results are discussed and compared to the Mach 10 cold hypersonic air data as obtained in the Langley 31 inch Mach 10 Facility as well as the perfect gas CFD calculations of NASA LaRC.

Gai, S. L.↗

Availability analysis of the traveling-wave maser amplifiers in the deep space network. Part 1: The 70-meter antennas

The results of the reliability and availability analyses of the individual S- and X-band traveling-wave maser (TWM) assemblies and their operational configurations in the 70-meter antennas of NASA's Deep Space Network (DSN) are described. For the period 1990 through 1991, the TWM availability parameters for the Telemetry Data System are: mean time between failures (MTBF), 930 hr; mean time to restore services (MTTRS), 1.4 hr; and the average availability, 99.85 percent. In previously published articles, the performance analysis of the TWM assemblies was confined to the determination of the parameters specified above. However, as the mean down time (MDT) for the repair of TWM's increases, the levels of the TWM operational availabilities and MTTRS are adversely affected. A more comprehensive TWM availability analysis is presented to permit evaluation of both MTBF and MDT effects. Performance analysis of the TWM assemblies, based on their station monthly failure reports, indicates that the TWM's required MTBF and MDT levels of 3000 hr and 36 to 48 hr, respectively, have been achieved by the TWM's only at the Canberra Deep Space Station (DSS 43). The Markov Process technique is employed to develop suitable availability measures for the S- and X-band TWM configurations when each is operated in a two-assembly standby mode. The derived stochastic expressions allow for the evaluation of those configurations' simultaneous availability for the Antenna Microwave Subsystem. The application of these expressions to demonstrate the impact of various levels of TWM maintainability (or MDT) on their configurations' operational availabilities is presented for each of the 70-m antenna stations.

Issa, T. N.↗

A small satellite design for deep space network testing and training

With the continuing exploration of the Solar System and the reemphasis on Earth focused missions, the need for faster data transmission rates has grown. Ka-band could allow a higher data delivery rate over the current X-band, however the adverse effects of the Earth's atmosphere on Ka are as yet unknown. The Deep Space Network and Jet Propulsion Lab have proposed to launch a small satellite that would simultaneously transmit X and Ka signals to test the viability of switching to Ka-band. The Mockingbird Design Team at the University of Texas at Austin applied small satellite design principles to achieve this objective. The Mockingbird design, named BATSAT, incorporates simple, low-cost systems designed for university production and testing. The BATSAT satellite is a 0.64 m diameter, spherical panel led satellite, mounted with solar cells and omni-directional antennae. The antennae configuration negates the need for active attitude control or spin stabilization. The space-frame truss structure was designed for 11 g launch loads while allowing for easy construction and solar-panel mounting. The communication system transmits at 1 mW by carrying the required Ka and X-band transmitters, as well as an S band transmitter used for DSN training. The power system provides the 8.6 W maximum power requirements via silicon solar arrays and nickel-cadmium batteries. The BATSAT satellite will be lofted into an 1163 km, 70 deg orbit by the Pegasus launch system. This orbit fulfills DSN dish slew rate requirements while keeping the satellite out of the heaviest regions of the Van Allen radiation belts. Each of the three DSN stations capable of receiving Ka-band (Goldstone, Canberra, and Madrid) will have an average of 85 minutes of view-time per day over the satellites ten year design life. Mockingbird Designs hopes that its small satellite design will not only be applicable to this specific mission scenario, but that it could easily be modified for instrument capability for university, government, and/or commercial research.

Mcwilliams, Dennis↗

Galileo Earth Moon Flyby

This video has five sections. The first is a live discussion of the information that scientists hope to gain by the Galileo flyby of the Moon. This section has no introduction. There is a great deal of the discussion about the lunar craters and lunar volcanism. There is also some discussion of the composition of the far side of the moon. The second section is a short animation that shows the final step to Jupiter with particular emphasis on the gravitational assisted velocity boost, which was planned to give the spacecraft the requisite velocity to make the trip to Jupiter. The next section is an update of the status of the flyby of the Moon, and the Earth, with an explanation of the trajectory around the earth, and the moon. A photograph of the tracking station in Canberra, Australia is included. The next section is a tour of a full-scale model of the spacecraft. The last section is a discussion with the person charged with the procurement of the instrumentation aboard the spacecraft; the importance of the lunar flyby to assist in the calibration of the instruments is discussed.

Source record↗

Deep Space Network Revitalization: Operations for the 21st Century

The National Aeronautics and Space Administration (NASA) supports unmanned space missions through a Deep Space Network (DSN) that is developed and operated by the Jet Propulsion Laboratory (JPL and its subcontractors. The DSN capabilities have been incrementally upgraded since its establishment in the late '50s and are delivered from three Deep Space Communications Complexes (DSCC's) near Goldstone, California, Madrid, Spain, and Canberra, Australia. At present each DSCC includes large antennas with diameters from 11 meters to 70 meters, that operate largely in S-band and X-band frequencies. In addition each DSCC includes all the associated electronics to receive and process the low-level telemetry signals, and radiate the necessary command with high-power transmitters. To accommodate support of the rapidly increasing number of missions by NASA and other space agencies, and to facilitate maintaining and increasing the level of service in a shrinking budget environment, JPL has initiated a bold road map with three key components: 1. A Network Simplification Project (NSP) to upgrade aging electronics, replacing them with modem commercially based components. NSP and related replacement tasks are projected to reduce the cost of operating the DSN by 50% relative to the 1997 levels. 2. Upgrade of all 34-m and 70-m antennas to provision of Ka-Band telemetry downlink capability, complemented by an existing X-band uplink capability. This will increase the effective telemetry downlink capacity by a factor of 4, without building any new antennas. 3. Establishment of an optical communications network to support for high data rate unmanned missions that cannot be accommodated with radiofrequency (RF) communications, as well as establish a path toward support of manned missions at Mars. In this paper we present the mission loading projected for 1998-2008 and the elements of the JPL road map that will enable supporting it with a reduced budget. Particular emphasis will be on streamlining the architecture and to reduce the DSN cost for operations, maintenance and sustaining engineering while at the same time also simplifying and reducing the operations cost for the flight missions.

Statman, Joseph I.↗

NASA Planetary Surface Exploration

Managed for NASA by the California Institute of Technology, the Jet Propulsion Laboratory is the lead U.S. center for robotic exploration of the solar system. JPL spacecraft have visited all known planets except Pluto (a Pluto mission is currently under study). In addition to its work for NASA, JPL conducts tasks for a variety of other federal agencies. In addition, JPL manages the worldwide Deep Space Network, which communicates with spacecraft and conducts scientific investigations from its complexes in California's Mojave Desert near Goldstone; near Madrid, Spain; and near Canberra, Australia. JPL employs about 6000 people.

Hayati, Samad↗

Orbit Determination Error Analysis Results for the Triana Sun-Earth L2 Libration Point Mission

Using the NASA Goddard Space Flight Center's Orbit Determination Error Analysis System (ODEAS), orbit determination error analysis results are presented for all phases of the Triana Sun-Earth L1 libration point mission and for the science data collection phase of a future Sun-Earth L2 libration point mission. The Triana spacecraft was nominally to be released by the Space Shuttle in a low Earth orbit, and this analysis focuses on that scenario. From the release orbit a transfer trajectory insertion (TTI) maneuver performed using a solid stage would increase the velocity be approximately 3.1 km/sec sending Triana on a direct trajectory to its mission orbit. The Triana mission orbit is a Sun-Earth L1 Lissajous orbit with a Sun-Earth-vehicle (SEV) angle between 4.0 and 15.0 degrees, which would be achieved after a Lissajous orbit insertion (LOI) maneuver at approximately launch plus 6 months. Because Triana was to be launched by the Space Shuttle, TTI could potentially occur over a 16 orbit range from low Earth orbit. This analysis was performed assuming TTI was performed from a low Earth orbit with an inclination of 28.5 degrees and assuming support from a combination of three Deep Space Network (DSN) stations, Goldstone, Canberra, and Madrid and four commercial Universal Space Network (USN) stations, Alaska, Hawaii, Perth, and Santiago. These ground stations would provide coherent two-way range and range rate tracking data usable for orbit determination. Larger range and range rate errors were assumed for the USN stations. Nominally, DSN support would end at TTI+144 hours assuming there were no USN problems. Post-TTI coverage for a range of TTI longitudes for a given nominal trajectory case were analyzed. The orbit determination error analysis after the first correction maneuver would be generally applicable to any libration point mission utilizing a direct trajectory.

Marr, G.↗

Stardust Dynamic Science at Wild 2: First Look

The Dynamic Science investigation on the STARDUST mission has been described previously. The data delivered by the STARDUST Project is multifold, but basically it consists of radio Doppler data from the Deep Space Network (DSN) and attitude control data (ACS) from the spacecraft. Doppler data were successfully recorded by JPL's Navigation System (closed-loop data) and also by its Radio Science System (open-loop data) at DSN stations DSS43 near Canberra Australia and at DSS14 at Goldstone California. Attitude control data were also successfully delivered to the Dynamic Science Team. Here we describe a preliminary analysis of the data. Beyond a closest approach distance of 150 km, a Doppler detection of a the Wild 2 nucleus mass was not expected. The current best estimate of the closest approach distance is 236.4 km, and as expected, any mass signal in the Doppler data is hopelessly buried in the noise. We have attempted to fit the data to a mass model with no success. However, analysis of the Doppler data and the ACS data for particle impacts on the spacecraft's Whipple shields is in progress, and will be reported at the meeting. The DSS43 closed-loop Doppler residuals are plotted as a function of time from the current best estimate of the time of Wild 2 closest approach, 2 January 2004, 19:43:11.7 UTC, Earth-receive time at the station.

Anderson, J. D.↗

Deep Space Network equipment performance, reliability, and operations management information system

The Deep Space Mission System (DSMS) Operations Program Office and the DeepSpace Network (DSN) facilities utilize the Discrepancy Reporting Management System (DRMS) to collect, process, communicate and manage data discrepancies, equipment resets, physical equipment status, and to maintain an internal Station Log. A collaborative effort development between JPL and the Canberra Deep Space Communication Complex delivered a system to support DSN Operations.

discrepancy reporting DSN operations web-based too↗