Search NASA⌕ Search

SEARCH · Search NASA

Results for “Capacity allocation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

The Recent Large Reduction in Space Launch Cost

The development of commercial launch systems has substantially reduced the cost of space launch. NASA’s space shuttle had a cost of about $1.5 billion to launch 27,500 kg to Low Earth Orbit (LEO), $54,500/kg. SpaceX’s Falcon 9 now advertises a cost of $62 million to launch 22,800 kg to LEO, $2,720/kg. Commercial launch has reduced the cost to LEO by a factor of 20. This will have a substantial impact on the space industry, military space, and NASA. Existing launch providers are reducing their costs and so are satellite developers. The military foresees an opportunity to rapidly replace compromised space assets that provided communications, weather, surveillance, and positioning. NASA supported the development of commercial space launch and NASA science anticipates lower cost missions, but human space flight planning seems unreactive. Specifically, it has been claimed that commercial spaceflight has not reduced the cost to provide cargo to the International Space Station (ISS). The key factor is that the space shuttle can provide cargo and crew to ISS while the Falcon 9 must also use the Dragon capsule, which adds cost and reduces payload. The cost of a Falcon 9 and Dragon capsule mission to ISS is about $140 million with a payload of 6,000 kg, $23,300/kg. The shuttle payload to ISS is less than to LEO, 16,050 kg, so its cost is also higher at $93,400/kg. The launch cost to ISS has been reduced by a factor of 4. Calculations that show commercial launch provides no cost reduction to ISS assume half the usually cited shuttle cost and allocate it to the actual delivered payload, about half the full capacity. In a split mission, with crew and pressurized cargo launched separately from hardware and materials, the higher Falcon 9 plus Dragon costs would apply only to a fraction of the launch mass. A 4 to 1 cost reduction saves most, 75%, of the total cost. A further reduction to 10 or 20 to 1 saves 90 or 95%, but this is only a small, 15 or 20%, portion of the original cost. The recently reduced space launch cost can be expected to substantially impact human space flight.

Jones, Harry W.↗

Optimal service allocation among two heterogeneous traffic types with no queueing

Two communication traffic streams with Poisson statistics arrive at a network node. These are to be transmitted across a channel with a total bandwidth capacity of C slots. Messages not accepted at the node are assumed to be lost. Under the assumptions of exponential service time distributions, the problem of dynamic allocation of available channel bandwidth among the two traffic types is studied in order to minimize a weighted sum of blocking probabilities. Modeling the system as a two-dimensional Markov chain is studied to minimize a weighted sum of blocking probabilities. Modeling the system as a two-dimensional Markov chain, it is shown by an application of dynamic programming principles that the optimal policy has the form of a 'switching curve'.

Lambadaris, I.↗

Development of Human System Integration at NASA

Human Systems Integration seeks to design systems around the capabilities and limitations of the humans which use and interact with the system, ensuring greater efficiency of use, reduced error rates, and less rework in the design, manufacturing and operational deployment of hardware and software. One of the primary goals of HSI is to get the human factors practitioner involved early in the design process. In doing so, the aim is to reduce future budget costs and resources in redesign and training. By the preliminary design phase of a project nearly 80% of the total cost of the project is locked in. Potential design changes recommended by evaluations past this point will have little effect due to lack of funding or a huge cost in terms of resources to make changes. Three key concepts define an effective HSI program. First, systems are comprised of hardware, software, and the human, all of which operate within an environment. Too often, engineers and developers fail to consider the human capacity or requirements as part of the system. This leads to poor task allocation within the system. To promote ideal task allocation, it is critical that the human element be considered early in system development. Poor design, or designs that do not adequately consider the human component, could negatively affect physical or mental performance, as well as, social behavior. Second, successful HSI depends upon integration and collaboration of all the domains that represent acquisition efforts. Too often, these domains exist as independent disciplines due to the location of expertise within the service structure. Proper implementation of HSI through participation would help to integrate these domains and disciplines to leverage and apply their interdependencies to attain an optimal design. Via this process domain interests can be integrated to perform effective HSI through trade-offs and collaboration. This provides a common basis upon which to make knowledgeable decisions. Finally, HSI must be considered early in the requirements development phase of system design and acquisition. This will provide the best opportunity to maximize return on investment (ROI) and system performance. HSI requirements must be developed in conjunction with capability ]based requirements generation through functional. HSI requirements will drive HSI metrics and embed HSI issues within the system design. After a system is designed, implementation of HSI oversights can be very expensive. An HSI program should be included as an integral part of a total system approach to vehicle and habitat development. This would include, but not limited to, workstation design, D&C development, volumetric analysis, training, operations, and human -robotic interaction. HSI is a necessary process for Human Space Flight programs to meet the Agency Human ]System standards and thus mitigate human risks to acceptable levels. NASA has been involved in HSI planning, procedures development, process, and implementation for many years, and has been building several internal and publicly accessible products to facilitate HSI fs inclusion in the NASA Systems Engineering Lifecycle. Some of these products include: NASA STD 3001 Volumes 1 and 2, Human Integration Design Handbook, NASA HSI Implementation Plan, NASA HSI Implementation Plan Templates, NASA HSI Implementation Handbook, and a 2 ]hour short course on HSI delivered as part of the NASA Space and Life Sciences Directorate Academy. These products have been created leveraging industry best practices and lessons learned from other Federal Government agencies.

Whitmore, Mihriban↗

System-Availability And Resource-Allocation Program

ACARA analyzes availability, life-cycle cost, and scheduling of resources. Uses statistical Monte Carlo method to simulate capacity states of system as well as failure and repair of components. Failures of components modeled mathematically by use of combination of exponential and Weibull probability distributions. Schedules replacement of components to optimize performance of system. Made to comply with any constraints on production of components, capacities of resupply vehicles, spares kept on site, crews, and/or equipment. Written in APL2.

Viterna, L. A.↗

Adaptation to high CO2 concentration in an optimal environment: radiation capture, canopy quantum yield and carbon use efficiency

The effect of elevated [CO2] on wheat (Triticum aestivum L. Veery 10) productivity was examined by analysing radiation capture, canopy quantum yield, canopy carbon use efficiency, harvest index and daily C gain. Canopies were grown at either 330 or 1200 micromoles mol-1 [CO2] in controlled environments, where root and shoot C fluxes were monitored continuously from emergence to harvest. A rapidly circulating hydroponic solution supplied nutrients, water and root zone oxygen. At harvest, dry mass predicted from gas exchange data was 102.8 +/- 4.7% of the observed dry mass in six trials. Neither radiation capture efficiency nor carbon use efficiency were affected by elevated [CO2], but yield increased by 13% due to a sustained increase in canopy quantum yield. CO2 enrichment increased root mass, tiller number and seed mass. Harvest index and chlorophyll concentration were unchanged, but CO2 enrichment increased average life cycle net photosynthesis (13%, P < 0.05) and root respiration (24%, P < 0.05). These data indicate that plant communities adapt to CO2 enrichment through changes in C allocation. Elevated [CO2] increases sink strength in optimal environments, resulting in sustained increases in photosynthetic capacity, canopy quantum yield and daily C gain throughout the life cycle.

Non-NASA Center↗

A Review of Function Allocation and En Route Separation Assurance

Today's air traffic control system has reached a limit to the number of aircraft that can be safely managed at the same time. This air traffic capacity bottleneck is a critical problem along the path to modernization for air transportation. The design of the next separation assurance system to address this problem is a cornerstone of air traffic management research today. This report reviews recent work by NASA and others in the areas of function allocation and en route separation assurance. This includes: separation assurance algorithms and technology prototypes; concepts of operations and designs for advanced separation assurance systems; and specific investigations into air-ground and human-automation function allocation.

Lewis, Timothy A.↗

Arranging computer architectures to create higher-performance controllers

Techniques for integrating microprocessors, array processors, and other intelligent devices in control systems are reviewed, with an emphasis on the (re)arrangement of components to form distributed or parallel processing systems. Consideration is given to the selection of the host microprocessor, increasing the power and/or memory capacity of the host, multitasking software for the host, array processors to reduce computation time, the allocation of real-time and non-real-time events to different computer subsystems, intelligent devices to share the computational burden for real-time events, and intelligent interfaces to increase communication speeds. The case of a helicopter vibration-suppression and stabilization controller is analyzed as an example, and significant improvements in computation and throughput rates are demonstrated.

Jacklin, Stephen A.↗

Traffic placement policies for a multi-band network

Recently protocols were introduced that enable the integration of synchronous traffic (voice or video) and asynchronous traffic (data) and extend the size of local area networks without loss in speed or capacity. One of these is DRAMA, a multiband protocol based on broadband technology. It provides dynamic allocation of bandwidth among clusters of nodes in the total network. A number of traffic placement policies for such networks are proposed and evaluated. Metrics used for performance evaluation include average network access delay, degree of fairness of access among the nodes, and network throughput. The feasibility of the DRAMA protocol is established through simulation studies. DRAMA provides effective integration of synchronous and asychronous traffic due to its ability to separate traffic types. Under the suggested traffic placement policies, the DRAMA protocol is shown to handle diverse loads, mixes of traffic types, and numbers of nodes, as well as modifications to the network structure and momentary traffic overloads.

Maly, Kurt J.↗

A design procedure for control/display systems

This paper proposes a design procedure for control and display systems in which levels of automation vary over a significant range. The elements of the primary analysis tool (the Optimal Control Model of the Human Operator) are briefly reviewed, and the use of the model at three levels of specification (information level, display-element level, and display-format level) is discussed. Based on observation and pilot commentary, it is assumed that the pilot allocates his attention to control the aircraft to the desired level of performance, and then, with remaining capacity, to monitor displays. This facet of behavior is incorporated into the design procedure so that regardless of the level of control automation, all systems are compared at the same level of control performance. The design procedure is applied to the longitudinal control of a CH-47 helicopter. The procedure points out the need for performance-workload relations for control, which are fairly well understood, and performance-workload relations for monitoring, about which little is known.

Curry, R. E.↗

Hubble Space Telescope

The Hubble Space Telescope will employ magnetic torque controllers, which make use of the Earth's magnetic field augmented by four reaction wheels. DC torques are easily allowed for, but variations, orbit by orbit, can result in excessive wheel speeds which can excite vibratory modes in the telescope structure. If the angular momentum from aerodynamic sources exceeds its allocation of 100 Nms, the excess has to come out of the maneuvering budget since the total capacity of the momentum storage system is fixed at 500 Nms. This would mean that maneuvers could not be made as quickly, and this would reduce the amount of science return. In summary, there is a definite need for a model that accurately portrays short term (within orbit) variations in density for use in angular momentum management analyses. It would be desirable to have a simplified model that could be used for planning purposes; perhaps applicable only over a limited altitude range (400 to 700 km) and limited latitude band.

Nurre, G.↗

Efficient scheduling algorithm for demand-assigned TDMA satellite systems

An efficient scheduling algorithm (stations burst plan) for demand-assigned time-division multiple-access (TDMA) satellite network systems is introduced. The total demand for transmitting data through a transponder may exceed the available bit-rate capacity, and a scheduler of the system wishes to utilize the system with minimum changes of slot allocations while maximizing throughputs. By implementing such a burst-plan algorithm, transmission of all demanded data traffic can be completed with minimum unused resources (idle slots). The underlying ideas adopted for the algorithm are that jobs with shorter remaining processing times should have higher priorities and that as many jobs are processed at a time as possible. The algorithm is particularly useful for deriving smooth burst plans for a satellite system with a large number of ground stations.

Durrani, Sajjad H.↗

Information efficiency in visual communication

This paper evaluates the quantization process in the context of the end-to-end performance of the visual-communication channel. Results show that the trade-off between data transmission and visual quality revolves around the information in the acquired signal, not around its energy. Improved information efficiency is gained by frequency dependent quantization that maintains the information capacity of the channel and reduces the entropy of the encoded signal. Restorations with energy bit-allocation lose both in sharpness and clarity relative to restorations with information bit-allocation. Thus, quantization with information bit-allocation is preferred for high information efficiency and visual quality in optimized visual communication.

Alter-Gartenberg, Rachel↗

Channel characterisation for future Ka-band Mobile Satellite Systems and preliminary results

Mobile satellite systems (MSS) are presently designed or planned to operate, with the exception of OMNITRACKS, in the lower part of the frequency spectrum (UHF to S-bands). The decisions taken at the last World Administrative Radio Conference in 1992 to increase the allocated L- and S-bands for MSS services will only partly alleviate the problem of system capacity. In addition the use of L-and S-band frequencies generally requires large antenna apertures on board the satellite terminal side. The idea of exploiting the large spectrum resources available at higher frequencies (20-30 GHz) and the perspective of reducing user terminal size (and possibly price too) have spurred the interest of systems designers and planners. On the other hand, Ka-band frequencies suffer from increased slant path losses due to atmospheric attenuation phenomena. The European Space Agency (ESA) has recently embarked on a number of activities aimed at studying the effect of the typical mobile propagation impairments at Ka-band. This paper briefly summarizes ESA efforts in this field of research and presents preliminary experimental results.

Sforza, Mario↗

High-Capacity Aeronautical Satellite Communication System

System primarily designed to serve aircraft en route. Provides 5,093 forward communication channels and 7,093 reverse channels. This allocation of forward and reverse channels reflects anticipated communication traffic patterns. East and west satellites relay messages from ground to airplanes and from airplanes to ground. Use of two satellites instead of one increases availability of services and reliability of system.

Sue, M. K.↗

Architectural design and simulation of a virtual memory

Virtual memory is an imaginary main memory with a very large capacity which the programmer has at his disposal. It greatly contributes to the solution of the dynamic storage allocation problem. The architectural design of a virtual memory is presented which implements by hardware the idea of queuing and scheduling the page requests to a paging drum in such a way that the access of the paging drum is increased many times. With the design, an increase of up to 16 times in page transfer rate is achievable when the virtual memory is heavily loaded. This in turn makes feasible a great increase in the system throughput.

Kwok, G.↗

Complexity Management Using Metrics for Trajectory Flexibility Preservation and Constraint Minimization

The growing demand for air travel is increasing the need for mitigating air traffic congestion and complexity problems, which are already at high levels. At the same time new surveillance, navigation, and communication technologies are enabling major transformations in the air traffic management system, including net-based information sharing and collaboration, performance-based access to airspace resources, and trajectory-based rather than clearance-based operations. The new system will feature different schemes for allocating tasks and responsibilities between the ground and airborne agents and between the human and automation, with potential capacity and cost benefits. Therefore, complexity management requires new metrics and methods that can support these new schemes. This paper presents metrics and methods for preserving trajectory flexibility that have been proposed to support a trajectory-based approach for complexity management by airborne or ground-based systems. It presents extensions to these metrics as well as to the initial research conducted to investigate the hypothesis that using these metrics to guide user and service provider actions will naturally mitigate traffic complexity. The analysis showed promising results in that: (1) Trajectory flexibility preservation mitigated traffic complexity as indicated by inducing self-organization in the traffic patterns and lowering traffic complexity indicators such as dynamic density and traffic entropy. (2)Trajectory flexibility preservation reduced the potential for secondary conflicts in separation assurance. (3) Trajectory flexibility metrics showed potential application to support user and service provider negotiations for minimizing the constraints imposed on trajectories without jeopardizing their objectives.

Idris, Husni↗

LLM: An L-band multibeam land mobile payload for Europe

The European Space Agency is developing, in the context of the ARTEMIS program, a multibeam reconfigurable mobile payload to provide pre-operational land-mobile satellite services at the L-band over Europe. The L-band Land-Mobile (LLM) payload features high capacity at L-band, efficient use of the L-band spectrum resources, and flexibility in reconfiguring the allocation of bandwith and RF power resources to the different beams. Additionally, a number of features were added to the payload purely for experimental purposes, like the provision of one steerable spot beam which can be repositioned anywhere within the coverage area, and the possibility to reuse L-band frequencies by spatial discrimination between non-adjacent beams, or via orthogonal polarizations. The architecture of the payload and the hardware implementation of the most critical subsystems are described.

Benedicto, J.↗

An expansion plan for the 60 Hz power distribution system at KSC: LC-39 substations load allocation plan

The increasing load density in the LC-39 area of Kennedy Space Center (KSC) can be met by either modifying the existing substation and increasing its capacity or by planning an additional new substation. Evidence that the later approach is more economical, enhances the system reliability, and would produce more satisfactory performance indices is provided. Network theory is the basis for the optimal location determination of the proposed substation. A load reallocation plan which minimizes investment cost and power losses and meets other desirable system features is drafted. The report should be useful to the system designer and can be a useful guideline for future facility planners.

Kalu, Alex↗