Search NASA⌕ Search

SEARCH · Search NASA

Results for “Charging Station Operator”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Optimal Managed Fast-Charging Model for Electric Vehicle Fleets with High Utilization and Multiple Charge-Acceptance Curves

A predictive control/scheduling optimization model is proposed for managed charging of an electric vehicle (EV) fleet - under time-of-use energy and demand prices, high vehicle utilization frequency (short dwell times), multiple charge- acceptance curves (configurable charging rates), and flexible vehicle demand. This context is particularly relevant for flight schools (small electric aircraft) or other commercial facilities where an EV fleet performs multiple operating and fast-charging sessions on the same day. The proposed model performs both the operational and charging scheduling of the vehicles, which is not typically done for residential managed charging and significantly increases problem complexity. The problem is formulated as a MILP model and a case study of a small fast-charging station is presented. Results demonstrate a significant reduction in operating cost, mainly from peak shaving during high demand price periods, achieved by coordinating the operation of different vehicles, chargers and charging rates.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Peer-to-peer communication control for resilient operations of networked cyberphysical systems

This report includes two main accomplishments of the peer-to-peer communication control for resilient operation of networked microgrids project in FY24, which include a scheme for cyberattack-aware coordination of networked microgrids for supporting voltages of bulk power systems and a scheme for price signal-based operations of EV-rich networked microgrids with mixed ownership. First, the cyberattack-aware scheme enables networked microgrids to distributedly determine the amount of reactive power injection to support the voltage of bulk power system (BPS) in a fair manner. In this scheme, a risk-informed algorithm is presented to generate the peer-to- peer (P2P) communication graph with minimal risk of attack on communication links. To deal with cyberattacks on MG controllers, the resilient consensus algorithm (CA) is utilized for MG controllers to robustly estimate the total reactive power headroom, from which the MGs can accurately provide the needed amount of reactive power injection for supporting the voltage of BPS. The CA implementation and performance within the P2P communication framework are demonstrated on the IEEE 39-bus system with 6 microgrids contained in the distribution feeder under different cyberattack scenarios. Second, the price-based scheme enables the usage of the real-time price signal for the operations of electric vehicle (EV)-rich networked-microgrids with mixed ownership, in which not all the microgrids can communicate with the distribution system operator (DSO). In this scheme, a max consensus is introduced to enable the real-time price signal to be propagated from the DSO to all the microgrids, from which each microgrid controller will manage the DERs to balance the load demand and the power injection from the EV charging stations within its microgrid. Numerical results over one day with 288 slots of 5-minute intervals on the modified 123-node test feeder including 3 microgrids with high penetration of EV are presented to evaluate how the price signal affects the operations of networked microgrids under different charging strategies of the EV charging stations. The result indicates that our proposed EVCS (dis)charging strategy, which leverages the flexibility of EVs to support the grid through discharging during peak demand, proves to be a cost-effective solution that reduces operational costs while improving the social welfare of EV charging.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Kansas City, Missouri, Streetlight Electric Vehicle Charging: Strategies and challenges for site selection of streetlight electric vehicle infrastructure in Kansas City, Missouri (Final Report)

Public streetlight charging, whether on streets in central business districts or residential areas, provides easy charging access for apartment residents and homeowners alike. While most electric vehicle (EV) drivers charge at home, they do so in garages or on driveways they own. For renters and residents of multifamily housing (MFH), however, this may not be an option. EVs have a lower cost of ownership compared to conventional vehicles, and a used EV may be an affordable option for a lower-income household. But without easy access to charging, even a low-cost used EV may not be an option for a prospective buyer. An affordable curbside charging network has the potential to expand EV adoption into neighborhoods that have to date seen minimal interest and uptake of the technology and associated charging infrastructure. Streetlight charging networks can provide an economical, scalable, and effective approach to providing equitable and convenient charging. Metropolitan Energy Center (MEC) is dedicated to the mission of creating resource efficiency, environmental health, and economic vitality in the Kansas City region and beyond. Since 1983, MEC has provided resources, outreach, and training to make alternative fuels and energy efficiency commonplace. MEC led a streetlight charging pilot project that installed limited EV charging infrastructure on the streetlight system in Kansas City, Missouri, to demonstrate and test the benefits of curbside charging for EVs at existing on-street parking locations. The project aimed to cost-effectively expand the charging network in Kansas City to support residential charging and provide infrastructure in one or more charging deserts throughout the city. This pilot evaluates the impact and overall success of streetlight charging based on community feedback, utilization of charging infrastructure, technical feasibility, and cost. The project has pursued a data- and community-driven site selection process designed to identify sites with high demand and high opportunity for EV charging. This project was funded by the U.S. Department of Energy (DOE) and awarded to MEC through a competitive proposal process. The novelty and complexity of this project required an organization that could facilitate collaboration across levels of government, community members, and industry partners. For the past 25 years, through Kansas City Regional Clean Cities, MEC has worked with numerous public and private fleets on a variety of projects to improve the environmental performance and efficiency of the regional vehicle fleet. To advance affordable, efficient, and clean transportation efforts, DOE Clean Cities and Communities coalitions create local networks of public and private sector stakeholders and engage communities. Rooted within their local communities, the coalitions serve as experts and ambassadors, bringing to bear the collective knowledge, experience, and practical know-how of the entire network from within DOE, its national laboratories, and diverse stakeholders in the field. MEC and its project partners made in-kind contributions to leverage federal dollars for the benefit of the Kansas City community. Findings from this project will help determine the best applications for streetlight charging technologies to maximize funding impact and serve community needs. The team evaluated locations based on expected charging demand, technical feasibility, safety considerations, and enhanced charging network siting needs. Throughout the project, the team gathered feedback and evaluated ways to make public charging for EVs available to all community members. The insights will help Kansas City and other communities streamline future efforts to support EV drivers through public charging in the city right-of-way. Furthermore, this project will inform citywide guidance for future installations. MEC is committed to a transparent and publicly accessible approach that encourages the collaborative evaluation of streetlight charging. The project has engaged the community to proactively identify and evaluate the benefits and impacts of streetlight charging. It was a priority for the project to ensure the benefits of this pilot are distributed equitably to all members of the Kansas City community and that new charging opportunities and associated resources are available in diverse neighborhoods across the city. The charging infrastructure supports an affordable curbside charging network that will enable more drivers to choose EVs and provide easy charging access for all community members interested in driving an EV. The community feedback received through this project informed future resources and opportunities to make EVs more accessible to all members of the Kansas City community. MEC worked with several community partners on this project, including Missouri University of Science and Technology (MST), Pennsylvania State University (Penn State), the National Renewable Energy Laboratory (NREL); the city of Kansas City, Missouri; Evergy; Black and McDonald (B&M); LilyPad EV; EVNoire; and Westside Housing Organization (WHO). Project partners contributed to the cost match required for DOE grants through capital expenditures, personnel, and other in-kind contributions. Detailed descriptions of project team organizations can be found in Appendix A. Project Partners. Analysts at NREL and MST/PennState developed site maps based on demand and equity considerations. MEC conducted outreach to community members to garner input on project design and site selection, and received approval from the Missouri Public Service Commission (PSC) for Evergy’s EV charging station ownership. MEC worked with all partners to gather additional siting criteria and developed a site selection evaluation checklist, and partners conducted site visits to proposed installation sites. Next, B&M, Evergy, and the city executed all site agreements, conducted site-specific engineering design, acquired associated permits, and issued notices to proceed site by site or in small batches. Finally, from January to April 2023, the project team installed 23 EV charging stations built on Kansas City’s streetlight system in six council districts. Evergy will own, operate, and monitor the stations for 10 years, sharing charging data with MEC for at least 1 year.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Assessment and Control of Spacecraft Charging Risks on the International Space Station

The International Space Station (ISS) operates in the F2 region of Earth's ionosphere, orbiting at altitudes ranging from 350 to 450 km at an inclination of 51.6 degrees. The relatively dense, cool F2 ionospheric plasma suppresses surface charging processes much of the time, and the flux of relativistic electrons is low enough to preclude deep dielectric charging processes. The most important spacecraft charging processes in the ISS orbital environment are: 1) ISS electrical power system interactions with the F2 plasma, 2) magnetic induction processes resulting from flight through the geomagnetic field and, 3) charging processes that result from interaction with auroral electrons at high latitude. Recently, the continuing review and evaluation of putative ISS charging hazards required by the ISS Program Office revealed that ISS charging could produce an electrical shock hazard to the ISS crew during extravehicular activity (EVA). ISS charging risks are being evaluated in an ongoing measurement and analysis campaign. The results of ISS charging measurements are combined with a recently developed model of ISS charging (the Plasma Interaction Model) and an exhaustive analysis of historical ionospheric variability data (ISS Ionospheric Specification) to evaluate ISS charging risks using Probabilistic Risk Assessment (PRA) methods. The PRA combines estimates of the frequency of occurrence and severity of the charging hazards with estimates of the reliability of various hazard controls systems, as required by NASA s safety and risk management programs, to enable design and selection of a hazard control approach that minimizes overall programmatic and personnel risk. The PRA provides a quantitative methodology for incorporating the results of the ISS charging measurement and analysis campaigns into the necessary hazard reports, EVA procedures, and ISS flight rules required for operating ISS in a safe and productive manner.

Koontz, Steve↗

Multi-modal Energy-optimal Trip Scheduling in Real-time (METS-R) for Transportation Hubs (Final Report)

This report summarizes the work performed under the award number EE0008524. The project develops the Multi-modal Energy-optimal Trip Scheduling in Real-time (METS-R) platform as the next-generation transportation solution based on autonomous electric vehicles (AEV) serving passenger trips from and to urban transportation hubs, to substantially reduce transportation energy consumption. Extensive data collection and analyses were first conducted to understand the demand patterns and energy consumption of hub-based on-road trips. Then, a data-driven framework that consists of an analytical module and a simulation module was proposed. For the analytical module, five planning + operation tools were developed to support the planning and energy-efficient operations of urban AEV services: the charging station planning that robotically allocates charging supplies based on the stationary charging demand distribution; the transit planning and demand adaptive scheduling model that efficiently generates\ candidate transit routes from hubs to other places and dynamically adjusts the transit time table to fit the current demand; the online energy-efficient routing that learns the energy-optimal paths from observations of link-level energy consumption in real-time; the hub-based ridesharing that matches trip requests together with account for the uncertainty of future trip demand and vehicle supply; and finally, the integrated demand prediction and anomaly detection pipeline that leverages the flight/train time table and support other planning/operation tools. To demonstrate the performance of these tools, a scalable high-performance agent-based simulator was built. We divided the urban space into multiple service zones where each zone was considered as an agent for passenger generation and vehicle charging. Two types of AEV agents were coded to model two types of mobility services: AEV taxi and AEV transit. For the AEV taxi, the team implemented the functions of pickup/drop-off passengers, energy-efficient routing, ridesharing, fleet rebalancing, and recharging. For the AEV bus, the team implemented the functions of demand-adaptive route scheduling, passenger boarding, and recharging. A high-performance computing framework was introduced to receive various profiling information (such as link energy updates, vehicle speed) from the simulator instances and communicate the operational commands back to the instances. The numerical experiments show that each of the proposed operational algorithms can reduce energy consumption and improve system efficiency. Furthermore, there exists the need to collectively consider multiple planning + operational strategies as multiple strategies can influence each other in terms of performance impacts. Recommendations for future work related to AEV planning and simulation are discussed.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cleaning up the Coasts: A System for the Removal of Marine Microplastics Using Semi-Autonomous Vehicles

In recent years, microplastic pollution has become an increasingly threatening problem for ocean ecosystems. With only 9% of plastics being successfully recycled, many end up in oceans where they break down into small particles less than 5 millimeters in length known as microplastics. These microplastics pose a threat to ocean wildlife, as many sea creatures are harmed by accidentally consuming them. Microplastics also end up contaminating human water and food supply. This report presents a system with the goal of identifying and collecting microplastics near coastlines in order to reduce the number of microplastics in the ocean that pose a threat to wildlife. The system consists of a combination of air and sea drones to locate and collect the microplastics, as well as charging stations to allow the drones to operate for extended periods of time. If implemented, this system will help combat microplastic pollution in oceans by preventing plastics from leaving the coastlines and going deeper where they could harm wildlife.

ocean cleanup↗

Enabling Extreme Fast Charging with Energy Storage Final Report

The objective of this project was to develop and demonstrate an extreme fast charging (XFC) station with three 350 kW charging ports that operate at a combined power exceeding 1 MW and mitigate the grid impact by employing smart charging algorithms, using an energy storage system, and connecting directly to a medium-voltage (15 kV-class three-phase) distribution feeder. This final report describes the team's achievements in all aspects of the technology development.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An Experimental Investigation of the Effects of Charging on the International Space Station

An experimental investigation has been undertaken to determine the effects associated with operating the International Space Station (ISS) without a Plasma Contactor Unit (PCU). The role of the PCU is to maintain the potential of the ISS to within 40 volts of the ambient plasma potential. In the event of a PCU failure, ISS structure may charge to - 160 volts with respect to the Low Earth Orbit (LEO) plasma, due to the use of high voltage photovoltaic solar arrays. Operation without a PCU will result in the charging of the oxide layers on anodized aluminum components facing into the RAM direction. In this investigation, arcs were observed as a result of anodized materials charging in a plasma environment. Actual ISS materials were used in the investigation. The materials included meteoroid and debris shield samples, as well as components from the Extravehicular Mobility Unit (EMU). Results show that the occurrence of arcs was dependent on several factors including material composition and applied voltage. The breakdown thresholds for the materials tested will be shown, as well as the voltage and current waveforms during an arc event. The damage resulting from an arc will also be described. In addition, a description of associated operational hazards resulting from arcing on the spacecraft will be provided.

Schneider, Todd↗

Joint Planning of EV Fast Charging Stations and Power Distribution Systems With Balanced Traffic Flow Assignment

To tackle the challenges introduced by the fast-growing charging demand of electric vehicles (EVs), the power distribution systems (PDSs) and fast charging stations (FCSs) of EVs should be planned and operated in a more coordinated fashion. However, existing planning approaches generally aim to minimize investment costs in PDSs while ignoring the risk of worsening traffic conditions. To overcome this research gap, this article integrates the interests of traffic networks into PDS and FCS joint planning model to mitigate negative impacts on traffic conditions caused by installing FCSs. First, a novel microscopic method that is different from traditional assignment methods is proposed to simulate the influences of FCSs on traffic flows and EV charging loads. Then, a multiobjective joint planning model is developed to minimize both the planning costs and unbalanced traffic flows. A new bilayer Benders decomposition algorithm is designed to solve the proposed joint planning model. Numerical results on two practical systems in China validate the feasibility of our microscopic method by comparing the simulated results with real data. Compared with existing approaches, it is also demonstrated that the proposed joint planning approach helps to balance traffic flow assignments and relieve traffic congestion.

bilayer expanded Benders decomposition↗

Assessment of Economic Viability of Direct Current Fast Charging Infrastructure Investments for Electric Vehicles in the United States

As the global transportation sector increasingly adopts electric vehicles, the demand for advanced and accessible charging infrastructure is rising. In addition to at-home electric vehicle (EV) charging, there is a growing need for the swift development of commercial direct current fast charging (DCFC) stations to meet on-the-go EV charging demands. While government funds are available to support the expansion of the EV charging network in the United States, the establishment of a robust nationwide EV charging infrastructure requires significant private sector investment. This study was conducted to assess the economic feasibility of various business models for fast charging stations in the U.S. using two case studies and exploring different operational strategies including sole ownership and collaborative ventures with public and private entities. The results indicate that based on the current adoption and utilization rates in the U.S., the business model involving an owner-operator collaborating with a public partner ensures profitability and protects the investment in DCFC stations from financial losses. The study also highlights that demand charges and electricity retail prices are the factors that affect the profitability of a DCFC station.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Optimal Siting of EV Fleet Charging Station Considering EV Mobility and Microgrid Formation for Enhanced Grid Resilience

Coordinating infrastructure planning for transportation and the power grid is essential for enhanced reliability and resilience during operation and disaster management. This paper presents a two-stage stochastic model to optimize the location of electric vehicle fleet charging stations (FEVCSs) to enhance the resilience of a distribution network. The first stage of this model deals with the decision to place an FEVCS at the most favorable and optimized location, whereas the second stage aims to minimize the weighted sum of the value of lost load in multiple potential scenarios with different faults. Indeed, the second stage is a joint grid restoration scheme with network reconfiguration and microgrid formation using available distributed generators and fleet electric vehicles. The proposed model is tested on a modified IEEE-33 node distribution network and a four-node transportation network. Case studies demonstrate the effectiveness of the proposed model.

25 ENERGY STORAGE↗

A Comparison of ARTEMIS Data with the Lunar Plasma Design Environment for NASA Crewed Missions

NASA’s Gateway will provide the capability for sustaining a human presence in cis-lunar space. Operations of the Gateway will include spacecraft dockings, extra vehicular activities (EVA), and high-power solar arrays. NASA’s experience with the International Space Station highlighted the importance of evaluating spacecraft charging effects for such operations. For crewed spacecraft, which tend to employ the use of dielectric surfaces in this dynamic plasma environment, reliance on spacecraft charging simulation packages, such as the NASA/Air Force Spacecraft Charging Analyzer Program (Nascap-2k) [Mandell et al., 2006] and Spacecraft Plasma Interaction System (SPIS) [Roussel et al., 2008], is required to understand the risks to hardware and humans. The variability in the lunar plasma environment as the Moon revolves around the Earth, lunar wake effects, and a strong dependency on photoemission and secondary electron emission creates challenges for spacecraft charging analysis. The Design Specification for Natural Environments (DSNE) [NASA, MSFC] is the primary resource for space environments affecting NASA’s crewed missions, and the DSNE provides plasma environments in a standard form for input into simulation packages. NASA developed the existing lunar plasma environment using data from Geotail [Nishida, 1994] along with published lunar plasma wake models [Halekas et al., 2005] based on Lunar Prospector. Since 2011, NASA’s twin Acceleration Reconnection Turbulence & Electrodynamics of Moon’s Interaction with the Sun (ARTEMIS) satellites [Angelopoulos, 2010] have been collecting high resolution plasma and fields observations within the lunar plasma environment providing a much larger dataset of the plasma properties in cislunar space. This research compares the existing lunar plasma environment definition with ARTEMIS data and makes recommendations on the refinement of the environment definition for future lunar missions.

ARTEMIS mission↗

An automated QC station for the calibration of the Mu2e calorimeter readout units

The Mu2e calorimeter will employ Readout Units, each made of two Silicon Photomultipliers arrays and two Front End Electronics boards. To calibrate them, we have designed, assembled and put in operation an automated Quality Control (QC) station. Gain, collected charge and photon detection efficiency are evaluated for each unit. Here, in this paper, the QC Station is presented, in its hardware and software aspects, summarizing also the tests performed on the ROUs and the first measurement results.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Development of a DC Distribution Testbed for High-Power EV Charging

This paper explores the design and implementation of a power hardware-in-the-loop (P-HIL) setup for DC distribution infrastructure integrated with high-power charging (HPC) of electric vehicles (EVs), DC loads, and sources. The utilization of DC distribution holds significant potential for enhancing the operation of a HPC station architecture. However, there are challenges establishing a DC charging hub including interoperability, commoditization, distributed energy resource integration, stability, DC protection, and lack of common system level controllers. To address these challenges, a testing setup is required that accommodates commercial off-the-shelf (COTS) products to evaluate different use cases at rated power and voltage levels. The developed P-HIL setup features a dedicated DC charging hub, DC-coupled chargers, DC loads/sources, DC protection, and a communication architecture. The integrated P-HIL system provides a versatile testing environment to address technology and interoperability gaps and implements a smart energy management system (SEMS). This platform enables comprehensive and robust testing of COTS devices, charger prototypes, SEMS controllers and protection schemes, which together will accelerate transition to EVs at scale. The setup is tested for various use-cases at full-scale, integrating 950 V DC bus voltage, 660 kW grid-tied inverter, 150 kW COTS charger, and 100 kW energy storage system within an open-source SEMS platform.

ADVANCED PROPULSION SYSTEMS,POWER TRANSMISSION AND↗

Comparison of On-orbit and Ground Based Hollow Cathode Operation

The Plasma Contactor Units (PCUs) were developed at NASA Glenn Research Center (GRC) and Boeing for charge control on board the International Space Station (ISS). Since the first ignition of a PCU on 10/16/2000 over 3,900 hours of operation have been demonstrated on a single unit. In order to guarantee that the PCUs hollow cathode assemblies (HCAs), which emit the electrons used for charge control, would satisfy the life requirement of 18,000 hours, a ground based hollow cathode life test program was initiated at GRC. The life test program aimed at 27,000 hours of operation on a single unit to demonstrate the industry standard 1.5 times operational life requirement. As of this printing, over 18,000 hours of operation have been accumulated on a single hollow cathode. By comparing the data received from the on-orbit HCAs to the data obtained for the life test cathodes, a comparison may be drawn to determine if the on-orbit HCAs are operating normally, with a final goal of predicting lifetime. Based on the data taken thus far, it can be concluded that the on-orbit HCAs are operating within their design specifications.

Patterson, Michael↗

Behind the Meter Storage for Electric Vehicle Charging, Electrochemical and Thermal Energy Storage, and Solar Photovoltaic

In response to the potentially large and irregular demand from EVs, along with changing load profiles from buildings with on-site generation, utilities are evaluating multiple options for managing dynamic loads, including time-of-use pricing, demand charges, battery storage, and curtailment of variable generation. Buildings, as well as commercial, public, and workplace EV charging operations, can use a combination of electrochemical battery storage and thermal energy storage coupled with on-site generation to manage energy costs as well as provide resiliency and reliability for EV charging and building energy loads. We are completing a behind the meter storage analysis that focuses on determining the optimal system designs and energy flows for thermal and electrochemical behind the meter storage with on-site solar photovoltaic (PV) generation enabling electric vehicle charging in various climates, building types, and utility rate structures. In completing this analysis, we have developed a tool that combines existing battery models via the System Advisor Model (SAM) and building modeling software via EnergyPlus into a single interface. This tool allows us to simulate a building with a detailed battery model to properly size the battery, thermal energy storage, and solar PV systems to maximize profit for the system owner. This also allows us to assess how the battery degrades under various supervisory control dispatch algorithms to control charging/discharging; we can also see how thermal energy storage is created and used to complement the battery to reduce thermal loads in the building. With this project, we can analyze new batteries that are designed specifically for energy storage, rather than designed to be extremely energy dense for electric vehicle applications, using battery lifetime models from other national labs and the existing SAM battery model, which has detailed lifetime and degradation parameters. We can also assess novel thermal storage technologies by integrating them into the whole building energy simulation program EnergyPlus. Because the model calls both SAM and EnergyPlus, required inputs need to be compatible for both models. These inputs include, on a high-level, the following: weather files, building and electric vehicle load profiles, electricity rate tariff information, and system cost information for the stationary battery, solar PV, and thermal storage system. The various buildings we are studying for this analysis are retail big-box grocery store, commercial office building, fleet vehicle depot and operations facility, multi-family residential, and electric vehicle charging station. For these different applications, the battery and thermal storage will be dispatched differently, and the various technologies are sized differently to optimize cost.

30 DIRECT ENERGY CONVERSION↗

Identification and Testing of Electric Vehicle Fast Charger Cybersecurity Mitigations

Fast-charging infrastructure for electric vehicles (EVs) is needed to enable and achieve the national goals of transitioning the vehicle fleet toward more electrification. Idaho National Laboratory, Oak Ridge National Laboratory, and the National Renewable Energy Laboratory (NREL) have jointly worked to identify, evaluate, and mitigate potential cyber-related consequences associated with fast charger systems. NREL contributed by considering cyberattack scenarios and consequences associated with integrating distributed energy resources (DERs) at fast-charging stations. The dynamic nature of fast-charger load profiles would encourage site operators to incorporate solar for energy cost reduction and energy storage for peak demand cost management at future charging facilities with multiple fast chargers at a site. These energy resources would be monitored and coordinated via a site energy management controller with data exchange between devices and local power metering infrastructure; thus, networking between devices and the design of the system becomes important in the overall cybersecurity posture. In addition, component vendors and system operators might have remote interfaces to any of these systems. It is therefore important to understand the breadth of the cyberattack surface and potential strategies to mitigate impacts. This project has focused on components and protocols expected to be found within a local charging site that includes multiple chargers and DER resources. Our methods and results are summarized in this final report.

42 ENGINEERING↗

Los Angeles Air Force Base Vehicle-to-Grid Demonstration (Final Project Report)

Electrification of non-tactical vehicle fleets represents a key efficiency and energy security objective for the United States Department of Defense. To achieve electrification, the department targeted vehicle-to-grid services as a way to decrease the overall cost of operating the vehicle fleet and achieve rough parity with traditional internal combustion engine vehicle fleets. This report describes efforts to aggregate a fleet of bi-directional electric vehicles and charging stations to provide regulation up and regulation down in the California Independent System Operator ancillary services market. A 29-vehicle electric vehicle demonstration fleet, consisting of mixed purpose and duty vehicles such as sedans, pickups, vans, and medium-duty trucks, was deployed at the Los Angeles Air Force base. The fleet provided frequency regulation to the California Independent System Operator’s wholesale electricity market to determine the capability of recouping some of the additional costs of procuring electric vehicles and their supporting infrastructure. Lawrence Berkeley National Laboratory, with its partner Kisensum, LLC, developed the fleet scheduling, optimization, and control software to allow the vehicle fleet at the air force base to participate in the ancillary services markets. This report focuses on the control software and market interactions, the significant challenges faced and solutions devised to address them, and examines the potential of using the electric vehicle fleet as an energy storage resource for the base buildings, an application known as vehicle-tobuilding, in providing demand response and emergency backup power. The report discusses key findings related to providing frequency regulation to the California Independent System Operator market, electric vehicle fleet performance, compatibility of varying resource parameters of vehicle fleet aggregation, the need for automated methods for communicating hour-ahead energy bidding, challenges related to battery capacity and charge/discharge rates, and monthly settlement revenue.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗