Search NASA⌕ Search

SEARCH · Search NASA

Results for “Chemical processes”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Simulation of DWPF Chemical Process Cell Using a Reaction Calorimeter

The Defense Waste Processing Facility (DWPF) converts liquid radioactive waste into glass using a Sludge Receipt Adjustment Tank (SRAT) and Slurry Mix Evaporator (SME) in addition to other processes. The SRAT and SME processes can be simulated on a small-scale using the Mettler-Toledo Reaction Calorimeter (RC1). This equipment is able to automate the execution and monitoring of experiments involving nonradioactive chemical simulants. During the chemical processing of sludge in the SRAT process, foam begins to form and can foam over the reaction vessel. The current antifoam used at DWPF creates a risk of increased flammability and has a limited pH range. Usually, mercury is circulated back into the reaction vessel during the SRAT process, making it difficult to remove. To combat foam over, novel antifoams will be tested during the boil-up process using the RC1. To improve mercury extraction, 3D-printed coalescer columns will be tested within the Mercury Water Wash Tank (MWWT) of the RC1. Testing of Simulant Sludge Batch 6 (SB6) was performed to ensure: the sludge would form a stable foam at boiling during full SRAT/SME runs; the antifoam would reduce the amount of foam within the vessel The sludge and a Precipitate Reactor Feed Tank (PRFT) simulant with monosodium titanate (MST) were mixed separately, combined, and then heated to boiling. As shown below, the antifoam used was able to eliminate the foam within the vessel, as expected. The FormLabs Form2 3D Printer can be used to create roughly 3-inch tall and 1-inch diameter columns from clear and ceramic resins. The columns will utilize chemical and physical forces to draw the mercury out of a condensed offgas stream leaving the RC1 reaction vessel. These columns will be tested during full SRAT/SME runs on the basis of how well they are able to collect elemental mercury. In preparation for full-scale runs, the RC1 equipment was assembled onto a custom table and tested with water runs. The software used to control automation, iControl, has a user-friendly interface that allows the experiment to be altered as needed. An example of the data recorded during an experimental run is represented in Figure 1 below. Water runs were utilized as a way to prove if the RC1 system was functioning in the following areas: Boil-up rates, Chemical additions using pumps, Temperature readings, Balance readings, Probe readings, Offgas system, Agitation. Future Plans: Five novel antifoams will be tested during full SRAT/SME runs. The most effective antifoam will be utilized in DWPF's Chemical Process Cell. The design of the Mercury Extraction Coalescer can be further manipulated to increase the extraction of not only elemental mercury, but other heavy metals in environmental remediation processes as well.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Experience of Hot Cell Renovation Work in CPF (Chemical Processing Facility)

Renovation work for operation room A of the Chemical Processing Facility (CPF) was carried out. Cell renovation work involved disassembly, removal and installation of new equipment for the CA-3 cell of operation room A and the crane renovation work involved the repair of the in-cell crane for the CA-5 cell of operation room A. There were not many examples of renovation work performed on cells under high radiation environment and alpha contamination in Japan. Lessons learnt: With respect to the cell renovation work and crane repair work, a method that gave full consideration to safety was employed and the work was performed without accidents or disaster. Moreover, through improvement of the method, reduction of radioactive exposure of the workers was achieved and a melt reduction device was designed to deal with the radioactive waste material that was generated in the renovation work to achieve significant melt reduction of waste material.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Effects of Semiconductor Processing Chemicals on Conductivity of Graphene

Graphene layers on SiO2/Si substrates were exposed to chemicals or gases commonly used in semiconductor fabrication processes, including solvents (isopropanol, acetone), acids (HCl), bases (ammonium hydroxide), UV ozone, H2O and O2 plasmas. The recovery of the initial graphene properties after these exposures was monitored by measuring both the layer resistance and Raman 2D peak position as a function of time in air or vacuum. Solvents and UV ozone were found to have the least affect while oxygen plasma exposure caused an increase of resistance of more than 3 orders of magnitude. Recovery is accelerated under vacuum but changes can persist for more than 5 hours. Careful design of fabrication schemes involving graphene is necessary to minimize these interactions with common processing chemicals.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Chemical Processes for Recovery of High Purity 234 U from Aged 238 PU

Purified 234 U (2.46E5 a) is an important radioisotope for commercial customers, and since the 1980s, the United States has experienced a market demand of 2–6 g per year. Purified 234 U is most efficiently recovered as a decay daughter from aged 238 Pu (87.7 a). Ever since the last recovery of tens of grams of 234 U by Monsanto Co.’s Mound Laboratory in 1980s, the DOE inventory of 234 U for US market decreased steadily. In 2016–2018, the Radiochemical Engineering Development Center at Oak Ridge National Laboratory (ORNL) carried out a campaign to recover 234 U from 16 spent Pu–Be neutron sources. A total 66.5 g of high purity 234 U of high isotopic abundance (>99.3%) was recovered in two phases of the campaign with selected chemical processes. Recovery of 234 U from aged 238 Pu commonly involves four major steps: (1) bulk plutonium removal from the matrix, (2) continued separation of plutonium from the matrix, (3) purification of 234 U from all other impurities, and (4) conversion of purified 234 U into a final product form, 234 U 3 O 8 . The first three steps are the key to ensuring the purity of the 234 U product. Historically, various chemical processes have been applied for uranium processing of these three steps, although on different scales or with different purity requirements. Because of the higher purity requirements specified for this order of 234 U product, the selected processing methods used in this campaign relied on a cyclical anion exchange process with MP-1 resins followed by uranium peroxide process to achieve the purified product. Process details will be compared with other options, and advantages and drawbacks will also be discussed.

07 ISOTOPE AND RADIATION SOURCES↗

Behavior of Mercury During DWPF Chemical Process Cell Processing

The Defense Waste Processing Facility has experienced significant issues with the stripping and recovery of mercury in the Chemical Processing Cell (CPC). The stripping rate has been inconsistent, often resulting in extended processing times to remove mercury to the required endpoint concentration. The recovery of mercury in the Mercury Water Wash Tank has never been high, and has decreased significantly since the Mercury Water Wash Tank was replaced after the seventh batch of Sludge Batch 5. Since this time, essentially no recovery of mercury has been seen. Pertinent literature was reviewed, previous lab-scale data on mercury stripping and recovery was examined, and new lab-scale CPC Sludge Receipt and Adjustment Tank (SRAT) runs were conducted. For previous lab-scale data, many of the runs with sufficient mercury recovery data were examined to determine what factors affect the stripping and recovery of mercury and to improve closure of the mercury material balance. Ten new lab-scale SRAT runs (HG runs) were performed to examine the effects of acid stoichiometry, sludge solids concentration, antifoam concentration, form of mercury added to simulant, presence of a SRAT heel, operation of the SRAT condenser at higher than prototypic temperature, varying noble metals from none to very high concentrations, and higher agitation rate. Data from simulant runs from SB6, SB7a, glycolic/formic, and the HG tests showed that a significant amount of Hg metal was found on the vessel bottom at the end of tests. Material balance closure improved from 12-71% to 48-93% when this segregated Hg was considered. The amount of Hg segregated as elemental Hg on the vessel bottom was 4-77% of the amount added. The highest recovery of mercury in the offgas system generally correlated with the highest retention of Hg in the slurry. Low retention in the slurry (high segregation on the vessel bottom) resulted in low recovery in the offgas system. High agitation rates appear to result in lower retention of mercury in the slurry. Both recovery of mercury in the offgas system and removal (segregation + recovery) from the slurry correlate with slurry consistency. Higher slurry consistency results in better retention of Hg in the slurry (less segregation) and better recovery in the offgas system, but the relationships of recovery and retention with consistency are sludge dependent. Some correlation with slurry yield stress and acid stoichiometry was also found. Better retention of mercury in the slurry results in better recovery in the offgas system because the mercury in the slurry is stripped more easily than the segregated mercury at the bottom of the vessel. Although better retention gives better recovery, the time to reach a particular slurry mercury content (wt%) is longer than if the retention is poorer because the segregation is faster. The segregation of mercury is generally a faster process than stripping. The stripping factor (mass of water evaporated per mass of mercury stripped) of mercury at the start of boiling were found to be less than 1000 compared to the assumed design basis value of 750 (the theoretical factor is 250). However, within two hours, this value increased to at least 2000 lb water per lb Hg. For runs with higher mercury recovery in the offgas system, the stripping factor remained around 2000, but runs with low recovery had stripping factors of 4000 to 40,000. DWPF data shows similar trends with the stripping factor value increasing during boiling. These high values correspond to high segregation and low retention of mercury in the sludge. The stripping factor for a pure Hg metal bead in water was found to be about 10,000 lb/lb. About 10-36% of the total Hg evaporated in a SRAT cycle was refluxed back to the SRAT during formic acid addition and boiling. Mercury is dissolved as a result of nitric acid formation from absorption of NO x . The actual solubility of dissolved mercury in the acidic condensate is about 100 times higher than the actual concentrations measured. Mercury metal present in the MWWT from previous batches could be dissolved by this acidic condensate. The test of the effect of higher SRAT condenser temperature on recovery of mercury in the MWWT and offgas system was inconclusive. The recovery at higher temperature was lower than several low temperature runs, but about the same as other runs. Factors other than temperature appear to affect the mercury recovery. The presence of chloride and iodide in simulants resulted in the formation of mercurous chloride and mercurous iodide, respectively, in the offgas system. Actual waste data shows that the chloride content is much less than the simulant concentrations. Future simulant tests should minimize the addition of chloride. Similarly, iodine addition should be eliminated unless actual waste analyses show it to be present; currently, total iodine is not measured on actual waste samples.

36 MATERIALS SCIENCE↗

Reduced product yield in chemical processes by second law effects

An analysis of second law effects in chemical processes, where product yield is explicitly related to the individual irreversibilities within the process to indicate a maximum theoretical yield, is presented. Examples are given that indicate differences between first and second law approaches toward process efficiency and process yield. This analysis also expresses production capacity in terms of the heating value of a product. As a result, it is particularly convenient in analyzing fuel conversion plants and their potential for improvement. Relationships are also given for the effects of irreversibilities on requirements for process heat and for feedstocks.

England, C.↗

Analysis of physical-chemical processes governing SSME internal fluid flows

The basic issues concerning the physical chemical processes of the Space Shuttle Main Engine are discussed. The objectives being to supply the general purpose CFD code PHOENICS and the associated interactive graphics package - GRAFFIC; to demonstrate code usage on SSME related problems; to perform computations and analyses of problems relevant to current and future SSME's; and to participate in the development of new physical models of various processes present in SSME components. These objectives are discussed in detail.

Singhal, A. K.↗

Renovation of CPF (Chemical Processing Facility) for Development of Advanced Fast Reactor Fuel Cycle System

CPF (Chemical Processing Facility) was constructed at Nuclear Fuel Cycle Engineering Laboratories of JAEA (Japan Atomic Energy Agency) in 1980 as a basic research field where spent fuel pins from fast reactor (FR) and high level liquid waste can be dealt with. The renovation consists of remodeling of the CA-3 cell and the laboratory A, installation of globe boxes, hoods and analytical equipments to the laboratory C and the analytical laboratory. Also maintenance equipments in the CA-5 cell which had been out of order were repaired. The CA-3 cell is the main cell in which important equipments such as a dissolver, a clarifier and extractors are installed for carrying out the hot test using the irradiated FR fuel. Since the CPF had specialized originally in the research function for the Purex process, it was desired to execute the research and development of such new, various reprocessing processes. Formerly, equipments were arranged in wide space and connected with not only each other but also with utility supply system mainly by fixed stainless steel pipes. It caused shortage of operation space in flexibility for basic experimental study. Old equipments in the CA-3 cell including vessels and pipes were removed after successful decontamination, and new equipments were installed conformably to the new design. For the purpose of easy installation and rearranging the experimental equipments, equipments are basically connected by flexible pipes. Since dissolver is able to be easily replaced, various dissolution experiments is conducted. Insoluble residue generated by dissolution of spent fuel is clarified by centrifugal. This small apparatus is effective to space-saving. Mini mixer settlers or centrifugal contactors are put on to the prescribed limited space in front of the backside wall. Fresh reagents such as solvent, scrubbing and stripping solution are continuously fed from the laboratory A to the extractor by the reagent supply system with semi-automatic observation system. The in-cell crane in CA-5 was renovated to increase driving efficiency. At the renovation for the in-cell crane, full scale mockup test and 3D simulation test had been executed in advance. After the renovation, hot tests in the CPF had been resumed from JFY 2002. New equipments such as dissolver, extractor, electrolytic device, etc. were installed in CA-3 conformably to the new design laid out in order to ensure the function and space. Glove boxes in the analysis laboratory were renewed in order to let it have flexibility from the viewpoint of conducting basic experiments (ex. U crystallization). Glove boxes and hoods were newly installed in the laboratory A for basic research and analysis, especially on MA chemistries. One laboratory (the laboratory C) was established to research about dry reprocessing. The renovation of the CPF has been executed in order to contribute to the development on the advanced fast reactor fuel cycle system, which will give us many sort of technical subject and experimental theme to be solved in the 2. Generation of the CPF.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Heterogeneous chemistry on Antarctic polar stratospheric clouds - A microphysical estimate of the extent of chemical processing

A detailed model of polar stratospheric clouds (PSCs), which includes nucleation, condensational growth. and sedimentation processes, has been applied to the study of heterogeneous chemical reactions. For the first time, the extent of chemical processing during a polar winter has been estimated for an idealized air parcel in the Antarctic vortex by calculating in detail the rates of heterogeneous reactions on PSC particles. The resulting active chlorine and NO(x) concentrations at first sunrise are analyzed with respect to their influence upon the Antarctic ozone hole using a photochemical model. It is found that the species present at sunrise are primarily influenced by the relative values of the heterogeneous reaction rate constants and the initial gas concentrations. However, the extent of chlorine activation is also influenced by whether N2O5 is removed by reaction with HCl or H2O. The reaction of N2O5 with HCl, which occurs rapidly on type 1 PSCs, activates the chlorine contained in the reservoir species HCl. Hence the presence and surface area of type 1 PSCs early in the winter are crucial in determining ozone depletion.

Drdla, K.↗

Some aspects of mathematical and chemical modeling of complex chemical processes

Some theoretical questions involved in the mathematical modeling of the kinetics of complex chemical process are discussed. The analysis is carried out for the homogeneous oxidation of ethylbenzene in the liquid phase. Particular attention is given to the determination of the general characteristics of chemical systems from an analysis of mathematical models developed on the basis of linear algebra.

Nemes, I.↗

CHEMICAL PROCESSES IN PROTOPLANETARY DISKS

We have developed a high-resolution combined physical and chemical model of a protoplanetary disk surrounding a typical T Tauri star. Our aims were to use our model to calculate the chemical structure of disks on small scales (submilliarcsecond in the inner disk for objects at the distance of Taurus, {approx}140 pc) to investigate the various chemical processes thought to be important in disks and to determine potential molecular tracers of each process. Our gas-phase network was extracted from the UMIST Database for Astrochemistry to which we added gas-grain interactions including freezeout and thermal and non-thermal desorption (cosmic-ray-induced desorption, photodesorption, and X-ray desorption), and a grain-surface network. We find that cosmic-ray-induced desorption has the least effect on our disk chemical structure while photodesorption has a significant effect, enhancing the abundances of most gas-phase molecules throughout the disk and affecting the abundances and distribution of HCN, CN, and CS, in particular. In the outer disk, we also see enhancements in the abundances of H{sub 2}O and CO{sub 2}. X-ray desorption is a potentially powerful mechanism in disks, acting to homogenize the fractional abundances of gas-phase species across the depth and increasing the column densities of most molecules, although there remain significant uncertainties in the rates adopted for this process. The addition of grain-surface chemistry enhances the fractional abundances of several small complex organic molecules including CH{sub 3}OH, HCOOCH{sub 3}, and CH{sub 3}OCH{sub 3} to potentially observable values (i.e., a fractional abundance of {approx}>10{sup -11}).

79 ASTRONOMY AND ASTROPHYSICS↗

Status Summary of Chemical Processing Development in Plutonium-238 Supply Program

This document summarizes the status of development of chemical processing in the Plutonium-238 Supply Program (PSP) near the end of Demonstration 1. The objective of the PSP is “to develop, demonstrate, and document a production process that meets program objectives and to prepare for its operation” (Frazier et al. 2016).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Chemical Processing and Analysis of 'JACEE' Circumpolar Flight 13 & 14

This informal presentation will address the chemical processing status, the current locations and state of data analysis (including mapping and densitometry of x-ray films, event lists and tracing of events in nuclear emulsions, etc.) of the 12 cosmic ray chambers comprising the JACEE-13 and JACEE-14 South Pole circumnavigational long duration balloon flights.

Fountain, Walter↗

Design standardization of unit operations for reducing the capital intensity and cost of small‐scale chemical processes

Abstract A methodology is proposed to reduce the cost and capital intensity of small‐scale chemical processes by creating new opportunities for economies of numbers through standardizing the equipment designs across multiple processes. We depart from asynchronous design of single‐processes and adopt a common‐functionality based simultaneous design of multiple processes that use similar unit operations. A generalized cost function is used to appropriately balance the trade‐offs between economies of scale and economies of numbers. An optimization‐based framework for design standardization is developed and illustrated using two case studies. The first involves the simultaneous synthesis of methanol and ammonia processes, and the second addresses the optimal synthesis of multi‐column natural gas liquid (NGL) fractionation processes for different natural gas sources. We observe that considerable reduction in capital intensity of small‐scale processes is possible through equipment standardization.

Arora, Akhil↗

An Optimization-Based Approach for Simultaneous Chemical Process and Heat Exchanger Network Synthesis

We propose a mixed-integer nonlinear programming (MINLP) model for simultaneous chemical process and heat exchanger network synthesis. The model allows process stream inlet/outlet temperatures and flow rates to vary and can be extended to handle unclassified streams, thereby facilitating integration with a process synthesis model. The proposed model is based on a generalized transshipment approach in which the heat cascade is built upon a “dynamic” temperature grid. Both hot and cold streams can cascade heat so that exchanger inlet and outlet temperature, heat duty, and area can be calculated at each temperature interval. Here, we develop mixed-integer constraints to model the number of heat exchangers in the network. Finally, we present several solution strategies tailored to improve the computation performance of the proposed models.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗