Search NASA⌕ Search

SEARCH · Search NASA

Results for “Content Code”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

BAD2matrix: Phylogenomic matrix concatenation, indel coding, and more

Common steps in phylogenomic matrix production include biological sequence concatenation, morphological data concatenation, insertion/deletion (indel) coding, gene content (presence/absence) coding, removing uninformative characters for parsimony analysis, recording with reduced amino acid alphabets, and occupancy filtering. Existing software does not accomplish these tasks on a phylogenomic scale using a single program. BAD2matrix is a Python script that performs the above-mentioned steps in phylogenomic matrix construction for DNA or amino acid sequences as well as morphological data. The script works in UNIX-like environments (e.g., LINUX, MacOS, Windows Subsystem for LINUX).

59 BASIC BIOLOGICAL SCIENCES↗

Organizational and psychological measures for data center energy efficiency: barriers and mitigation strategies

Abstract It was last estimated that in 2020, data centers comprised approximately 2% of total US electricity consumption, with an estimated annual growth rate of 4%. As our country increasingly relies on information technology (IT), our data centers (DCs) will need to increase their energy efficiency (EE) to stabilize their energy consumption. The task of studying EE in DCs is complicated by the interconnected nature of humans and mission-critical technical systems. Moreover, the literature tends to focus on technology solutions such as improvements to IT equipment, cooling infrastructure, and software, without addressing organizational and psychological drivers. Our research demystifies the complex interactions between humans and DCs, by asking What non-technical barriers impede EE investment decision-making and/or implementing energy management strategies? To begin to answer this question, we perform a literature review of 86 resources, ranging from peer-reviewed journal publications to handbooks. We also consider related fields such as organizational behavioral management and energy intensive buildings. We develop a public Zotero library, perform content coding, and complete a rudimentary network analysis. Our findings from the literature review suggest that (1) technological solutions are abundant in the literature but fall short of providing practical guidance on the pitfalls of implementation, (2) making energy efficiency a priority at the executive level of organizations will be largely ineffective if the IT and facilities staff are not directly incentivized to increase EE, and (3) there is minimal current understanding of how the individual psychologies of IT and facilities staff affect EE implementation in DCs. In the next phase of our research, we plan to interview data center operators/experts to ground-truth our literature findings and collaboratively design decarbonization policy solutions that target organizational structure, empower individual staff, and foster a supportive external market.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A National Infrastructure for Artificial Intelligence on the Grid (NI4AI) (Final Scientific/Technical Report)

Electric utilities have traditionally taken a very pragmatic yet myopic approach with grid sensors and the resulting collected data. Sensors are purchased and deployed to solve a specific, known problem that has risen to sufficient awareness as to justify the effort of deploying sensors and the needed capital investment. This sensor data flows into proprietary software packages with limited functionality intended only to address the initial problem. This approach aligns with the financial incentives of the utility to deploy capital into fixed hardware assets for which the corporations earn a rate of return. This mentality stands in stark contrast to the big data revolution that started nearly 25 years ago with the rise of Google. In this worldview, data is a fundamental business asset; successful organizations collect, store, explore, merge, and exploit as much data as possible to not only solve problems well understood today but also to tackle new problems that will inevitably rise tomorrow. The ARPA-E Open Innovation 2018 project entitled A National Infrastructure for Artificial Intelligence on the Grid or NI4AI for short was designed to demonstrate this alternative paradigm for using data. To do this, the project was composed of three key thrust areas. The first major component deployed a variety of high-frequency grid sensors and captured terabytes of both wide-scale and localized grid measurements, generating high-value datasets for grid research and algorithm development. The second aspect made available PingThings’ PredictiveGridTM, a horizontally scalable, cloud-based data management and AI platform built for time series data to explore and exploit the collected data. Finally, the project fostered a diverse and open research community composed of experts from numerous fields through focused educational content, code sharing, and data science competitions. Shifting away from “single use” sensors and closed data silos within electric utilities is a major benefit to the public at large. This legacy approach to data is incredibly (1) capital intensive (new sensors must be deployed for each new problem and problems tend to arise continuously) and (2) painfully slow (new problems must be identified first and then new sensors must be deployed to collect data to begin to address the issue). The transition to a carbon neutral grid requires a massive transformation of the existing grid infrastructure and will continue to challenge the legacy grid in unforeseen ways. The only way to make the energy transition cost effective is for utilities to abandon this dated data paradigm and adopt more contemporary approaches. NI4AI has shown that it is technically possible and economically feasible to ingest, explore, and exploit grid data collected from even very high frequency sensing, such as continuous point on wave sensors collecting measurements 10,000 times a second. In fact, the PredictiveGrid platform used is commercially available and deployed at several utilities in the United States. Project accomplishments were numerous and included (1) making available a state of the art time series platform to the community, (2) collecting over 520 streams of time series data from grid sensors totaling over 1 trillion grid measurements, and (3) developing and nurturing a community within the industry focused on the use of data to create value for utilities and, ultimately, end consumers.

97 MATHEMATICS AND COMPUTING↗

Data and Code for Understanding Generative AI Content with Embedding Models

This repository contains code for the experiments in the paper "Understanding Generative AI Content with Embedding Models". Constructing high-quality features is critical to any quantitative data analysis. While feature engineering was historically addressed by carefully hand-crafting data representations based on domain expertise, deep neural networks (DNNs) now offer a radically different approach. DNNs implicitly engineer features by transforming their input data into hidden feature vectors called embeddings. For embedding vectors produced by foundation models -- which are trained to be useful across many contexts -- we demonstrate that simple and well-studied dimensionality-reduction techniques such as Principal Component Analysis uncover inherent heterogeneity in input data concordant with human-understandable explanations. Of the many applications for this framework, we find empirical evidence that there is intrinsic separability between real samples and those generated by artificial intelligence (AI).

Vargas, Max [Pacific Northwest National Laboratory↗

Compact video content representation for video coding using low multi-linear tensor rank approximation with dynamic core tensor order

Tensor is a multi-way representation of an entity that is widely used in many applications of mathematics and physics. The wide range of tensor algebra operations attract the researchers of graphical and vision field to identify unique methods for various applications such as segmentation, compression, indexing and so on. In this paper, low multi-linear rank approximation of a tensor is used for decomposition so as to perform compression on a video that is represented as a 4D tensor. Thus, the encoder has blocks for (1) multilinear rank approximation method so as to aid decomposition, (2) sparsity removal of residual data to reduce the required memory storage to a small level, (3) quantization on the sparse less residual data and (4) LZ77 dictionary coding for the video. The decoder uses a tensor reconstruction block along with residual error correction block that reduces loss/error in the reconstructed video. The size of core tensor is an important factor in rank approximation. It is identified at run time depending on the video contents. This size is determined adaptively using Tikhonov’s regularization method. The best value of core tensor size is identified with the corner of L-curve which preserves the video contents from heavy loss/error. Experimental results of the proposed work on comparison with H.264/AVC compression method indicate that the proposed method achieves up to 10% improvement in compression ratio with the least amount of loss and a maximum signal to noise ratio of 0.14. The proposed system gives better compression ratio than H.265 for videos with more number of frames without compromising quality.

97 MATHEMATICS AND COMPUTING↗

Enhancing obfuscation of digital content through use of linear error correction codes

Technologies related to enhancing security of digital content are described. Linear error correction codes (LECCs) are employed for dual purposes: 1) to obfuscate digital content; and 2) to verify integrity of the digital content. A transmitter computing system obfuscates digital content based upon an obfuscation protocol, wherein the obfuscated digital content includes an LECC. A receiver computing system deobfuscates the digital content by performing the inverse of the obfuscation protocol.

Corral, Celestino A.↗

CH Packaging Program Guidance

The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and U.S. Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: "each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." They further state: "each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP charges the U.S. Department of Energy (DOE) or the Waste Isolation Pilot Plant (WIPP) management and operating (M&O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required.In accordance with 10 CFR Part 71, certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21 regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are conducted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Program Guidance

The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and U.S. Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: "each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." They further state: "each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP charges the U.S. Department of Energy (DOE) or the Waste Isolation Pilot Plant (WIPP) management and operating (M&O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required. In accordance with 10 CFR Part 71, certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21 regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are conducted. This document provides the instructions to be followed to operate, maintain, and test the TRUPACT-II and HalfPACT packaging. The intent of these instructions is to standardize operations. All users will follow these instructions or equivalent instructions that assure operations are safe and meet the requirements of the SARPs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Program Guidance

The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and U.S. Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: "each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the pplication." They further state: "each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP charges the U.S. Department of Energy (DOE) or the Waste Isolation Pilot Plant (WIPP) management and operating (M&O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required. In accordance with 10 CFR Part 71, certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21 regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are conducted. This document provides the instructions to be followed to operate, maintain, and test the TRUPACT-II and HalfPACT packaging. The intent of these instructions is to standardize operations. All users will follow these instructions or equivalent instructions that assure operations are safe and meet the requirements of the SARPs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RH Packaging Program Guidance

The purpose of this program guidance document is to provide the technical requirements for use, operation, inspection, and maintenance of the RH-TRU 72-B Waste Shipping Package (also known as the "RH-TRU 72-B cask") and directly related components. This document complies with the requirements as specified in the RH-TRU 72-B Safety Analysis Report for Packaging (SARP), and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9212. If there is a conflict between this document and the SARP and/or C of C, the C of C shall govern. The C of C states: "...each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." It further states: "...each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP tasks the Waste Isolation Pilot Plant (WIPP) Management and Operating (M&O) Contractor with assuring the packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8, "Deliberate Misconduct." Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required.In accordance with 10 CFR Part 71, "Packaging and Transportation of Radioactive Material," certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21, "Reporting of Defects and Noncompliance," regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are conducted. This document details the instructions to be followed to operate, maintain, and test the RH-TRU 72-B packaging. This Program Guidance standardizes instructions for all users. Users shall follow these instructions or equivalent approved instructions. Following these instructions assures that operations meet the requirements of the SARP.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RH Packaging Program Guidance (Rev. 3)

The purpose of this program guidance document is to provide the technical requirements for use, operation, inspection, and maintenance of the Remote Handled-Transuranic (RH-TRU) 72-B Waste Shipping Package (also known as the "RH-TRU 72-B") and directly related components. This document complies with the requirements as specified in the RH-TRU 72-B Safety Analysis Report for Packaging (SARP), and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9212. If there is a conflict between this document and the SARP and/or C of C, the C of C shall govern. The C of C states: "...each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." It further states: "...each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP tasks the Waste Isolation Pilot Plant (WIPP) Management and Operating (M&O) Contractor with assuring the packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8, "Deliberate Misconduct." Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required. In accordance with 10 CFR Part 71, "Packaging and Transportation of Radioactive Material," certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21, "Reporting of Defects and Noncompliance," regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are conducted. This document details the instructions to be followed to operate, maintain, and test the RH-TRU 72-B packaging. This Program Guidance standardizes instructions for all users. Users shall follow these instructions or equivalent approved instructions. Following these instructions assures that operations meet the requirements of the SARP.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RH Packaging Program Guidance (Rev. 3.1)

The purpose of this program guidance document is to provide the technical requirements for use, operation, inspection, and maintenance of the Remote-Handled Transuranic (RH-TRU) 72-B Waste Shipping Package (also known as the "RH-TRU 72-B") and directly related components. This document complies with the requirements as specified in the RH-TRU 72-B Safety Analysis Report for Packaging (SARP), and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9212. If there is a conflict between this document and the SARP and/or C of C, the C of C shall govern. The C of C states, "each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." It further states: "…each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP tasks the Department of Energy Carlsbad Field Office or the Waste Isolation Pilot Plant (WIPP) Management and Operating (M&O) Contractor with assuring the packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8, "Deliberate Misconduct." Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required. In accordance with 10 CFR Part 71, "Packaging and Transportation of Radioactive Material," certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21, "Reporting of Defects and Noncompliances," regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are conducted. This document details the instructions to be followed to operate, maintain, and test the RH-TRU 72-B packaging. This Program Guidance standardizes instructions for all users. Users shall follow these instructions or equivalent approved instructions. Following these instructions assures that operations meet the requirements of the SARP.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tidal Current Cross-flow Turbine Wake ADV and PIV Data

Measurements in the wake of a high-solidity cross-flow turbine in a laboratory flume obtained using Acoustic Doppler Velocimetry and Particle Image Velocimetry for the purposes of characterizing the turbine wake and comparing the methods.

16 TIDAL AND WAVE POWER↗

RH Packaging Operations Manual (Rev. 3)

This procedure provides operating instructions for the remote-handled transuranic (RH-TRU) 72-B Cask Waste Shipping Package (hereinafter referred to as "72-B cask"). In this document, "Packaging" refers to the assembly of components necessary to ensure compliance with the packaging requirements (not loaded with a payload). "Package" refers to a Type B packaging that, with its radioactive contents, is designed to retain the integrity of its containment and shielding when subject to the normal conditions of transport and hypothetical accident test conditions set forth in 10 CFR Part 71. Before 72-B cask loading operations begin, loading procedures and revisions must be sent to the DOE Carlsbad Field Office (CBFO) at site.documents@wipp.ws for approval. Loading of the 72-B cask can be done one of two ways: on the cask trailer in the vertical position or by removing the cask from the trailer and loading it in an area designated for remote-handling. Two types of trailers were specially designed to transport the 72-B cask: a spread axle trailer requiring a crane to rotate the cask and a cask uprighting trailer designed with built-in hydraulics to rotate the 72-B cask into the vertical position while on the trailer. The hydraulic power unit is a separate piece of equipment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RH Packaging Operations Manual (Rev. 4)

This procedure provides operating instructions for the remote-handled transuranic (RH-TRU) 72-B Waste Shipping Package (hereinafter referred to as "RH-TRU 72-B"). In this document, "Packaging" refers to the assembly of components necessary to ensure compliance with the packaging requirements (not loaded with a payload). "Package" refers to a Type B packaging that, with its radioactive contents, is designed to retain the integrity of its containment and shielding when subject to the normal conditions of transport and hypothetical accident test conditions set forth in 10 CFR Part 71. Before RH-TRU 72-B loading operations begin, loading procedures and revisions must be sent to the DOE Carlsbad Field Office (CBFO) at site.documents@wipp.ws for approval. Loading of the RH-TRU 72-B can be done one of two ways: on the cask trailer in the vertical position or by removing the cask from the trailer and loading it in an area designated for remote-handling. Two types of trailers were specially designed to transport the RH-TRU 72-B: a spread-axle trailer requiring a crane to rotate the cask and a cask uprighting trailer designed with built-in hydraulics to rotate the RH-TRU 72-B into the vertical position while on the trailer. The hydraulic power unit is a separate piece of equipment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RH Packaging Operations Manual (Rev. 5)

This procedure provides operating instructions for the remote-handled transuranic (RH-TRU) 72-B Waste Shipping Package (hereinafter referred to as "RH-TRU 72-B"). In this document, "Packaging" refers to the assembly of components necessary to ensure compliance with the packaging requirements (not loaded with a payload). "Package" refers to a Type B packaging that, with its radioactive contents, is designed to retain the integrity of its containment and shielding when subject to the normal conditions of transport and hypothetical accident test conditions set forth in 10 CFR Part 71. Before RH-TRU 72-B loading operations begin, loading procedures and revisions must be sent to the DOE Carlsbad Field Office (CBFO) at site.documents@wipp.ws for approval. Loading of the RH-TRU 72-B can be done one of two ways: on the cask trailer in the vertical position or by removing the cask from the trailer and loading it in an area designated for remote-handling. Two types of trailers were specially designed to transport the RH-TRU 72-B: a spread-axle trailer requiring a crane to rotate the cask and a cask uprighting trailer designed with built-in hydraulics to rotate the RH-TRU 72-B into the vertical position while on the trailer. The hydraulic power unit is a separate piece of equipment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗