Search NASA⌕ Search

SEARCH · Search NASA

Results for “Cost prediction”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

The Opportunity in Commercial Approaches for Future NASA Deep Space Exploration Elements

In 2011, NASA released a report assessing the market for commercial crew and cargo services to low Earth orbit (LEO). The report stated that NASA had spent a few hundred million dollars in the Commercial Orbital Transportation Services (COTS) program on the portion related to the development of the Falcon 9 launch vehicle. Yet a NASA cost model predicted the cost would have been significantly more with a non-commercial cost-plus contracting approach. By 2016 a NASA request for information stated it must "maximize the efficiency and sustainability of the Exploration Systems development programs", as "critical to free resources for reinvestment...such as other required deep space exploration capabilities." This work joins the previous two events, showing the potential for commercial, public private partnerships, modeled on programs like COTS, to reduce the cost to NASA significantly for "...other required deep space exploration capabilities." These other capabilities include landers, stages and more. We mature the concept of "costed baseball cards", adding cost estimates to NASA's space systems "baseball cards." We show some potential costs, including analysis, the basis of estimates, data sources and caveats to address a critical question - based on initial assessment, are significant agency resources justified for more detailed analysis and due diligence to understand and invest in public private partnerships for human deep space exploration systems? The cost analysis spans commercial to cost-plus contracting approaches, for smaller elements vs. larger, with some variation for lunar or Mars. By extension, we delve briefly into the potentially much broader significance of the individual cost estimates if taken together as a NASA investment portfolio where public private partnership are stitched together for deep space exploration. How might multiple improvements in individual systems add up to NASA human deep space exploration achievements, realistically, affordably, sustainably, in a relevant timeframe?

cost modeling estimation↗

Using Adaptive Mesh Refinement to Study Grid Resolution Effects for Shock-Boundary Layer Interactions

Adaptive Mesh Refinement (AMR) promises a much more computationally efficient means to obtain a discrete approximation to a continuous boundary value problem of a specified accuracy than classic isotropic grid refinement. The AMR capability of OVERFLOW (a computational fluid dynamics (CFD) code) is utilized to provide estimates of the exact analytical solutions to problems of interest to turbulence modeling. Predictions of surface pressure and skin friction, essentially the state of stress at the surface, shows little difference with grids believed to be "grid resolved." Velocity profiles, on the other hand, show marked differences in flows with shocks. The AMR method, as implemented in OVERFLOW 2.2k, appears to provide the ability to produce arbitrarily accurate solutions at a predictable cost much smaller than classic uniform mesh refinement.

Turbulence Modeling↗

Using Adaptive Mesh Refinement to Study Grid Resolution Effects for Shock/Boundary-Layer Interactions

Adaptive Mesh Refinement (AMR) promises a much more computationally efficient meansto obtain a discrete approximation to a continuous boundary value problem of a specifiedaccuracy than classic isotropic grid refinement. The AMR capability of OVERFLOW is utilizedto provide estimates of the exact analytical solutions to problems of interest to turbulencemodeling. Predictions of surface pressure and skin friction, essentially the state of stress at thesurface, shows little difference with grids believed to be "grid resolved." Velocity profiles, on theother hand, show marked differences in flows with shocks. The AMR method, as implementedin OVERFLOW2.2k, appears to provide the ability to produce arbitrarily accurate solutionsat a predictable cost much smaller than classic uniform mesh refinement.

Adaptive Mesh Refinement↗

Structural assembly in space

A cost algorithm for predicting assembly costs for large space structures is given. Assembly scenarios are summarized which describe the erection, deployment, and fabrication tasks for five large space structures. The major activities that impact total costs for structure assembly from launch through deployment and assembly to scientific instrument installation and checkout are described. Individual cost elements such as assembly fixtures, handrails, or remote minipulators are also presented.

Stokes, J. W.↗

Principles for problem aggregation and assignment in medium scale multiprocessors

One of the most important issues in parallel processing is the mapping of workload to processors. This paper considers a large class of problems having a high degree of potential fine grained parallelism, and execution requirements that are either not predictable, or are too costly to predict. The main issues in mapping such a problem onto medium scale multiprocessors are those of aggregation and assignment. We study a method of parameterized aggregation that makes few assumptions about the workload. The mapping of aggregate units of work onto processors is uniform, and exploits locality of workload intensity to balance the unknown workload. In general, a finer aggregate granularity leads to a better balance at the price of increased communication/synchronization costs; the aggregation parameters can be adjusted to find a reasonable granularity. The effectiveness of this scheme is demonstrated on three model problems: an adaptive one-dimensional fluid dynamics problem with message passing, a sparse triangular linear system solver on both a shared memory and a message-passing machine, and a two-dimensional time-driven battlefield simulation employing message passing. Using the model problems, the tradeoffs are studied between balanced workload and the communication/synchronization costs. Finally, an analytical model is used to explain why the method balances workload and minimizes the variance in system behavior.

Nicol, David M.↗

The Launch Systems Operations Cost Model

One of NASA's primary missions is to reduce the cost of access to space while simultaneously increasing safety. A key component, and one of the least understood, is the recurring operations and support cost for reusable launch systems. In order to predict these costs, NASA, under the leadership of the Independent Program Assessment Office (IPAO), has commissioned the development of a Launch Systems Operations Cost Model (LSOCM). LSOCM is a tool to predict the operations & support (O&S) cost of new and modified reusable (and partially reusable) launch systems. The requirements are to predict the non-recurring cost for the ground infrastructure and the recurring cost of maintaining that infrastructure, performing vehicle logistics, and performing the O&S actions to return the vehicle to flight. In addition, the model must estimate the time required to cycle the vehicle through all of the ground processing activities. The current version of LSOCM is an amalgamation of existing tools, leveraging our understanding of shuttle operations cost with a means of predicting how the maintenance burden will change as the vehicle becomes more aircraft like. The use of the Conceptual Operations Manpower Estimating Tool/Operations Cost Model (COMET/OCM) provides a solid point of departure based on shuttle and expendable launch vehicle (ELV) experience. The incorporation of the Reliability and Maintainability Analysis Tool (RMAT) as expressed by a set of response surface model equations gives a method for estimating how changing launch system characteristics affects cost and cycle time as compared to today's shuttle system. Plans are being made to improve the model. The development team will be spending the next few months devising a structured methodology that will enable verified and validated algorithms to give accurate cost estimates. To assist in this endeavor the LSOCM team is part of an Agency wide effort to combine resources with other cost and operations professionals to support models, databases, and operations assessments.

Prince, Frank A.↗

KSC Construction Cost Index

Kennedy Space Center cost Index aids in conceptual design cost estimates. Report discusses development of KSC Cost Index since January 1974. Index since January 1974. Index provides management, design engineers, and estimators an up-to-data reference for local labor and material process. Also provides mount and rate of change in these costs used to predict future construction costs.

Brown, J. A.↗

Development of advanced high temperature in-cylinder components and tribological systems for low heat rejection diesel engines, phase 1

Analysis and concept design work completed in Phase 1 have identified a low heat rejection engine configuration with the potential to meet the Heavy Duty Transport Technology program specific fuel consumption goal of 152 g/kW-hr. The proposed engine configuration incorporates low heat rejection, in-cylinder components designed for operation at 24 MPa peak cylinder pressure. Water cooling is eliminated by selective oil cooling of the components. A high temperature lubricant will be required due to increased in-cylinder operating temperatures. A two-stage turbocharger air system with intercooling and aftercooling was selected to meet engine boost and BMEP requirements. A turbocompound turbine stage is incorporated for exhaust energy recovery. The concept engine cost was estimated to be 43 percent higher compared to a Caterpillar 3176 engine. The higher initial engine cost is predicted to be offset by reduced operating costs due the lower fuel consumption.

Kroeger, C. A.↗

Feasibility Study of Solar Dome Encapsulation of Photovoltaic Arrays

The technical and economic advantages of using air-supported plastic enclosures to protect flat plate photovoltaic arrays are described. Conceptual designs for a fixed, latitude-tilt array and a fully tracking array were defined. Detailed wind loads and strength analyses were performed for the fixed array. Detailed thermal and power output analyses provided array performance for typical seasonal and extreme temperature conditions. Costs of each design as used in a 200 MWe central power station were defined from manufacturing and material cost estimates. The capital cost and cost of energy for the enclosed fixed-tilt array were lower than for the enclosed tracking array. The enclosed fixed-tilt array capital investment was 38% less, and the levelized bus bar energy cost was 26% less than costs for a conventional, glass-encapsulated array design. The predicted energy cost for the enclosed fixed array was 79 mills/kW-h for direct current delivered to the power conditioning units.

Source record↗

X-1 to X-Wings: Developing a Parametric Cost Model

In todays cost-constrained environment, NASA needs an X-Plane database and parametric cost model that can quickly provide rough order of magnitude predictions of cost from initial concept to first fight of potential X-Plane aircraft. This paper takes a look at the steps taken in developing such a model and reports the results. The challenges encountered in the collection of historical data and recommendations for future database management are discussed. A step-by-step discussion of the development of Cost Estimating Relationships (CERs) is then covered.

parametric cost model↗

Pragmatic Stress Prediction on Additively Manufactured Coupons

Prediction of residual stresses from process parameters for additively manufactured large metal parts is computationally expensive. NASA is currently developing meter-scale parts with direct energy deposition. Practically, the predictive computational methods need to efficiently scale-up to meter-scale parts. Coupled thermal-mechanical multi-physics simulations have been developed with the pragmatic method using ABAQUS, COMSOL Multiphysics, ALE3D software. The residual stresses are a result of the manufacturing process which creates thermal cycling of the build layers. The pragmatic method uses lumped thermal layers for stress predictions to reduce computational costs. The stress predictions as well as deformations of the different codes are compared with each other and with ANSYS Additive using identical material models, boundary and initial conditions. The codes were used to simulate three different geometries: a thin wall, hollow cylinder and twin-cantilever part. The coupon parts were then manufactured with Inconel-625. The residual stresses in these parts were measured using X-ray diffraction as well as neutron beam diffraction at NIST. The stress measurements for the two technologies are compared. The pragmatic stress prediction method enabled predictions of the multi-centimeter scale parts using desktop computer workstations in only a few hours for each coupon. The results of the simulated stress predictions compared favorably with the measured stresses even though thermally lumped layers were employed. Finally, a two-meter scale nozzle was simulated using ANSYS Additive. The simulations were used to examine the build orientation trade-space with respect to resulting geometric deformation. The predicted deformations were compared to measurements of an actual subscale part manufactured with direct energy deposition.

Additive Manufacturing↗

Pragmatic Stress Prediction on Additively Manufactured Coupons

Prediction of residual stresses from process parameters for additively manufactured large metal parts is computationally expensive. NASA is currently developing meter-scale parts with direct energy deposition. Practically, the predictive computational methods need to efficiently scale-up to meter-scale parts. Coupled thermal-mechanical multi-physics simulations have been developed with the pragmatic method using ABAQUS, COMSOL Multiphysics, ALE3D software. The residual stresses are a result of the manufacturing process which creates thermal cycling of the build layers. The pragmatic method uses lumped thermal layers for stress predictions to reduce computational costs. The stress predictions as well as deformations of the different codes are compared with each other and with ANSYS Additive using identical material models, boundary and initial conditions. The codes were used to simulate three different geometries: a thin wall, hollow cylinder and twin-cantilever part. The coupon parts were then manufactured with Inconel-625. The residual stresses in these parts were measured using X-ray diffraction as well as neutron beam diffraction at NIST. The stress measurements for the two technologies are compared. The pragmatic stress prediction method enabled predictions of the multi-centimeter scale parts using desktop computer workstations in only a few hours for each coupon. The results of the simulated stress predictions compared favorably with the measured stresses even though thermally lumped layers were employed. Finally, a two-meter scale nozzle was simulated using ANSYS Additive. The simulations were used to examine the build orientation trade-space with respect to resulting geometric deformation. The predicted deformations were compared to measurements of an actual subscale part manufactured with direct energy deposition.

pragmatic method↗

NASA's X-Plane Database and Parametric Cost Model v 2.0

The NASA Armstrong Cost Engineering Team with technical assistance from NASA HQ (SID)has gone through the full process in developing new CERs from Version #1 to Version #2 CERs. We took a step backward and reexamined all of the data collected, such as dependent and independent variables, cost, dry weight, length, wingspan, manned versus unmanned, altitude, Mach number, thrust, and skin. We used a well- known statistical analysis tool called CO$TAT instead of using "R" multiple linear or the "Regression" tool found in Microsoft Excel(TradeMark). We setup an "array of data" by adding 21" dummy variables;" we analyzed the standard error (SE) and then determined the "best fit." We have parametrically priced-out several future X-planes and compared our results to those of other resources. More work needs to be done in getting "accurate and traceable cost data" from historical X-plane records!

life cycle cost↗

Ramjet cost estimating handbook

The subject program was conducted for the purpose of generating cost information on ramjet engines and developing a methodology that could be employed to accurately predict production costs ramjet engines. The methodology addresses many different ramjet types, sizes and production quantities. The methodology determines the cost of individual modules of ramjet assemblies based on similarity of the modules to baseline components that are identified in a cost handbook. (There are typically around 20 basic components of a given ramjet to be costed.) The total cost of the engine is a summation of all the appropriate cost elements. A significant accomplishment of the program was the development of a large cost data base on many different configurations, materials of construction and variations in manufacturing processes. This data base should provide a good foundation on which to build other cost data as it becomes available.

Emmons, H. T.↗

Computational techniques for design optimization of thermal protection systems for the space shuttle vehicle. Volume 1: Final report

Computational techniques were developed and assimilated for the design optimization. The resulting computer program was then used to perform initial optimization and sensitivity studies on a typical thermal protection system (TPS) to demonstrate its application to the space shuttle TPS design. The program was developed in Fortran IV for the CDC 6400 but was subsequently converted to the Fortran V language to be used on the Univac 1108. The program allows for improvement and update of the performance prediction techniques. The program logic involves subroutines which handle the following basic functions: (1) a driver which calls for input, output, and communication between program and user and between the subroutines themselves; (2) thermodynamic analysis; (3) thermal stress analysis; (4) acoustic fatigue analysis; and (5) weights/cost analysis. In addition, a system total cost is predicted based on system weight and historical cost data of similar systems. Two basic types of input are provided, both of which are based on trajectory data. These are vehicle attitude (altitude, velocity, and angles of attack and sideslip), for external heat and pressure loads calculation, and heating rates and pressure loads as a function of time.

Source record↗

Economics of liquid hydrogen from water electrolysis

An economical model for preliminary analysis of LH2 cost from water electrolysis is presented. The model is based on data from vendors and open literature, and is suitable for computer analysis of different scenarios for 'directional' purposes. Cost data associated with a production rate of 10,886 kg/day are presented. With minimum modification, the model can also be used to predict LH2 cost from any electrolyzer once the electrolyzer's cost data are available.

Lin, F. N.↗